Sei sulla pagina 1di 30

GROUP 4 MECHATRONICS SYSTEM

1. ALL ACTUATORS SPEED ARE SLOW


※ Boom, Arm, Bucket, Swing and travel speed are slow, but engine speed is good.
※ Spec : P-mode 1850 ± 50 rpm S -mode 1750 ± 50 rpm E-mode 1650 ± 50 rpm
※ Before carrying out below procedure, check all the related connectors are properly inserted and
fault code on the cluster.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective
YES Check pressure hydraulic system
at EPPR valve
NO Check electric Defective Replace
current at EPPR SPEC : 2~25 kgf/cm2
NO
EPPR valve
valve See TEST 3

SPEC : 100~700 mA
See TEST 2
Defective MCU Replace
Check if HCESPN NO
140 active fault
display on the LCD YES
Short circuit or Check & repair
poor connection wire harness or
between CN-52 between CN-52
Check resistance
YES at EPPR valve -CN-75 -CN-75

SPEC : 15~25Ω(20˚C) Defective EPPR Replace


See TEST 1 NO
valve

Wiring diagram

MCU
FUSE
8
NO.12
9

10 PUMP EPPR VALVE

9 1
18
10 2

CN-52 CN-1 CN-75

140L6MS01

6-40
2) TEST PROCEDURE SPEC : 15~25Ω(20˚C)
(1) Test 1 : Check resistance at connector
CN-75 EPPR valve
CN-75.
① Starting switch OFF.
② Disconnect connector CN-75 from EPPR
valve at main hydraulic pump.
Multimeter
③ Check resistance between 2 lines as
figure. Valve casing

Main pump

130ZF6MS33

(2) Test 2 : Check electric current at EPPR Spec : 100~700 mA


valve.
① Disconnect connector CN-75 from EPPR Adapter(P/no.:21Q6-50410)
valve.
EPPR valve
② Insert the adapter to CN-75 and install
Multimeter
CN-75
multimeter as figure.
③ Start engine.
④ Set S-mode and cancel auto decel
mode. Valve casing
⑤ Position the multimodal dial at 10.
⑥ If tachometer show approx 1750±50 rpm
disconnect one wire harness from EPPR
valve. Main pump
⑦ Check electric current at bucket circuit
relief position. 145ZF5MS21

(3) Test 3 : Check pressure at EPPR valve. Spec : 2~25 kgf/cm2 (30~350 psi)
① Remove plug and connect pressure Pressure adjusting Pilot pressure
screw locknut supply line
gauge as figure.
EPPR valve
·Gauge capacity : 0 to 50 kgf/cm2
CN-75
(0 to 725 psi)
② Start engine. Valve casing
③ Set S-mode and cancel auto decel
mode.
④ Position the multimodal dial at 10.
⑤ If tachometer show approx 1750±50 rpm
check pressure at relief position of bucket
circuit by operating bucket control lever. Main pump
⑥ If pressure is not correct, adjust it.
⑦ After adjust, test the machine. 145ZF5MS22

6-41
2. ENGINE STALL
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Not enough Check engine
engine power fault
YES Check pressure Contact cummins
at EPPR valve

SPEC:2~25 kgf/cm2 Defective EPPR Replace


See TEST 5 NO
Check electric valve
current at EPPR
valve
YES
Short circuit or Check and repair
SPEC : 100~700 mA poor connection wire harness
See TEST 4
Check resistance between
between CN-52 - CN-75
NO at EPPR valve

SPEC : 15~25Ω(20 )
See TEST 1
NO
Defective EPPR Replace
valve

Wiring diagram

MCU
FUSE
8
NO.12
9

10 PUMP EPPR VALVE

9 1
18
10 2

CN-52 CN-1 CN-75

140L6MS01

6-42
2) TEST PROCEDURE Spec : 100~700 mA
(1) Test 4 : Check electric current at EPPR Adapter(P/no.:21Q6-50410)
valve.
EPPR valve
① Disconnect connector CN-75 from EPPR
Multimeter
CN-75
valve.
② Insert the adapter to CN-75 and install
multimeter as figure.
③ Start engine. Valve casing
④ Set S-mode and cancel auto decel
mode.
⑤ Position the multimodal dial at 10.
⑥ If rpm show approx 1750±50 rpm Main pump
disconnect one wire harness from EPPR
valve.
⑦ Check electric current at bucket circuit 145ZF5MS21

relief position.

