Sei sulla pagina 1di 80

Government of India

Department of Space
ISRO Satellite Centre
Bengaluru – 560017
Phone: +91-080-2508 4370, Fax: +91-080-2520 5283/84

No. ISAC/PUR/EOI/AIT of Satellites/2016 June 16, 2016

INVITATION FOR EXPRESSION OF INTEREST [EoI] FOR SYSTEMS


ASSEMBLY, INTEGRATION AND TESTING OF STANDARD ISRO SATELLITES
THROUGH INDUSTRY

ISRO Satellite Centre [ISAC] of Indian Space Research Organization [ISRO] under
Department of Space, Government of India is the lead centre of ISRO for Design,
Development, Fabrication and Testing of all Indian made Satellites. As a sequel to its
mandate of spacecraft realisation, the Centre is engaged in the development of
cutting-edge technologies of relevance to its Satellite Building Activities and setting
up of infrastructure for Design, Development, Fabrication and Testing of Spacecraft.

The proposal is to invite Expression of Interest and to enter into Contract with
Industry for Systems Assembly, Integration and Testing [AIT] of Standard ISRO
Satellites at ISAC.

The Brief Description, Scope of Work, Tenure of Work, Manpower Estimation, Safety
Precautions, Non-Disclosure Agreements, etc., forming part of the AIT Activity is
available in the EoI Document which can be downloaded from our Websites
www.isac.gov.in and/or www.isro.gov.in under “Tenders” and submit along with the
Document fee Rs. 573/- in the form of Demand Draft drawn in favour of Accounts
Officer, ISAC, Bengaluru before the specified date and time.

Interested Vendor[s] having sufficient know-how, experience/expertise and sound


financial background are invited to express their interest for Systems Assembly,
Integration and Testing of Standard ISRO Satellites at ISAC.

Along with the “Expression of Interest”, please furnish the following information
related to Vendor[s]:-
1. Registered address with Phone, Fax, Email, Web etc.
2. Company Status (Proprietary / Partnership / Private Ltd. etc.) with Name and
Address of Proprietor, Partners, Board of Directors, etc.
3. Associates : (a) Indian (b) Foreign
4. List of Major Customers with full address and their Contact Persons.
5. Details of other Contracts, if any now in hand.

Contd... 2/-
: 2 :

6. Copy of latest Annual Report.


7. Financial Capacity / Credit facilities available.
8. Name and Address of Bankers.
9. Trade Association to which you belong to.
10. Establishment / Sales / Service Tax Registration Number.
11. Nature of Business.
12. Any other information you consider relevant.

Pre – EoI Conference:

1. A Pre-EoI meeting for Expression of Interest is arranged at ISRO Satellite


Centre, Bengaluru in order to have a better understanding of our Invitation to
EoI document, clarify doubts if any and other allied technical details of
Systems Assembly, Integration and Testing of Standard ISRO Satellites at
ISAC.

2. The interested Vendor[s] are hereby requested to take part in the Pre-EoI
meeting on the Date, Time and Venue mentioned here below:-

3. Date of Pre-EoI Meeting : July 12, 2016

4. Time : 10.00 Hrs, IST

5. Focal Point & Venue of Pre-EoI Meeting : Shri. Belgaonkar. P. V


Head, GIS-4/GID
System Integration Group
ISRO Satellite Centre,
HAL Airport Road,
Vimanapura Post,
Bengaluru – 560 017.
Contact No. 23027159
E-mail: pramod@isac.gov.in

6. Last date for submission of EoI : August 02, 2016 at 14.00 Hrs.

7. Opening date of EoI : August 02, 2016 at 15.00 Hrs

8. Interested Vendor[s] may please provide the details of the representative[s]


taking part in the Pre-EoI meeting for Expression of Interest well in advance in
order to arrange for Security clearance.

9. Please note that request for “preponement/postponement of Pre-EoI meeting


for Expression of Interest” will not be entertained under any circumstances.

Contd... 3/-
: 3 :

10. The Vendor[s] who do not participate in the Pre-EoI Meeting for Expression of
Interest will not be considered and shall be disqualified.

11. In the event if the Vendor[s] are unable to attend the Pre-EoI Meeting for
Expression of Interest physically, a Pre-EoI Meeting for Expression of Interest
through Video Conference / Skype / Conference Call shall be arranged by
ISRO Satellite Centre, Bengaluru upon the request from Vendor[s], if mutually
agreeable.

12. Data required for Security Clearance for Pre-EoI Conference on or


before July 11, 2016:

a. Name of the visitor:


b. Mobile Number:
c. Nationality:
d. Date of Birth:
e. Place of Birth:
f. Gender:
g. Passport Number, Validity, Date and Place of Issue [Photocopy of Passport is
to be attached]:
h. Business Visa Number and validity [Photocopy of Business Visa is to be
attached]:
i. Occupation:
j. Name and Address of Organization/Company:

“Expression of Interest” with all the above information shall reach the undersigned,
Quoting above Reference Number on or before August 02, 2016 at 14.00 Hrs. This
proposal is initiated as a Pre-EoI Qualification. ISAC reserves the right to accept or
reject all or any such “Expression of Interest”; without assigning any reasons what so
ever.

Sd/-
Head, Purchase & Stores
Government of India
Department of Space
ISRO Satellite Centre
Bengaluru – 560017

Phone: +91-080-2508 4370, Fax: +91-080-2520 5283/84

No. ISAC/PUR/EOI/AIT of Satellites/2016 June 16, 2016

INVITATION FOR EXPRESSION OF INTEREST [EoI] FOR SYSTEMS


ASSEMBLY, INTEGRATION AND TESTING OF STANDARD ISRO SATELLITES
THROUGH INDUSTRY

ISRO Satellite Centre [ISAC] of Indian Space Research Organization [ISRO] under
Department of Space, Government of India is the lead centre of ISRO for Design,
Development, Fabrication and Testing of all Indian made Satellites. As a sequel to its
mandate of spacecraft realisation, the Centre is engaged in the development of
cutting-edge technologies of relevance to its Satellite Building Activities and setting
up of infrastructure for Design, Development, Fabrication and Testing of Spacecraft.

The proposal is to invite Expression of Interest and to enter into Contract with
Industry for Systems Assembly, Integration and Testing [AIT] of Standard ISRO
Satellites at ISAC.

The Brief Description, Scope of Work, Tenure of Work, Manpower Estimation, Safety
Precautions, Non-Disclosure Agreements, etc., forming part of the AIT Activity is
available in the EoI Document which can be downloaded from our Websites
www.isac.gov.in and/or www.isro.gov.in under “Tenders” and submit along with the
Document fee Rs. 573/- in the form of Demand Draft drawn in favour of Accounts
Officer, ISAC, Bengaluru before the specified date and time.

