Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
UNIVERSITY OF SASKATCHEWAN
College of Engineering
CE 470.3: Design in Structural Steel
________________________________________________________________
Lab. No. 2 –– Bolted Connections
Monsi Sekulovic, Kawsar Ahmed, Metro Hrabok 29 September 2010.
[n = 12 bolts] Figure 1:
applied Load through
50 c.g. of bolt group.
150
75
150
20 T cos 30o
30o
16
T sin 30o T
o
page 1 of 7
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
90 kN
(factored Load)
[Table 3-37]
Handbook
g1=80 L127x76x6.4 76.2
clip angles
35
100 170
35 page 6-51
Handbook
W360x51 7.2
127
W250x67
Figure 2
page 2 of 7
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
Solution:
a) bolts connecting long (5”) leg of L and beam web (ein-plane)
90 kN
W360x51 Beam
Vf must be Vr and Br
(i) Vr (bolt double shear)= standard clearance= 10mm
[Table 3-4] [Table 3-37] Handbook
(ii) Br (beam web) =
_______________________________________________
b) bolts connecting short (3”) leg of L and column flange (e faying surfaces at column)
(i) Vf /bolt =
(ii) Tf / bolt=
100
(iii) Vr /bolt (single shear) =
(iv) Tr /bolt =
- also check if Vf Br
page 3 of 7
(i) Br (connecting leg L)=
(ii) Br (column flange)=
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
c) check: shear and block shears in clip Ls <Fy = 0.300 kn/mm2, Fu =0.450 kn/mm2>
[use Clause 13.11 and Figure 2-24 for Ls and read pages 3-56 57 in the Handbook]
90 kN
6.35
90 kN
90 kN
6.35
6.35
page 4 of 7
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
e=250
50 A
80
80
B P
50
Figure 3a)
page 5 of 7
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
50 A
80
80
B P
50
Figure 3b)
page 6 of 7
THESE NOTES ARE SUBJECT
TO CHANGE WITHOUT NOTICE.
REPORT ERRORS AND OMISSIONS
CE470 (Sept 2010) Lab No. 2 – Bolted Connections (S16-09) TO: M.M. Hrabok (CE470 website).
Lx=500 mm
Pz=-90 kN
160 100
Py=+36 kN
Y
C D Px=+27 kN
160 100
E F
Figure 4