(2) Test 5 : Check pressure at EPPR valve. SPEC : 2~25 kgf/cm2 (30~350 psi)
① Remove plug and connect pressure Pressure adjusting Pilot pressure
screw locknut supply line
gauge as figure.
EPPR valve
·Gauge capacity : 0 to 50 kgf/cm2
CN-75
(0 to 725 psi)
② Start engine. Valve casing
③ Set S-mode and cancel auto decel
mode.
④ Position the multimodal dial at 10.
⑤ If rpm show approx 1750±50 rpm check
pressure at relief position of bucket
circuit by operating bucket control lever. Main pump
⑥ If pressure is not correct, adjust it.
⑦ After adjust, test the machine. 145ZF5MS22

6-43
3. MALFUNCTION OF CLUSTER OR MODE SELECTION SYSTEM
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Y R G
Cause Remedy
YES
No power supply to Check fuse No.8
See if all lamps Y R G the MCU
YES off in the MCU
case YES
Y R G MCU failure Replace
Y R G Y R G
See if HCESPN
Y R G
840 active fault NO
display on the LCD
Y R G
NO Y R G

NO

OK Y R G
Check connection Cluster failure Replace
between CN-51
ⓐ (22) - CN-56A(6)
or CN-51(32) -
CN-56A(7) No connection Check and repair
NO
Starting switch : OFF

Wiring diagram

CLUSTER
BATT.24V
IG 24V MCU
GND
CAN1 HI
CAN1 LO
CAN2 HI 6 6 22
CAN2 LO 7 5 32
RS-232 RX
RS-232 TX CN-56A CN-5 1
AUX LEFT
CN-51
AUX RIGHT
AUX GND FUSE

NO.8
130ZF6MS02

6-44
4. AUTO DECEL SYSTEM DOES NOT WORK
· Fault code : HCESPN 105, FMI 0~4 (work pressure sensor)
HCESPN 108, FMI 0~4 (travel oil pressure sensor)
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Defective travel Replace
Check voltage
NO pressure switch
between CD-6(A)
and (C)
Short circuit or poor Replace or repair
NO
Check voltage SPEC : connection
between CN-52 Starting switch ON : 24±2V between CN-51(3)-
(38)-GND and CD-6(A) and / or
CN-52(37)-GND CN-51(13)-CD-6
(C) (fault code 108
SPEC :
Actuator operating : 1~5V
displayed)
See TEST 7, 8 YES
Defective work Replace
Check voltage
pressure sensor
between CD-7(A)
NO and (C)
Short circuit or poor Replace or repair
NO
SPEC : connection
Starting switch ON : 24±2V between CN-51(3)-
CD-7(A) and / or
CN-51(13)-CD-7
(C) (fault code 105
displayed)

Wiring diagram

CN-51
CD-6
3 A SUPPLY
B SIG
13 C RETURN
TRAVEL PRESSURE SENSOR
MCU

38 CD-7
A SUPPLY
37 B SIG
C RETURN
CN-52 WORK PRESSURE SENSOR

300L6MS03

6-45
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 7 : Check voltage at CN-52 (38) and
ground.
① Prepare 1 piece of thin sharp pin, steel or MCU
copper.
PIN
② Insert prepared pin to rear side of CN-51 CN-52

connectors : One pin to (38) of CN-52.


③ Starting switch ON.
④ Check voltage as figure.
(2) Test 8 : Check voltage at CN-52 (37) and
ground.
① Prepare 1 piece of thin sharp pin, steel or 10 9 8 7 6 5 4 3 2 1

copper CN-52
20 11 Female
② Insert prepared pin to rear side of 30
38
21

connectors : One pin to (37) of CN-52. 40 39 38 37 36 34 33 32 31

③ Starting switch ON. GROUND


④ Check voltage as figure.

Multimeter

10 9 8 7 6 5 4 3 2 1
CN-52
20 11 Female
30 21
37

40 39 38 37 36 35 34 33 32 31

GROUND

Multimeter
300L6MS04

6-46
5. MALFUNCTION OF PUMP 1 PRESSURE SENSOR
· Fault code : HCESPN 120, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(5)-GND (29)-CN-1(5)
Check voltage SPEC : Detective P1 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(29) - GND YES between Short circuit or Replace or repair
SPEC : CD-42(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(5)-
See TEST 9 SPEC :
Starting switch ON : CD-42(B)
24±2V
Check voltage Short circuit or Replace or repair
NO
between poor connection
NO CN-1(4)-(6) between
CD-42(A)-CN-1(4)
SPEC :
Starting switch ON :
or CD-42(C)-CN-1
24±2V (6)