Pre – EoI Conference:

1. Date of Pre-EoI Meeting : July 12, 2016

2. Time : 10.00 Hrs, IST

3. Last date for submission of EoI : August 02, 2016 at 14.00 Hrs.

4. Opening date of EoI : August 02, 2016 at 15.00 Hrs


p

Invitation for Expression of Interest (EoI)


for Systems Assembly, Integration &
Testing of Standard ISRO Satellites
through Industry
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

Table of Content

Sl No. Chapter Page No

1. INTRODUCTION 3

2. SCOPE OF WORK 15

3. TENURE OF WORK 27

4. MANPOWER ESTIMATION 33

5. SAFETY PRECAUTIONS 37

6. CONFIDENTIALITY AND NON-DISCLOSURE 41

7. GENERAL TERMS AND CONDITIONS 45

GENERAL INSTRUCTION FOR SUBMISSION OF EOI


8. 51
PROPOSAL

9. RESPONSE FORMAT 57

Expression of Interest 1
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

This page is intentionally left blank

Expression of Interest 2
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

1. INTRODUCTION

Expression of Interest 3
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

This page is intentionally left blank

Expression of Interest 4
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

1. INTRODUCTION

1.1 ISRO Satellite Centre

ISRO Satellite Centre (ISAC) is one of the lead Centres of the Indian Space
Research Organisation (ISRO) responsible for design, development,
assembly & integration of satellites for various applications.

ISAC main campus is spread across a 32 acre campus at Old Airport Road,
Vimanapura in Bengaluru. To cater to the growing demand for satellite
applications, ISRO Satellite Integration & Testing Establishment (ISITE), a 110
acre campus which is about 8 km away from the main campus was also
established. ISAC/ISITE house state-of-the-art design, fabrication, and test
facilities and large cleanrooms for the assembly, integration and testing of
various types of satellites. Laboratory for Electro-Optics Systems (LEOS),
situated at Peenya Industrial Estate, Bangalore is engaged in design,
development and production of Electro-Optic sensors and camera optics for
satellites and launch vehicles.

The ISAC main campus and ISITE campus are hereinafter collectively
referred to as ‘ISAC’.

The specialised teams of scientists, engineers and technicians at ISAC have


built more than 80 complex and advanced satellites for various applications in
areas of telecommunications, television broadcasting, VSAT services, tele-
medicine, tele-education, navigation, weather forecasting, disaster warning,
search & rescue operations, earth observations, natural resource
management, space science and interplanetary missions etc. The Satellite
Programme at ISAC is categorized into:

Geo-Stationary Satellite Programme

Satellite Navigation Programme

Expression of Interest 5
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

Earth Observation Programme

Microwave and Remote Sensing Programme

Space Science and Planetary exploration Programme

Small Satellite Programme

Based on the mass and power generation, communication satellites are


classified into mainly four major bus platform:

I-1K Bus Satellite – 1 to 1.5 ton class satellite

I-2K Bus Satellite – 2 to 2.3 ton class satellite

I-3K Bus Satellite – 3 to 3.5 ton class satellite

I-4/6K Bus Satellite – 4 to 6.5 ton class satellite

Likewise, the remote sensing and small satellite are classified into IRS Bus
Satellite, IMS-1 Bus and IMS-2 bus depending upon the mass and
configuration of the satellite

ISAC is presently engaged in the challenging task of building future


generation advanced communication, remote sensing,navigation and
space science satellites. ISAC has set the target of building about 10-12
satellites per year to cater to the growing demand for satellite based
applications. In order to meet this huge demand, ISAC is striving for
increasing collaboration and contribution from Indian vendor to build
satellites. Presently, vendors are involved in various satellite building
activities such as electronic and mechanical subsystem parts
manufacturing, subsystem fabrication and testing, etc. There is a huge
opportunity for vendor to contribute in the field of space by building
satellites and the scope of vendor participation is bound to increase, both
in terms of volume and complexity. Vendor participation on

Expression of Interest 6
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

a large scale is required not only to meet goals of ISAC but also for self-
reliance resulting in higher throughput.

After successfully completing the vendor’s participation in subsystem level


fabrication and testing, ISAC is seeking to extend the scope of vendor
participation to spacecraft level assembly, integration and testing activities.
On successful completion of these tests, the spacecraft will be shipped to
the launch base for launch. The vendors which are interested in
collaborating with ISAC to assemble integrate and test satellites as per
ISAC’s procedures and guidelines shall express their interest for the same.
The details of ISAC’s requirements from vendors are provided in the
subsequent chapters.

Expression of Interest 7
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

1.2 Satellite Subsystem:

Satellite is an amalgamation of multiple disciplines of engineering and science


streams such as mechanical, electrical, electronics, computer science,
information technology etc. Typically a satellite can be broadly classified into
mainframe subsystem, payload subsystem and other subsystems as shown in
the figure below.

SATELLITE SUBSYSTEM

MAINFRAME PAYLOAD ACTIVITY


SUBSYSTEM SUBSYSTEM
MISSION PLANNING &
STRUCTURE COMMUNICATION ANALYSIS
THERMAL NAVIGATION RELIABILITY &
QUALITY ASSURANCE
MECHANISM REMOTE SENSING
ASSEMBLY
PROPULSION INTEGRATION &
POWER TESTING

TTC-Baseband
AOCS
SENSORS,
ACTUATORS
INERTIAL SYSTEMS
COMMUNICATION
SYSTEM

Fig 1: Satellite Subsystems


The mainframe subsystem comprises of many tangible subsystems such as
structural system, propulsion system, deployment mechanisms, thermal control
system, digital system, attitude orbit & control system, sensor systems, inertial

Expression of Interest 8
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

systems, power system, communication system etc. Payload subsystems are


mission specific and application dependent such as communication, navigation,
remote sensing and space science etc. Besides these subsystems, mission
planning & analysis, reliability & quality assurance and Assembly integration &
testing activity are also integral part of satellite system. The other activities
involved are procurement, system engineering, project management and
documentation.
A Typical Disassembled view of a spacecraft is shown below:

PROPELLANT &
PRESSURANT
TTC ANTENNA
TANKS
F
NORTH SOLAR ARRAY u
H TTC HORN
e EARTH SENSOR
O
x
WEST PANEL
KU
SHAPED
REFLECTOR

Ku BAND
TWTA SOUTH PANEL

NORTH PANEL

EAST PANEL
SOUTH
KU MOMENTUM SOLAR
SHAPED WHEELS ARRAY
REFLECTOR MAIN
LAM
STRUCTURE BATTERY PANEL

Fig 2: Typical Disassembled view of a spacecraft

The major subsystem of a typical satellite is discussed in brief in the subsequent


section

Expression of Interest 9
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

1.2.1 Structural System

Structural subsystems includes Primary central cylinder


made of CFRP face skin and aluminium honey comb core,
shear webs and equipment panels. It provides the basic
shapes, strength and rigidity to the satellite.

