Sei sulla pagina 1di 212

BASIS AND CONSIDERATION

1 Contractor's profit
2 Overhead expenses
3 VAT
4 Foreman
5 Head mason
6 Mason
7 Skilled labour /Helper
8 Ordinary labour
9 Machine operator
10 Lime
11 Bamboo
12 Bailing-out water
13 Palisading
14 Bamboo driving
15 G.I. wire
16 Sal ballah
17 Nails and gazals etc
18 Wooden plank
19 Garjan size timber
20 40 grade rod
21 Bricks
22 Fine sand
23 1.2 F.M sand
24 2.5 Sylhet sand
25 Cement
26 Form work place & remove
27 Breaking brick chips
28 Bitumenous coating
29 Crushed stone chips
30 Roylty of earth
31 Truck fare: Dhaka city
32 Truckfare: Narayanganj
33 Truck fare: Ctg.
34 Truck fare: other area
35 Scaffolding
36 10 holes machine made ceramic brick
37 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks
38 9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face/textured
39 klinker facing bricks
40 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks
41 200 x 100 x 50 mm machine made hard pressed klinker facing bricks
42 200 x 50 x 50 mm machine made klinker facing strips
43 200 x 62 x 50 mm machine made klinker red strips
44 4'' x 4'' x 4'' design block
45 Colour pigment
46 6.5'' x 4.75'' x 4'' design block
47 6.5" x 6" x 4" design block
48 25 mm thick patent stone (1:2:4) with brick/chips for mosaic work
49 25 mm thick patent stone (1:1.5:3) with stone/chips for mosaic work
50 Mosaic chips: India
51 Mosaic chips: Pakistan
52 White cement
53 Minar stone
54 5 mm glass strip
55 Mosaic machine operator
56 Hire charge of mosaic cutting machine
57 Pumic stone
58 Labour cost of mosaic with glass strip
59 Labour cost of mosaic without glass strip
60 1/2" plaster on walls (1:4)
61 Marble dust / powder
Machine made pre-polished double layer terrazo tiles
62 (Conpac production): 10" x 10" size Silver mixed
63 Machine made pre-polished double layer terrazo tiles
64 (Conpac production): 10" x 10" size White special
65 Machine made pre-polished re-constituted homogeneous natural

aqa BASIS(1-40) - 1
66 marble slab: 13" x 13" size Italian Travertino.
67 Machine charge for cutting tiles
68 20 mm thick marble stone
69 18 mm thick marble stone
70 16 mm thick marble stone
71 12 mm thick marble stone
72 20 mm thick colored/ grey marble stone
73 Marble cutting & shaping machine in/c cutting disc.
74 Marble polishing machine in/c polishing stone
75 White wall tiles of dufferent sizes
76 Coloured wall tiles of different sizes
77 Special design coloured wall tiles
78 White floor tiles of dufferent sizes
79 Coloured floor tiles of different sizes
80 Special design coloured floor tiles
81 GP(Homogeneous) 305 x 305 mm floor tiles
82 GP(Homogeneous) 400 x 400 mm floor tiles
83 GP (Mirror polished) 300 x 300 mm floor tiles
84 GP (Mirror polished) 396 x 396 mm floor tiles
85 GP (Mirror polished) 300 x 600 mm floor tiles
86 GP 305 x 305 mm floor (stair) tiles
87 140 x 140 x 8.5 mm acid proof floor tiles
88 100 x 100 x 8.5 mm acid proof floor tiles
89 Quartz Homogeneous tiles
90 Embossed Homogeneous tiles
91 Special Quality Fibrous floor tiles
92 Water pump for concreting or similar purpose
93 Supplying & fixing Rupban or equivalent sheet and hessian tape (where
necessary) for making water-tight sufficiently

aqa BASIS(1-40) - 2
10.00%
3.00%
23.00%
Tk. 600.00 Each
Tk. 750.00 Each
Tk. 600.00 Each
Tk. 550.00 Each
Tk. 450.00 Each
Tk. 500.00 Each
Tk. 50.00 kg.
Tk. 6.00 rft.
Tk. 1,000.00 day
Tk. 17.08 sft.
Tk. 6.63 rft.
Tk. 110.00 kg.
Tk. 30.00 rft.
Tk. 40.00 kg.
Tk. 360.00 cft.
Tk. 710.00 cft.
Tk. 72,000.00 ton
Tk. 10,500.00 % 0 Nos.
Tk. 1,400.00 % cft.
Tk. 3,000.00 % cft.
Tk. 4,500.00 % cft.
Tk. 465.00 bag
Tk. 15.00 sft.
Tk. 750.00 % cft.
Tk. 150.00 % sft.
Tk. 14,000.00 % cft.
Tk. 250.00 % 0 cft.
Tk. 3,000.00 Trip
Tk. 450.00 Trip
Tk. 400.00 Trip
Tk. 375.00 Trip
Tk. 8.00 sft.
Tk. 7,000.00 % 0 Nos.
Tk. 6,380.00 % 0 Nos.

Tk. 7,670.00 % 0 Nos.


Tk. 7,100.00 % 0 Nos.
Tk. 7,630.00 % 0 Nos.
Tk. 4,973.00 % 0 Nos.
Tk. 12,783.00 % 0 Nos.
Tk. 9,520.00 % 0 Nos.
Tk. 30.00 Ibs.
Tk. 11,970.00 % 0 Nos.
Tk. 15,530.00 % 0 Nos.
Tk. 1,034.41 % sft.
Tk. 1,366.37 % sft.
Tk. 9.33 kg.
Tk. 9.00 kg.
Tk. 16.75 kg.
Tk. 200.00 Each
Tk. 3.00 rft.
Tk. 160.00 Each
Tk. 70.00 day
Tk. 140.00 Each
Tk. 1,482.50 % sft.
Tk. 1,295.00 % sft.
Tk. 6.95 sft.
Tk. 12.00 Per kg.

Tk. 42.79 Per sft.

Tk. 53.24 Per sft.

aqa BASIS(1-40) - 3
Tk. 101.00 Per sft.
Tk. 100.00 % sft.
Tk. 440.00 Per sft.
Tk. 400.00 Per sft.
Tk. 360.00 Per sft.
Tk. 310.00 Per sft.
Tk. 300.00 Per sft.
Tk. 1,025.00 Per day
Tk. 290.00 Per day
Tk. 36.00 Per sft.
Tk. 40.00 Per sft.
Tk. 42.00 Per sft.
Tk. 38.00 Per sft.
Tk. 42.00 Per sft.
Tk. 45.00 Per sft.
Tk. 48.00 Per sft.
Tk. 54.00 Per sft.
Tk. 88.00 Per sft.
Tk. 103.50 Per sft.
Tk. 115.00 Per sft.
Tk. 60.00 Per sft.
Tk. 90.00 Per sft.
Tk. 96.00 Per sft.
Tk. 50.00 Per sft.
Tk. 60.00 Per sft.
Tk. 75.00 Per sft.
Tk. 150.00 Per day

Tk. 1.00 Per sft.

aqa BASIS(1-40) - 4
RATE ANALYSIS
A. BUILDING WORKS

1. EARTH WORKS, MASS CONCRETE, DPC & PLINTH FILLING

ANALYSIS FOR ITEM NO. 1(a)


Earth work in foundation trenches up to 1.5 m depth and 60 m lead including protecting and
maintaining the trench.
Considering 1000 cft. work
1. Mason 0.5 No. @ Tk. 600.00
2. Ordinary labour 10 Nos. @ Tk. 450.00
3. Skilled labour 2.5 Nos. @ Tk. 550.00
4. For lay-out:
i) Head mason 0.25 No. @ Tk. 750.00
ii) Lime for marking 0.5 kg @ Tk. 50.00
iii) Bamboo for spikes 5 rft. @ Tk. 6.00
5. Tools and plant, sundries etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 321

ANALYSIS FOR ITEM NO. 1(b)


Extra rate for each additional 1 meter depth exceeding 1.5 meter
Considering 1000 cft. work
1. Mason 0.125 No. @ Tk. 600.00
2. Ordinary labour 3 Nos. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 70

ANALYSIS FOR ITEM NO. 1(c)


Extra rate for each 30 m additional lead beyond 60 m
Considering 1000 cft. work
1. Mason 0.125 No. @ Tk. 600.00
2. Ordinary labour 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 1
R
Ra

Say, Tk. 26

aqa (1-40) - 2
ANALYSIS FOR ITEM NO. 1(d)
Extra rate for earth work in excavation in foundation trenches, all around protected by palisading and
de-watering up to 1.5 m depth and 60 m lead. (condition and quantity of the soil must be supported by
sub-soil investigation report and approved by concerned S.E. before commencing the work)
Considering:
1 x 22'-0" x 12'-0" x 5'-0" = 1320 cft. of work
1. De-watering/bailing out water 1 day @ Tk. 1,000.00
2. Shore protection: Palisading (rate from item No. 173)
2 x 22'-0" x 5'-0"= 220.00 sft.
2 x 12'-0" x 5'-0"= 120.00 sft.
340.00 sft. @ Tk. 17.08
3. Bamboo for driving (rate from item No.172)
2 x 5 x 8'-0"= 80.00 rft.
2 x 1 x 8'-0"= 16.00 rft.
96.00 rft. @ Tk. 6.63
4. 1/8" G.I. wire for anchoring:
2 x 2 x 5 x 7'-0"= 140.00 rft.
2 x 2 x 1 x 7'-0"= 28.00 rft.
168.00 rft.
= 3.21 kg @ Tk. 110.00

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 290

aqa (1-40) - 3
ANALYSIS FOR ITEM NO. 1(e)
Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering
for depth exceeding 1.5 m (condition of the soil must be supported by sub-soil investigation report and
approved by concerned S.E. before commencing the work).
Considering: 1 x 22'-0" x 12'-0" x 8'-0" = 2112 cft. of work
1. Bailing out water 2 days @ Tk. 1,000.00
2. Shore protection: Palisading (rate from item No. 173)
2 x 22'-0" x 8'-0"= 352.00 sft.
2 x 12'-0" x 8'-0"= 192.00 sft.
544.00 sft. @ Tk. 17.08
3. Ballah driving for anchoring:
2 x 5 x 12'-0"= 120.00 rft.
2 x 1 x 12'-0"= 24.00 rft.
144.00 rft. @ Tk. 30.00
4. Ballah post for tieing:
2 x 5 x 5'-0"= 50.00 rft.
2 x 1 x 5'-0"= 10.00 rft.
60.00 rft. @ Tk. 30.00
5. 3/8" dia M.S. rod for anchoring ballah post:
2 x 5 x 5'-0"= 50.00 rft.
2 x 1 x 5'-0"= 10.00 rft.
60.00 rft.
= 22.56 Ibs @ Tk. 32.65
(a) Skilled labour 3.75 Nos. @ Tk. 550.00
(b) Head mason 1.875 Nos. @ Tk. 750.00
6. Wooden plank
2 x 11 x 4" x 2" x 8'-6"= 10.39 cft.
2 x 5 x 4" x 2" x 8'-6"= 4.72 cft.
= 15.1 cft.
Add wastage 5% 0.8 cft.
15.9 cft. @ Tk. 360.00
U
7. Ballah for runner
2 x 3 x 22'-0"= 132 rft.
2 x 3 x 12'-0"= 72 rft.
204 rft. @ Tk. 30.00
U
8. Nails, gazals etc. L.S. 18 kg @ Tk. 40.00

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 565

ANALYSIS FOR ITEM NO. 2(a)


One layer brick flat soling in foundation or in floor.
Considering 100 sft of work
1. Bricks 300 Nos. @ Tk. 10,500.00
2. Fine sand 5 cft. @ Tk. 1,400.00

aqa (1-40) - 4
3. Head mason 0.125 No. @ Tk. 750.00
4. Mason 0.25 No. @ Tk. 600.00
5. Skilled labour 1 No. @ Tk. 550.00
6. Local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 621

aqa (1-40) - 5
ANALYSIS FOR ITEM NO. 2(b)
One layer herrring bone bond soling in foundation or in floor.
Considering 100 sft of work
1. Bricks 500 Nos. @ Tk. 10,500.00
2. Fine sand 10 cft. @ Tk. 1,400.00
3. Head mason 0.125 No. @ Tk. 750.00
4. Mason 0.5 No. @ Tk. 600.00
5. Skilled labour 1 No. @ Tk. 550.00
6. Local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 981

ANALYSIS FOR ITEM NO. 2(c)


Brick on end edging
Considering 100 rft of work
1. Bricks 250 Nos. @ Tk. 10,500.00
2. Fine sand 2 cft. @ Tk. 1,400.00
3. Head mason 0.125 No. @ Tk. 750.00
4. Mason 0.25 No. @ Tk. 600.00
5. Skilled labour 0.75 No. @ Tk. 550.00
6. Local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 157

ANALYSIS FOR ITEM NO. 3(a)


(i) Mass concrete in foundation (1:3:6) with brick chips & 100% local sand of F.M. 1.2
Considering 100 cft. of work
1. Bricks for 90 cft chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 45 cft. @ Tk. 3,000.00
3. Cement 12 bags @ Tk. 465.00
4. Breaking chips in/c screening 90 cft. @ Tk. 750.00
5. Labour for casting:
i) Head mason 0.25 No. @ Tk. 750.00
ii) Mason 0.75 No. @ Tk. 600.00
iii) Skilled labour 2 Nos. @ Tk. 550.00
iv) Ordinary labour 2 Nos. @ Tk. 450.00
6. Curing
7. Mixture machine, pump, local carriage, sundries, T & P etc.
8. Extra cost of wood for side shutter: for 100 cft
2 x 60'-0" x 4" x 1"= 3.33 cft.
2 x 5'-0" x 4" x 1"= 0.28 cft.
10 x 6" x 2" x 1" = 0.07 cft.
3.68 cft.
Add 5% wastage 0.18 cft.
3.86 cft. @ Tk. 360.00
U

aqa (1-40) - 6
9. Labour for side shutter
2 x 40'-0" x 6" = 40.00 sft.
2 x 5' - 0" x 6" = 5.00 sft.
45.00 sft. @ Tk. 7.50

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 7
R
Ra

Say, Tk. 9,724

(ii) Mass concrete in floor (1:3:6) with brick chips & 100% local sand of F.M. 1.2
Considering 100 cft. of work
1. Bricks for 90 cft chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 45 cft. @ Tk. 3,000.00
3. Cement 12 bags @ Tk. 465.00
4. Breaking chips in/c screening 90 cft. @ Tk. 750.00
5. Labour for casting:
i) Head mason 0.25 No. @ Tk. 750.00
ii) Mason 0.75 No. @ Tk. 600.00
iii) Skilled labour 2 Nos. @ Tk. 550.00
iv) Ordinary labour 2 Nos. @ Tk. 450.00
6. Curing
7. Mixture machine, pump, local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 9,445

ANALYSIS FOR ITEM NO. 3(b)


(i) Mass concrete in foundation (1:2:4) with brick chips & 100% local sand of F.M. 1.2
Considering 100 cft. of work
1. Bricks for 90 cft chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 45 cft. @ Tk. 3,000.00
3. Cement 18 bags @ Tk. 465.00
4. Breaking chips in/c screening 90 cft. @ Tk. 750.00
5. Labour for casting:
i) Head mason 0.25 No. @ Tk. 750.00
ii) Mason 0.75 No. @ Tk. 600.00
iii) Skilled labour 2 Nos. @ Tk. 550.00
iv) Ordinary labour 2 Nos. @ Tk. 450.00
6. Curing
7. Mixture machine, pump, local carriage, sundries, T & P etc.
8. Extra cost of wood for side shutter: for 100 cft
2 x 60'-0" x 4" x 1"= 3.33 cft.
2 x 5'-0" x 4" x 1"= 0.28 cft.
10 x 6" x 2" x 1" = 0.07 cft.
3.68 cft.
Add 5% wastage 0.18 cft.
3.86 cft. @ Tk. 360.00
U
9. Labour for side shutter
2 x 40'-0" x 6" = 40.00 sft.
2 x 5'-0" x 6" = 5.00 sft.
45.00 sft. @ Tk. 7.50

aqa (1-40) - 8
Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 11,094

aqa (1-40) - 9
(ii) Mass concrete in floor (1:2:4) with brick chips & 100% local sand of F.M. 1.2
Considering 100 cft. of work
1. Bricks for 90 cft chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 45 cft. @ Tk. 3,000.00
3. Cement 18 bags @ Tk. 465.00
4. Breaking chips in/c screening 90 cft. @ Tk. 750.00
5. Labour for casting:
i) Head mason 0.25 No. @ Tk. 750.00
ii) Mason 0.75 No. @ Tk. 600.00
iii) Skilled labour 2 Nos. @ Tk. 550.00
iv) Ordinary labour 2 Nos. @ Tk. 450.00
6. Curing
7. Mixture machine, pump, local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 10,815

ANALYSIS FOR ITEM NO. 4(a)


75 mm or 3" thick damp proof course (1:1.5:3) with 50% Sylhet sand (F.M. 2.5) & 50%
local sand (F.M. 1.2) and brick chips
Considering 100 cft. of work (covering 400 sft. area)
1. Cost for concrete:
i) Bricks for chips 706 Nos. @ Tk. 10,500.00
ii) Sand (F.M. 2.5) 20.75 cft. @ Tk. 4,500.00
iii) Sand (F.M 1.2) 20.75 cft. @ Tk. 3,000.00
iv) Cement 22 bags @ Tk. 465.00
v) Breaking chips in/c screening 83 cft. @ Tk. 750.00
vi) Curing
vii) Mixture machine, pump, local carriage, sundries, T & P etc.