Short circuit or Replace or repair


NO poor connection
between CN-1(4)-
CN-51(3) or CN-1
(6) - CN-51(13)

Wiring diagram

CN-51
CD-42
3 4 A SUPPLY
5 B SIG
13 6 C RETURN
PUMP 1 PRESSURE SENSOR
MCU CN-1

29

CN-52

300L6MS05

6-47
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 9 : Check voltage at CN-52 (29) and
ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
MCU
② Insert prepared pin to rear side of
connectors : One pin to (29) of CN-52. PIN
CN-51 CN-52
③ Starting switch ON.
④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20
29
11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS06

6-48
6. MALFUNCTION OF PUMP 2 PRESSURE SENSOR
· Fault code : HCESPN 121, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(3)-GND (12)-CN-1(3)
Check voltage SPEC : Detective P2 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(12) - GND YES between Short circuit or Replace or repair
SPEC : CD-43(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(3)-
See TEST 10 SPEC :
Starting switch ON : CD-43(B)
24±2V
Check voltage Short circuit or Replace or repair
NO
between poor connection
NO CN-1(4)-(6) between
CD-43(A)-CN-1(4)
SPEC :
Starting switch ON :
or CD-43(C)-CN-1
24±2V (6)

Short circuit or Replace or repair


NO poor connection
between CN-1(4)-
CN-51(3) or CN-1
(6) - CN-51(13)

Wiring diagram

CN-51
CD-43
3 4 A SUPPLY
3 B SIG
13 6 C RETURN
PUMP 2 PRESSURE SENSOR
MCU CN-1

12

CN-52

300L6MS07

6-49
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 10 : C heck voltage at CN-52 (12)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (12) of CN-52. PIN

③ Starting switch ON. CN-51 CN-52

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20
12
11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS08

6-50
7. MALFUNCTION OF PUMP 3 PRESSURE SENSOR
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(7)-GND (32)-CN-1(7)
Check voltage SPEC : Detective P3 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(32) - GND YES between Short circuit or Replace or repair
SPEC : CD-44(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(7)-
See TEST 11 SPEC :
Starting switch ON : CD-44(B)
24±2V
Check voltage Short circuit or Replace or repair
NO
between poor connection
NO CN-1(4)-(6) between
CD-44(A)-CN-1(4)
SPEC :
Starting switch ON :
or CD-44(C)-CN-1
24±2V (6)

Short circuit or Replace or repair


NO poor connection
between CN-1(4)-
CN-51(3) or CN-1
(6) - CN-51(13)

Wiring diagram

CN-51
CD-44
3 4 A SUPPLY
7 B SIG
13 6 C RETURN
PUMP 3 PRESSURE SENSOR
MCU CN-1

32

CN-52

300L6MS09

6-51
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 11 : C heck voltage at CN-52 (32)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
MCU
② Insert prepared pin to rear side of
PIN
connectors : One pin to (32) of CN-52.
CN-51 CN-52
③ Starting switch ON.
④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20 11 Female
30 21
32

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS10

6-52
8. MALFUNCTION OF NEGATIVE 1 PRESSURE SENSOR
· Fault code : HCESPN 123, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(1)-GND (33)-CN-1(1)
Check voltage SPEC : Detective N1 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(33) - GND YES between Short circuit or Replace or repair
SPEC : CD-70(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(1)-
See TEST 12 SPEC :
Starting switch ON : CD-70(B)
24±2V
Check voltage Short circuit or Replace or repair
NO
between poor connection
NO CN-1(4)-(6) between
CD-70(A)-CN-1(4)
SPEC :
Starting switch ON :
or CD-70(C)-CN-1
24±2V (6)

Short circuit or Replace or repair


NO poor connection
between CN-1(4)-
CN-51(3) or CN-1
(6) - CN-51(13)

Wiring diagram

CN-51
CD-70
3 4 A SUPPLY
1 B SIG
13 6 C RETURN
NEGATIVE 1 PRESSURE SENSOR
MCU CN-1

33

CN-52
300L6MS11

6-53
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 12 : C heck voltage at CN-52 (33)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (33) of CN-52. PIN