1.2.2 Thermal Control Systems:

The function of the thermal control system is to keep the temperature of


the payloads and mainframe subsystems housed in the satellite within the
specified limits throughout the mission life. Thermal management is done
through thermal control elements employing passive and active thermal
elements such as optical solar
reflectors (OSR), multi layer
insulation (MLI) blankets; heat
sinks, surface coatings, paints,
tapes, filler material, heaters, heat pipes etc.

1.2.3 Mechanism System:

Mechanisms are employed to stow and hold down


the appendages of the satellite. These include
hold-down and release systems, deployment
mechanisms, reflector mechanisms and other
special mechanisms as required by the mission.
Typically a satellite has two wings; each wing consists of one yoke and
solar panels on the north and south sides of satellites

Expression of Interest 10
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

1.2.4 Propulsion system:

Propulsion system is required for orbit raising and orbit maintenance


operations throughout the mission phase of the
satellite. The propulsion system of the satellite is a
unified bi-propellant propulsion system using
mono-methyl hydrazine (MMH) as fuel, mixed
oxides of nitrogen (MON3) as oxidizer and
gaseous helium as pressurant. The satellite employs thrusters for station
keeping. It also employs a liquid apogee motor for orbit raising operations.

1.2.5 Power System:

The power system comprises of the solar panels used to generate the
required power, batteries to store and make available the required power
for eclipse support and the electronics to manage, control and distribute
the power throughout the satellite.

1.2.6 Attitude and Orbit Control System:

The Attitude and Orbit Control (AOCS) Subsystem is the onboard


computer that integrates Telecommand, telemetry, sensor
processing, thermal control, and spacecraft autonomous

Expression of Interest 11
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

operations. It comprises of software and hardware deliverable system. It


helps in Orientation of the spacecraft axes with respect to an inertial
reference frame and provides stable platform for the mission. Together with
the propulsion subsystem, AOCS provides the capability of 3-axis attitude
control with thrusters in the transfer orbit in addition to orbit rising and fine
orbit adjustment. The satellite carries Sensors such as Sun Sensor, Star
Sensor and the Inertial Reference Unit (IRU) based on Dynamically Tuned
Gyros that provides attitude data.

1.2.7 Telemetry & Telecommand Base band systems:

Telemetry and Telecommand (TTC-Baseband) system


based on processor, HMCs and FPGA’s is configured to
serve the requirements of spacecraft health monitoring through Telemetry
and commanding for control during all the phases of the Mission.

1.2.8 Communication System:

TTC-RF system provides the link


between the spacecraft and ground
station. The primary function of the subsystem is command reception,
telemetry transmission. The elements of the communication system are
Transmitters, Receivers and antenna systems.

1.2.9 Payload Systems:

Payload subsystems are mission specific and are intended to perform the
desired mission objective. The different kind of payloads depending upon
the missions is given below.

Expression of Interest 12
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

Table1: Different Types of payloads

Type of Satellite Payload subsystems

Communication Transponders in S, C, Ext C,Ku, Ka band


Satellite

Navigation Satellite Navigation payload

Remote Sensing Application specific payloads like camera,


Satellite Scatterometer, imager, sounder, SAR, PAN
camera etc

Space Science Scientific instruments like Telescopes, IR


Cameras etc.

Interplanetary Missions Probes , Orbiters & Rovers

1.2.10 Mission planning & Analysis:

Besides these tangible deliverables, the first and the foremost activity for a
satellite building is the mission planning & analysis. It includes, mission
planning and operation, Orbit selection and Local time studies, ground
segment software suite, Pre launch, launch and post launch operation.

1.2.11 Reliability & Quality Assurance:

A satellite works in a hostile space environment and therefore it calls for


high reliability and quality of satellite systems. It is utmost essential to
ensure the quality assurance of components, parts, materials and process
so that satellite perform its intended on-orbit operations. Stringent reliability
analysis and quality assurance procedures are adopted at all stages of
satellite building to meet the space reliability and quality standards.

1.2.12 Assembly Integration & Testing (AIT):

The qualified spacecraft subsystem hardware flows into the AIT Cleanroom
for electrical & mechanical integration activity in a sequential manner. The

Expression of Interest 13
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

completely integrated/assembled satellite undergoes a series of tests


including Thermovac test, Vibration test, Acoustic test, Compact antenna
ranging test, physical parameter measurements, Dynamic tests etc that
ultimately qualifies the spacecraft for launch.

Expression of Interest 14
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSTRY

2. SCOPE OF WORK

Expression of Interest 15
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 16
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

2. SCOPE OF WORK

It is proposed to carry out the assembly, Integration and testing (AIT) activities of
two number of ISRO Standard bus satellites with the participation of the
prospective vendor. The entire activity is planned to be carried out in two phases
viz Phase-1 and Phase-2. During Phase-1, the AIT activities of the first satellite
will be done by ISAC while on-the-job training will be given to the vendor. The AIT
activities of the second satellite will be carried out by the selected vendor under
the supervision of ISRO/ISAC in phase-2.
After successful completion of Phase-2, potential vendors may be invited to take
up satellite fabrication activities on an end-to-end basis and/or carry out assembly,
integration and testing of spacecraft at ISAC/ISITE campus which is beyond the
scope of this EoI.
The Vendor shall take up the activity within ISAC premises at ISITE (ISRO
Satellite Integration and Test Establishment) campus, Marathalli, Bangalore. ISAC
will provide all necessary infrastructures & facilities to facilitate vendor to carry out
Assembly, Integration and Testing of ISRO Standard bus satellites.

