Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
Th unitit consist
The i t off Effluent
Effl t treatment
t t t plant
l t off capacity it 100 KL/day
KL/d &
Sewage treatment plant of capacity 55 KL/day below the ground with
p
separate collection sumps p for ETP & STP for the service y yard of Metro
Railway. The collection sumps with Bar screens shall be a part of the
unit The ETP & STP shall be designed as a single unit with water
unit.
retaining structures in RCC with RCC top structure and MS epoxy
coated,
coated non-skid
non skid type removable manhole covers, covers including piping, piping
l
valves, h i l dosing
necessary chemical d i i d by
as required b theth manufacturer’s
f t ’
design. All the equipments, piping, pumps, blowers and electricals are as
p
per manufacturer’s design g & are to be housed in a common p plant room
for both ETP & STP also to be built below the ground level. Including
excavation in all kind of soil (hard rock) dewatering,
dewatering refilling,
refilling watering,
watering
ramming removing and disposal of the surplus excavated material as per
ramming,
i t ti
instructions b site
by it incharge.
i h All MS galvanised
l i d puddle
ddl flanges,
fl i l t
inlet.
outlet,
tl t overflow,
fl vents,
t covers, electronic
l t i type
t level
l l indicator
i di t in i allll water
t
tanks, drain channel with CI gratings & sump for housing pumps.
The ETP & STP shall be complete in RCC and consist of the following
units but not limited to these units as may be required by the
manufacturer’s
manufacturer s design to meet the requirement of treated ETP / Sewage
discharge
di h norms as per local
l l body
b d for
f final
fi l disposal
di l in
i the
th river.
i Including
I l di
all type of civil work and ventilators including excavation in all kind of soil
((including
g hard rock), ) dewatering, g refilling,
g ramming, g removing g and
disposal
p of the surplus
p excavated material as pper instructions byy site
incharge and making good the same complete as required.
required
Separate
p collection cum equalisation
q sumps
p for collecting
g the effluent &
a)
sewage separately in respective sumps(RCC).
b)) Aeration tank fitted with diffusers at the bottom for STP ((RCC).
)
Secondary clarifier having a feed pipe with a provision of scum removal
c) and launders with weir plate etc.etc with sludge recirculation arrangement
b air
by i lift pump (RCC).
(RCC)
Surge
Su ge tank
a o of capac
capacity
y 55 Kl/day
/day for
o SSTP for collecting
o co ec g the
e treated
ea ed water
ae
d)
(RCC).
(RCC)
PVC hypochlorite dosing tank(100 ltr. Cap), 01 no. with suitable capacity
e)
dosing
g pump,01
p p, no.
Sludge
Sl d h ldi
holding t k off capacity
tank it 5 kl each
h for
f collecting
ll ti th sludge
the l d
f)
generated
t d from
f the
th ETP & STP (RCC)
(RCC).
Flash mixer of suitable capacity for the mixing of effluent & dosing
METRO
g) LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) COMPANY LTD LTD.
chemicals ((RCC). )
Page
P 1
AM DGM
JGM
Tender Package No.-MEGA/CONS/DEPOT/E-W/1/2015 BOQ-PHE Works
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
Pi
Primary li tank
settling k for
f the
h ETP with
i h fixing
fi i arrangement off PVC media,
di
i) complete with scum removal & launders with weir plate etc. The tank
shall have sludge
g removal arrangement
g at the bottom (RCC).
( )
S
Supply off all required shop drawings by the contractor & approved by
p)
consultants.
STP and ETP as described above including all type of civil and MS
* SET 1 7096218.38 7096218
structural work complete as required
7.2 SUMP PUMPS FOR STP
Supplying, Installing,
Supplying Installing testing and commissioning of non-clog
non clog 35mm solid
handling
h dli typet fully
f ll submersible
b ibl pumps (1working
(1 ki + 1 standby)
t db ) in
i sump.
