CINEMATOGRAPHY PRE-PRODUCTION CHECKLIST
FILM THLE: PROD #
PRODUCTION DATES:
PRODUCER: DIRECTOR:
DIRECTOR OF PHOTOGRAPHY:
PRODUCTION MANAGER:
THREE WEEKS PRIOR TO SHOOT DATE
1. script wir SCENE NUMBERS
2G snorusr
3. Ey CINEMATOGRAPHY LOCATION INFORMATION FORM
4G Locarion smiuis
5. E] PRELIMINARY CREW CONTACT LIS
6 EJ VIDEO TAPE REQUEST OR FILM STOCK REQUEST FORM
REQUIRED FORMS
L QUEST APPLICATION (IF APPLICABLE)
2. IN AUTHORIZATION. (UF APPLICABI
i TAL CAMERA RIGGING AUTHORIZATION (IF APPLICABLE)
4 )UIPMENT REQUEST - FOR PHOTO TEST
TWO WEEKS PRIOR TO SHOOT DATE
1. PHOTOGRAPHIC LOOK TEST
2. EJ FINALSCOUT - ALL LOCATIONS / STAGES
3. E] LiGHTING DIAGRAM
4. [] POWER - BREAKER BOX LOCATION & DISTRIBUTION DIAGRAM.
5] EQUIPMENT REQUEST LIST - CAMERA / LIGHTING / GRIP / EXPENDABLES
6 OG] FINALCREWLIsT
DATE:
DIRECTOR OF PHOTOGRAPHY
PRODUCTION MANAGER