SUMMARY OF CHANGES

Addenda to the 1998 Edition of the Code are issued in the form of replacement pages. Revisions,
additions, or deletions are incorporated directly into the affected pages. It is advisable, however,
that all replaced pages be retained for reference.

Replace or insert the pages listed. Changes given below are identified on the pages by a
margin note, A99, placed next to the affected area. Revisions to the 1998 Edition are indicated
by 98. For the listing below, the Page references the affected area. A margin note, (A99),
placed next to the heading indicates Location. Revisions are listed under change.

Page Location Change


iii Listing of Sections Title to Section III, Division 3 revised
xiii-xxii Roster Updated to reflect A99
1, 3 Part PG Contents Updated to reflect A99
6 PG-6.1 Reference to SA-203 deleted
7, 8 PG-9.2 References to SB-163, SB-514, and SB-
564 added
10 PG-11.1.1 Second sentence revised
Footnote 2 Revised
Footnote 4 Revised
11 PG-11.3.1 Revised
PG-11.3.2 Revised
12–12.3 PG-19 Added
Table PG-19 Added
Fig. PG-19 Added
17, 17.1 PG-27.4 Under Note 6, table revised
PG-28 Added
Fig. PG-28 Added
PG-29.4 Revised
27 PG-34.2 Last sentence revised
29 PG-36.4.4 Definition of trn revised
33, 34 PG-42.1 Revised
PG-42.1.9 Revised
PG-42.4.1 Revised
PG-42.4.3 Revised
PG-42.4.7 Revised
PG-42.4.8 Revised
PG-42.4.9 Revised
PG-42.4.10 Revised
PG-42.4.11 Revised
47, 48 PG-60.1.1 Revised in its entirety
PG-60.1.2 Deleted
54 PG-67.6 Revised
58 PG-71.2 Revised
61 PG-73.3.4 Subparagraph (a) revised

ASME B&PVC Sec1$$$cos 06-07-99 04:35:43 pd: soc Rev 14.04


Page Location Change
65 PG-99 Revised in its entirety
PG-99.3.3 Deleted
77 PW Contents Updated to reflect A99
87 Fig. PW-16.1 Revised
88 PW-16.1 Revised
89, 89.1 PW-16.6 Added
95, 96 Table PW-39 Note (1)(e) revised
97, 98 Table PW-39 Note (1)(d) revised
100–102 PW-41.2.3 Revised
Table PW-39 P-No. 9A deleted
Table PW-39 P-No. 9B deleted
131 Part PFT Contents Updated to reflect A99
134–139 PFT-11.4.2 Revised in its entirety
PFT-11.4.3 Revised in its entirety
Title Title above PFT-13 revised
PFT-14 Redesignated as PFT-15 and new PFT-
14 added
PFT-14.1 Redesignated as PFT-15.1 and revised in
its entirety
PFT-14.2 Redesignated as PFT-15.2
PFT-16.6 Deleted
PFT-16.7 Deleted
PFT-17 Revised
PFT-17.9 Deleted
PFT-17.11.2 Deleted
PFT-17.11.3 Deleted
PFT-18.1.1 Deleted
PFT-18.1.2 Deleted
PFT-19.2 Revised
PFT-19.5 Deleted
PFT-19.6 Deleted
158 PMB-14 Revised
165 PEB-18.1 Revised
183 A-20.2 Revised in its entirety
186 A-22.6.3.1 Revised
203 A-100.4.8 Deleted
A-100.4.9 Deleted
243 Form P-4A (1) Items 3 and 4 revised
(2) Circled guide numbers 3a and 4a
added
(3) Certificate of Shop Compliance re-
vised

ASME B&PVC Sec1$$$cos 06-07-99 04:35:43 pd: soc Rev 14.04


Page Location Change
244 Form P-4A (1) Certificate of Field Fabrication Com-
pliance revised
(2) Certificate of Field Assembly Compli-
ance revised

245 A-354.1 (1) Items 3, 4, 11, 12, 15, and 18 revised


(2) Items 3a and 4a added
247 Form P-4B (1) Items 3 and 4 revised
(2) Circled guide numbers 3a and 4a
added
249 A-354.2 (1) Items 3 and 4 revised
(2) Items 3a and 4a added
264 Table A-360 Revised in its entirety
266 A-370 Description of “PP” revised
277, 278, 282 Index Updated to reflect A99

NOTE:
Volume 44 of the Interpretations to Section I of the ASME Boiler and Pressure Vessel Code
follows the last page of this Addenda.

ASME B&PVC Sec1$$$cos 06-07-99 04:35:43 pd: soc Rev 14.04