The pump shall be complete in S.S. S S including lifting
f arrangement for
f the
pumps including piping, valves on the discharge of pumps, level
controllers,
co o e s, probes,
p obes, cable,
cab e, etc.
e c including
c ud g connection
co ec o to o STP
S
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
RPM 90-120
: 90 120
* Type
T : Turbine
T bi SET 1 86890.56
86890 56 86891
75
7.5 BAR SCREENS FOR ETP & STP
Supply
S l off Bar
B screen 1 sett for
f ETP’s
ETP’ effluent
ffl t collection
ll ti sump and
d 1 sett
* SETS 4 15708.68
15708 68 62835
for STP’s collection sump. The screens shall be in SS.
Supplying Installing,
Supplying, Installing testing and commissioning of air diffusion system
shall
h ll include
i l d the
th following:
f ll i
3 nos twin type rotary air blower (two working & one standby) driven
th
through h V-belt
V b lt or directly
di tl coupledl d through
th h flexible
fl ibl coupling li t a TEFC
to
(totally enclosed fan coil) motor of suitable rating for 415 ±.10% volts, 3
a)
phase,, 50 cycles
p y AC supply
pp y with all accessories,, i.e.,, coupling,
p g, base
frame, NRVs (non return valve), safety valves etc. – 1 set. The blower
shall be operating through cyclic timers to enhance the life of blowers.
blowers
Non clog type air dispersion system capable of handling 4-5 cfm of air
with oxygen transfer efficiency of 3
3-4% depth. Air
4% per meter of water depth
c)) di i
dispersion id shall
grid h ll be
b assembled
bl d in
i the
th modular
d l form
f off MOC SS
(mode of construction stainless steel) so that they can be repaired
/replaced
p easilyy from the top.
p
7.8
78 DOSING SYSTEM FOR ETP
Supplying, Installing, testing and commissioning of Chemical dosing
system
y consisting
g of the following:
g
Dosing tanks of capacity 500 ltrs(2nos) & 100 ltrs.(1no) in HDPE (High
a
density polyethelyne)
polyethelyne).
Dosing pumps,
g p p , Pi-diaphragm
p g metering g type
yp suitable for handling
g lime,,
b
poly & Ferric with adjustable capacities, 06 nos.
* (02 nos.(1 working +1 standby) for handling each dosing chemical). SET 1 720606.70 720607
METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) COMPANY LTD
LTD.
Page
P 3
AM DGM
JGM
Tender Package No.-MEGA/CONS/DEPOT/E-W/1/2015 BOQ-PHE Works
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
7.9
79 DISSOLVE AIR FLOATATION SYSTEM FOR ETP
Supply, Installation,
Supply Installation testing & Commissioning of dissolved air flotation
unit in MS construction with epoxy coating.
coating The DAF (Dissolve air
floatation) shall have suitable feed pumps in SS.
SS
Dia.--
Dia 1500 mm
Supercell tank depth 600 mm
O
Overallll height
h i ht 1000 mm
* Capacity 8 kl/hr SET 1 799697.67 799698
7.10
7 10 FILTER FEED PUMPS FOR ETP
Providing
g and fixingg vertical online p
pumping
p g set(1
( workingg + 1 standby) y)
complete in SS with CI base to feed water to the filter. The pump shall
have TEFC (totally enclosed fan coil) induction motor mounted on a
common baseframe with coupling guard,150
guard 150 mm dia pressure gauge and
cock Motor to be suitable for 415 V + 10% V,
GM isolation cock. V 3 Phase,
Phase 50
cycles
l AC power supply. l Including
I l di allll necessary piping,
i i valves
l andd other
th
accessories till the Plant room. RCC foundation with plastering and MS
angle
g edgingg g with epoxy
p y p paint for the entire equipment
q p complete
p as
required.