③ Starting switch ON. CN-51 CN-52

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20 11 Female
30 21
33

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS12

6-54
9. MALFUNCTION OF NEGATIVE 2 PRESSURE SENSOR
· Fault code : HCESPN 124, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace
YES
Short circuit or Replace or repair
poor connection
YES Check voltage between CN-52-
between
CN-1(2)-GND (17)-CN-1(2)
Check voltage SPEC : Detective N2 Replace or repair
between CN-52 Actuator operating: 1~5V NO
Check voltage pressure sensor
(17) - GND YES between Short circuit or Replace or repair
SPEC : CD-44(A)-(C) poor connection
Actuator operating: 1~5V between CN-1(2)-
See TEST 13 SPEC :
Starting switch ON : CD-71(B)
24±2V
Check voltage Short circuit or Replace or repair
NO
between poor connection
NO CN-1(4)-(6) between
CD-71(A)-CN-1(4)
SPEC :
Starting switch ON :
or CD-71(C)-
24±2V CN-1(6)

Short circuit or Replace or repair


NO poor connection
between CN-1(4)-
CN-51(3) or CN-1
(6) - CN-51(13)

Wiring diagram

CN-51
CD-71
3 4 A SUPPLY
2 B SIG
13 6 C RETURN
NEGATIVE 2 PRESSURE SENSOR
MCU CN-1

17

CN-52

300L6MS13

6-55
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 13 : C heck voltage at CN-52 (17)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
MCU
② Insert prepared pin to rear side of
connectors : One pin to (17) of CN-52. PIN
CN-51 CN-52
③ Starting switch ON.
④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20
17
11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS14

6-56
10. MALFUNCTION OF SWING PRESSURE SENSOR
· Fault code : HCESPN 135, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective swing Replace or repair
(36) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 14 between CD-24 between CN-52
NO (A)-(C) (36)-CD-24 (B)
SPEC :
Starting switch ON :
24±2V Short circuit or Replace or repair
NO
poor connection
between CD-24
(A)-CN-51(3) or
CD-24(C)- CN-51
(13)

Wiring diagram

CN-51
CD-24
3 A SUPPLY
B SIG
13 C RETURN
SWING PRESSURE SENSOR
MCU

36

CN-52

300L6MS15

6-57
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 14 : C heck voltage at CN-52 (36)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (36) of CN-52. PIN

③ Starting switch ON. CN-51 CN-52

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20 11 Female
30 21
36

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS16

6-58
11. MALFUNCTION OF ARM IN/OUT & BUCKET IN PRESSURE SENSOR
· Fault code : HCESPN 133, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective arm in/ Replace or repair
(14) - GND out & bucket in
SPEC : pressure sensor
Actuator operating: 1~5V Check voltage Short circuit or Replace or repair
See TEST 15 between CD-35 poor connection
NO (A)-(C) between CN-52
(14)-CD-35 (B)
SPEC :
Starting switch ON :
24±2V Short circuit or Replace or repair
NO
poor connection
between CD-35
(A)-CN-51(3) or
CD-35(C)- CN-51
(13)

Wiring diagram

CN-51
CD-35
3 A SUPPLY
B SIG
13 C RETURN
ARM IN/OUT & BUCKET IN
PRESSURE SENSOR
MCU

14

CN-52

300L6MS17

6-59
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 15 : C heck voltage at CN-52 (14)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
MCU
② Insert prepared pin to rear side of
connectors : One pin to (14) of CN-52. PIN
CN-51 CN-52
③ Starting switch ON.
④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
14
20 11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS18

6-60
12. MALFUNCTION OF BOOM UP PRESSURE SENSOR
· Fault code : HCESPN 127, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-52 Detective boom up Replace or repair
(19) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 16 between CD-32 between CN-52
NO (A)-(B) (19)-CD-32 (B)
SPEC :
Starting switch ON :
24±2V Short circuit or Replace or repair
NO
poor connection
between CD-32
(A)-CN-51(3) or
CD-32(C)- CN-51
(13)

Wiring diagram

CN-51
CD-32
3 A SUPPLY
B SIG
13 C RETURN
BOOM UP PRESSURE SENSOR
MCU

19

CN-52

300L6MS19

6-61
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 16 : C heck voltage at CN-52 (19)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (19) of CN-52. PIN

③ Starting switch ON. CN-51 CN-52

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-52
20
19
11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS20

6-62
13. MALFUNCTION OF BOOM DOWN PRESSURE SENSOR
· Fault code : HCESPN 128, FMI 0~4
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

Check voltage YES


between CN-53 Detective boom up Replace or repair
(23) - GND pressure sensor
SPEC : Short circuit or Replace or repair
Actuator operating: 1~5V Check voltage poor connection
See TEST 17 between CD-85 between CN-53
NO (A)-(B) (23)-CD-85 (B)
SPEC :
Starting switch ON :
24±2V Short circuit or Replace or repair
NO
poor connection
between CD-85
(A)-CN-53(3) or
CD-85(C)- CN-53
(13)