Cos
2. Labour for casting 100 sft.
i) Head mason 0.50 No. @ Tk. 750.00
ii) Mason 1 No. @ Tk. 600.00
iii) Ordinary labour 3 Nos. @ Tk. 450.00
iv) Bitumenous coating 100 sft. @ Tk. 150.00
3. Cost of wood for side shutter (considering 10" width & 120 rft long wall):
2 x 120'-0" x 3" x 1"= 5.00 cft.
25 x 1'-3" x 1.5" x 1"= 0.33 cft.
2 x 25 x 1'-0" x 2" x 1"= 1.39 cft.
6.72 cft.
Add 5% wastage 0.34 cft.
= 7.06 cft. @ Tk. 360.00
U
4. Labour for side shutter:
2 x 120'-0" x 3" = 60.00 sft. @ Tk. 15.00

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 10
R
Ra

Say, Tk. 1,346

ANALYSIS FOR ITEM NO. 4(b)


75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips
Considering 100 cft. of work (covering 400 sft. area)
1. Cost for concrete:
i) Crushed stone chips 83 cft. @ Tk. 14,000.00
ii) Sand (F.M. 2.5) 41.5 cft. @ Tk. 4,500.00
iii) Cement 22 bags @ Tk. 465.00
iv) Curing.
vii) Mixture machine, pump, local carriage, sundries, T & P etc.

Cos
2. Labour for casting 100 sft.
i) Head mason 0.50 No. @ Tk. 750.00
ii) Mason 1 No. @ Tk. 600.00
iii) Ordinary labour 3 Nos. @ Tk. 450.00
iv) Bitumenous coating 100 sft. @ Tk. 150.00
3. Cost of wood for side shutter (considering 10" width & 120 rft long wall):
2 x 120'-0" x 3" x 1"= 5.00 cft.
25 x 1'-3" x 2" x 1"= 0.43 cft.
2 x 25 x 1'-0" x 2" x 1"= 1.39 cft.
6.82 cft.
Add 5% wastage 0.34 cft.
= 7.16 cft. @ Tk. 360.00
U
4. Labour for side shutter:
2 x 120'-0" x 3" = 60.00 sft. @ Tk. 15.00

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,492

ANALYSIS FOR ITEM NO. 5(a)


Sand filling in foundation and plinth with local sand (F.M. 0.80)
Considering 100 cft. of work
1. Sand (F.M. 0.8) considering
30% for compaction 130 cft. @ Tk. 1,400.00
2. Head mason 1/8 No. @ Tk. 750.00
3. Labour for levelling,
compacting, watering etc. 2/3 No. @ Tk. 450.00
4. Sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,109

ANALYSIS FOR ITEM NO. 5(b)


Sand filling in foundation and plinth with local sand (F.M. 1.2)
Considering 100 cft. of work
1. Sand (F.M. 1.2) considering
30% for compaction 130 cft. @ Tk. 3,000.00

aqa (1-40) - 11
2. Head mason 1/8 No. @ Tk. 750.00
3. Labour for levelling,
compacting, watering etc. 2/3 No. @ Tk. 450.00
4. Sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 2,129

ANALYSIS FOR ITEM NO. 5(c)


Sand filling in foundation and plinth with local sand (F.M. 2.5)
Considering 100 cft. of work
1. Sand (F.M. 2.5) considering
30% for compaction 130 cft. @ Tk. 4,500.00
2. Head mason 1/8 No. @ Tk. 750.00
3. Labour for levelling, compacting etc.
watering etc. 2/3 No. @ Tk. 450.00
4. Sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 3,087

ANALYSIS FOR ITEM NO. 5(d)


Khoa consolidation in foundation trenches or floor: brick-chips and sand (F.M. 1.2) (2:1)
Considering 100 cft. of work (loose volume 135 cft)
1. Picked jhama or 1st class
bricks for 90 cft. khoa 765 Nos. @ Tk. 10,500.00
2. Breaking 19 to 12 mm chips 90 cft. @ Tk. 750.00
3. Sand (F.M. 1.2) 45 cft. @ Tk. 3,000.00
4. Labour for mixing, spreading, levelling, compacting, watering etc.
(a) Head mason 1/4 No. @ Tk. 750.00
(b) Mason 3/4 No. @ Tk. 600.00
(c) Skilled labour 2 Nos. @ Tk. 550.00
(d) Ordinary labour 2 Nos. @ Tk. 450.00
5. local carriage, T & P, sundries etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 6,342

ANALYSIS FOR ITEM NO. 6


Earth filling in foundation trenches and plinth (earth available at site)
Considering 1000 cft. of work
1. Labour for filling
including local carriage 12 Nos. @ Tk. 450.00
2. Head mason for supervision 1/8 No. @ Tk. 750.00
3. Skilled labour for dressing
& consolidation 2 Nos. @ Tk. 550.00

aqa (1-40) - 12
4. Sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 340

2. SITE IMPROVEMENT

Site improvement/earth filling with carted earth carried by truck or any other means
Considering 1000 cft. of work in/c consolidation, dressing and local carriage
a) For Dhaka Metropolitan Area
Loose earth required in/c 15% shrinkage = 1,150.00
1. Royalty for earth 1150 cft. @ Tk. 250.00
2. Labour for cutting in/c loading & unloading the truck/cart
a) Ordinary labour 7 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
3. Truck hire charge 7 Trucks @ Tk. 3,000.00
4. Labour for local carriage, levelling & compacting etc. complete:
a) Ordinary labour 6 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
5. Sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,397

ANALYSIS FOR ITEM NO. 7(b)


Site improvement/earth filling with carted earth carried by truck or any other means
Considering 1000 cft. of work in/c consolidation, dressing and local carriage
b) For Narayanganj Area
Loose earth required in/c 15% shrinkage = 1,150.00
1. Royalty for earth 1150 cft. @ Tk. 250.00
2. Labour for cutting in/c loading & unloading the truck/cart
a) Ordinary labour 7 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
3. Truck hire charge 7 Trucks @ Tk. 450.00
4. Labour for local carriage, levelling & compacting etc. complete:
a) Ordinary labour 6 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
5. Sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 521

ANALYSIS FOR ITEM NO. 7(c)


Site improvement/earth filling with carted earth carried by truck or any other means
Considering 1000 cft. of work in/c consolidation, dressing and local carriage

aqa (1-40) - 13
c) For Chittagong metropolitan area
Loose earth required in/c 15% shrinkage = 1,150.00
1. Royalty for earth 1150 cft. @ Tk. 250.00
2. Labour for cutting in/c loading & unloading the truck/cart
a) Ordinary labour 7 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
3. Truck hire charge 7 Trucks @ Tk. 400.00
4. Labour for local carriage, levelling & compacting etc. complete:
a) Ordinary labour 6 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
5. Sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 504

ANALYSIS FOR ITEM NO. 7(d)


Site improvement/earth filling with carted earth carried by truck or any other means
Considering 1000 cft. of work in/c consolidation, dressing and local carriage
d) For other than Dhaka, N'ganj, Ctg. metropolitan area
Loose earth required in/c 15% shrinkage = 1,150.00
1. Royalty for earth 1150 cft. @ Tk. 250.00
2. Labour for cutting in/c loading & unloading the truck/cart
a) Ordinary labour 7 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
3. Truck hire charge 7 Trucks @ Tk. 375.00
4. Labour for local carriage, levelling & compacting etc. complete:
a) Ordinary labour 6 Nos. @ Tk. 450.00
b) Skilled labour 1 No. @ Tk. 550.00
5. Sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

aqa (1-40) - 14
VAT

R
Ra

Say, Tk. 495

3. BRICK WORK & FANCY SCREEN BRICK WORK

ANALYSIS FOR ITEM NO. 8


Brick work with first class bricks in foundation (1:6)
Considering 100 cft. work
1. Bricks 1100 Nos. @ Tk. 10,500.00
2. Sand (F.M 1.2) in/c wastage 36 cft. @ Tk. 3,000.00
3. Cement 4 bags @ Tk. 465.00
4. Head mason 0.10 No. @ Tk. 750.00
5. Mason 1 No. @ Tk. 600.00
6. Skilled labour 1 No. @ Tk. 550.00
7. Ordinary labour 1.5 Nos. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 2 Nos. @ Tk. 450.00
9. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
10. Local carriage, sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 8,984

ANALYSIS FOR ITEM NO. 9


Brick work with first class bricks in superstructure (1:6)
Considering 100 cft. of work
1. Materials and labour as per item No. 8
2. Scaffolding 25 sft. @ Tk. 8.00
3. Extra labour for carriage 1 No. @ Tk. 450.00
4. Extra labour for curing 1/2 No. @ Tk. 450.00
5. Screening & washing sand etc. 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 9,634

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

aqa (1-40) - 15
ANALYSIS FOR ITEM NO. 10
Brickwork with 1st class bricks in superstructure (1:4)
Considering 100 cft. of work
1. Bricks 1100 Nos. @ Tk. 10,500.00
2. Sand (F.M 1.2) in/c wastage 40 cft. @ Tk. 3,000.00
3. Cement 6 bags @ Tk. 465.00
4. Head mason 0.10 No. @ Tk. 750.00
5. Mason 1 No. @ Tk. 600.00
6. Skilled labour 1 No. @ Tk. 550.00
7. Ordinary labour 2.5 Nos. @ Tk. 450.00
8. Labour for soaking
& cleaning bricks 2 Nos. @ Tk. 450.00
9. Screening and washing sand 1 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 10,039

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

ANALYSIS FOR ITEM NO. 11


Exposed brick work in exterior wall in superstructure (1:4)
Considering 100 cft. of work
1. Bricks 1100 Nos. @ Tk. 10,500.00
Extra cost for special quality 1st class bricks
in/c sorting out the bricks @ 20%
2. Sand (F.M. 1.2) in/c wastage 40 cft. @ Tk. 3,000.00
3. Cement in/c pointing 6.5 bags @ Tk. 465.00
4. Head mason 1/2 No. @ Tk. 750.00
5. Mason 1.5 Nos. @ Tk. 600.00
6. Skilled labour 1.5 Nos. @ Tk. 550.00
7. Ordinary labour 2 Nos. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 2 Nos. @ Tk. 450.00
9. Labour for screening &
washing sand 1 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

aqa (1-40) - 16
Say, Tk. 11,606

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

aqa (1-40) - 17
ANALYSIS FOR ITEM NO. 12(a)
Brick work with 10 holes machine made bricks (1:4)
Considering 100 cft. work
1. Bricks 1100 Nos. @ Tk. 7,000.00
2. Sand (F.M 1.2) in/c wastage 40 cft. @ Tk. 3,000.00
3. Cement 6.5 bags @ Tk. 465.00
4. Head mason 0.50 No. @ Tk. 750.00
5. Mason 1.5 No. @ Tk. 600.00
6. Skilled labour 1.5 No. @ Tk. 550.00
7. Ordinary labour 2 Nos. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 2 Nos. @ Tk. 450.00
9. Labour for screening and
washing sand 1.00 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 8,582

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

ANALYSIS FOR ITEM NO. 12(b)


Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4)
Considering 100 cft. work
1. Bricks 1100 Nos. @ Tk. 6,380.00
2. Sand (F.M 1.2) in/c wastage 40.0 cft. @ Tk. 3,000.00
3. Cement 6.5 bags @ Tk. 465.00
4. Head mason 0.25 No. @ Tk. 750.00
5. Mason 2.0 No. @ Tk. 600.00
6. Skilled labour 1.5 No. @ Tk. 550.00
7. Ordinary labour 2.0 Nos. @ Tk. 450.00
8. Labour for soaking
& cleaning bricks 1.0 Nos. @ Tk. 450.00
9. Labour for screening and
washing sand 1/2 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 7,972

aqa (1-40) - 18
(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

aqa (1-40) - 19
ANALYSIS FOR ITEM NO. 12(c)
Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made rock-face/textured klinker
facing bricks (1:4)
Considering 100 cft. work
1. Bricks 1100 Nos. @ Tk. 7,670.00
2. Sand (F.M 1.2) in/c wastage 40 cft. @ Tk. 3,000.00
3. Cement 6.5 bags @ Tk. 465.00
4. Head mason 0.25 No. @ Tk. 750.00
5. Mason 2 No. @ Tk. 600.00
6. Skilled labour 1.5 No. @ Tk. 550.00
7. Ordinary labour 2.0 Nos. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
9. Screening and washing sand 1/ 2 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, sundries, T & P etc. L.S.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 8,668

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

ANALYSIS FOR ITEM NO. 12(d)


Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4)
Considering 100 cft. work
1. Bricks 1100 Nos. @ Tk. 7,100.00
Sand (F.M 2.5) in/c wastage 24 cft. @ Tk. 4,500.00
2. Sand (F.M 1.2) in/c wastage 40 cft. @ Tk. 3,000.00
3. Cement 6.5 bags @ Tk. 465.00
4. Head mason 0.25 No. @ Tk. 750.00
5. Mason 2 No. @ Tk. 600.00
6. Skilled labour 1.5 No. @ Tk. 550.00
7. Ordinary labour 2 Nos. @ Tk. 450.00
8. Labour for soaking
& cleaning bricks 1 Nos. @ Tk. 450.00
9. Screening and washing sand 1/2 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 labour per day: 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, sundries, T & P etc.

Contractor's profit
Overhead expenses

VAT

(a) Ground floor R


Ra

Say, Tk. 8,891

(b) Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c charges
(c) Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % cft.) in/c charges
(d) Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.) in/c charges

aqa (1-40) - 20
ANALYSIS FOR ITEM NO. 13
Extra rate (for per meter increase of height) over the rate of item No. 9, 10, 11 & 12 where free
height of the structure exceeds 4 meter.
Considering 100 cft. of work
1. Extra head mason 0.05 No. @ Tk. 750.00
2. Extra mason 0.2 No. @ Tk. 600.00
3. Extra skilled labour 0.1 No. @ Tk. 550.00
4. Extra ordinary labour 0.3 No. @ Tk. 450.00
5. Extra for scaffolding 12.5 sft. @ Tk. 8.00
6. Extra for local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 242

ANALYSIS FOR ITEM NO. 14(a)


Facing brick work with 200 x 100 x 50 mm machine made hard pressed klinker facing bricks (1:4)
with out side pointing.
Considering 100 sft. of work
1. 200 x 100 x 50 mm facing bricks (facing 200 x 100 mm)
in/c 5% wastage 452 Nos. @ Tk. 7,630.00
2. Sand (F.M. 1.2) in/c wastage 12 cft. @ Tk. 3,000.00
3. Cement in/c for pointing 2.26 bags @ Tk. 465.00
4. Head mason 1 No. No. Tk. 750.00
5. Mason 2.25 Nos. @ Tk. 600.00
6. Skilled labour 1.5 Nos. @ Tk. 550.00
7. Ordinary labour 1.5 Nos. @ Tk. 450.00
8. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
9. Scaffolding 25 sft. @ Tk. 8.00
10. Washing of sand, local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,447

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 14(b)


Facing brick work with 200 x 50 x 50 mm machine made klinker facing strips (1:4) with outside pointing.
Considering 100 sft. of work
1. 200 x 50 x 50 mm facing bricks (facing 200 x 50 mm)
in/c 5% wastage 856 Nos. @ Tk. 4,973.00
2. Sand (F.M. 1.2) in/c wastage 14 cft. @ Tk. 3,000.00
3. Cement in/c for pointing 2.75 bags @ Tk. 465.00
4. Head mason 1 No. No. Tk. 750.00
5. Mason 2 1/3 Nos. @ Tk. 600.00
6. Skilled labour 1.5 Nos. @ Tk. 550.00
7. Ordinary labour 1.5 Nos. @ Tk. 450.00
8. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
9. Scaffolding 25 sft. @ Tk. 8.00
10. Washing of sand, local carriage, storage & sundries etc.

aqa (1-40) - 21
Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,652

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

aqa (1-40) - 22
ANALYSIS FOR ITEM NO. 14(c)
Facing brick work with 200 x 62 x 50 mm machine made klinker red strips (1:4) with out side pointing.
Considering 100 sft. of work
1. 200 x 62 x 50 mm machine made klinker
facing red strips (facing 200 x 62 mm)
in/c 5% wastage 704 Nos. @ Tk. 12,783.00
2. Sand (F.M. 1.2) in/c wastage 14 cft. @ Tk. 3,000.00
3. Cement in/c for pointing 2.75 bags @ Tk. 465.00
4. Head mason 1 No. No. Tk. 750.00
5. Mason 2 Nos. @ Tk. 600.00
6. Skilled labour 1.5 Nos. @ Tk. 550.00
7. Ordinary labour 1.5 Nos. @ Tk. 450.00
8. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
9. Scaffolding 25 sft. @ Tk. 8.00
10. Washing of sand, local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 2,332

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 15(a)


125 mm brick work with first class bricks (1:6) in superstructure
Considering 100 sft. work
1. Bricks 480 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 18 cft. @ Tk. 3,000.00
3. Cement 1.75 bags @ Tk. 465.00
4. Head mason 0.1 No. @ Tk. 750.00
5. Mason 3/4 No. @ Tk. 600.00
6. Skilled labour 1/2 No. @ Tk. 550.00
7. Ordinary labour 1/2 No. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
9. Labour for screening &
washing sand 1/2 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,392

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

aqa (1-40) - 23
ANALYSIS FOR ITEM NO. 15(b)
125 mm brick work with first class bricks (1:4) in superstructure
Considering 100 sft. work
1. Bricks 480 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 17 cft. @ Tk. 3,000.00
3. Cement 2.6 bags @ Tk. 465.00
4. Head mason 0.1 No. @ Tk. 750.00
5. Mason 3/4 No. @ Tk. 600.00
6. Skilled labour 1/2 No. @ Tk. 550.00
7. Ordinary labour 1/2 No. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
9. Labour for screening &
washing sand 1/4 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,430

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 15(c)


125 mm brick work with 10 hole machine made ceramic bricks (1:4) in superstructure
Considering 100 sft. work
1. Bricks 480 Nos. @ Tk. 7,000.00
2. Sand (F.M. 1.2) 18 cft. @ Tk. 3,000.00
3. Cement 2.8 bags @ Tk. 465.00
4. Head mason 0.1 No. @ Tk. 750.00
5. Mason 1 No. @ Tk. 600.00
6. Skilled labour 1/2 No. @ Tk. 550.00
7. Ordinary labour 1 No. @ Tk. 450.00
8. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
9. Labour for screening &
washing sand 1/4 No. @ Tk. 450.00
10. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
11. Scaffolding 25 sft. @ Tk. 8.00
12. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 24
R

(i) Ground floor R


Ra

Say, Tk. 1,253

aqa (1-40) - 25
(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 16(a)


Fancy screen work in wall with 4'' x 4'' x 4'' design block in all floors (1:3).
Considering 100 sft. of work
A. Cost of materials
1. 4" x 4" x 4" design
block in/c wastage 990 Nos. @ Tk. 9,520.00
2. Sand (F.M. 1.2) 3.75 cft. @ Tk. 3,000.00
3. Cement 1 bag @ Tk. 465.00
4. Colour pigment 1 Ib @ Tk. 30.00
B. Cost of labour
1. Head mason 1 No. @ Tk. 750.00
2. Mason 2.25 Nos. @ Tk. 600.00
3. Skilled labour 2.5 Nos. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
5. Labour for soaking &
cleaning blocks. 1 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
7. Scaffolding 25 sft. @ Tk. 8.00
8. Washing of sand, local carriage & storage etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 2,337

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 16(b)


Fancy screen work in wall with 6.5'' x 4.75'' x 4'' design block in all floors (1:3) facing 6.5" x 4"
Considering 100 sft. of work
A. Cost of materials
1. 6.5" x 4.75" x 4" design
block in/c wastage 525 Nos. @ Tk. 11,970.00
2. Sand (F.M. 1.2) 3.75 cft. @ Tk. 3,000.00
3. Cement 1 bag @ Tk. 465.00
4. Colour pigment 1 Ib @ Tk. 30.00
B. Cost of labour
1. Head mason 1 No. @ Tk. 750.00
2. Mason 2 Nos. @ Tk. 600.00
3. Skilled labour 2 Nos. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
5. Labour for soaking & .
cleaning blocks 0.50 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
7. Scaffolding 25 sft. @ Tk. 8.00
8. Washing of sand, local carriage & storage etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R

aqa (1-40) - 26
R

Say, Tk. 1,770

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 16(c)


Fancy Screen work with 6'' x 6'' x 4'' design block in all floors (1:3)
Considering 100 sft. of work
A. Cost of materials
1. 6.5" x 6" x 4" design
block in/c wastage 440 Nos. @ Tk. 15,530.00
2. Sand (F.M. 1.2) 3.75 cft. @ Tk. 3,000.00
3. Cement 1 bag @ Tk. 465.00
4. Colour pigment 1 Ib @ Tk. 30.00
B. Cost of labour
1. Head mason 1 No. @ Tk. 750.00
2. Mason 2 Nos. @ Tk. 600.00
3. Skilled labour 2 Nos. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
5. Labour for soaking &
cleaning blocks. 0.50 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 No. labour per day 1.75 Nos. @ Tk. 450.00
7. Scaffolding 25 sft. @ Tk. 8.00
8. Washing of sand, local carriage & storage etc.

