Coding
Unit Testing
SIT
UAT
Production
Code Migration: Project lead need to approve it or project lead might himself promote to further
databases
Defect Management or Defect Prevention: Monthly gathering of entire team. Discussion focusing on
mainly common or high impact defects ranges to one time or rare defects depending on time.
1. Analysis:
a. Analysis document
b. Sign off from user
2. Functional Design:
a. Functional specifications document (Func Spec)
b. Sign off from user
3. Technical Design:
a. Technical specification document (Tech Spec)
b. Sign off from user (If required)
4. Coding
a. Program placed in the appropriate library and/or project to be kept in ready state to
migrate
b. Coding Check list
5. Unit Testing
a. Test Case document or Test Plan document
b. Test Results
c. Self Review Check list
6. SIT
a. SIT test plan
b. SIT Test results
c. Sign off
7. UAT
a. UAT Test plan
b. UAT test results
c. Sign off
8. Production move
a. Check list for verification of the project or codes
b. Sign off