Wiring diagram

CN-53 CD-85
3 A SUPPLY
B SIG
13 C RETURN
BOOM DOWN PRESSURE SENSOR
23

MCU
300L6MS25

6-63
2) TEST PROCEDURE SPEC : Actuator operating : 1~5 V
(1) Test 17 : C heck voltage at CN-53 (23)
and ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (23) of CN-53. PIN

③ Starting switch ON. CN-53

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
CN-53
20
23
11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS26

6-64
14. MALFUNCTION OF POWER MAX
· Fault code : HCESPN 166, FMI 4 or 6
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Short circuit or poor Repair or replace
connection between
YES Check resistance CN-88(1)-CN-52 (2)
between CN-88
(1)-(2)
Defective power Repair or replace
NO
YES Check resistance SPEC: 15-35Ω max. solenoid valve
between CN-51 See TEST 19 Check hydraulic
(18)-GND
system

Is voltage between Short circuit or poor Repair or replace


NO
CN-88(2)-GND connection between
SPEC : Power max button pressed ON : 0Ω
normal? Power max button released OFF : ∞ Ω CN-51(18)-CS-29
SPEC
Starting switch ON :
24±1V Short circuit or poor Repair or replace
Starting switch OFF : NO
connection between
0V
See TEST 18 CN-88(2)-
Fuse No. 24

Wiring diagram

MCU
POWER MAX SOLENOID
2 1

2
CN-52 CN-88

18 6
FUSE
5
NO.24
CN-51 CN-4
POWER MAX SWITCH

1
2

CS-29

130ZF6MS03

6-65
2) TEST PROCEDURE SPEC : Starting switch ON : 24±1V
Starting switch OFF : 0V
(1) Test 18: Check voltage between connector
CN-88 (2) - GND.
① Disconnect connector CN-88 from power
max solenoid valve.
Power max switch
② Start switch ON.
③ Check voltage as figure.

LH RCV lever
CN-88

Power max
solenoid valve
2 1
1 2

GROUND

Multimeter 130ZF6MS14

(2) Test 19: Check resistance of the solenoid SPEC : 15~35Ω


valve between CN-88 (1)-(2).
① Starting switch OFF.
② Disconnect connector CN-88 from power Power max switch
max solenoid valve.
③ Check resistance as figure.

LH RCV lever
CN-88

Power max 2 1
solenoid valve
1 2

Multimeter 130ZF6MS15

6-66
15. MALFUNCTION OF BOOM PRIORITY EPPR VALVE
· Fault code : HCESPN 141, FMI 5 or 6
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Short circuit or poor Repair or replace
connection between
CN-52(35)-CN-133
Check resistance (1) or CN-52(34)-
between CN-133(2)
CN-133(1)-(2)
SPEC : 20~30V
Starting switch : ON
Defective EPPR Repair or replace
NO
valve

Wiring diagram

MCU

35

CN-133

34 2

BOOM PRIORITY
EPPR VALVE
CN-52

300L6MS23

6-67
16. MALFUNCTION OF ARM REGENERATION SOLENOID
· Fault code : HCESPN 170, FMI 4 or 6
※ Before carrying out below procedure, check all the related connectors are properly inserted.
1) INSPECTION PROCEDURE

Cause Remedy
YES
Defective MCU Replace

YES Check voltage


YES
between CN-52 Short circuit or Replace or repair
(1)-GND
poor connection
Check resistance between CN-52
SPEC :
Starting switch ON : between arm
Check voltage NO (1)-CN-135 (1)
24±2V regen solenoid
between CN-135(2) See TEST 20
- GND SPEC : 15~35Ω Defective Replace
NO
SPEC : solenoid valve
Starting switch ON :
20~30V
Open circuit Replace or repair
NO
between CN-135
(2)-Fuse No. 24

Wiring diagram

MCU
CN-135
1 1

ARM REGENERATION SOLENOID

FUSE

NO.24
CN-52

145LCR6MS04

6-68
2) TEST PROCEDURE SPEC : Starting switch ON : 24±2 V
(1) Test 20 : Check voltage at CN-52 (1) and
ground.
① Prepare 1 piece of thin sharp pin, steel or
copper.
② Insert prepared pin to rear side of MCU
connectors : One pin to (1) of CN-52. PIN
③ Starting switch ON. CN-51 CN-52

④ Check voltage as figure.

10 9 8 7 6 5 4 3 2 1
1 CN-52
20 11 Female
30 21

40 39 38 37 36 34 33 32 31

GROUND

Multimeter

300L6MS22

6-69

Potrebbero piacerti anche