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,852

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 17(a)


50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks (1:4)
Considering 100 sft. of work
A. Cost of materials
1. 200 x 100 x 50 mm klinker paving
bricks (facing 200 x 50 mm)
in/c 5% wastage 856 Nos. @ Tk. 7,630.00
2. Sand (F.M. 1.2) 16 cft. @ Tk. 3,000.00
3. Cement (in/c for flush pointing) 3.25 bags @ Tk. 465.00
B. Cost of labour
1. Head mason 1/4 No. @ Tk. 750.00
2. Mason 1.5 Nos. @ Tk. 600.00
3. Skilled labour 3 Nos. @ Tk. 550.00
4. Ordinary labour 1.5 Nos. @ Tk. 450.00
5. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
7. Local carriage & storage, sundries etc.

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 27
R
Ra

Say, Tk. 2,004

ANALYSIS FOR ITEM NO. 17(b)


100 mm thick brick on edge pavement with 200 x 100 x 50 mm klinker paving bricks (1:4)
Considering 100 sft. of work
A. Cost of materials
1. 200 x 100 x 50 mm klinker paving
bricks (facing 200 x 100 mm)
in/c 5% wastage 452 Nos. @ Tk. 7,630.00
2. Sand (F.M. 1.2) 13 cft. @ Tk. 3,000.00
3. Cement (in/c for flush pointing) 2.5 bags @ Tk. 465.00
B. Cost of labour
1. Head mason 1/4 No. @ Tk. 750.00
2. Mason 1 No. @ Tk. 600.00
3. Skilled labour 2.5 Nos. @ Tk. 550.00
4. Ordinary labour 1.5 Nos. @ Tk. 450.00
5. Labour for soaking &
cleaning bricks 0.50 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
7. Local carriage & storage, sundries etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,358

ANALYSIS FOR ITEM NO. 17(c)


50 mm thick flat brick pavement with 200 x 50 x 50 mm klinker paving bricks (1:4)
facing 200 mm x 50 mm
Considering 100 sft. of work
A. Cost of materials
1. 200 x 50 x 50 mm klinker paving
bricks (facing 200 x 50 mm)
in/c 5% wastage 856 Nos. @ Tk. 4,973.00
2. Sand (F.M. 1.2) 10 cft. @ Tk. 3,000.00
3. Cement (in/c for flush pointing) 2.5 bags @ Tk. 465.00
B. Cost of labour
1. Head mason 1/4 No. @ Tk. 750.00
2. Mason 1.25 Nos. @ Tk. 600.00
3. Skilled labour 2.5 Nos. @ Tk. 550.00
4. Ordinary labour 1.5 Nos. @ Tk. 450.00
5. Labour for soaking &
cleaning bricks 1 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
7. Local carriage & storage, sundries etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,521

aqa (1-40) - 28
ANALYSIS FOR ITEM NO. 18(a)
115 mm thick brick pavement with 1st class bricks (1:4)
Considering 100 sft. work
A. Cost of materials
1. 1st class bricks in/c wastage 480 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 15 cft. @ Tk. 3,000.00
3. Cement (in/c for flush pointing) 3 bags @ Tk. 465.00
B. Cost of labour
1. Head mason 1/4 No. @ Tk. 750.00
2. Mason 1.25 Nos. @ Tk. 600.00
3. Skilled labour 2.25 Nos. @ Tk. 550.00
4. Ordinary labour 1.5 Nos. @ Tk. 450.00
5. Labour for soaking &
cleaning bricks 1/2 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
7. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,642

ANALYSIS FOR ITEM NO. 18(b)


115mm thick brick pavement with 10 holes ceramic bricks (1:4)
Considering 100 sft. of work
A. Cost of materials
1. 10 holes ceramic bricks 480 Nos. @ Tk. 7,000.00
2. Sand (F.M. 1.2) 15 cft. @ Tk. 3,000.00
3. Cement (in/c for flush pointing) 3.25 bags @ Tk. 465.00
B. Cost of labour
1. Head mason 1/4 No. @ Tk. 750.00
2. Mason 1.25 Nos. @ Tk. 600.00
3. Skilled labour 2.25 Nos. @ Tk. 550.00
4. Ordinary labour 1.5 Nos. @ Tk. 450.00
5. Labour for soaking &
cleaning bricks 1/2 No. @ Tk. 450.00
6. Labour for 7 days curing
@ 1/4 labour per day 1.75 Nos. @ Tk. 450.00
7. Local carriage, storage & sundries etc.

Contractor's profit
Overhead expenses

VAT

R
Ra

Say, Tk. 1,408

4. FLOORING AND FLOOR FINISH

ANALYSIS FOR ITEM NO. 19


3" thick cement concrete (C.C.) in floor (1:3:6)
Considering 100 sft. of work
From item No. 3(a) cost of concrete =
1. For 3" thick 100 sft of work
2. Add extra for floor casting: Mason 1 No. @ Tk. 600.00

Contractor's profit
Overhead expenses

aqa (1-40) - 29
VAT

Ra

Say, Tk. 831

ANALYSIS FOR ITEM NO. 20(a)


25 mm thick artificial patent stone flooring (1:2:4) with brick chips

Considering 100 cft. of work covering 1200 sft. area


1. Bricks @ 8.5 Nos. per cft. chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 18 bags @ Tk. 465.00
5. Breaking chips in/c screening 90 cft. @ Tk. 750.00
6. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
7. Local carriage, sundries, T & P and washing of sand etc.

For 100
8. Extra cement for finishing 1/2 bag @ Tk. 465.00
9. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1" x 3/4" = 0.21 cft.
Add 5% wastage 0.01 cft.
0.22 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1" = 3.33 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 530

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 20(b)


38 mm thick artificial patent stone flooring (1:2:4) with brick chips
Considering 100 cft. of work covering 800 sft. area
1. Bricks @ 8.5 Nos. per cft. chips 765 Nos. @ Tk. 10,500.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 18 bags @ Tk. 465.00
5. Breaking brick chips
in/c screening 90 cft. @ Tk. 750.00
6. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
7. Local carriage, sundries, T & P and washing of sand etc.

For 100
8. Extra cement for finishing 1/2 bag @ Tk. 465.00
9. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00

aqa (1-40) - 30
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft.
Add 5% wastage 0.02 cft.
0.33 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1.5" = 5 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 658

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 20(c)


25 mm thick artificial patent stone flooring (1:2:4) with 1/2" down graded stone chips
Considering 100 cft. of work covering 1200 sft. area
1. Crushed stone chips 90 cft. @ Tk. 14,000.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 18 bags @ Tk. 465.00
5. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
6. Local carriage, sundries, T & P and washing of sand etc.

For 100
7. Extra cement for finishing 1/2 bag @ Tk. 465.00
8. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1" x 3/4" = 0.21 cft.
Add 5% wastage 0.01 cft.
0.22 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1" = 3.33 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 578

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 20(d)


38 mm thick artificial patent stone flooring (1:2:4) with 1/2" down graded stone chips

aqa (1-40) - 31
Considering 100 cft. of work covering 800 sft. area
1. Crushed stone chips 90 cft. @ Tk. 14,000.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 18 bags @ Tk. 465.00
5. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
6. Local carriage, sundries, T & P and washing of sand etc.

For 100
7. Extra cement for finishing 1/2 bag @ Tk. 465.00
8. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft.
Add 5% wastage 0.02 cft.
0.33 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1.5" = 5 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 731

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 20(e)


25 mm thick artificial patent stone flooring (1 : 1.5 : 3) with 1/2" down graded stone chips
Considering 100 cft. of work covering 1200 sft. area
1. Crushed stone chips 90 cft. @ Tk. 14,000.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 22 bags @ Tk. 465.00
5. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
6. Local carriage, sundries, T & P and washing of sand etc.

For 100
7. Extra cement for finishing 1/2 bag @ Tk. 465.00
8. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1" x 3/4" = 0.21 cft.
Add 5% wastage 0.01 cft.
0.22 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1" = 3.33 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

aqa (1-40) - 32
VAT

(i) Ground floor R


Ra

Say, Tk. 602

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 20(f)


38 mm thick artificial patent stone flooring (1: 1.5 : 3) with 1/2" down graded stone chips

Considering 100 cft. of work covering 800 sft. area


1. Crushed stone chips 90 cft. @ Tk. 14,000.00
2. Sand (F.M. 1.2) 22.5 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 22.5 cft. @ Tk. 4,500.00
4. Cement 22 bags @ Tk. 465.00
5. Labour for 7 days curing
@ 1/4 labour per day. 1.75 Nos. @ Tk. 450.00
6. Local carriage, sundries, T & P and washing of sand etc.

For 100
7. Extra cement for finishing 1/2 bag @ Tk. 465.00
8. Labour cost:
i) Head mason 1/5 No. @ Tk. 750.00
ii) Mason 3/4 No. @ Tk. 600.00
iii) Skilled labour 1 No. @ Tk. 550.00
iv) Ordinary labour 1 No. @ Tk. 450.00
10. Extra cost of Garjan batten for side shutter
2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft.
Add 5% wastage 0.02 cft.
0.33 cft. @ Tk. 710.00
Using 10 times @ Tk. 71.00
11. Labour for shuttering
2 x 4 x 5'-0" x 1.5" = 5 sft. @ Tk. 2.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 765

(ii) Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c charges
(iii) Add for each addl. Floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) in/c charges
(iv) Add for each addl floor for 10th floor and above (@ 1.25 Nos. lab per % sft.) in/c charges

5. MOSAIC WORK

ANALYSIS FOR ITEM NO. 21(a)-I


10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone
with BRICK-CHIPS: (white cement : grey cement = 9 : 1)

Considering 100 sft. of work


A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag @ Tk. 465.00
3. Mosaic chips (Indian: Deradun) 125 kg @ Tk. 9.33
4. Minar stone @ 300 sft/stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of

aqa (1-40) - 33
1/2 bag cement for neat finish
& 1/4 No. mason 100 sft. @ Tk. 1,034.41

B. Cost of labour
For mixing, laying, compacting & curing:
1. Head mason 3/4 No. @ Tk. 750.00
2. Skilled labour 3/4 No. @ Tk. 550.00
3. Ordinary labour 1 No. @ Tk. 450.00
For glass strip laying:
1. Mason 3/4 No. @ Tk. 600.00
2. Ordinary labour 3/4 No. @ Tk. 450.00
Hire charge of mosaic cutting machine in/c operation:
1. Hire charge in/c meter
setting and electricity cost. 1 day @ Tk. 70.00
2. Machine operator 1 No. @ Tk. 160.00
3. Helper/Skilled labour 1 No. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
5. Pumic stone 3 Nos. @ Tk. 140.00
For spreading oxalic acid and washing:
1. Ordinary labour 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,309

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(a)-II


10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone
(1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone (from item No. 21(a)-I)
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,376

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(b)-I


10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone
with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag. @ Tk. 465.00
3 Pakistani onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00

aqa (1-40) - 34
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for
neat finish and 1/4 No. mason 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as 21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 897

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(b)-II


10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent
stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 21(b)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 947

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(c)-I


10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick
patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag. @ Tk. 465.00
3. Indian Deradun mosaic chips 125 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for
neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
For mixing, laying, compacting and curing:
1. Head mason 3/4 No. @ Tk. 750.00
2. Skilled labour 3/4 No. @ Tk. 550.00
3. Ordinary labour 1 No. @ Tk. 450.00
Hire charge of mosaic cutting machine and operation:
1. Hire charge in/c meter setting 1 day @ Tk. 70.00
2. Machine operator 1 No. @ Tk. 160.00
3. Helper/Skilled labour 1 No. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
5. Pumic stone 3 Nos. @ Tk. 140.00
Pumic stone oxalic acid and washing:

aqa (1-40) - 35
Ordinary labour 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,155

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(c)-II


10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick
patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 21(c)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,205

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 21(d)-I


10 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick
patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag. @ Tk. 465.00
3. Pakistani Onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for
neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(c) -I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 815

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 36
ANALYSIS FOR ITEM NO. 21(d)-II
10 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick
patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 21(d)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 865

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(a)-I


12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent
stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 126 kg @ Tk. 16.75
2. Grey cement 0.28 bag. @ Tk. 465.00
3. Indian Deradun mosaic chips 140 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement
for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 971

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(a)-II


12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick
patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)

Considering 100 sft. of work


A. Cost of mosaic excluding cost of patent stone (from item No. 22 (a)-I)
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and and 1/4 No. mason: Item No. 20 (e)

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 37
(i) Ground floor R
Ra

Say, Tk. 1,021

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(b)-I


12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick
Considering 100 sft. of work
A. Cost of materials
1. White cement 126 kg @ Tk. 16.75
2. Grey cement 0.28 bag. @ Tk. 465.00
3 Pakistani onix mosaic chips 140 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for
neat finish and 1/4 No. mason 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as 21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 964

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(b)-II


12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick
patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 22(b)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


Ra

Say, Tk. 1,014

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(c)-I


12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick
patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 126 kg @ Tk. 16.75
2. Grey cement 0.28 bag. @ Tk. 465.00

aqa (1-40) - 38
3. Indian Deradun mosaic chips 140 kg @ Tk. 9.33
4. Minar Stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41
B. Cost of labour
same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 889

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(c)-II


12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick
patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 22(c)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 939

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(d)-I


12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm
thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 126 kg @ Tk. 16.75
2. Grey cement 0.28 bag. @ Tk. 465.00
3. Pakistani onix mosaic chips 140 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 882

aqa (1-40) - 39
(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 22(d)-II


12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm
thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 22(d)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 932

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(a)-I


10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm
thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft of work
A. Cost of materials:
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. India Deradun mosaic chips 125 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for
neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 858

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(a)-II


10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c
25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 23(a)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

aqa (1-40) - 40
VAT

(i) Ground floor R


R

Say, Tk. 908

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(b)-I


10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. Pakistani Onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour:
same as item No.21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 852

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM No 23(b)-II


10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. work
A. Cost of mosaic excluding cost of patent stone: from item No. 23(b)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 902

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(c)-I


10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)

aqa (1-40) - 41
Considering 100 sft. of work
A. Cost of materials:
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. India Deradun mosaic chips 125 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 777

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(c)-II


10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 23 (c)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20 (e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 826

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(d)-I


10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. Pakistani Onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 42
(i) Ground floor R
R

Say, Tk. 770

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 23(d)-II


10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 23(d)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 820

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(a)-I


12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 70 kg @ Tk. 16.75
2. Grey cement 1.4 bag @ Tk. 465.00
3. Indian Deradun mosaic chips 140 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 909

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(a)-II


12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 24(a)-I

aqa (1-40) - 43
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 958

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(b)-I

12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 70 kg @ Tk. 16.75
2. Grey cement 1.4 bags @ Tk. 465.00
3. Pakistan Onix mosaic chips 140 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00
6. Cost of patent stone excluding cost of cement for neat
finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 22(a)-I 100 sft. @ Tk. 1,482.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 902

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(b)-II


12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 24(b)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 951

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges

aqa (1-40) - 44
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(c)-I


12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 70 kg @ Tk. 16.75
2. Grey cement 1.4 bag @ Tk. 465.00
3. Indian Deradun mosaic chips 140 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement
for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour
same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 827

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(c)-II


12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of mosaic excluding cost of patent stone: from item No. 24(c)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 876

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(d)-I


12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1)
Considering 100 sft. of work
A. Cost of materials:
1. White cement 70 kg @ Tk. 16.75
2. Grey cement 1.4 bag @ Tk. 465.00
3. Pakistani Onix mosaic chips 140 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. Cost of patent stone excluding cost of cement
for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