The scope of work involved in each phase is discussed in brief below:

2.1 Phase 1: First ISRO Standard bus satellite realization (On-the-Job


Training):

A project team with members from ISAC and selected vendor shall be
constituted after the selection of the qualified vendor. The required skilled
manpower from the vendor shall be inducted and provided an orientation training
programme on satellite systems and associated systems engineering concepts.
During the realization of first ISRO Standard bus satellite; the vendor will get on-
the-job training on the assembly, integration and testing activities of the satellite.
The flight mainframe subsystems, payload, harness and all the other supporting
infrastructure/facilities, equipment, resources and accessories shall be provided
by ISAC. The vendor shall also be responsible in bringing out necessary

Expression of Interest 17
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

documentation for system assembly, integration and testing activities. All the
activities mentioned will be carried out using ISAC facilities/Infrastructure

Fig 3: First ISRO Standard bus satellite Realization


The Scope of Work during Phase-1 is summarized below:
Table 2: Scope of Work - Phase 1
Sl.No Activities ISAC Vendor
2.1.1 Satellite Prime responsibility Partici pation in the
Subsystem Orientation training Orientation training
Readiness programme programme
Documentation
2.1.2 Satellite Prime Participation under
assembly and responsibility ISAC supervision
integration On-the-job training Documentation
activities
2.1.3 Spacecraft Prime Partici pation under
Testing – responsibility ISAC supervision
Facilities/Infrast On-the-job training Documentation
ructure
2.1.4 Project Prime Documentation eg:
Management responsibility checklist, status
On-the-job training report, time line
charts
2.1.5 Quality Prime Partici pation under
Management responsibility ISAC supervision
On-the-job training Documentation

Expression of Interest 18
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

2.1.1 Satellite Subsystem Readiness:

ISAC will be responsible for the delivery of satellite subsystem to


cleanroom realized through external vendors, other ISRO work Centres
and in-house agencies during this phase. The vendor manpower shall be
provided orientation training programme in the area of Configuration
Management, Systems Engineering, Subsystem fabrication and testing,
test and evaluation and QA/QC aspects.

2.1.2 Satellite Assembly and Integration Activities:


ISAC will be responsible to carry out the spacecraft assembly and
integration activities while the vendor will be imparted training
programme and on-the-job training and shall actively participate in all the
AIT activities. The vendor shall be provided with orientation training
programme and on-the-job training in order to get acquainted with the
satellite building activities. Exposure to the system engineering aspects,
subsystem design, fabrication and testing, spacecraft level AIT activities,
project management, quality management, facility management etc shall
be provided so that the vendor can take up the entire AIT activities as
listed below during the second phase.

Table 3: List of major AIT Activities


1. Receipt Inspection of Structure, Positionining on Fixture

2. Receipt Inspection of Propulsion System

3. Receipt Inspection of Equipment Panel & Assembly

4. Propulsion System Integration & testing

5. Thermal implementation Activities on Structure,


Propulsion elements & Panels
6. Harness installation on panels and patch brackets

7. Receipt Inspection of Subsystem Hardware and payload

Expression of Interest 19
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Table 3: List of major AIT Activities


8. Assembly & Integration of Subsystems and payload

9. Disassembled Mode IST

10. Preparation of Panels for Closure

11. Panel closure

12. Assembled Mode IST

13. Preparation for Thermo-vacuum Test

14. Containerisation of Satellite, Movement to Thermo-


vacuum Chamber, Satellite Removal, Assembly into
Chamber
15. Satellite Thermo-vacuum Test

16. Removal of Satellite from Chamber, Containerisation,


Movement to Clean Room, Positioning on Fixture
17. EMI/EMC test

18. Alignment of Various Subsystem Hardware

19. End-to-end polarity test

20. Appendages integration & testing

21. Measurement of Physical Parameters of Satellite (CG,


MI, Mass)
22. LAM deck assembly & testing

23. Preparation for Satellite Dynamic Test

24. Satellite Fit Check with Launch Vehicle Adaptor

25. Containerisation of Satellite, Movement to Vibration Lab,


Satellite Removal, Assembly onto Shaker
26. Vibration Test

Expression of Interest 20
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Table 3: List of major AIT Activities


27. Removal of Satellite from Shaker, Positioning on
Fixture, Movement to Acoustic Test Facility, Position on
Fixture
28. Acoustic Test

29. CATF test

30. SP-1 IST

31. Removal of Satellite from Fixture, Containerisation,


Movement to Launch Base

2.1.3 Spacecraft Testing- Infrastructure/Facilities:

ISAC is equipped with state-of-the-art facilities/infrastructure for the


design, development, assembly, integration and testing of satellites
under one roof. Some of the major capital intensive
facilities/infrastructure includes 1 lakh class cleanroom, mechanical
ground support equipment, electrical ground support equipment,
handling and positioning fixture, thermovac chamber, vibration test
facility, Acoustic test facility, Compact antenna test facility, physical
parameter measurement machine, appendages deployment zero g
fixture etc. In this phase, while ISAC will be primarily responsible to
operate the facilities and conduct the test, the vendor shall be provided
with necessary training to actively participate during the tests.

2.1.4 Project Management:

Budget planning, systems engineering, contract management,


configuration management, procurement management, inventory
management etc are the major component of satellite project
management. Training in the relevant project management aspects that
facilitate the smooth and seamless execution of the AIT phase shall be
imparted to the vendor. The vendor shall be provided with adequate

Expression of Interest 21
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

exposure to prepare required documents during this phase. Necessary


documentation such as status report, checklist shall be generated by the
vendor will the support of ISAC during this phase.

2.1.5 Quality Management:

ISAC shall be primarily responsible for the quality and reliability aspects
during this phase. Quality control/ quality assurance plan and procedure
will be worked out by ISAC in order to ensure the compliance of satellite
system/ subsystem/part/component to the space grade quality and
reliability standards of ISAC. Necessary documentation such as test
procedures, test results, inspection report, audit report, failure analysis
report, non-conformance report etc shall be generated at each stage of
the satellite life cycle. The vendor shall be provided with necessary
training and shall actively participate in all the quality management
aspects of satellite AIT activities

2.2 Phase 2: Second satellite Realization:

Based on the knowledge and expertise gained by the vendor during the
realization of the first ISRO Standard bus satellite, the Vendor will now be
geared up to further expand their scope of participation in the satellite AIT
activities. During phase-2, ISAC shall be responsible to realize and deliver
spacecraft systems, payload, harness, checkout systems, mechanical ground
support equipment, electrical ground support equipment etc to the clean room.
With the availability of spacecraft subsystems, the vendor shall be completely
responsible to carry out the assembly, integration and testing of the spacecraft
under the supervision of ISAC. The overall project management is the
responsibility of ISAC. Quality control and assurance is the primary
responsibility of the vendor while the auditing responsibility is of ISAC. The

Expression of Interest 22
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

vendor will be responsible for necessary documentation during all the stages
of system assembly, integration and test activities.

Fig 4: Second ISRO Standard bus satellite Realization


The Scope of Work during Phase-2 is summarized below:

Table 4: Scope of Work - Phase 2


Sl.No Activities ISAC Vendor
2.2.1 Satellite Subsystem Prime responsibility Deliverable check-
Readiness list
Documentation
2.2.2 Satellite assembly and Supervision Prime responsibility
integration acti vities Documentation
2.2.3 Spacecraft Testing – Operation and Utilization
Facilities/Infrastructure supervision Documentation
2.2.4 Project Manag ement Prime responsibility Participation
Documentation
2.2.5 Quality Management Audit Prime responsibility
Documentation

2.2.1 Subsystem Readiness:

ISAC will be responsible for the delivery of satellite subsystem to


cleanroom realized through external vendors, other ISRO work Centres

Expression of Interest 23
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

and in-house agencies during this phase. The vendor manpower shall
prepare a subsystem deliverable check-list and submit the report to
ISAC. Subsequent to the clearance of the checklist report by ISAC focal
point, the vendor shall initiate the spacecraft assembly and integration
activities.

