STRUCTURAL COMMENTS FOR THE JALAN BANI BU ALI HOSPITAL - ICU CCU
REVISED CALCULATIONS AND DRAWINGS
PLEASE INCLUDE IN THE FINALIZED STRUCTURAL DRAWINGS FOR FINAL APPROVAL AS PER THE
MINOR COMMENTS ON THE DRAWING SHEETS
Column at the intersection of Grids F and 1 in dwg S2001 , tagged as C6 , is not found in the
Schedule of Columns in Dwg S 2005. Kindly verify .
Flexible sheet between R.C. Wall and Column C3 was meant to be tagged from Foundation up to
Roof , and therefore needs to be mentioned in dwgs S 2001 , S 2002 , S 2003 and S 2004
Verify if Footing F8 is indeed not used in the Foundation Plan ( we recommend to tag it as NOT
USED in the Footing Schedule in dwg S 2005 )
As per our last meeting , the curtailed bottom reinforcement as tabulated in the Schedule of Roof
Beams ( Dwg S 2006 ) for Beam B6 stipulated still remains uncorrected in your submittal .
Please verify and correct if indeed required.
STAAD calculations for Plinth PB1 on STAAD p. 31 showed 1423.6 mm2 at supports corresponding
to 4Y25mm as Top Rebars on ONE LAYER .
However , in the Schedule of Plinth Beam in Dwg S 2006 , Plinth Beam PB1 only showed 3Y20 Top
Reinft. Overspan on ONE LAYER ( 940mm2 ONLY ) with 2Y16 ( 402 mm2) bars as Continues
Support bars.
We suggest for you to use 25mm bars for this Plinth Beam PB1 as per your calculations.
Kindly verify the adequacy the flexural reinforcements of Plinth Beam PB5 for the worst case ,
say along Grid H , between Grids 6 and 8 , along with ALL of its placements in the Plinth Framing.
We suggest for you to use 25mm bars for this beam also as per your calculations.
WE REMIND YOU TO DOUBLE CHECK YOUR FRAMING PLANS AGAINST YOUR SCHEDULES OF
DIMENSIONS & REINFORCEMENTS BEAM BY BEAM / COLUMN BY COLUMN , TO ENSURE THE
STRUCTURAL INTEGRITY OF YOUR DESIGN.
2. ITEM B : STRUCTURAL CALCULATIONS
NOTE :
The structural calculations is APPROVED with minor comments – approved on principle , that the
Consultant have complied with structural design and constructions parameters of Ministry of Health
Verify the Column Designation of the Column tagged as C1 ( column dimensions does not match
with drawings )
The following MINOR INCLUSIONS had already been complied with in your report
Grade of concrete to be C40 , not M40 ( we use British Standard ) - ok !
Please include in the Table of Load Combinations ( page 3 ) - the Load Combinations whicn
involves wind and seismic load cases , both for Service Limits State ( For Foundation ) and
Ultimate Limit state ( for Reinforced Concrete Design ) – ok !
Please include in your STAAD calculations , the output results for the following :
o Slab S3 ( which carries the chillers ) – ok !
o Plinth Beam PB1 – ok !
Prepared by :