B. Cost of labour

aqa (1-40) - 45
same as item No. 22(c)-I 100 sft. @ Tk. 1,295.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 820

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 24(d)-II


12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1)

Considering 100 sft. of work


A. Cost of mosaic excluding cost of patent stone: from item No. 24(d)-I
B. Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of
cement for neat finish and 1/4 No. mason: Item No. 20(e)

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 869

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 25(a)


10 mm thick (finished) mosaic on wall with Indian chips: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag @ Tk. 465.00
3. Indian Deradun mosaic chips 125 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. 1/2" thick plaster (1:4) 100 sft. @ Tk. 6.95

B. Cost of labour
For mixing, laying, compacting and curing:
1. Head mason 1 No. @ Tk. 750.00
2. Skilled labour 3/4 No. @ Tk. 550.00
3. Ordinary labour 1 No. @ Tk. 450.00
Labour charge for cutting mosaic mosaic wall surface with mumic stone:
1. Skilled labour 10 Nos. @ Tk. 550.00
2. Pumic stone 2.5 Nos. @ Tk. 140.00
For spreading oxalic acid and washing:
1. Ordinary labour 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R

aqa (1-40) - 46
R

Say, Tk. 1,761

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 25(b)


10 mm thick (finished) mosaic on wall with Pakistani chips: (white cement : grey cement = 9 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 109 kg @ Tk. 16.75
2. Grey cement 0.22 bag @ Tk. 465.00
3. Pakistan Onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. 1/2" thick plaster (1:4) 100 sft. @ Tk. 6.95

B. Cost of labour
same as item No. 25(a) 100 sft. @ Tk. 7,912.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,755

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 26(a)


10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1 : 1)
Considering 100 sft. of work
A. Cost of materials
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. Indian Deradun mosaic chips 125 kg @ Tk. 9.33
4. Minar stone 1/3 No. @ Tk. 200.00
5. 1/2" thick plaster (1:4) 100 sft. @ Tk. 6.95

B. Cost of labour
For mixing, laying, compacting & curing:
1. Head mason 1 No. @ Tk. 750.00
2. Skilled labour 3/4 No. @ Tk. 550.00
3. Ordinary labour 1 No. @ Tk. 450.00
Labour for cutting mosaic wall surface with mumic stone:
1. Skilled labour 10 Nos. @ Tk. 550.00
2. Pumic stone 2.5 Nos. @ Tk. 140.00
For spreading oxalic acid and washing:
1. Ordinary labour 1 No. @ Tk. 450.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,716

aqa (1-40) - 47
(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 26(b)


10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 1 : 1)

Considering 100 sft. of work


A. Cost of materials:
1. White cement 62.5 kg @ Tk. 16.75
2. Grey cement 1.25 bag @ Tk. 465.00
3. Pakistani Onix mosaic chips 125 kg @ Tk. 9.00
4. Minar stone 1/3 No. @ Tk. 200.00
5. 1/2" thick plaster (1:4) 100 sft. @ Tk. 6.95

B. Cost of labour
same as item No. 26(a) 100 sft. @ Tk. 7,912.50

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,710

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(a)-I


10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(a)-I 100 sft. @ Tk. 8,867.88
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,363

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(a)-II


10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(a)-II 100 sft. @ Tk. 9,199.84
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

aqa (1-40) - 48
(i) Ground floor R
R

Say, Tk. 1,412

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(b)-I


10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(b)-I 100 sft. @ Tk. 5,996.63
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 933

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(b)-II


10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(b)-II 100 sft. @ Tk. 6,328.59
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 983

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(c)-I


10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(c)-I 100 sft. @ Tk. 7,720.38
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R

aqa (1-40) - 49
R

Say, Tk. 1,191

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(c)-II


10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work 100 sft of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(c)-II 100 sft. @ Tk. 8,052.34
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,241

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(d)-I


10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(d)-I 100 sft. @ Tk. 5,449.13
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 851

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 27(d)-II


10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 21(d)-II 100 sft. @ Tk. 5,781.09
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

aqa (1-40) - 50
Say, Tk. 901

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(a)-I


12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. work
A. Cost of materials, labour in/c T & P:
same as item No. 22(a)-I 100 sft. @ Tk. 6,490.48
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,007

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(a)-II


12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(a)-II 100 sft. @ Tk. 6,822.44
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,057

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(b)-I


12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(b)-I 100 sft. @ Tk. 6,444.28
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

aqa (1-40) - 51
Say, Tk. 1,000

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(b)-II


12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip
in/c 25 mm thick patent stone (1: 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(b)-II 100 sft. @ Tk. 6,776.24
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,050

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(c)-I


12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(c)-I 100 sft. @ Tk. 5,942.98
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 925

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(c)-II


12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5: 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(c)-II 100 sft. @ Tk. 6,274.94
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 975

aqa (1-40) - 52
(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(d)-I


12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone with BRICK-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(d)-I 100 sft. @ Tk. 5,896.78
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 918

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 28(d)-II


12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip
in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 22(d)-II 100 sft. @ Tk. 6,228.74
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 968

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 29(a)


10 mm thick (finished) coloured mosaic on wall with Indian chips
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 25(a) 100 sft. @ Tk. 11,768.47
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,797

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges

aqa (1-40) - 53
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 29(b)


10mm thick (finished) coloured mosaic on wall with Pakistani chips
Considering 100 sft. of work
A. Cost of materials, labour in/c T & P:
same as item No. 25(b) 100 sft. @ Tk. 11,727.22
B. Add for colour pigment 8 Ibs @ Tk. 30.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,790

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 30(a)


200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Indian chips
Considering 100 sft. of work
A. Cost of materials
a) Sand-cement mortar base (3:1):
1. Grey cement for mortar & slury 4.25 bags @ Tk. 465.00
2. Sand (F.M.1.2) 7 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 7 cft. @ Tk. 4,500.00
b) Bottom of the tiles: sand - cement (2:1):
1. Grey cement 1.33 bags @ Tk. 465.00
2. Sand (F.M. 1.2) 1.67 cft. @ Tk. 3,000.00
3. Sand (F.M. 2.5) 1.67 cft. @ Tk. 4,500.00
c) Top of the tiles:
1. White cement 112.5 kg @ Tk. 16.75
2. Grey cement 0.25 bags @ Tk. 465.00
3. Indian Deradun mosaic chips 125 kg @ Tk. 9.33

B. Labour charges and others


a) Charges for mosaic tiles making:
1. Hire charges & setting
up machine 1 day @ Tk. 70.00
2. Machine operator 3/4 No. @ Tk. 500.00
3. Foreman 1/4 No. @ Tk. 600.00
b) Labour for laying tiles:
1. Mosaic head mistry 1/2 No. @ Tk. 750.00
2. Mosaic mistry 1/2 No. @ Tk. 600.00
3. Ordinary labour 1/2 No. @ Tk. 450.00
c) Labour for curing:
1. Ordinary labour after making 1 No. @ Tk. 450.00
2. Ordinary labour after laying 1/4 No. @ Tk. 450.00
d) Mosaic cutting machine:
1. Hire charge of machine 1 No. @ Tk. 70.00
2. Machine operator 1 No. @ Tk. 500.00
3. Helper/skilled operator 1 No. @ Tk. 550.00
4. Ordinary labour 1 No. @ Tk. 450.00
e) Pumic stone 3 Nos. @ Tk. 140.00
f) Minar stone 1/3 No. @ Tk. 200.00
g) Labour for spreading acid & washing etc.:
1. Skilled labour 1/2 No. @ Tk. 550.00

Contractor's profit
Overhead expenses

aqa (1-40) - 54
VAT

(i) Ground floor R


R

Say, Tk. 1,594

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 30(b)


200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Pakistani chips.
Considering 100 sft. of work
1. Cost of materials& labour:
same as item No. 30 (a) 100 sft. @ Tk. 10,651.00
2. Less cost of Indian (deradun)
mosaic chips -120 kg @ Tk. 9.33
3. Add cost of Pakistani (Onix)
mosaic chips 120 kg @ Tk. 9.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,588

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 30(c)


Machine made pre-polished double layer terraazo tiles: 10" x 10" silver mixed.
Considering 100 sft. of work
1. Cost of 10" x 10" size silver mixed
double layer terrazo tiles 100 sft. @ Tk. 42.79
2. Material cost for laying on 25 mm thick sand-cement mortar (1:4)
a) Cement 2 bag. @ Tk. 465.00
b) Sand (F.M. 1.2) 10 cft. @ Tk. 3,000.00
c) White cement 1.8 kg @ Tk. 16.75
d) Marble dust / powder 1.8 kg @ Tk. 12.00
3 Labour for laying
a) Head mason 1 No. @ Tk. 750.00
b) Mason 3 Nos. @ Tk. 600.00
c) Ordinary labour 5 Nos. @ Tk. 450.00
d) Local carriage, storage and sundries etc.
4. Machine charge for cutting tiles 100 sft. @ Tk. 100.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,599

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 55
ANALYSIS FOR ITEM NO. 30(d)
Machine made pre-polished double layer terraazo tiles: 10" x 10" White special
Considering 100 sft. of work
1. Cost of terrazo tiles work excluding cost of terrazo
tiles: same as item No. 31(a)
2. Cost of 10" x 10" size white
special double layer terrazo tiles 100 sft. @ Tk. 53.24

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 1,755

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

6. GLAZED TILES AND MARBLE STONE WORK

ANALYSIS FOR ITEM NO. 31(a)


Marble stone flooring with 20 mm thick De Carrara / Ariston / Venus marble stone (Italy)
Considering 100 ( 10'-0" x 10'-0") sft. of work
A. Cost of materials
1. 20 mm thick marble stone 100 sft. @ Tk. 440.00
2. White cement 4 kg @ Tk. 16.75
3. Grey cement for sand cement
mortar base & slury 3.64 bag @ Tk. 465.00
4. Sand (F.M. 1.2) 4.16 cft. @ Tk. 3,000.00
5. Sand (F.M. 2.5) 4.16 cft. @ Tk. 4,500.00

B. Cost for cutting, shaping, tools and plants etc.


1. Hire charge of cutting and shaping
machine in/c cutting disc. 1 day @ Tk. 1,025.00
2. Foreman 1 No. @ Tk. 600.00
3. Machine operator 1 No. @ Tk. 500.00
4. Helper 1 No. @ Tk. 550.00

C. Labour cost for laying


1. Mason 5.5 Nos. @ Tk. 600.00
2. Helper 2.0 Nos. @ Tk. 550.00

D. Polishing
1. Hire charge of marble polishing
machine in/c polishing stone 2.5 days @ Tk. 290.00
2. Operator 2.5 Nos. @ Tk. 500.00
3. Helper 2.5 Nos. @ Tk. 550.00

Total (
Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 9,275

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 56
ANALYSIS FOR ITEM NO. 31(b)
Marble stone flooring with 18 mm thick De Carrara / Ariston / Venus marble stone (Italy)
Considering 100 ( 10'-0" x 10'-0") sft. of work
A. Cost of marble works: same as item No. 31(a)
Less cost of 20 mm thick marble stone

B. 18 mm thick marble stone 100 sft. @ Tk. 400.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 8,677

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 31(c)


Machine made pre-polished re-constituted homogeneous natural marble slab: 13" x 13" size
Italian Travertino.
Considering 100 sft. of work
1. Cost of 13" x 13" size machine made pre-polished
Travertino marble slab: Italian 100 sft. @ Tk. 101.00
2. Material cost for laying on 25 mm thick sand-cement mortar (1:4)
a) Cement 2 bag. @ Tk. 465.00
b) Sand (F.M. 1.2) 10 cft. @ Tk. 3,000.00
c) White cement 1.8 kg @ Tk. 16.75
d) Marble dust / powder 1.8 kg @ Tk. 12.00
3. Labour for laying
a) Head mason 1 No. @ Tk. 750.00
b) Mason 3 Nos. @ Tk. 600.00
c) Ordinary labour 5 Nos. @ Tk. 450.00
d) Local carriage, storage and sundries etc.
4. Machine charge for cutting tiles 100 sft. @ Tk. 100.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 2,470

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 32


Marble stone flooring with 16 mm thick De Carrara / Ariston / Venus marble stone (Italy)
Considering 100 sft. of work
A. Cost of marble works excluding cost of marble stone: from item 31(b)
B. 16 mm thick marble stone 100 sft. @ Tk. 360.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

aqa (1-40) - 57
Say, Tk. 8,078

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 33


Marble stone on walls with 12 mm thick De Carrara / Ariston / Venus stone (Italy)
Considering 100 sft. of work
A. Cost of materials
1. 12 mm thick marble stone 100 sft. @ Tk. 310.00
2. Grey cement 1.7 bag @ Tk. 465.00
3. Sand (F.M. 1.2) 2.08 cft. @ Tk. 3,000.00
4. Sand (F.M. 2.5) 2.08 cft. @ Tk. 4,500.00
5. White cement 4 kg @ Tk. 16.75

B. Cost for cutting, shaping, tools and plants etc.


1. Hire charge of cutting and shaping
machine in/c cutting disc. 1 day @ Tk. 1,025.00
2. Foreman 1 No. @ Tk. 600.00
3. Machine operator 1 No. @ Tk. 500.00
4. Helper 1 No. @ Tk. 550.00

C. Labour cost for laying


1. Mason 5.5 Nos. @ Tk. 600.00
2. Helper 2 Nos. @ Tk. 550.00
3. Scaffolding 100 sft. @ Tk. 8.00

D. Polishing
1. Hire charge of marble polishing
machine in/c polishing stone 2.5 days @ Tk. 290.00
2. Machine operator 2.5 Nos. @ Tk. 500.00
3. Helper 2.5 Nos. @ Tk. 550.00

Total (
Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 7,531

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 34


Marble stone FLOORING with 20 mm thick grey / coloured marble stone (India / Pakistan)

Considering 100 sft. of work


A. Cost of marble works excluding cost of marble stone: from item 31(b)
B. 20 mm thick coloured
marble stone 100 sft. @ Tk. 300.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 7,181

aqa (1-40) - 58
(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 35


Marble stone on WALL with 20 mm thick grey / coloured marble stone (India / Pakistan)
Considering 100 sft. of work
A. Cost of marble works on walls: same as item No. 33
Less cost of m

B. Add cost of 20 mm thick


colored marble stone 100 sft. @ Tk. 300.00

Contractor's profit
Overhead expenses

VAT

(i) Ground floor R


R

Say, Tk. 7,382

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 36


Supplying, fitting and fixing glazed WALL tiles on cement mortar base (3:1):
Laying cost on walls excluding cost of glazed tiles.
Considering 100 sft. of work
A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1):
1 Cement 1.87 bags @ Tk. 465.00
2. Sand (F.M. 1.2) 7.03 cft. @ Tk. 3,000.00
3. White cement 3.60 kg @ Tk. 16.75
B. Labour cost:
1. Head mason 2.00 Nos. @ Tk. 750.00
2. Mason 2.00 Nos. @ Tk. 600.00
3. Skilled labour 3.00 Nos. @ Tk. 550.00
4. Ordinary labour 3.00 Nos. @ Tk. 450.00
5. local carriage, sundries, T & P & washing of sand etc.

Laying cos
(i) Ground floor
(a) White glazed tiles of different sizes
Considering 100 sft. of work
1. Cost of tiles 100 sft. @ Tk. 36.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,290.75

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,656


(b) Coloured galazed wall tiles of different sizes
Considering 100 sft. of work
1. Cost of tiles 100 sft. @ Tk. 40.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,290.75

Contractor's profit

aqa (1-40) - 59
Overhead expenses

VAT

R
R

Say, Tk. 1,719


(c) Special design glazed coloured wall tiles
Considering 100 sft. of work
1. Cost of tiles 100 sft. @ Tk. 42.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,290.75

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,751

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 37


Supplying, fitting and fixing glazed FLOOR tiles on cement mortar base (2:1):
Laying cost on FLOOR excluding cost of glazed tiles.
Considering 100 sft. of work
A. Cost of materialsfor base with 3/4'' (av) thick cement mortar (2:1):
1. Cement 2.50 bags @ Tk. 465.00
2. Sand (F.M. 1.2) 6.25 cft. @ Tk. 3,000.00
3. White cement 3.60 kg @ Tk. 16.75
B. Labour Cost :
1. Head mason 2 Nos. @ Tk. 750.00
2. Mason 2 Nos. @ Tk. 600.00
3. Skilled labour 3 Nos. @ Tk. 550.00
4. Ordinary labour 3 Nos. @ Tk. 450.00
5. Local carriage, sundries, T & P etc.

Cos
(i) Ground floor
a) White glazed floor tiles of different sizes
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 38.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,728


b) Coloured glazed floor tiles of different sizes
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 42.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit

aqa (1-40) - 60
Overhead expenses

VAT

R
R

Say, Tk. 1,791


c) Special design coloured glazed floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 45.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,838

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 38 - I


Supplying, fitting and fixing unglazed homogeneous floor tiles on cement mortar base (2:1):
Cost for laying floor tiles: same as item No. 37
(i) For ground floor
a) GP (homogeneous) 305 x 305 mm floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 48.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,885


b) GP (homogeneous) 400 x 400 mm floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 54.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 1,979

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 61
ANALYSIS FOR ITEM NO. 38 - II
Supplying, fitting and fixing mirror polished floor tiles on cement mortar base (2:1):

Cost for laying floor tiles: same as item No. 37

(i) For ground floor


a) GP (mirror polished) 300 x 300 mm floor tiles
Considering 100 sft. work

1. Cost of tiles 100 sft. @ Tk. 88.00


Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 2,514


b) GP (mirror polished) 396 x 396 mm floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 103.50
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 2,757


c) GP (mirror polished) 300 x 600 mm floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 115.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 2,938


d) GP 305 x 305 mm floor (stair) tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 60.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

aqa (1-40) - 62
Say, Tk. 2,074

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 38 - III


Supplying, fitting and fixing acid-proof floor tiles on cement mortar base (2:1):
Cost for laying floor tiles: same as item No. 37
(i) For Ground floor
a) 140 x 140 x 8.5 mm acid proof floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 90.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 2,545


b) 100 x 100 x 8.5 mm acid proof floor tiles
Considering 100 sft. work
1. Cost of tiles 100 sft. @ Tk. 96.00
Add wastage
2. Laying cost 100 sft. @ Tk. 7,560.30

Contractor's profit
Overhead expenses

VAT

R
R

Say, Tk. 2,639

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 63
ANALYSIS FOR ITEM NO. 39(a)
(a) Supplying, fitting and fixing homogeneous quartz floor tiles on cement mortar base (3:1):
Considering 100 sft. of work
A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1):
1 Cement 1.87 bags @ Tk. 465.00
2. Sand (F.M. 1.2) 7.03 cft. @ Tk. 3,000.00
3. White cement 3.60 kg @ Tk. 16.75
B. Labour cost:
1. Head mason 2.00 Nos. @ Tk. 750.00
2. Mason 2.00 Nos. @ Tk. 600.00
3. Skilled labour 3.00 Nos. @ Tk. 550.00
4. Ordinary labour 3.00 Nos. @ Tk. 450.00
5. Local carriage, sundries, T & P & washing of sand etc.