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
Test p
pressure -- 5.2 Kg/Cm2
g
p
Capacityy 6000 Ltr/Hr SET 1 130281.08 130281
7 15
7.15 ACTIVATED CARBON FILTER FOR STP
Test pressure
p --- 5 Kg/Cm2
g
Capacity --- 6000 Ltrs/Hr SET 1 148075.89 148076
7.16
7 16 SLUDGE LIFTING PUMP FOR ETP
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
Supplying, installing,
Supplying installing testing and commissioning of Filter press Ratchet
Ratchet-
Type of suitable size with 02 nos
nos. screw pump (1 working + 1 standby)
standby),
valves electrical feeder & cabling.
pipelines & valves, cabling
Filter press size:18
size:18” x 18
18” x 16 nos plates in PP (poly propylene)
* Screw pump capacity: 3 CMH@ 5 Kg/Sqcm pressure SET 1 516727 73
516727.73 516728
7.18 DRAINAGE PUMPS
S l i
Supplying, I t lli
Installing, t ti and
testing d commissioning
i i i off non-clog
l 10mm
10 lid
solid
handling type fully submersible pumps (1 working + 1 standby) complete
in SS in p plant drainage g p pit to transfer the waste water into collection
sump. The pump shall be complete in S.S. including lifting arrangement
for the pumps including piping,
piping valves on the discharge of pumps,
pumps level
controllers probes,
controllers, probes cable,
cable etc.
etc including connection to STP
Providing,
g fixing,
g testing
g and commissioning g of air vessel Tank
made from 6 mm thick M.S. p plate of 450 mm dia & 2m height g with
dished ends of 8mm thick,thick supporting legs,
legs inlet & outlet flanged
7 19
7.19 connections pressure switches with valve to operate as per operating
connections, Nos 1 315045 73
315045.73 315046
sequences including 50 mm dia drain valve, valve air release valve with
stop
t cock k on the
th top
t duly
d l painted
i t d from
f inside
i id and d outside
t id complete
l t as
required.
7.20
7 20 ELECTRICAL CONTROL PANEL for ETP & STP.
Supplying, installing,
Supplying installing testing and commissioning of control panel all
weather
eather proof,
proof cubicle
c bicle ttype, mounted
pe floor mo equipments,
nted for all the eq ipments fitted
with
ith allll the
th necessary switch-gears
it h indicating
i di ti lights
li ht andd spares to
t run the
th
* system automatic/manual. Including level controller, wiring, cabling to the SET 1 41193.55 41194
various equipments
q p like blowers,, p
pumps,
p , and chlorination systems.
y The
control panel will have all the necessary electrical protection such as
thermal overload relaysrelays, single phase prevention and interlocking
interlocking.
A
Approval l from
f ll i
pollution controll board
b d including
i l di i
arranging raw sewage
for testingg and commissioning. g Contractor shall include the cost of
7.21 all chemicals ((consumed during g testing
g & commissioning)
g) and the cost L.S. 1 32987.56 32988
of such items of works which are not explicity mentioned above but are
mandatory to have pollution board approval.
approval
TOTAL OF SUB-SECTION-7
SUB SECTION 7 C/F TO SUMMARY 12162911
Note:
ETP and STP supplier may change the design to meet the project
requirement keeping the tender requirement unchanged and meeting
1))
with requirment of Pollution Control Board with the approval of Engineer
METRO LINK
I EXPRESS
In-Charge.
Ch FOR GANDHINAGAR AND AHMEDABAD (MEGA) COMPANY LTD LTD.
Page
P 6
AM DGM
JGM
Tender Package No.-MEGA/CONS/DEPOT/E-W/1/2015 BOQ-PHE Works
SL N
No DESCRIPTION OF ITEM UNIT QTY.
QTY ESTIMATED RATE(In
RATE(I Rs.)
R ) AMOUNT(In
AMOUNT(I Rs.)
R )
METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) COMPANY LTD
LTD.
Page
P 7
AM DGM
JGM