Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
00m
3 lanes (10.95m)
Inner shoulder 1m
outer shoulder 1.5m
100 km/hr Pyramids higher institute
P.H.I For Engineering And Technology
75.00m
325.00m
140.00m
ay
nw
Ru
n
ai
M
ic
Bas
Tickets
Service
Tickets
Tickets
Service
Restaurant
Tickets
m
construction limits.
5.00
5.00
R2 0m
50
0.0
R26
R26
.00 5
m R2
2-The Designed speed is 120 km/hr
for free way and 100 km/hr for
Existing Roads and 60km/hr for
4 lanes (14.6m)
Inner shoulder 1m
parking road.
Loop A Loop B outer shoulder 2.5m
120 km/hr 3-All Curbs are Standard
553.67m
Barrier Curbs 12.5*30*15 cm3
90.00m 325.00m 140.00m 75.00m 4-All Cross slopes are 2% for
the Carriage way, Median 10:1
75.00m 140.00m
536.24m
325.00m 90.00m
Median 15m and outer shoulders
are 3%. KEY WORDS
Symbol Name
Loop C Loop D
RD ROAD
M Main
S Secondary
00m
R2
m
0.0
0 m 50
5.00
.00 LP Loop
.
5
5
R2 m
6
R26
R2
Ramp H CR Curve
Ramp G P Point
R Ring
DR/MOHAMMED IBRAHEM
ENG/MAHMOUD EL-HAWARY
Name: Date 9/7/2016
140.00m
20110116
75.00m
DRAWING TITLE:
Interchange plan
Drawing No.
90.00m
18 Scale 1:4250