2.2.2 Spacecraft Assembly And Integration Activities:

The vendor shall carry out the spacecraft assembly and integration
activities as per approved assembly sequence plan of ISAC as
summarized below. All the activities mentioned will be carried out using
ISAC facilities/Infrastructure.

Table 5: List of major AIT Activities


1. Receipt Inspection of Structure, Positionining on Fixture

2. Receipt Inspection of Propulsion System

3. Receipt Inspection of Equipment Panel & Assembly

4. Propulsion System Integration & testing

5. Thermal implementation Activities on Structure, Propulsion elements


& Panels
6. Harness installation on panels and patch brackets

7. Receipt Inspection of Subsystem Hardware and payload

8. Assembly & Integration of Subsystems and payload

9. Disassembled Mode IST

10. Preparation of Panels for Closure

11. Panel closure

12. Assembled Mode IST

13. Preparation for Thermo-vacuum Test

Expression of Interest 24
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Table 5: List of major AIT Activities


14. Containerisation of Satellite, Movement to Thermo-vacuum Chamber,
Satellite Removal, Assembly into Chamber
15. Satellite Thermo-vacuum Test

16. Removal of Satellite from Chamber, Containerisation, Movement to


Clean Room, Positioning on Fixture
17. EMI/EMC test

18. Alignment of Various Subsystem Hardware

19. End-to-end polarity test

20. Appendages integration & testing

21. Measurement of Physical Parameters of Satellite (CG, MI, Mass)

22. LAM deck assembly & testing

23. Preparation for Satellite Dynamic Test

24. Satellite Fit Check with Launch Vehicle Adaptor

25. Containerisation of Satellite, Movement to Vibration Lab, Satellite


Removal, Assembly onto Shaker
26. Vibration Test

27. Removal of Satellite from Shaker, Positioning on Fixture, Movement


to Acoustic Test Facility, Position on Fixture
28. Acoustic Test

29. CATF test

30. SP-1 IST

31. Removal of Satellite from Fixture, Containerisation, Movement to


Launch Base

The total assembly shall be carried out with the vendor on-line Q.C
while ISAC QA/QC team will audit the activity at each stage. The vendor
shall report all anomalies/non-conformance related to AIT activities to
ISAC as and when observed. The vendor shall proceed to next stage
only after the clearance from the ISAC QA team. The vendor shall submit

Expression of Interest 25
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

AIT check-list, cleanroom log history sheet, inspection and assembly


report, Non conformance report etc to ISAC as and when required.

2.2.3 Spacecraft Testing – Facilities/Infrastructure

The spacecraft level testing activities such as thermovac test,vibration


test, acoustic test, antenna test and associated test will be carried out by
the vendor. In this phase, vendor shall be provided with all the necessary
infrastructure/facilities to carry out the testing activities under ISAC
supervision. The operation of the infrastructure/facilities shall be the
responsibility of ISAC.

2.2.4 Project Management:

The overall planning, execution and monitoring of the spacecraft AIT


activities of the second satellite as per the defined scope of work and
within the prescribed time schedule is the primary responsibility of the
vendor in this phase. ISAC shall provide the necessary support and
guidance as and when necessary for the smooth completion of this
phase.

2.2.5 Quality Management:

Quality control and assurance shall be the primary responsibility of the


vendor during this phase while the auditing responsibility is of ISAC. The
vendor shall follow the test plan and procedure, guidelines as defined by
the QA/QC team of ISAC. The vendor shall generate all necessary
documentation in to order to ensure the compliance of the satellite
systems with the space grade quality and reliability standards of ISAC

Expression of Interest 26
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

3. TENURE OF WORK

Expression of Interest 27
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 28
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

3. TENURE OF WORK:
3.1 Phase -1 & Phase-2 Tenure of work

The first ISRO Standard bus satellite is required to be ready for shipment to
launch base by 8 months from the date of work order release. The second ISRO
Standard bus satellite shall be ready 10 months after the readiness of the first
satellite. The overall schedule is depicted below:

Fig 5: Overall Tenure of work

The Overall Realization Schedule plan of the first ISRO Standard bus satellite is
given below:

Expression of Interest 29
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Fig 6: First Satellite Overall Realization Schedule


The Overall Realization Schedule plan of the second ISRO Standard bus satellite is
given below:

Fig 7: Second Satellite Overall Realization Schedule

Expression of Interest 30
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

3.2 Long Term Business Plan:

In view of growing demand of satellite based services, there will be a continuous


load of realizing 10-12 satellites in a year. The future requirement of satellite is
enormous and a suitable vendor nurtured by ISAC can take up the satellite
realization portfolio so that ISAC can focus on the core research and
developmental activities in satellite technology. The tie up with the selected
vendor may be broaden if required in the due course of time depending upon the
technical and managerial expertise and experience gained by the vendor in
satellite building activities, subsystem realization process, system engineering
,space grade quality and reliability standards and future project load. Looking
forward, the association with the vendor may be expanded for the realization of
an additional three ISRO Standard bus satellites as summarized below.

Fig 8: Overall Realization Schedule: Five ISRO Standard bus satellite

Expression of Interest 31
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 32
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

4. MANPOWER
ESTIMATION

Expression of Interest 33
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 34
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

4. MANPOWER ESTIMATION:

It is estimated that around 50 personnel are required from the vendor for a period of
about 18 months to realize the two ISRO Standard bus satellites. An approximate
manpower estimation with their qualifications required are as given below:

20 (8: mechanical, 12: electrical/electronic) engineers with a minimum


qualification of BE / BTech
15 technicians with a minimum qualification of Diploma
15 tradesmen with a minimum qualification of ITI

The man-power employed by the vendor shall have experience of working in


relevant / similar areas and must possess a minimum of first class pass marks /
percentage / grading with respect to their qualification. The vendor shall ensure that
the manpower provided by vendor shall be retained throughout the phase-1 and
phase-2 time period. The estimated manpower required to carry out the satellite AIT
activities depends upon the expertise and learning skill of the vendor manpower.
The above number may vary based on upon the spacecraft configuration and
complexity.
The vendor shall be provided with orientation and on-the-job training in order to get
acquainted with the satellite building activities during phase-1. An orientation
training programme for the vendor manpower shall be provided wherein, they will be
introduced to satellite subsystem, system engineering aspects, project
management, and subsystem fabrication and testing, spacecraft level AIT etc.
It will be followed by on-the-job training in the AIT activities of the first ISRO
Standard bus satellite such as thermal fabrication and implementation, propulsion
integration and test activities, subsystem assembly, integration and testing,
integrated spacecraft level testing, checkout operations, In other words, the vendor
man power shall participate in AIT activities with ISAC team to realize the first ISRO
Standard bus satellite. After the completion of the AIT activities of the first ISRO
Standard bus satellite, the manpower will be work on the second ISRO Standard

Expression of Interest 35
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

bus satellite. The on-the-job training will help vendor manpower to take up all
aspects of AIT activities of the second ISRO Standard bus satellite in phase-2.The
technical skill, competency and quality of the vendor manpower play a vital role in
the successful completion of the phase-1 and Phase-2.

