ESTRUCTURA DE PUENTE
OBRAS PROVISIONALES GLB GLB 9,079.42
TRABAJOS PRELIMINARES GLB GLB 2,094.89
MOVIMIENTOS DE TIERRA GLB GLB 27,059.67
OBRAS DE CONCRETO SIMPLE GLB GLB 7,869.32
VIGAS GLB GLB 29,635.23
DIAFRAGMA GLB GLB 4,075.59
LOSA DE CIRCULACION GLB GLB 15,779.57
LOSA DE APROXIMACION GLB GLB 3,004.15
VEREDA GLB GLB 5,557.37
ESTRIBOS GLB GLB 92,888.08
PARAPETO DE ESTRIBO GLB GLB 5,575.59
ALAS GLB GLB 151,113.59
274,094.47
FALSO PUENTE GLB GLB 37,234.52
BARANDAS GLB GLB 5,993.94
SISTEMA DE DRENAJE GLB GLB 894.38
APOYOS GLB GLB 3,947.14
JUNTAS GLB GLB 1,117.98
SEÑALIZACION HORIZONTAL GLB GLB 120.13
SEÑALIZACION VERTICAL GLB GLB 1,942.28
VESTIDURAS GLB GLB 327.96
PLACA RECORDATORIA GLB GLB 514.12
ASFALTO GLB GLB 1,924.74
ESTRUCTURA DE ACCESOS
TRABAJOS PRELIMINARES GLB GLB 1,851.31
MOVIMIENTO DE TIERRAS GLB GLB 31,427.09
ESTRUCTURA DE GAVIONES
TRABAJOS PRELIMINARES GLB GLB 441.24
GAVIONES GLB GLB 56,821.49
TRABAJOS PRELIMINARES GLB GLB 506.12
GAVIONES GLB 84,678.52 GLB 55,915.12
MITIGACION DE IMPACTO AMBIENTAL
MITIGACION DE IMPACTO AMBIENTAL GLB GLB 6,523.00
FLETE TERRESTRE
FLETE TERRESTRE GLB GLB 9,508.87
CAPACITACION
CHARLAS A LA COMUNIDAD BENEFICIARIA GLB 3,240.00 GLB 1,850.00
CAPACITACION EN TEMAS DE ORGANIZACIÓN, GESTION Y GLB GLB 1,500.00
MANTENIMIENTO DE PUENTES
ESTRUCTURA DE PUENTE
OBRAS PROVISIONALES 9,079.42 9,079.42
TRABAJOS PRELIMINARES 2,094.89 2,094.89
MOVIMIENTOS DE TIERRA 27,059.67 27,059.67
OBRAS DE CONCRETO SIMPLE 7,869.32 7,869.32
VIGAS 29,635.23 29,635.23
DIAFRAGMA 4,075.59 4,075.59
LOSA DE CIRCULACION 15,779.57 15,779.57
LOSA DE APROXIMACION 3,004.15 3,004.15
VEREDA 5,557.37 5,557.37
ESTRIBOS 92,888.08 92,888.08
PARAPETO DE ESTRIBO 5,575.59 5,575.59
ALAS 151,113.59 151,113.59
274,094.47
FALSO PUENTE 37,234.52 37,234.52
BARANDAS 5,993.94 5,993.94
SISTEMA DE DRENAJE 894.38 894.38
APOYOS 3,947.14 3,947.14
JUNTAS 1,117.98 1,117.98
SEÑALIZACION HORIZONTAL 120.13 120.13
SEÑALIZACION VERTICAL 1,942.28 1,942.28
VESTIDURAS 327.96 327.96
PLACA RECORDATORIA 514.12 514.12
ASFALTO 1,924.74 1,924.74
ESTRUCTURA DE ACCESOS
TRABAJOS PRELIMINARES 1,851.31 1,851.31
MOVIMIENTO DE TIERRAS 31,427.09 31,427.09
ESTRUCTURA DE GAVIONES
TRABAJOS PRELIMINARES 441.24 441.24
GAVIONES 56,821.49 56,821.49
TRABAJOS PRELIMINARES 506.12 506.12
GAVIONES 84,678.52 55,915.12 55,915.12
FLETE TERRESTRE
FLETE TERRESTRE 9,508.87 9,508.87
CAPACITACION
CHARLAS A LA COMUNIDAD BENEFICIARIA 3,240.00 1,850.00 1,850.00
3,240.00
CAPACITACION EN TEMAS DE ORGANIZACIÓN, GESTION Y 1,500.00 1,500.00
MANTENIMIENTO DE PUENTES
COSTO DIRECTO
GASTOS GENERALES
SUBTOTAL
SUPERVISION
PRESUPUESTO TOTAL
Expediente
técnico/Estudio % de incremento o
Presupuesto definitivo decremento de “D”,
Deductivo (C) S/. Modificado 2/ respecto al PIP
(D) = (A) + (B) - (C) viable
S/.
441,028.06
9,079.42
2,094.89
27,059.67
7,869.32
29,635.23
4,075.59
15,779.57
3,004.15
5,557.37
92,888.08
5,575.59
151,113.59
61%
37,234.52
5,993.94
894.38
3,947.14
1,117.98
120.13
1,942.28
327.96
514.12
1,924.74
1,851.31
31,427.09
129,715.84
441.24
56,821.49
506.12
55,915.12 53%
6,523.00
9,508.87
3,350.00
1,850.00 3%
3%
1,500.00
707,159.74 95%
45,927.51 59%
0.00 -100%
753,087.25 93%
18,600.64 50%
19,500.00 58%
791,187.89 81%
4,566.73 0%
22,320.00 0%
62,032.41 0%
88,919.14 0%
7,113.53 0%
96,032.67 0%
2,880.98 0%
98,913.65 0%
5,993.94 5,993.94 0%
5,500.50 5,500.50 0%
4,792.48 4,792.48 0%
16,286.92 16,286.92 0%
1,302.95 1,302.95 0%
17,589.87 17,589.87 0%
527.7 527.70 0%
18,117.57 18,117.57 0%
DIFICADO:
GASTOS GENERALES 8%