C. Cost of tiles 100.00 sft. @ Tk. 50.00


Add wastage

Contractor's profit
Overhead expenses

VAT

R
R

(i) For Ground floor Say, Tk. 1,876

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

(b) Supplying, fitting and fixing homogeneous embossed floor tiles on cement mortar base (3:1):
Considering 100 sft work
A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1):
1 Cement 1.87 bags @ Tk. 465.00
2. Sand (F.M. 1.2) 7.03 cft. @ Tk. 3,000.00
3. White cement 3.60 kg @ Tk. 16.75
B. Labour cost:
1. Head mason 2.00 Nos. @ Tk. 750.00
2. Mason 2.00 Nos. @ Tk. 600.00
3. Skilled labour 3.00 Nos. @ Tk. 550.00
4. Ordinary labour 3.00 Nos. @ Tk. 450.00
5. Local carriage, sundries, T & P & washing of sand etc.

C. Cost of tiles 100.00 sft. @ Tk. 60.00


Add wastage

Contractor's profit
Overhead expenses

VAT

R
R

(i) For Ground floor Say, Tk. 1,244

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

ANALYSIS FOR ITEM NO. 40


Supplying, fitting and fixing 300 x 300 mm / 400 x 400 mm size of special quality fibreous
floor tiles (foreign made) on cement mortar base (3:1):
Considering 100 sft. of work
A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1):
1 Cement 1.87 bags @ Tk. 465.00

aqa (1-40) - 64
2. Sand (F.M. 1.2) 7.03 cft. @ Tk. 3,000.00
3. White cement 3.60 kg @ Tk. 16.75
B. Labour cost:
1. Head mason 2.00 Nos. @ Tk. 750.00
2. Mason 2.00 Nos. @ Tk. 600.00
3. Skilled labour 3.00 Nos. @ Tk. 550.00
4. Ordinary labour 3.00 Nos. @ Tk. 450.00
5. Local carriage, sundries, T & P & washing of sand etc.

C. Cost of tiles 100.00 sft. @ Tk. 75.00


Add wastage

Contractor's profit
Overhead expenses

VAT

R
R

(i) For Ground floor Say, Tk. 1,480

(ii) Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c charges
(iii) Add for each addl floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges
(iv) Add for each addl floor for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

aqa (1-40) - 65
& PLINTH FILLING

1(a)

each = Tk. 300.00


each = Tk. 4,500.00
each = Tk. 1,375.00

each = Tk. 187.50


Per kg = Tk. 25.00
Per rft. = Tk. 30.00
= Tk. 112.50
Total = Tk. 6,530.00
10.00% = Tk. 653.00
3.00% = Tk. 195.90
Tk. 7,378.90
23.00% = Tk. 1,697.15
Grand total = Tk. 9,076.05
Rate per cft. = Tk. 9.08
Rate per cum. = Tk. 320.66

.00 Per cum.

1(b)

each = Tk. 75.00


each = Tk. 1,350.00
Total = Tk. 1,425.00
10.00% = Tk. 142.50
3.00% = Tk. 42.75
Tk. 1,610.25
23.00% = Tk. 370.36
Grand total = Tk. 1,980.61
Rate per cft. = Tk. 1.98
Rate per cum. = Tk. 69.92

.00 Per cum.

1(c)

each = Tk. 75.00


each = Tk. 450.00
Total = Tk. 525.00
10.00% = Tk. 52.50
3.00% = Tk. 15.75
Tk. 593.25
23.00% = Tk. 136.45
Grand total = Tk. 729.70

aqa (1-40) - 66
Rate per cft. = Tk. 0.73
Rate per cum. = Tk. 25.78

.00 Per cum.

aqa (1-40) - 67
NO. 1(d)
nd
y

Per day = Tk. 1,000.00

Per sft. = Tk. 5,807.20

Per rft. = Tk. 636.48

Per kg = Tk. 353.10


Total = Tk. 7,796.78
10.00% = Tk. 779.68
3.00% = Tk. 233.90
Tk. 8,810.36
23.00% = Tk. 2,026.38
Grand total = Tk. 10,836.74
Rate per cft. = Tk. 8.21
Rate per cum. = Tk. 289.94

.00 Per cum.

aqa (1-40) - 68
NO. 1(e)
ring

Per day = Tk. 2,000.00

Per sft. = Tk. 9,291.52

Per rft. = Tk. 4,320.00

Per rft. = Tk. 1,800.00

Per Ib. = Tk. 736.58


each = Tk. 2,062.50
each = Tk. 1,406.25

Per cft.
Using 6 times = Tk. 954.00

Per rft.
Using 6 times = Tk. 1,020.00
Per kg = Tk. 720.00
Total = Tk. 24,310.85
10.00% = Tk. 2,431.09
3.00% = Tk. 729.33
Tk. 27,471.27
23.00% = Tk. 6,318.39
Grand total = Tk. 33,789.66
Rate per cft. = Tk. 16.00
Rate per cum. = Tk. 565.04

.00 Per cum.

2(a)

Per % 0 Nos. = Tk. 3,150.00


Per % cft. = Tk. 70.00

aqa (1-40) - 69
each = Tk. 93.75
each = Tk. 150.00
each = Tk. 550.00
L.S. = Tk. 135.00
Total = Tk. 4,148.75
10.00% = Tk. 414.88
3.00% = Tk. 124.46
Tk. 4,688.09
23.00% = Tk. 1,078.26
Grand total = Tk. 5,766.35
Rate per sft. = Tk. 57.66
Rate per sqm. = Tk. 620.65

.00 Per sqm.

aqa (1-40) - 70
2(b)

Per % 0 Nos. = Tk. 5,250.00


Per % cft. = Tk. 140.00
each = Tk. 93.75
each = Tk. 300.00
each = Tk. 550.00
L.S. = Tk. 225.00
Total = Tk. 6,558.75
10.00% = Tk. 655.88
3.00% = Tk. 196.76
Tk. 7,411.39
23.00% = Tk. 1,704.62
Grand total = Tk. 9,116.01
Rate per sft. = Tk. 91.16
Rate per sqm. = Tk. 981.25

.00 Per sqm.

2(c)

Per % 0 Nos. = Tk. 2,625.00


Per % cft. = Tk. 28.00
each = Tk. 93.75
each = Tk. 150.00
each = Tk. 412.50
L.S. = Tk. 135.00
Total = Tk. 3,444.25
10.00% = Tk. 344.43
3.00% = Tk. 103.33
Tk. 3,892.01
23.00% = Tk. 895.16
Grand total = Tk. 4,787.17
Rate per rft. = Tk. 47.87
Rate per rm. = Tk. 157.06

.00 Per rm.

3(a)

Per % 0 Nos. = Tk. 8,032.50


Per % cft. = Tk. 1,350.00
Per bag. = Tk. 5,580.00
Per % cft. = Tk. 675.00

each = Tk. 187.50


each = Tk. 450.00
each = Tk. 1,100.00
each = Tk. 900.00
L.S. = Tk. 225.00
L.S. = Tk. 742.50

Per cft.
Using 6 times = Tk. 231.60

aqa (1-40) - 71
Per sft. = Tk. 337.50
Total = Tk. 19,811.60
10.00% = Tk. 1,981.16
3.00% = Tk. 594.35
Tk. 22,387.11
23.00% = Tk. 5,149.04

aqa (1-40) - 72
Grand total = Tk. 27,536.15
Rate per cft. = Tk. 275.36
Rate per cum. = Tk. 9,724.34

.00 Per cum.

Per % 0 Nos. = Tk. 8,032.50


Per % cft. = Tk. 1,350.00
Per bag. = Tk. 5,580.00
Per % cft. = Tk. 675.00

each = Tk. 187.50


each = Tk. 450.00
each = Tk. 1,100.00
each = Tk. 900.00
L.S. = Tk. 225.00
L.S. = Tk. 742.50
Total = Tk. 19,242.50
10.00% = Tk. 1,924.25
3.00% = Tk. 577.28
Tk. 21,744.03
23.00% = Tk. 5,001.13
Grand total = Tk. 26,745.16
Rate per cft. = Tk. 267.45
Rate per cum. = Tk. 9,445.00

.00 Per cum.

3(b)

Per % 0 Nos. = Tk. 8,032.50


Per % cft. = Tk. 1,350.00
Per bag. = Tk. 8,370.00
Per % cft. = Tk. 675.00

each = Tk. 187.50


each = Tk. 450.00
each = Tk. 1,100.00
each = Tk. 900.00
L.S. = Tk. 225.00
L.S. = Tk. 742.50

Per cft.
Using 6 times = Tk. 231.60

Per sft. = Tk. 337.50


Total = Tk. 22,601.60

aqa (1-40) - 73
10.00% = Tk. 2,260.16
3.00% = Tk. 678.05
Tk. 25,539.81
23.00% = Tk. 5,874.16
Grand total = Tk. 31,413.97
Rate per cft. = Tk. 314.14
Rate per cum. = Tk. 11,093.85

.00 Per cum.

aqa (1-40) - 74
Per % 0 Nos. = Tk. 8,032.50
Per % cft. = Tk. 1,350.00
Per bag. = Tk. 8,370.00
Per % cft. = Tk. 675.00

each = Tk. 187.50


each = Tk. 450.00
each = Tk. 1,100.00
each = Tk. 900.00
L.S. = Tk. 225.00
L.S. = Tk. 742.50
Total = Tk. 22,032.50
10.00% = Tk. 2,203.25
3.00% = Tk. 660.98
Tk. 24,896.73
23.00% = Tk. 5,726.25
Grand total = Tk. 30,622.98
Rate per cft. = Tk. 306.23
Rate per cum. = Tk. 10,814.51

.00 Per cum.

4(a)

Per % 0 Nos. = Tk. 7,413.00


Per % cft. = Tk. 933.75
Per % cft. = Tk. 622.50
Per bag. = Tk. 10,230.00
Per % cft. = Tk. 622.50
L.S. = Tk. 225.00
L.S. = Tk. 742.50
Total = Tk. 20,789.25
Cost for 100 sft. = Tk. 5,197.31

each = Tk. 375.00


each = Tk. 600.00
each = Tk. 1,350.00
Per % sft. = Tk. 150.00

Per cft.
Using 6 times = Tk. 423.60

Per sft. = Tk. 900.00


Total = Tk. 8,995.91
10.00% = Tk. 899.59
3.00% = Tk. 269.88
Tk. 10,165.38
23.00% = Tk. 2,338.04
Grand total = Tk. 12,503.42

aqa (1-40) - 75
Rate per sft. = Tk. 125.03
Rate per sqm. = Tk. 1,345.82

.00 Per sqm.

4(b)

Per % cft. = Tk. 11,620.00


Per % cft. = Tk. 1,867.50
Per bag. = Tk. 10,230.00
L.S. = Tk. 225.00
L.S. = Tk. 742.50
Total = Tk. 24,685.00
Cost for 100 sft. = Tk. 6,171.25

each = Tk. 375.00


each = Tk. 600.00
each = Tk. 1,350.00
Per % sft. = Tk. 150.00

Using 6 times = Tk. 429.60

Per sft. = Tk. 900.00


Total = Tk. 9,975.85
10.00% = Tk. 997.59
3.00% = Tk. 299.28
Tk. 11,272.72
23.00% = Tk. 2,592.73
Grand total = Tk. 13,865.45
Rate per sft. = Tk. 138.65
Rate per sqm. = Tk. 1,492.43

.00 Per sqm.

5(a)

Per % cft. = Tk. 1,820.00


each = Tk. 93.75

each = Tk. 300.00


L.S. = Tk. 45.00
Total = Tk. 2,258.75
10.00% = Tk. 225.88
3.00% = Tk. 67.76
Tk. 2,552.39
23.00% = Tk. 587.05
Grand total = Tk. 3,139.44
Rate per cft. = Tk. 31.39
Rate per cum. = Tk. 1,108.54

.00 Per cum.

5(b)

Per % cft. = Tk. 3,900.00

aqa (1-40) - 76
each = Tk. 93.75

each = Tk. 300.00


L.S. = Tk. 45.00
Total = Tk. 4,338.75
10.00% = Tk. 433.88
3.00% = Tk. 130.16
Tk. 4,902.79
23.00% = Tk. 1,127.64
Grand total = Tk. 6,030.43
Rate per cft. = Tk. 60.30
Rate per cum. = Tk. 2,129.49

.00 Per cum.

5(c)

Per % cft. = Tk. 5,850.00


each = Tk. 93.75

each = Tk. 300.00


L.S. = Tk. 45.00
Total = Tk. 6,288.75
10.00% = Tk. 628.88
3.00% = Tk. 188.66
Tk. 7,106.29
23.00% = Tk. 1,634.45
Grand total = Tk. 8,740.74
Rate per cft. = Tk. 87.41
Rate per cum. = Tk. 3,086.88

.00 Per cum.

5(d)

Per % 0Nos. = Tk. 8,032.50


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,350.00

each= Tk. 187.50


each= Tk. 450.00
each= Tk. 1,100.00
each= Tk. 900.00
= Tk. 225.00
Total = Tk. 12,920.00
10.00% = Tk. 1,292.00
3.00% = Tk. 387.60
Tk. 14,599.60
23.00% = Tk. 3,357.91
Grand total = Tk. 17,957.51
Rate per cft. = Tk. 179.58
Rate per cum. = Tk. 6,341.87

.00 Per cum

.6

each = Tk. 5,400.00


each = Tk. 93.75

each = Tk. 1,100.00

aqa (1-40) - 77
= Tk. 337.50
Total = Tk. 6,931.25
10.00% = Tk. 693.13
3.00% = Tk. 207.94
Tk. 7,832.32
23.00% = Tk. 1,801.43
Grand total = Tk. 9,633.75
Rate per cft. = Tk. 9.63
Rate per cum. = Tk. 340.08

.00 Per cum.

cft.
Per % 0 cft. = Tk. 287.50

each = Tk. 3,150.00


each = Tk. 550.00
Per truck = Tk. 21,000.00

each = Tk. 2,700.00


each = Tk. 550.00
= Tk. 225.00
Total = Tk. 28,462.50
10.00% = Tk. 2,846.25
3.00% = Tk. 853.88
Tk. 32,162.63
23.00% = Tk. 7,397.40
Grand total = Tk. 39,560.03
Rate per cft. = Tk. 39.56
Rate per cum. = Tk. 1,397.06

.00 Per cum.

7(b)

cft.
Per % 0 cft. = Tk. 287.50

each = Tk. 3,150.00


each = Tk. 550.00
Per truck = Tk. 3,150.00

each = Tk. 2,700.00


each = Tk. 550.00
= Tk. 225.00
Total = Tk. 10,612.50
10.00% = Tk. 1,061.25
3.00% = Tk. 318.38
Tk. 11,992.13
23.00% = Tk. 2,758.19
Grand total = Tk. 14,750.32
Rate per cft. = Tk. 14.75
Rate per cum. = Tk. 520.90

.00 Per cum.

7(c)

aqa (1-40) - 78
cft.
Per % 0 cft. = Tk. 287.50

each = Tk. 3,150.00


each = Tk. 550.00
Per truck = Tk. 2,800.00

each = Tk. 2,700.00


each = Tk. 550.00
= Tk. 225.00
Total = Tk. 10,262.50
10.00% = Tk. 1,026.25
3.00% = Tk. 307.88
Tk. 11,596.63
23.00% = Tk. 2,667.22
Grand total = Tk. 14,263.85
Rate per cft. = Tk. 14.26
Rate per cum. = Tk. 503.59

.00 Per cum.

7(d)

cft.
Per % 0 cft. = Tk. 287.50

each = Tk. 3,150.00


each = Tk. 550.00
Per truck = Tk. 2,625.00

each = Tk. 2,700.00


each = Tk. 550.00
= Tk. 225.00
Total = Tk. 10,087.50
10.00% = Tk. 1,008.75
3.00% = Tk. 302.63
Tk. 11,398.88

aqa (1-40) - 79
23.00% = Tk. 2,621.74
Grand total = Tk. 14,020.62
Rate per cft. = Tk. 14.02
Rate per cum. = Tk. 495.12

.00 Per cum.

BRICK WORK

.8

Per % 0 Nos. = Tk. 11,550.00


Per % cft. = Tk. 1,080.00
Per bag = Tk. 1,860.00
each = Tk. 75.00
each = Tk. 600.00
each = Tk. 550.00
each = Tk. 675.00

each = Tk. 900.00

each = Tk. 787.50


= Tk. 225.00
Total = Tk. 18,302.50
10.00% = Tk. 1,830.25
3.00% = Tk. 549.08
Tk. 20,681.83
23.00% = Tk. 4,756.82
Grand total = Tk. 25,438.65
Rate per cft. = Tk. 254.39
Rate per cum. = Tk. 8,983.78

.00 Per cum

.9

= Tk. 18,302.50
Per sft. = Tk. 200.00
each = Tk. 450.00
each = Tk. 225.00
each = Tk. 450.00
Total = Tk. 19,627.50
10.00% = Tk. 1,962.75
3.00% = Tk. 588.83
Tk. 22,179.08
23.00% = Tk. 5,101.19
Grand total = Tk. 27,280.27
Rate per cft. = Tk. 272.80

Rate per cft. = Tk. 272.80


Rate per cum. = Tk. 9,634.03

.00 Per cum.