Expression of Interest 36
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

5. SAFETY
PRECAUTIONS

Expression of Interest 37
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 38
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

5. SAFETY PRECAUTIONS

The vendor should strictly adhere to the general work rules, procedures and

office timings followed at ISAC.

The personnel of vendor must adhere to all the safety guidelines while handling

components, cards, and packages during testing and transporting, particularly the

ESD protection measures such as wearing ESD overcoats, footwear, wrist bands,

grounding and other measures as per ISAC ESD protection guidelines.

Vendor is responsible to ensure the safe handling of the sub-

assemblies/equipment being used during the AIT of the satellite. The vendor shall

strictly conform to the safety and security procedures laid by ISAC.

Expression of Interest 39
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 40
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

6. CONFIDENTIALITY
AND NON-
DISCLOSURE

Expression of Interest 41
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 42
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

6. CONFIDENTIALITY AND NON-DISCLOSURE

All documents prepared for fabrication, assembly, integration, test procedures,

log books, drawings, schematics and any other communication, codes revealed

during the satellite realization will be exclusive property of ISAC and vendor shall

have no right whatsoever on them.

These documents are to be strictly confidential and should not be reproduced,

copied/ transmitted to any media without explicit permission of ISAC.

Further, the vendor must not quote any of these works in any publications or to

any of their customers without explicit permission from ISAC and adhere to strict

confidentiality.

Expression of Interest 43
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 44
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

7. GENERAL TERMS
AND CONDITIONS

Expression of Interest 45
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 46
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

7. GENERAL TERMS AND CONDITIONS

7.1 This EoI is not an offer and is issued with no commitment. ISAC reserves

the right to withdraw the EoI and change or vary any part thereof at any

stage. ISAC also reserves the right to disqualify any vendor/proposal,

should it be so necessary at any stage.

7.2 Timing and sequence of events resulting from this EoI shall ultimately be

determined by ISAC

7.3 By submitting a proposal, each vendor shall be deemed to acknowledge

that it has carefully read all chapters of this EoI, and has fully informed

itself as to all existing terms and conditions.

7.4 The proposal and all correspondence and documents shall be written in

English.

7.5 The vendor shall not subcontract the work related to satellite assembly,

integration & testing to any other third party without the permission of

ISAC.

7.6 Vendor shall compulsorily fill up the Response format and compliance

matrix (Part- I & Part- II) as given in chapter 9 in the EoI

7.7 Vendor shall be prepared to work beyond working hours and on holidays

to meet the project schedules, if necessary

7.8 The cost of components/systems damaged due to

negligence/mishandling by the vendor shall be recovered from the

vendor’s payment

Expression of Interest 47
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

7.9 Minor rework and testing thereon required due to the above shall be

done by the vendor without any financial implications.

7.10 ISAC shall provide the necessary infrastructure/equipment while the

Vendor shall ensure the availability of all necessary resources and

logistics support required for the execution of the work at ISAC

7.11 Vendor shall ensure the minimum wage guidelines like salary, ESI, PF

and Insurance etc. for their manpower as per the wages act and produce

the evidence documents when required

7.12 Start of project will be decided and communicated by ISAC through work

order by ISAC focal point

7.13 Orientation training Programme shall be provided by ISAC to the vendor

7.14 Vendor shall be prepared to accept any short closure of the work order

decided by ISAC.

7.15 The Vendor must be a registered company under the Companies Act,

1956 or a partnership firm registered under Partnership Act or a

Proprietorship firm. The Vendor should be registered with the concerned

departments [Service Tax, Sales Tax, VAT etc] for legally carrying out its

business activities. The Vendor should also have a valid PAN. The

Vendor should submit Self attested copy(ies) of the Certificates of

Incorporation and other certificates that are legally required for carrying

out its business activities. The certificates should be valid at the time of

EoI submission and should be certified by an authorized signatory. A

copy of PAN Card should also be submitted.

Expression of Interest 48
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

7.16 The Vendor shall provide the details of the ownership of the company

and details of owners / directors along with complete addresses of the

owners / directors and their other activities. If the company is owned by

another company similar details of the owner should be provided.

7.17 Not be insolvent, in receivership, or being wound up, not have its affairs

administered by a court or a judicial officer, not have its business

activities suspended, not have been blacklisted, defaulted and must not

be the subject of legal proceedings for any of the foregoing reasons;

7.18 Not have, and their directors and officers not have, been convicted of any

criminal offence related to their professional conduct or the making of

false statements or misrepresentations as to their qualifications to enter

into a procurement contract within a period of three years preceding the

commencement of the procurement process, or not have been otherwise

disqualified pursuant to debarment proceedings;

7.19 Not have a conflict of interest in the EoI in question as specified in the

EoI document

Expression of Interest 49
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 50
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

8. GENERAL
INSTRUCTION FOR
SUBMISSION OF EoI
PROPOSAL

Expression of Interest 51
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE,
STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 52
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

8. GENERAL INSTRUCTION FOR SUBMISSION OF EoI PROPOSAL

Vendor participation is going to be a major steering factor in order to aid ISAC/ISRO in

meeting the objective of building 10-12 satellites per year. Presently many public and

private companies are directly or indirectly involved in satellite building activities. The

demand for space application is growing manifold across the globe and ISRO/ISAC is

keen to provide vendors opportunities to expand their contribution in satellite realization

activities. With this backdrop, it is now proposed to carry out satellites AIT activities

through an external vendor. In order to achieve this target, one major capable vendor

will be selected to build satellites.

