Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
10-10-95/110 Un
11.1.2 Other consultants' fees (default);
10-10-45/610 Desk study for ground investigation;
10-10-75/135 Ge
11.1.2 Other consultants' fees (default); 0.3.1 Temporary support to adjacent structures; 9.2.6 Control and
10-20-75/110 En11.1.1 Project team and design team consultants' fees (default);
70-70-40/130 Ins
7.2.1 Repairs to existing services (default);
40-10-06/105 An
0.6.3 Other extraordinary site investigation works (default);
10-10-75/105 Ar11.3.1 Main contractor's design consultants' fees; 11.1.2 Other consultants' fees (default); 9.2.6 Control and
10-10-75/106 Bi11.1.2 Other consultants' fees; 4.1.8 Bird and vermin control (default);
10-10-75/125 Ec11.1.2 Other consultants' fees (default); 9.2.6 Control and protection;
10-10-75/140 In11.1.2 Other consultants' fees (default); 9.2.6 Control and protection;
10-10-75/107 In11.1.2 Other consultants' fees; 4.1.8 Bird and vermin control (default);
10-10-75/185 To11.3.1 Main contractor's design consultants' fees; 11.1.2 Other consultants' fees (default); 9.2.6 Control and
10-20-30/120 De11.1.2 Other consultants' fees (default);
10-10-75/110 A11.1.3 Site investigation fees (default); 9.2.6 Control and protection;
10-20-30/110 Bu
11.1.2 Other consultants' fees (default); 0.3.1 Temporary support to adjacent structures;
10-20-30/130 Sp11.1.2 Other consultants' fees (default);
10-20-60/180 Str
11.1.1 Project team and design team consultants' fees (default);
10-70-90/105 Ti11.3.1 Main contractor's design consultants' fees; 11.1.2 Other consultants' fees (default);
10-10-45/135 Ge
11.1.3 Site investigation fees (default);
10-10-75/160 Pr11.1.3 Site investigation fees (default); 9.2.6 Control and protection;
70-70-40/120 Ins
5.8.1 Electrical mains and sub-mains distribution;
25-25-60/190 Ba8.4.4 Barriers and guardrails (default); 2.7.2 Balustrades and handrails; 2.5.5 Subsidiary walls, balustrades a
25-20-30/190 F8.4.1 Fencing and railings (default); 8.4.4 Barriers and guardrails;
20-85-45/190 Ma8.6.1 Surface water and foul water drainage; 2.2.3 Drainage to balconies; 8.2.1 Roads, paths and pavings (d
25-20-85/190 Ve8.4.1 Fencing and railings; 8.4.4 Barriers and guardrails (default);
20-15-05/190 As2.4.2 Stair/ramp finishes; 3.2.1 Finishes to floors; 2.3.2 Roof coverings; 8.2.1 Roads, paths and pavings (defa
20-15-05/195 As2.4.2 Stair/ramp finishes; 8.2.2 Special surfacings and pavings (default); 3.2.1 Finishes to floors; 2.3.2 Roof c
20-15-35/190 B7.6.2 Concrete repairs; 2.4.2 Stair/ramp finishes; 8.2.2 Special surfacings and pavings (default); 3.2.1 Finishe
20-15-50/190 M2.4.2 Stair/ramp finishes; 8.2.2 Special surfacings and pavings (default); 3.2.1 Finishes to floors; 2.3.2 Roof c
20-15-35/195 Sp2.4.2 Stair/ramp finishes; 8.2.2 Special surfacings and pavings (default); 3.2.1 Finishes to floors; 2.3.2 Roof c
20-15-85/195 Sp8.2.2 Special surfacings and pavings (default);
20-15-85/190 U8.2.1 Roads, paths and pavings (default);
20-15-90/190 Un2.4.2 Stair/ramp finishes; 2.3.2 Roof coverings; 8.2.1 Roads, paths and pavings (default);
40-40-45/105 Ins
2.3.2 Roof coverings (default);
and alteration works;
tructures; 9.2.6 Control and protection;
Roads, paths and pavings (default); 2.3.4 Roof drainage; 8.5.1 Site/street furniture and equipment;