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

aqa (1-40) - 80
10

Per % 0 Nos. = Tk. 11,550.00


Per % cft. = Tk. 1,200.00
Per bag = Tk. 2,790.00
each = Tk. 75.00
each = Tk. 600.00
each = Tk. 550.00
each = Tk. 1,125.00

each = Tk. 900.00


each = Tk. 450.00

each = Tk. 787.50


Per sft. = Tk. 200.00
= Tk. 225.00
Total = Tk. 20,452.50
10.00% = Tk. 2,045.25
3.00% = Tk. 613.58
Tk. 23,111.33
23.00% = Tk. 5,315.61
Grand total = Tk. 28,426.94
Rate per cft. = Tk. 284.27
Rate per cum. = Tk. 10,039.00 284.552154

.00 Per cum

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

11

Per % 0 Nos. = Tk. 11,550.00

= Tk. 2,310.00
Per % cft. = Tk. 1,200.00
Per bag = Tk. 3,022.50
each = Tk. 375.00
each = Tk. 900.00
each = Tk. 825.00
each = Tk. 900.00

each = Tk. 900.00

each = Tk. 450.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 23,645.00
10.00% = Tk. 2,364.50
3.00% = Tk. 709.35
Tk. 26,718.85
23.00% = Tk. 6,145.34
Grand total = Tk. 32,864.19
Rate per cft. = Tk. 328.64
Rate per cum. = Tk. 11,605.92

aqa (1-40) - 81
.00 Per cum

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

aqa (1-40) - 82
2(a)

Per % 0 Nos. = Tk. 7,700.00


Per % cft. = Tk. 1,200.00
Per bag = Tk. 3,022.50
each = Tk. 375.00
each = Tk. 900.00
each = Tk. 825.00
each = Tk. 900.00

each = Tk. 900.00

each = Tk. 450.00

each = Tk. 787.50


Per sft. = Tk. 200.00
= Tk. 225.00
Total = Tk. 17,485.00
10.00% = Tk. 1,748.50
3.00% = Tk. 524.55
Tk. 19,758.05
23.00% = Tk. 4,544.35
Grand total = Tk. 24,302.40
Rate per cft. = Tk. 243.02
Rate per cum. = Tk. 8,582.25

.00 Per cum

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

2(b)

Per % 0 Nos. = Tk. 7,018.00


Per % cft. = Tk. 1,200.00
Per bag = Tk. 3,022.50
each = Tk. 187.50
each = Tk. 1,200.00
each = Tk. 825.00
each = Tk. 900.00

each = Tk. 450.00

each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
= Tk. 225.00
Total = Tk. 16,240.50
10.00% = Tk. 1,624.05
3.00% = Tk. 487.22
Tk. 18,351.77
23.00% = Tk. 4,220.91
Grand total = Tk. 22,572.68
Rate per cft. = Tk. 225.73
Rate per cum. = Tk. 7,971.65

.00 Per cum

aqa (1-40) - 83
Per cum = Tk. 235.61
Per cum = Tk. 329.85
Per cum = Tk. 376.98

aqa (1-40) - 84
12(c)

Per % 0 Nos. = Tk. 8,437.00


Per % cft. = Tk. 1,200.00
Per bag = Tk. 3,022.50
each = Tk. 187.50
each = Tk. 1,200.00
each = Tk. 825.00
each = Tk. 900.00

each = Tk. 450.00


each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
= Tk. 225.00
Total = Tk. 17,659.50
10.00% = Tk. 1,765.95
3.00% = Tk. 529.79
Tk. 19,955.24
23.00% = Tk. 4,589.71
Grand total = Tk. 24,544.95
Rate per cft. = Tk. 245.45
Rate per cum. = Tk. 8,668.07

.00 Per cum

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

2(d)

Per % 0 Nos. = Tk. 7,810.00


Per % cft. = Tk. 1,080.00
Per % cft. = Tk. 1,200.00
Per bag = Tk. 3,022.50
each = Tk. 187.50
each = Tk. 1,200.00
each = Tk. 825.00
each = Tk. 900.00

each = Tk. 450.00


each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 18,112.50
10.00% = Tk. 1,811.25
3.00% = Tk. 543.38
Tk. 20,467.13
23.00% = Tk. 4,707.44
Grand total = Tk. 25,174.57
Rate per cft. = Tk. 251.75
Rate per cum. = Tk. 8,890.55

.00 Per cum

Per cum = Tk. 235.61


Per cum = Tk. 329.85
Per cum = Tk. 376.98

aqa (1-40) - 85
13

each = Tk. 37.50


each = Tk. 120.00
each = Tk. 55.00
each = Tk. 135.00
Per sft. = Tk. 100.00
L.S. = Tk. 45.00
Total = Tk. 492.50
10.00% = Tk. 49.25
3.00% = Tk. 14.78
Tk. 556.53
23.00% = Tk. 128.00
Grand total = Tk. 684.53
Rate per cft. = Tk. 6.85
Rate per cum. = Tk. 241.91

.00 Per cum.

4(a)

Per % 0 Nos. = Tk. 3,448.76


Per % cft. = Tk. 360.00
Per bag = Tk. 1,050.90
each = Tk. 750.00
each = Tk. 1,350.00
each = Tk. 825.00
each = Tk. 675.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 9,672.16
10.00% = Tk. 967.22
3.00% = Tk. 290.16
Tk. 10,929.54
23.00% = Tk. 2,513.79
Grand total = Tk. 13,443.33
Rate per sft. = Tk. 134.43
Rate Per sqm. = Tk. 1,447.00

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

4(b)
nting.

Per % 0 Nos. = Tk. 4,256.89


Per % cft. = Tk. 420.00
Per bag = Tk. 1,278.75
each = Tk. 750.00
each = Tk. 1,380.00
each = Tk. 825.00
each = Tk. 675.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 450.00

aqa (1-40) - 86
Total = Tk. 11,043.14
10.00% = Tk. 1,104.31
3.00% = Tk. 331.29
Tk. 12,478.74
23.00% = Tk. 2,870.11
Grand total = Tk. 15,348.85
Rate per sft. = Tk. 153.49
Rate Per sqm. = Tk. 1,652.17

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

aqa (1-40) - 87
14(c)
ng.

Per % 0 Nos. = Tk. 8,999.23


Per % cft. = Tk. 420.00
Per bag = Tk. 1,278.75
each = Tk. 750.00
each = Tk. 1,200.00
each = Tk. 825.00
each = Tk. 675.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 450.00
Total = Tk. 15,585.48
10.00% = Tk. 1,558.55
3.00% = Tk. 467.56
Tk. 17,611.59
23.00% = Tk. 4,050.67
Grand total = Tk. 21,662.26
Rate per sft. = Tk. 216.62
Rate Per sqm. = Tk. 2,331.70

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

5(a)

Per % 0 Nos. = Tk. 5,040.00


Per % cft. = Tk. 540.00
Per bag = Tk. 813.75
each = Tk. 75.00
each = Tk. 480.00
each = Tk. 275.00
each = Tk. 225.00

each = Tk. 450.00

each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 9,306.25
10.00% = Tk. 930.63
3.00% = Tk. 279.19
Tk. 10,516.07
23.00% = Tk. 2,418.70
Grand total = Tk. 12,934.77
Rate per sft. = Tk. 129.35

Rate per sft. = Tk. 129.35


Rate per sqm. = Tk. 1,392.32

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

aqa (1-40) - 88
5(b)

Per % 0 Nos. = Tk. 5,040.00


Per % cft. = Tk. 510.00
Per bag = Tk. 1,209.00
each = Tk. 75.00
each = Tk. 480.00
each = Tk. 275.00
each = Tk. 225.00

each = Tk. 450.00

each = Tk. 135.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 9,559.00
10.00% = Tk. 955.90
3.00% = Tk. 286.77
Tk. 10,801.67
23.00% = Tk. 2,484.38
Grand total = Tk. 13,286.05
Rate per sft. = Tk. 132.86

Rate per sft. = Tk. 132.86


Rate per sqm. = Tk. 1,430.11

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

15(c)

Per % 0 Nos. = Tk. 3,360.00


Per % cft. = Tk. 540.00
Per bag = Tk. 1,302.00
each = Tk. 75.00
each = Tk. 600.00
each = Tk. 275.00
each = Tk. 450.00

each = Tk. 450.00

each = Tk. 135.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 8,377.00
10.00% = Tk. 837.70
3.00% = Tk. 251.31
Tk. 9,466.01
23.00% = Tk. 2,177.18

aqa (1-40) - 89
Grand total = Tk. 11,643.19
Rate per sft. = Tk. 116.43

Rate per sft. = Tk. 116.43


Rate per sqm. = Tk. 1,253.25

.00 Per sqm.

aqa (1-40) - 90
Per sqm = Tk. 43.09
Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

6(a)

Per % 0 Nos. = Tk. 9,424.80


Per % cft. = Tk. 112.50
Per bag = Tk. 465.00
Per Ib = Tk. 30.00

each = Tk. 750.00


each = Tk. 1,350.00
each = Tk. 1,375.00
each = Tk. 450.00

each = Tk. 450.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 15,619.80
10.00% = Tk. 1,561.98
3.00% = Tk. 468.59
Tk. 17,650.37
23.00% = Tk. 4,059.59
Grand total = Tk. 21,709.96
Rate per sft. = Tk. 217.10
Rate per sqm = Tk. 2,336.86

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

6(b)

Per % 0 Nos. = Tk. 6,284.25


Per % cft. = Tk. 112.50
Per bag = Tk. 465.00
Per Ib = Tk. 30.00

each = Tk. 750.00


each = Tk. 1,200.00
each = Tk. 1,100.00
each = Tk. 450.00

each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 11,829.25
10.00% = Tk. 1,182.93
3.00% = Tk. 354.88
Tk. 13,367.06
23.00% = Tk. 3,074.42
Grand total = Tk. 16,441.48
Rate per sft. = Tk. 164.41

aqa (1-40) - 91
Rate per sqm = Tk. 1,769.71

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

16(c)

Per % 0 Nos. = Tk. 6,833.20


Per % cft. = Tk. 112.50
Per bag = Tk. 465.00
Per Ib = Tk. 30.00

each = Tk. 750.00


each = Tk. 1,200.00
each = Tk. 1,100.00
each = Tk. 450.00

each = Tk. 225.00

each = Tk. 787.50


Per sft. = Tk. 200.00
L.S. = Tk. 225.00
Total = Tk. 12,378.20
10.00% = Tk. 1,237.82
3.00% = Tk. 371.35
Tk. 13,987.37
23.00% = Tk. 3,217.10
Grand total = Tk. 17,204.47
Rate per sft. = Tk. 172.04
Rate per sqm = Tk. 1,851.84

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

7(a)

Per % 0 Nos. = Tk. 6,531.28


Per % cft. = Tk. 480.00
Per bag = Tk. 1,511.25

each = Tk. 225.00


each = Tk. 900.00
each = Tk. 1,650.00
each = Tk. 675.00

each = Tk. 450.00

each = Tk. 787.50


L.S. = Tk. 225.00
Total = Tk. 13,397.53
10.00% = Tk. 1,339.75
3.00% = Tk. 401.93
Tk. 15,139.21
23.00% = Tk. 3,482.02

aqa (1-40) - 92
Grand total = Tk. 18,621.23
Rate per sft. = Tk. 186.21
Rate per sqm. = Tk. 2,004.36

.00 Per sqm.

7(b)

Per % 0 Nos. = Tk. 3,448.76


Per % cft. = Tk. 390.00
Per bag = Tk. 1,162.50

each = Tk. 225.00


each = Tk. 600.00
each = Tk. 1,375.00
each = Tk. 675.00

each = Tk. 225.00

each = Tk. 787.50


L.S. = Tk. 225.00
Total = Tk. 9,076.26
10.00% = Tk. 907.63
3.00% = Tk. 272.29
Tk. 10,256.18
23.00% = Tk. 2,358.92
Grand total = Tk. 12,615.10
Rate per sft. = Tk. 126.15
Rate per sqm. = Tk. 1,357.88

.00 Per sqm.

17(c)

Per % 0 Nos. = Tk. 4,256.89


Per % cft. = Tk. 300.00
Per bag = Tk. 1,162.50

each = Tk. 225.00


each = Tk. 750.00
each = Tk. 1,375.00
each = Tk. 675.00

each = Tk. 450.00

each = Tk. 787.50


L.S. = Tk. 225.00
Total = Tk. 10,169.39
10.00% = Tk. 1,016.94
3.00% = Tk. 305.08
Tk. 11,491.41
23.00% = Tk. 2,643.02
Grand total = Tk. 14,134.43
Rate per sft. = Tk. 141.34
Rate per sqm. = Tk. 1,521.38

.00 Per sqm.

aqa (1-40) - 93
8(a)

Per % 0 Nos. = Tk. 5,040.00


Per % cft. = Tk. 450.00
Per bag = Tk. 1,395.00

each = Tk. 225.00


each = Tk. 750.00
each = Tk. 1,237.50
each = Tk. 675.00

each = Tk. 225.00

each = Tk. 787.50


L.S = Tk. 225.00
Total = Tk. 10,972.50
10.00% = Tk. 1,097.25
3.00% = Tk. 329.18
Tk. 12,398.93
23.00% = Tk. 2,851.75
Grand total = Tk. 15,250.68
Rate per sft. = Tk. 152.51
Rate per sqm. = Tk. 1,641.62

.00 Per sqm.

8(b)

Per % 0 Nos. = Tk. 3,360.00


Per % cft. = Tk. 450.00
Per bag = Tk. 1,511.25

each = Tk. 225.00


each = Tk. 750.00
each = Tk. 1,237.50
each = Tk. 675.00

each = Tk. 225.00

each = Tk. 787.50


L.S = Tk. 225.00
Total = Tk. 9,408.75
10.00% = Tk. 940.88
3.00% = Tk. 282.26
Tk. 10,631.89
23.00% = Tk. 2,445.33
Grand total = Tk. 13,077.22
Rate per sft. = Tk. 130.77
Rate per sqm. = Tk. 1,407.61

.00 Per sqm.

INISH

19

Tk. 19,811.60
= Tk. 4,952.90
each = Tk. 600.00
Total = Tk. 5,552.90
10.00% = Tk. 555.29
3.00% = Tk. 166.59

aqa (1-40) - 94
Tk. 6,274.78
23.00% = Tk. 1,443.20
Grand total = Tk. 7,717.98
Rate Per sft = Tk. 77.18
Rate Per sqm. = Tk. 830.77

.00 Per sqm.

0(a)

Per % 0 Nos. = Tk. 8,032.50


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 8,370.00
Per % cft. = Tk. 675.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 20,227.50
For 100 sft. of work = Tk. 1,685.63
Per bag = Tk. 232.50

each = Tk. 150.00


each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 15.62

Per sft. = Tk. 8.33


Total = Tk. 3,542.08
10.00% = Tk. 354.21
3.00% = Tk. 106.26
Tk. 4,002.55
23.00% = Tk. 920.59
Grand total = Tk. 4,923.14
Rate per sft. = Tk. 49.23
Rate per sqm. = Tk. 529.91

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

0(b)

Per % 0 Nos. = Tk. 8,032.50


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 8,370.00

Per % cft. = Tk. 675.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 20,227.50
For 100 sft. of work = Tk. 2,528.44
Per bag = Tk. 232.50

each = Tk. 150.00

aqa (1-40) - 95
each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 23.43

Per sft. = Tk. 12.50


Total = Tk. 4,396.87
10.00% = Tk. 439.69
3.00% = Tk. 131.91
Tk. 4,968.47
23.00% = Tk. 1,142.75
Grand total = Tk. 6,111.22
Rate per sft. = Tk. 61.11
Rate per sqm. = Tk. 657.79

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

20(c)

Per % cft. = Tk. 12,600.00


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 8,370.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 24,120.00
For 100 sft. of work = Tk. 2,010.00
Per bag = Tk. 232.50

each = Tk. 150.00


each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 15.62

Per sft. = Tk. 8.33


Total = Tk. 3,866.45
10.00% = Tk. 386.65
3.00% = Tk. 115.99
Tk. 4,369.09
23.00% = Tk. 1,004.89
Grand total = Tk. 5,373.98
Rate per sft. = Tk. 53.74
Rate per sqm. = Tk. 578.46

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

0(d)

aqa (1-40) - 96
Per % cft. = Tk. 12,600.00
Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 8,370.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 24,120.00
For 100 sft. of work = Tk. 3,015.00
Per bag = Tk. 232.50

each = Tk. 150.00


each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 23.43

Per sft. = Tk. 12.50


Total = Tk. 4,883.43
10.00% = Tk. 488.34
3.00% = Tk. 146.50
Tk. 5,518.27
23.00% = Tk. 1,269.20
Grand total = Tk. 6,787.47
Rate per sft. = Tk. 67.87
Rate per sqm. = Tk. 730.55

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

20(e)

Per % cft. = Tk. 12,600.00


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 10,230.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 25,980.00
For 100 sft. of work = Tk. 2,165.00
Per bag = Tk. 232.50

each = Tk. 150.00


each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 15.62

Per sft. = Tk. 8.33


Total = Tk. 4,021.45
10.00% = Tk. 402.15
3.00% = Tk. 120.64
Tk. 4,544.24

aqa (1-40) - 97
23.00% = Tk. 1,045.18
Grand total = Tk. 5,589.42
Rate per sft. = Tk. 55.89
Rate per sqm. = Tk. 601.60

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

20(f)

Per % cft. = Tk. 12,600.00


Per % cft. = Tk. 675.00
Per % cft. = Tk. 1,012.50
Per bag = Tk. 10,230.00

each = Tk. 787.50


L.S. = Tk. 675.00
Sub-total = Tk. 25,980.00
For 100 sft. of work = Tk. 3,247.50
Per bag = Tk. 232.50

each = Tk. 150.00


each = Tk. 450.00
each = Tk. 550.00
each = Tk. 450.00

Per cft.
Per cft. = Tk. 23.43

Per sft. = Tk. 12.50


Total = Tk. 5,115.93
10.00% = Tk. 511.59
3.00% = Tk. 153.48
Tk. 5,781.00
23.00% = Tk. 1,329.63
Grand total = Tk. 7,110.63
Rate per sft. = Tk. 71.11
Rate per sqm. = Tk. 765.43

.00 Per sqm.