8.1 Steps for selecting the potential vendor:

The following flowchart depicts the steps for selecting the potential vendor. The

process begins with the call for Expression of Interest (EoI). The interested

vendors shall submit the EoI proposal clearly indicating the details required in

chapter 9 Response format with supporting documents. A Pre-EoI

Conference with interested vendors would be conducted at ISAC campus before

the submission of EoI. The purpose of the conference is to provide vendors an

opportunity to seek clarifications regarding any aspect of the EoI. The vendors

finally responding to the EoI shall be shortlisted based on their compliance with

the EoI requirement. Subsequently a pre-bid meeting between ISAC and the

shortlisted vendors will be held at ISAC wherein detailed presentations on the

scope of work, roles and responsibilities and modalities of engagement will be

Expression of Interest 53
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

made. A visit to vendor’s campus may be conducted for assessment of the

capabilities stated in the EoI. The vendors shortlisted (based on EoI and

assessment of their potential to carry out the proposed work) would be issued

Request for Proposal, inviting their technical and commercial bids at a later date.

Subsequently, based on the response to RFP, a potential vendor will be selected

and order will be awarded.

Call for Expression of


Interest

Pre-EoI Conference

EoI-Response
Submission

Shortlisting of Vendors

Pre -Bid Meeting

Release of Request
For Proposal (RFP)

Selecting the Vendor

Placing the Order for


Satellite Realization

Fig 8: Steps of selecting the potential vendor

Expression of Interest 54
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

8.2 Guidelines for EoI submission:

The objective of this EoI is to solicit proposals from the interested vendor for
participation in the satellite AIT activities as discussed in the scope of work. The
interested vendor are expected to examine all instructions, scope of work, tenure
of work, manpower estimation, safety precautions, confidentiality and non-
disclosure, general terms and conditions, submission guidelines and other details
in the EoI documents. Failure to furnish complete information as mentioned in the
EoI documents or submission of a proposal not substantially responsive to the EoI
documents in every respect will be at the Vendor's risk and may result in rejection
of the proposal. The EoI is not an offer and is issued with no commitment. ISAC
reserves the right to withdraw the EoI and change or vary any part thereof at any
stage, if it determines that such action is in the best interest of the Government of
India. ISAC also reserves the right to disqualify any proposal, should it be so
necessary at any stage.

The proposal should be submitted as an Expression of Interest (EoI), clearly


providing the details requested below with documentary proof/supporting
documents.

The vendor has to provide the information as per the formats prescribed in
chapter 9 Response Format. The overall compliance matrix as per section
9.9 should also be submitted as per of the EoI proposal. All these inputs
may be furnished in MS word document neatly typed in the said formats.
The proposal and all correspondence and documents shall be written in
English.

Expression of Interest 55
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 56
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9. RESPONSE FORMATS

Expression of Interest 57
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

This page is intentionally left blank

Expression of Interest 58
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9. RESPONSE FORMATS
9.1 Cover Letter
(Company letterhead)

[Date]
To,
HEAD, PURCHASE & STORES
ISRO Satellite Centre
HAL Airport Road, Vimanapura Post
Bangalore -560017
Karnataka

Dear Sir,

Ref: “Expression of Interest for systems assembly, integration &

testing of standard ISRO satellites through Industry”

Having examined the Expression of Interest (EoI), the receipt of which is hereby duly
acknowledge, we, the undersigned, intend to submit a proposal in response to the
Expression of Interest (EoI).
We attach hereto the response as required by the EoI, which constitutes our proposal
Primary and Secondary contacts for our company are:
Primary Contact Secondary Contact

Name:

Title:

Company Name:

Address:

Phone :

Expression of Interest 59
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Primary Contact Secondary Contact

Mobile:

Fax :

E – mail :

We confirm that the information contained in this response or any part thereof,
including its exhibits, and other documents and instruments delivered or to be
delivered to ISAC is true, accurate, verifiable and complete. This response includes
all information necessary to ensure that the statements therein do not in whole or in
part mislead ISAC in its short-listing process.

We fully understand and agree to comply that on verification, if any of the information
provided here is found to be misleading the short listing process, we are liable to be
dismissed from the selection process or termination of the contract during the
realization of Phase-1 and Phase -2 , if selected to do so.

We agree for unconditional acceptance of all the terms and conditions set out in the
EoI document.

It is hereby confirmed that I / We are entitled to act on behalf of our company/


corporation/ firm / organization and empowered to sign this document as well as
such other documents, which may be required in this connection.

Dated this

(Signature) (In the capacity of)

(Name)

Duly authorized to sign the EoI Response for and on behalf of :

(Name and Address of Company) Seal / Stamp of Vendor

Expression of Interest 60
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Witness Signature :

Witness Name :

Witness Address:

CERTIFICATE AS TO AUTHORIZED SIGNATORIES

I, …………………………………………., the Company Secretary of


……………………………….., certify that
………………………………………………………………. Who signed the above EoI is
authorized to do so and bind the company by authority of its board / governing body.

Date :

Signature :
(Company Seal)

Expression of Interest 61
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.2 General Details of the Vendor


9.2.1
Name of the Vendor

Year of Establishment
9.2.2

provide details in 1-2 pages


Brief profile and core capabilities
9.2.3 (enclose separate sheet )
of the vendor

Type of Vendor
9.2.4 Government/Public sector
Undertaking/Private/Others

9.2.5 Head office location and address:

9.2.6 Local address in Bangalore if any:

9.2.7 Corporate website URL:

Quality certification (such as


9.2.8
MIL/ISRO/DRDO/Aerospace):

9.2.9 Vendor’s Quality Standards

Expression of Interest 62
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.3 Aerospace/Space Related Activities

9.3.1 In case the vendor is having/had any Purchase order/Contract (from

January 01, 2012 onwards) from ISRO Centres or aerospace Industry.

provide the following details:

Name of the ISRO Statement Date of release: Present Remark


Sl
Centre/Aerospac e of Work Purchase order Status s
No.
Industry /Contract

1.

2.

3.

4.

5.

6.

9.3.2 List of sub-contractor involved in executing the Purchase order/Contract

(from January 01,2012 onwards) from ISRO Centres or aerospace industry

if any.

9.3.3 At present ISAC has qualified vendors for various satellite related activities.

If required, is the vendor willing to form a consortium with these vendors to

enable successful completion of the scope of work as defined in chapter 2-

Scope of work? Yes/No

Expression of Interest 63
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.4 Vendor Expert Manpower

9.4.1 Management structure of the vendor

9.4.2 Manpower Strength as on 1st June 2016

Total no. of Engineers (Engg.) Total no. of Technicians


Stream
(Tech.)

Mechanical

Electronics

Computer

Science

Others

9.4.3 Years of Experience as on 1st June 2016

Mechanical Electronics Computer Sci. Others


Experience
Engg. Tech. Engg. Tech. Engg. Tech. Engg. Tech.