Per sqm = Tk. 43.09


Per sqm = Tk. 57.45
Per sqm = Tk. 71.81

1(a)-I

Per kg = Tk. 1,825.75


Per bag. = Tk. 102.30
Per kg = Tk. 1,166.25
each = Tk. 66.67
Per rft. = Tk. 360.00

aqa (1-40) - 98
Per % sft. = Tk. 1,034.41
Sub-total = Tk. 4,555.38

each = Tk. 562.50


each = Tk. 440.00
each = Tk. 450.00
=
each = Tk. 480.00
each = Tk. 360.00

Per day = Tk. 70.00


each = Tk. 160.00
each = Tk. 550.00
each = Tk. 450.00
each = Tk. 420.00

each = Tk. 450.00


Sub-total = Tk. 4,312.50
Total = Tk. 8,867.88
10.00% = Tk. 886.79
3.00% = Tk. 129.38
Tk. 9,884.05
23.00% = Tk. 2,273.33
Grand total = Tk. 12,157.38
Rate per sft. = Tk. 121.57
Rate per sqm. = Tk. 1,308.58

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

= Tk. 7,833.47

= Tk. 1,366.37
Total = Tk. 9,199.84
10.00% = Tk. 919.98
3.00% = Tk. 276.00
Tk. 10,395.82
23.00% = Tk. 2,391.04
Grand total = Tk. 12,786.86
Rate per sft. = Tk. 127.87
Rate per sqm. = Tk. 1,376.39

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

1(b)-I
ne

Per kg = Tk. 1,825.75


Per bag = Tk. 102.30
Per kg = Tk. 1,125.00
each = Tk. 66.67

aqa (1-40) - 99
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,514.13

Per % sft. = Tk. 1,482.50


Total = Tk. 5,996.63
10.00% = Tk. 599.66
3.00% = Tk. 179.90
Tk. 6,776.19
23.00% = Tk. 1,558.52
Grand total = Tk. 8,334.71
Rate per sft. = Tk. 83.35
Rate per sqm. = Tk. 897.18

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(b)-II

= Tk. 4,962.22

= Tk. 1,366.37
Total = Tk. 6,328.59
10.00% = Tk. 632.86
3.00% = Tk. 189.86
Tk. 7,151.31
23.00% = Tk. 1,644.80
Grand total = Tk. 8,796.11
Rate per sft. = Tk. 87.96
Rate per sqm. = Tk. 946.80

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

1(c)-I

Per kg = Tk. 1,825.75


Per bag = Tk. 102.30
Per kg = Tk. 1,166.25
each = Tk. 66.67

Per % sft = Tk. 1,034.41


Sub-Total = Tk. 4,195.38

each = Tk. 562.50


each = Tk. 412.50
each = Tk. 450.00

Per day = Tk. 70.00


each = Tk. 160.00
each = Tk. 550.00
each = Tk. 450.00
each = Tk. 420.00

aqa (1-40) - 100


each = Tk. 450.00
Sub-total = Tk. 3,525.00
Total = Tk. 7,720.38
10.00% = Tk. 772.04
3.00% = Tk. 231.61
Tk. 8,724.03
23.00% = Tk. 2,006.53
Grand total = Tk. 10,730.56
Rate per sft. = Tk. 107.31
Rate per sqm = Tk. 1,155.08

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

= Tk. 6,685.97

= Tk. 1,366.37
Total = Tk. 8,052.34
10.00% = Tk. 805.23
3.00% = Tk. 241.57
Tk. 9,099.14
23.00% = Tk. 2,092.80
Grand total = Tk. 11,191.94
Rate per sft. = Tk. 111.92
Rate per sqm = Tk. 1,204.71

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

1(d)-I

Per kg = Tk. 1,825.75


Per bag = Tk. 102.30
Per kg = Tk. 1,125.00
each = Tk. 66.67

Per % sft = Tk. 1,034.41


Sub-total = Tk. 4,154.13

Per % sft. = Tk. 1,295.00


Total = Tk. 5,449.13
10.00% = Tk. 544.91
3.00% = Tk. 163.47
Tk. 6,157.51
23.00% = Tk. 1,416.23
Grand total = Tk. 7,573.74
Rate per sft. = Tk. 75.74
Rate per sqm = Tk. 815.27

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 101


(d)-II

= Tk. 4,414.72

= Tk. 1,366.37
Total = Tk. 5,781.09
10.00% = Tk. 578.11
3.00% = Tk. 173.43
Tk. 6,532.63
23.00% = Tk. 1,502.50
Grand total = Tk. 8,035.13
Rate per sft. = Tk. 80.35
Rate per sqm = Tk. 864.89

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

2(a)-I

Per kg = Tk. 2,110.50


Per bag. = Tk. 130.20
Per kg = Tk. 1,306.20
each = Tk. 66.67
Per rft. Tk. 360.00

Per % sft = Tk. 1,034.41


Sub-total = Tk. 5,007.98

Per % sft. = Tk. 1,482.50


Total = Tk. 6,490.48
10.00% = Tk. 649.05
3.00% = Tk. 194.71
Tk. 7,334.24
23.00% = Tk. 1,686.88
Grand total = Tk. 9,021.12
Rate per sft. = Tk. 90.21
Rate per sqm = Tk. 971.02

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

= Tk. 5,456.07

= Tk. 1,366.37
Total = Tk. 6,822.44
10.00% = Tk. 682.24
3.00% = Tk. 204.67
Tk. 7,709.35
23.00% = Tk. 1,773.15
Grand total = Tk. 9,482.50

aqa (1-40) - 102


Rate per sft. = Tk. 94.83
Rate per sqm. = Tk. 1,020.75

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

2(b)-I

Per kg = Tk. 2,110.50


Per bag = Tk. 130.20
Per kg = Tk. 1,260.00
each = Tk. 66.67
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,961.78

Per % sft. = Tk. 1,482.50


Total = Tk. 6,444.28
10.00% = Tk. 644.43
3.00% = Tk. 193.33
Tk. 7,282.04
23.00% = Tk. 1,674.87
Grand total = Tk. 8,956.91
Rate per sft. = Tk. 89.57
Rate per sqm. = Tk. 964.13

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(b)-II

= Tk. 5,409.87

= Tk. 1,366.37
Total = Tk. 6,776.24
10.00% = Tk. 677.62
3.00% = Tk. 203.29
Tk. 7,657.15
23.00% = Tk. 1,761.14
Grand total = Tk. 9,418.29
Rate per sft. = Tk. 94.18
Rate per sqm. = Tk. 1,013.75

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

2(c)-I

Per kg = Tk. 2,110.50


Per bag = Tk. 130.20

aqa (1-40) - 103


Per kg = Tk. 1,306.20
each = Tk. 66.67

Per % sft = Tk. 1,034.41

Per % sft. = Tk. 1,295.00


Sub-total = Tk. 5,942.98
10.00% = Tk. 594.30
3.00% = Tk. 178.29
Tk. 6,715.57
23.00% = Tk. 1,544.58
Grand total = Tk. 8,260.15
Rate per sft. = Tk. 82.60
Rate per sqm = Tk. 889.11

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

= Tk. 4,908.57

= Tk. 1,366.37
Total = Tk. 6,274.94
10.00% = Tk. 627.49
3.00% = Tk. 188.25
Tk. 7,090.68
23.00% = Tk. 1,630.86
Grand total = Tk. 8,721.54
Rate per sft. = Tk. 87.22
Rate per sqm = Tk. 938.84

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

2(d)-I

Per kg = Tk. 2,110.50


Per bag. = Tk. 130.20
Per kg = Tk. 1,260.00
each = Tk. 66.67

Per % sft = Tk. 1,034.41


Sub-total = Tk. 4,601.78

Per % sft. = Tk. 1,295.00


Total = Tk. 5,896.78
10.00% = Tk. 589.68
3.00% = Tk. 176.90
Tk. 6,663.36
23.00% = Tk. 1,532.57
Grand total = Tk. 8,195.93
Rate per sft. = Tk. 81.96
Rate per sqm = Tk. 882.22

.00 Per sqm.

aqa (1-40) - 104


Per sqm = Tk. 14.36
Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(d)-II

= Tk. 4,862.37

= Tk. 1,366.37
Total = Tk. 6,228.74
10.00% = Tk. 622.87
3.00% = Tk. 186.86
Tk. 7,038.47
23.00% = Tk. 1,618.85
Grand total = Tk. 8,657.32
Rate per sft. = Tk. 86.57
Rate per sqm = Tk. 931.84

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

3(a)-I
mm

Per kg = Tk. 1,046.88


Per bag. = Tk. 581.25
Per kg = Tk. 1,166.25
each = Tk. 66.67
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,255.46

Per % sft. = Tk. 1,482.50


Total = Tk. 5,737.96
10.00% = Tk. 573.80
3.00% = Tk. 172.14
Tk. 6,483.90
23.00% = Tk. 1,491.30
Grand total = Tk. 7,975.20
Rate per sft. = Tk. 79.75
Rate per sqm = Tk. 858.43

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

= Tk. 4,703.55

= Tk. 1,366.37
Total = Tk. 6,069.92
10.00% = Tk. 606.99
3.00% = Tk. 182.10

aqa (1-40) - 105


Tk. 6,859.01
23.00% = Tk. 1,577.57
Grand total = Tk. 8,436.58
Rate per sft. = Tk. 84.37
Rate per sqm = Tk. 908.16

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

3(b)-I

Per kg = Tk. 1,046.88


Per bag. = Tk. 581.25
Per kg = Tk. 1,125.00
each = Tk. 66.67
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,214.21

Per % sft. = Tk. 1,482.50


Total = Tk. 5,696.71
10.00% = Tk. 569.67
3.00% = Tk. 170.90
Tk. 6,437.28
23.00% = Tk. 1,480.57
Grand total = Tk. 7,917.85
Rate per sft. = Tk. 79.18
Rate per sqm = Tk. 852.29

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

b)-II

= Tk. 4,662.30

= Tk. 1,366.37
Total = Tk. 6,028.67
10.00% = Tk. 602.87
3.00% = Tk. 180.86
Tk. 6,812.40
23.00% = Tk. 1,566.85
Grand total = Tk. 8,379.25
Rate per sft. = Tk. 83.79
Rate per sqm = Tk. 901.92

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

3(c)-I

aqa (1-40) - 106


Per kg = Tk. 1,046.88
Per bag. = Tk. 581.25
Per kg = Tk. 1,166.25
each = Tk. 66.67

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 3,895.46

Per % sft. = Tk. 1,295.00


Total = Tk. 5,190.46
10.00% = Tk. 519.05
3.00% = Tk. 155.71
Tk. 5,865.22
23.00% = Tk. 1,349.00
Grand total = Tk. 7,214.22
Rate per sft. = Tk. 72.14
Rate per sqm = Tk. 776.51

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

= Tk. 4,156.05

= Tk. 1,366.37
Total = Tk. 5,522.42
10.00% = Tk. 552.24
3.00% = Tk. 165.67
Tk. 6,240.33
23.00% = Tk. 1,435.28
Grand total = Tk. 7,675.61
Rate per sft. = Tk. 76.76
Rate per sqm = Tk. 826.24

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

3(d)-I

Per kg = Tk. 1,046.88


Per bag. = Tk. 581.25
Per kg = Tk. 1,125.00
each = Tk. 66.67

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 3,854.21

Per % sft. = Tk. 1,295.00


Total = Tk. 5,149.21
10.00% = Tk. 514.92
3.00% = Tk. 154.48
Tk. 5,818.61
23.00% = Tk. 1,338.28

aqa (1-40) - 107


Grand total = Tk. 7,156.89
Rate per sft. = Tk. 71.57
Rate per sqm = Tk. 770.38

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(d)-II

= Tk. 4,114.80

= Tk. 1,366.37
Total = Tk. 5,481.17
10.00% = Tk. 548.12
3.00% = Tk. 164.44
Tk. 6,193.73
23.00% = Tk. 1,424.56
Grand total = Tk. 7,618.29
Rate per sft. = Tk. 76.18
Rate per sqm = Tk. 820.00

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

4(a)-I

Per kg = Tk. 1,172.50


Per bag. = Tk. 651.00
Per kg = Tk. 1,306.20
each = Tk. 66.67
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-Total = Tk. 4,590.78

Per % sft. = Tk. 1,482.50


Total = Tk. 6,073.28
10.00% = Tk. 607.33
3.00% = Tk. 182.20
Tk. 6,862.81
23.00% = Tk. 1,578.45
Grand total = Tk. 8,441.26
Rate per sft. = Tk. 84.41
Rate per sqm = Tk. 908.59

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

= Tk. 5,038.87

aqa (1-40) - 108


= Tk. 1,366.37
Total = Tk. 6,405.24
10.00% = Tk. 640.52
3.00% = Tk. 192.16
Tk. 7,237.92
23.00% = Tk. 1,664.72
Grand total = Tk. 8,902.64
Rate per sft. = Tk. 89.03
Rate per sqm = Tk. 958.32

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

4(b)-I

Per kg = Tk. 1,172.50


Per bag. = Tk. 651.00
Per kg = Tk. 1,260.00
each = Tk. 66.67
Per rft. = Tk. 360.00

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,544.58

Per % sft. = Tk. 1,482.50


Total = Tk. 6,027.08
10.00% = Tk. 602.71
3.00% = Tk. 180.81
Tk. 6,810.60
23.00% = Tk. 1,566.44
Grand total = Tk. 8,377.04
Rate per sft. = Tk. 83.77
Rate per sqm = Tk. 901.70

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(b)-II

= Tk. 4,992.67

= Tk. 1,366.37
Total = Tk. 6,359.04
10.00% = Tk. 635.90
3.00% = Tk. 190.77
Tk. 7,185.71
23.00% = Tk. 1,652.71
Grand total = Tk. 8,838.42
Rate per sft. = Tk. 88.38
Rate per sqm = Tk. 951.32

.00 Per sqm.

Per sqm = Tk. 14.36

aqa (1-40) - 109


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

4(c)-I

Per kg = Tk. 1,172.50


Per bag. = Tk. 651.00
Per kg = Tk. 1,306.20
each = Tk. 66.67

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,230.78

Per % sft. = Tk. 1,295.00


Total = Tk. 5,525.78
10.00% = Tk. 552.58
3.00% = Tk. 165.77
Tk. 6,244.13
23.00% = Tk. 1,436.15
Grand total = Tk. 7,680.28
Rate per sft. = Tk. 76.80
Rate per sqm = Tk. 826.68

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

= Tk. 4,491.37

= Tk. 1,366.37
Total = Tk. 5,857.74
10.00% = Tk. 585.77
3.00% = Tk. 175.73
Tk. 6,619.24
23.00% = Tk. 1,522.43
Grand total = Tk. 8,141.67
Rate per sft. = Tk. 81.42
Rate per sqm = Tk. 876.40

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

4(d)-I

Per kg = Tk. 1,172.50


Per bag. = Tk. 651.00
Per kg = Tk. 1,260.00
each = Tk. 66.67

Per % sft. = Tk. 1,034.41


Sub-total = Tk. 4,184.58

aqa (1-40) - 110


Per % sft. = Tk. 1,295.00
Total = Tk. 5,479.58
10.00% = Tk. 547.96
3.00% = Tk. 164.39
Tk. 6,191.93
23.00% = Tk. 1,424.14
Grand total = Tk. 7,616.07
Rate per sft. = Tk. 76.16
Rate per sqm = Tk. 819.79

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(d)-II

= Tk. 4,445.17

= Tk. 1,366.37
Total = Tk. 5,811.54
10.00% = Tk. 581.15
3.00% = Tk. 174.35
Tk. 6,567.04
23.00% = Tk. 1,510.42
Grand total = Tk. 8,077.46
Rate per sft. = Tk. 80.77
Rate per sqm = Tk. 869.41

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

5(a)

Per kg = Tk. 1,825.75


Per bag = Tk. 102.30
Per kg = Tk. 1,166.25
each = Tk. 66.67
Per sft. = Tk. 695.00
Sub-total = Tk. 3,855.97

each = Tk. 750.00


each = Tk. 440.00
each = Tk. 450.00

each = Tk. 5,500.00


each = Tk. 350.00

each = Tk. 450.00


Sub-total = Tk. 7,912.50
Total (A+B) = Tk. 11,768.47
10.00% = Tk. 1,176.85
3.00% = Tk. 353.05
Tk. 13,298.37
23.00% = Tk. 3,058.63
Grand total = Tk. 16,357.00
Rate per sft. = Tk. 163.57

aqa (1-40) - 111


Rate per sqm = Tk. 1,760.67

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

5(b)

Per kg = Tk. 1,825.75


Per bag = Tk. 102.30
Per kg = Tk. 1,125.00
each = Tk. 66.67
Per sft. = Tk. 695.00
Sub-total = Tk. 3,814.72

Per % sft. = Tk. 7,912.50


Total = Tk. 11,727.22
10.00% = Tk. 1,172.72
3.00% = Tk. 351.82
Tk. 13,251.76
23.00% = Tk. 3,047.90
Grand total = Tk. 16,299.66
Rate per sft. = Tk. 163.00
Rate per sqm = Tk. 1,754.53

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

6(a)

Per kg = Tk. 1,046.88


Per bag = Tk. 581.25
Per kg = Tk. 1,166.25
each = Tk. 66.67
Per sft. = Tk. 695.00
Sub-total = Tk. 3,556.05

each = Tk. 750.00


each = Tk. 412.50
each = Tk. 450.00

each = Tk. 5,500.00


each = Tk. 350.00

each = Tk. 450.00


Sub-total = Tk. 7,912.50
Total (A+B) = Tk. 11,468.55
10.00% = Tk. 1,146.86
3.00% = Tk. 344.06
Tk. 12,959.47
23.00% = Tk. 2,980.68
Grand total = Tk. 15,940.15
Rate per sft. = Tk. 159.40
Rate per sqm = Tk. 1,715.78