0 to 2 years

>2 to 5

years

>5 to 10

years

>10 years

Expression of Interest 64
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.4.4 Is the vendor willing to deploy their manpower to work in ISAC /ISITE

campus Yes/No

9.4.5 The vendor shall ensure that the manpower provided by vendor shall be

retained throughout the phase-1 and phase-2 time period. Yes/No

9.4.6 Is the vendor willing to work in regular shift (8 hrs shifts), two shift or three

shift mode operation if required depending upon the phase of the project.

Yes/No

9.4.7 The vendor shall provide all logistics support to its manpower for the

execution of the work at ISAC Yes/No

9.4.8 Please provide risk management plan to handle unforeseen situations such

as attrition etc?

Expression of Interest 65
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.5 Infrastructure Capabilities

9.5.1 List of major infrastructure presently available to build systems/subsystem

related to either satellite or launch vehicle or aerospace related systems

such as cleanroom, electronic fabrication facility, mechanical fabrication

facility, environment test chambers etc.(facilities used to execute orders

from ISRO Centres or aerospace vendors)

Name of Year of Brief


Sl.No
Infrastructure/Facility commissioning specifications

1.

2.

3.

4.

5.

9.5.2 Is the vendor willing to invest in resources-

manpower/equipment/facilities/infrastructure? Yes/No

Expression of Interest 66
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.6 Financial Details:

9.6.1 Financial Information

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16

Revenue (in

INR Crores)

Profit before

Tax(in INR

Crores)

Revenue from

services(in

INR Crores)

9.6.1.1 Mandatory Supporting Documents

9.6.1.1.1 Auditor certified statements for the last four years 2012-

13,2013-14,2014-15 and 2015-16 (please includes only the

sections on profit and loss , revenue,and assets, not the entire

balance sheet)

9.6.1.1.2 Unaudited certified statements certified by the company

auditors for the latest year 2015-16(in case auditor certified

statement for 2015-16 is not available

9.6.1.1.3 Certification by the company auditors supporting the revenue

break up.

Expression of Interest 67
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.7 Legal Aspects

9.7.1 The Vendor must be a registered company under the Companies Act, 1956

or a partnership firm registered under Partnership Act or a Proprietorship

firm. The vendor should be registered with the concerned departments

[Service Tax, Sales Tax, VAT etc] for legally carrying out its business

activities. The vendor should also have a valid PAN. The Vendor should

submit Self attested copy(ies) of the Certificates of Incorporation and other

certificates that are legally required for carrying out its business activities.

The certificates should be valid at the time of EoI submission and should be

certified by an authorized signatory. A copy of PAN Card should also be

submitted.

Expression of Interest 68
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.8 Others

9.8.1 The Vendor shall provide the details of the ownership of the company and

details of owners / directors along with complete addresses of the owners /

directors and their other activities. If the company is owned by another

company similar details of the owner should be provided.

9.8.2 Not be insolvent, in receivership, or being wound up, not have its affairs

administered by a court or a judicial officer, not have its business activities

suspended, not have been blacklisted, defaulted and must not be the

subject of legal proceedings for any of the foregoing reasons

9.8.3 Not have, and their directors and officers not have, been convicted of any

criminal offence related to their professional conduct or the making of false

statements or misrepresentations as to their qualifications to enter into a

procurement contract within a period of three years preceding the

commencement of the procurement process, or not have been otherwise

disqualified pursuant to debarment proceedings

9.8.4 Not have a conflict of interest in the EoI in question as specified in the EoI

document

Expression of Interest 69
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.9 Compliance Matrix to be filled by Vendor


9.9.1 Part- I Compliance Matrix

Refer
Compliance
Chapter Description Remark
(Yes/No)
No

2 Acceptance to Scope of work

3 Acceptance to Tenure of work

4 Acceptance to Manpower Estimation

5 Acceptance to Safety precautions

Acceptance to Confidentiality and


6
non-disclosure

Acceptance to General Terms and


7
Conditions

Acceptance to General instruction for


8.
submission of EoI proposal

9
Acceptance to Response Format

Expression of Interest 70
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

9.9.2 Part- II Compliance Matrix

Chapt Compliance Supporting


Description Remark
er No (Yes/No) Document

Covering Letter
9.1.

9.2. General Information

9.2.1. Data provided as per 9.2.1

9.2.2. Data provided as per 9.2.2

Attached separate sheet as per


9.2.3.
9.2.3

9.2.4. Data provided as per 9.2.4

9.2.5. Data provided as per 9.2.5

9.2.6. Data provided as per 9.2.6

9.2.7. Data provided as per 9.2.7

9.2.8. Data provided as per 9.2.8

9.2.9. Data provided as per 9.2.9

9.3. Aerospace/Space Related

Activities

Expression of Interest 71
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Chapt Compliance Supporting


Description Remark
er No (Yes/No) Document

All details & supporting documents


9.3.1.
as per 9.3.1 attached?

List of sub-contractor as per 9.3.2


9.3.2.
attached?

Acceptance to 9.3.3
9.3.3.

9.4. Vendor Expert Man power

9.4.1. All details as per 9.4.1 attached?

9.4.2. All details as per 9.4.2 attached?

All details & supporting documents


9.4.3.
as per 9.4.3 attached?

9.4.4. Acceptance to 9.4.4

9.4.5. Acceptance to 9.4.5

9.4.6. Acceptance to 9.4.6

9.4.7. Acceptance to 9.4.7

9.4.8. Acceptance to 9.4.8

Expression of Interest 72
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Chapt Compliance Supporting


Description Remark
er No (Yes/No) Document

9.5. Infrastructure Capabilities

List of major infrastructure as per


9.5.1.
9.5.1 attached?

9.5.2. Acceptance to 9.5.2

9.6. Financial Details

All details & supporting documents


9.6.1.
as per 9.6.1

9.7. Legal aspects

All details & supporting documents


9.7.1.
as per 9.7.1

9.8. Others

All details & supporting documents


9.8.1.
as per 9.8.1

All details & supporting documents


9.8.2.
as per 9.8.2

All details & supporting documents


9.8.3.
as per 9.8.3

Expression of Interest 73
SYSTEMS ASSEMBLY,
INTEGRATION & TESTING OF
ISRO SATELLITE CENTRE, STANDARD ISRO SATELLITES
BENGALURU THROUGH INDUSRTY

Chapt Compliance Supporting


Description Remark
er No (Yes/No) Document

All details & supporting documents


9.8.4.
as per 9.8.4

The vendor has to provide the information as per the formats prescribed in

chapter 9 Response format 9.1 to 9.8. The overall compliance matrix as per

section 9.9 should also be submitted as per of the EoI proposal. All the above

inputs may be furnished in MS word document neatly typed in the above said

formats.

Expression of Interest 74

Potrebbero piacerti anche