.00 Per sqm.

aqa (1-40) - 112


Per sqm = Tk. 14.36
Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

6(b)

Per kg = Tk. 1,046.88


Per bag = Tk. 581.25
Per kg = Tk. 1,125.00
each = Tk. 66.67
Per sft. = Tk. 695.00
Sub-total = Tk. 3,514.80

Per % sft. = Tk. 7,912.50


Total (A+B) = Tk. 11,427.30
10.00% = Tk. 1,142.73
3.00% = Tk. 342.82
Tk. 12,912.85
23.00% = Tk. 2,969.96
Grand total = Tk. 15,882.81
Rate per sft. = Tk. 158.83
Rate per sqm = Tk. 1,709.65

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

7(a)-I

Per % sft. = Tk. 8,867.88


Per Ib. = Tk. 240.00
Total = Tk. 9,107.88
10.00% = Tk. 910.79
3.00% = Tk. 273.24
Tk. 10,291.91
23.00% = Tk. 2,367.14
Grand total = Tk. 12,659.05
Rate per sft. = Tk. 126.59
Rate per sqm = Tk. 1,362.61

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

Per % sft. = Tk. 9,199.84


Per Ib. = Tk. 240.00
Total = Tk. 9,439.84
10.00% = Tk. 943.98
3.00% = Tk. 283.20
Tk. 10,667.02
23.00% = Tk. 2,453.41
Grand total = Tk. 13,120.43

aqa (1-40) - 113


Rate per sft. = Tk. 131.20
Rate per sqm = Tk. 1,412.24

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

7(b)-I

Per % sft. = Tk. 5,996.63


Per Ib. = Tk. 240.00
Total = Tk. 6,236.63
10.00% = Tk. 623.66
3.00% = Tk. 187.10
Tk. 7,047.39
23.00% = Tk. 1,620.90
Grand total = Tk. 8,668.29
Rate per sft. = Tk. 86.68
Rate per sqm = Tk. 933.02

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(b)-II

Per % sft. = Tk. 6,328.59


Per Ib. = Tk. 240.00
Total = Tk. 6,568.59
10.00% = Tk. 656.86
3.00% = Tk. 197.06
Tk. 7,422.51
23.00% = Tk. 1,707.18
Grand total = Tk. 9,129.69
Rate per sft. = Tk. 91.30
Rate per sqm = Tk. 982.75

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

7(c)-I

Per % sft. = Tk. 7,720.38


Per Ib. = Tk. 240.00
Total = Tk. 7,960.38
10.00% = Tk. 796.04
3.00% = Tk. 238.81
Tk. 8,995.23
23.00% = Tk. 2,068.90
Grand total = Tk. 11,064.13
Rate per sft. = Tk. 110.64

aqa (1-40) - 114


Rate per sqm = Tk. 1,190.93

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

Per % sft. = Tk. 8,052.34


Per Ib. = Tk. 240.00
Total = Tk. 8,292.34
10.00% = Tk. 829.23
3.00% = Tk. 248.77
Tk. 9,370.34
23.00% = Tk. 2,155.18
Grand total = Tk. 11,525.52
Rate per sft. = Tk. 115.26
Rate per sqm = Tk. 1,240.66

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

7(d)-I

Per % sft. = Tk. 5,449.13


Per Ib. = Tk. 240.00
Total = Tk. 5,689.13
10.00% = Tk. 568.91
3.00% = Tk. 170.67
Tk. 6,428.71
23.00% = Tk. 1,478.60
Grand total = Tk. 7,907.31
Rate per sft. = Tk. 79.07
Rate per sqm = Tk. 851.11

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(d)-II

Per % sft. = Tk. 5,781.09


Per Ib. = Tk. 240.00
Total = Tk. 6,021.09
10.00% = Tk. 602.11
3.00% = Tk. 180.63
Tk. 6,803.83
23.00% = Tk. 1,564.88
Grand total = Tk. 8,368.71
Rate per sft. = Tk. 83.69
Rate per sqm = Tk. 900.84

aqa (1-40) - 115


.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

8(a)-I

Per sft. = Tk. 6,490.48


Per Ib. = Tk. 240.00
Total = Tk. 6,730.48
10.00% = Tk. 673.05
3.00% = Tk. 201.91
Tk. 7,605.44
23.00% = Tk. 1,749.25
Grand total = Tk. 9,354.69
Rate per sft. = Tk. 93.55
Rate per sqm = Tk. 1,006.97

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(a)-II

Per sft. = Tk. 6,822.44


Per Ib. = Tk. 240.00
Total = Tk. 7,062.44
10.00% = Tk. 706.24
3.00% = Tk. 211.87
Tk. 7,980.55
23.00% = Tk. 1,835.53
Grand total = Tk. 9,816.08
Rate per sft. = Tk. 98.16
Rate per sqm = Tk. 1,056.59

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

8(b)-I

Per % sft. = Tk. 6,444.28


Per Ib. = Tk. 240.00
Total = Tk. 6,684.28
10.00% = Tk. 668.43
3.00% = Tk. 200.53
Tk. 7,553.24
23.00% = Tk. 1,737.25
Grand total = Tk. 9,290.49
Rate per sft. = Tk. 92.90
Rate per sqm = Tk. 999.98

aqa (1-40) - 116


.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(b)-II

Per % sft. = Tk. 6,776.24


Per Ib. = Tk. 240.00
Total = Tk. 7,016.24
10.00% = Tk. 701.62
3.00% = Tk. 210.49
Tk. 7,928.35
23.00% = Tk. 1,823.52
Grand total = Tk. 9,751.87
Rate per sft. = Tk. 97.52
Rate per sqm = Tk. 1,049.71

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

8(c)-I

Per % sft. = Tk. 5,942.98


Per Ib. = Tk. 240.00
Total = Tk. 6,182.98
10.00% = Tk. 618.30
3.00% = Tk. 185.49
Tk. 6,986.77
23.00% = Tk. 1,606.96
Grand total = Tk. 8,593.73
Rate per sft. = Tk. 85.94
Rate per sqm = Tk. 925.06

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(c)-II

Per % sft. = Tk. 6,274.94


Per Ib. = Tk. 240.00
Total = Tk. 6,514.94
10.00% = Tk. 651.49
3.00% = Tk. 195.45
Tk. 7,361.88
23.00% = Tk. 1,693.23
Grand total = Tk. 9,055.11
Rate per sft. = Tk. 90.55
Rate per sqm = Tk. 974.68

.00 Per sqm.

aqa (1-40) - 117


Per sqm = Tk. 14.36
Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

8(d)-I

Per % sft. = Tk. 5,896.78


Per Ib. = Tk. 240.00
Total = Tk. 6,136.78
10.00% = Tk. 613.68
3.00% = Tk. 184.10
Tk. 6,934.56
23.00% = Tk. 1,594.95
Grand total = Tk. 8,529.51
Rate per sft. = Tk. 85.30
Rate per sqm = Tk. 918.17

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

(d)-II

Per % sft. = Tk. 6,228.74


Per Ib. = Tk. 240.00
Total = Tk. 6,468.74
10.00% = Tk. 646.87
3.00% = Tk. 194.06
Tk. 7,309.67
23.00% = Tk. 1,681.22
Grand total = Tk. 8,990.89
Rate per sft. = Tk. 89.91
Rate per sqm = Tk. 967.79

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

9(a)

Per % sft. = Tk. 11,768.47


Per Ib. = Tk. 240.00
Total = Tk. 12,008.47
10.00% = Tk. 1,200.85
3.00% = Tk. 360.25
Tk. 13,569.57
23.00% = Tk. 3,121.00
Grand total = Tk. 16,690.57
Rate per sft. = Tk. 166.91
Rate per sqm = Tk. 1,796.62

.00 Per sqm.

Per sqm = Tk. 14.36

aqa (1-40) - 118


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

9(b)

Per % sft. = Tk. 11,727.22


Per Ib. = Tk. 240.00
Total = Tk. 11,967.22
10.00% = Tk. 1,196.72
3.00% = Tk. 359.02
Tk. 13,522.96
23.00% = Tk. 3,110.28
Grand total = Tk. 16,633.24
Rate per sft. = Tk. 166.33
Rate per sqm = Tk. 1,790.38

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

0(a)

Per kg = Tk. 1,976.25


Per % cft. = Tk. 210.00
Per % cft. = Tk. 315.00

Per bag = Tk. 618.45


Per % cft. = Tk. 50.10
Per % cft. = Tk. 75.15

Per kg = Tk. 1,884.38


Per bag = Tk. 116.25
Per kg = Tk. 1,166.25
Sub-total = Tk. 6,411.83

Per day = Tk. 70.00


each = Tk. 400.00

each = Tk. 375.00


each = Tk. 300.00
each = Tk. 225.00

each = Tk. 450.00


each = Tk. 135.00

Per day = Tk. 70.00


each = Tk. 500.00
Per day = Tk. 550.00
each = Tk. 450.00
each = Tk. 420.00
each = Tk. 60.00

each = Tk. 275.00


Sub-total = Tk. 4,239.17
Total (A+B) = Tk. 10,651.00
10.00% = Tk. 1,065.10
3.00% = Tk. 319.53

aqa (1-40) - 119


Tk. 12,035.63
23.00% = Tk. 2,768.19
Grand total = Tk. 14,803.82
Rate per sft. = Tk. 148.04
Rate per sqm = Tk. 1,593.50

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

0(b)

Per % sft. = Tk. 10,651.00

Per kg = Tk. (1,119.60)

Per kg = Tk. 1,080.00


Total = Tk. 10,611.40
10.00% = Tk. 1,061.14
3.00% = Tk. 318.34
Tk. 11,990.88
23.00% = Tk. 2,757.90
Grand total = Tk. 14,748.78
Rate per sft. = Tk. 147.49
Rate per sqm = Tk. 1,587.58

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

30(c)

Per sft. = Tk. 4,279.00

Per bag = Tk. 930.00


Per % cft = Tk. 300.00
Per kg = Tk. 30.15
Per kg = Tk. 21.60

each = Tk. 750.00


each = Tk. 1,800.00
each = Tk. 2,250.00
L.S. = Tk. 225.00
Per % sft. = Tk. 100.00
Sub-total = Tk. 10,685.75
10.00% = Tk. 1,068.58
3.00% = Tk. 320.57
Tk. 12,074.90
23.00% = Tk. 2,777.23
Grand total = Tk. 14,852.13
Rate per sft. = Tk. 148.52
Rate per sqm = Tk. 1,598.67

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 120


0(d)

= Tk. 6,406.75

Per sft. = Tk. 5,324.00


Total = Tk. 11,730.75
10.00% = Tk. 1,173.08
3.00% = Tk. 351.92
Tk. 13,255.75
23.00% = Tk. 3,048.82
Grand total = Tk. 16,304.57
Rate per sft. = Tk. 163.05
Rate per sqm = Tk. 1,755.07

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

ONE WORK

1(a)

Per sft = Tk. 44,000.00


Per kg = Tk. 67.00

Per bag. = Tk. 1,692.60


Per % cft. = Tk. 124.80
Per % cft. = Tk. 187.20
Sub-total = Tk. 46,071.60

Per day = Tk. 1,025.00


each = Tk. 600.00
each = Tk. 500.00
each = Tk. 550.00
Sub-total = Tk. 2,675.00

each = Tk. 3,300.00


each = Tk. 1,100.00
Sub-total = Tk. 4,400.00

Per day = Tk. 725.00


each = Tk. 1,250.00
each = Tk. 1,375.00
Sub-total = Tk. 8,850.00
Total (A+B+C+D) = Tk. 61,996.60
10.00% = Tk. 6,199.66
3.00% = Tk. 1,859.90
Tk. 70,056.16
23.00% = Tk. 16,112.92
Grand total = Tk. 86,169.08
Rate per sft. = Tk. 861.69
Rate per sqm = Tk. 9,275.23

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 121


1(b)

= Tk. 61,996.60
= Tk. (44,000.00)
Total = Tk. 17,996.60
Per sft. = Tk. 40,000
Sub-total = Tk. 57,996.60
10.00% = Tk. 5,799.66
3.00% = Tk. 1,739.90
Tk. 65,536.16
23.00% = Tk. 15,073.32
Grand total = Tk. 80,609.48
Rate per sft. = Tk. 806.09
Rate per sqm = Tk. 8,676.75

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

31(c)

Per sft. = Tk. 10,100.00

Per bag = Tk. 930.00


Per % cft = Tk. 300.00
Per kg = Tk. 30.15
Per kg = Tk. 21.60

each = Tk. 750.00


each = Tk. 1,800.00
each = Tk. 2,250.00
L.S. = Tk. 225.00
Per % sft. = Tk. 100.00
Sub-total = Tk. 16,506.75
10.00% = Tk. 1,650.68
3.00% = Tk. 495.20
Tk. 18,652.63
23.00% = Tk. 4,290.10
Grand total = Tk. 22,942.73
Rate per sft. = Tk. 229.43
Rate per sqm = Tk. 2,469.58

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

32

= Tk. 17,996.60
Per sft. = Tk. 36,000
Sub-total = Tk. 53,996.60
10.00% = Tk. 5,399.66
3.00% = Tk. 1,619.90
Tk. 61,016.16
23.00% = Tk. 14,033.72
Grand total = Tk. 75,049.88
Rate per sft. = Tk. 750.50
Rate per sqm = Tk. 8,078.38

aqa (1-40) - 122


.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

33

Per sft. = Tk. 31,000.00


Per bag = Tk. 790.50
Per % cft. = Tk. 62.40
Per % cft. = Tk. 93.60
Per kg = Tk. 67.00
Sub-total = Tk. 32,013.50

Per day = Tk. 1,025.00


each = Tk. 600.00
each = Tk. 500.00
each = Tk. 550.00
Sub-total = Tk. 2,675.00

each = Tk. 3,300.00


each = Tk. 1,100.00
Per sft. = Tk. 800.00
Sub-total = Tk. 5,200.00

Per day = Tk. 725.00


each = Tk. 1,250.00
each = Tk. 1,375.00
Sub-total = Tk. 10,450.00
Total (A+B+C+D) = Tk. 50,338.50
10.00% = Tk. 5,033.85
3.00% = Tk. 1,510.16
Tk. 56,882.51
23.00% = Tk. 13,082.98
Grand total = Tk. 69,965.49
Rate per sft. = Tk. 699.65
Rate per sqm = Tk. 7,531.03

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

34

= Tk. 17,996.60

Per sft. = Tk. 30,000


Sub-total = Tk. 47,996.60
10.00% = Tk. 4,799.66
3.00% = Tk. 1,439.90
Tk. 54,236.16
23.00% = Tk. 12,474.32
Grand total = Tk. 66,710.48
Rate per sft. = Tk. 667.10
Rate per sqm = Tk. 7,180.66

.00 Per sqm.

aqa (1-40) - 123


Per sqm = Tk. 14.36
Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

35

= Tk. 50,338.50
Less cost of marble stone = Tk. (31,000.00)
Total = Tk. 19,338.50

Per sft. = Tk. 30,000.00


Sub-total = Tk. 49,338.50
10.00% = Tk. 4,933.85
3.00% = Tk. 1,480.16
Tk. 55,752.51
23.00% = Tk. 12,823.08
Grand total = Tk. 68,575.59
Rate per sft. = Tk. 685.76
Rate per sqm = Tk. 7,381.52

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

36

t of glazed tiles.

Per bag = Tk. 869.55


Per % cft. = Tk. 210.90
Per kg = Tk. 60.30

each = Tk. 1,500.00


each = Tk. 1,200.00
each = Tk. 1,650.00
each = Tk. 1,350.00
L.S. = Tk. 450.000
Total = Tk. 7,290.75
Laying cost per % sft. = Tk. 7,290.75

Per sft. = Tk. 3,600.00


5% = Tk. 180.00
Per % sft. = Tk. 7,290.75
Total = Tk. 11,070.75
10.00% = Tk. 1,107.08
3.00% = Tk. 332.12
Tk. 12,509.95
23.00% = Tk. 2,877.29
Grand total = Tk. 15,387.24
Rate per sft. = Tk. 153.87
Rate per sqm = Tk. 1,656.26

.00 Per sqm.

Per sft. = Tk. 4,000.00


5% = Tk. 200.00
Per % sft. = Tk. 7,290.75
Total = Tk. 11,490.75
10.00% = Tk. 1,149.08

aqa (1-40) - 124


3.00% = Tk. 344.72
Tk. 12,984.55
23.00% = Tk. 2,986.45
Grand total = Tk. 15,971.00
Rate per sft. = Tk. 159.71
Rate per sqm = Tk. 1,719.12

.00 Per sqm.

Per sft. = Tk. 4,200.00


5% = Tk. 210.00
Per % sft. = Tk. 7,290.75
Total = Tk. 11,700.75
10.00% = Tk. 1,170.08
3.00% = Tk. 351.02
Tk. 13,221.85
23.00% = Tk. 3,041.03
Grand total = Tk. 16,262.88
Rate per sft. = Tk. 162.63
Rate per sqm = Tk. 1,750.55

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

37

f glazed tiles.

Per bag. = Tk. 1,162.50


Per % cft. = Tk. 187.50
Per kg = Tk. 60.30

each = Tk. 1,500.00


each = Tk. 1,200.00
each = Tk. 1,650.00
each = Tk. 1,350.00
L.S. = Tk. 450.00
Total = Tk. 7,560.30
Cost per % sft. = Tk. 7,560.30

Per sft. = Tk. 3,800.00


5% = Tk. 190.00
Per % sft. = Tk. 7,560.30
Total = Tk. 11,550.30
10.00% = Tk. 1,155.03
3.00% = Tk. 346.51
Tk. 13,051.84
23.00% = Tk. 3,001.92
Grand total = Tk. 16,053.76
Rate per sft. = Tk. 160.54
Rate per sqm = Tk. 1,728.05

.00 Per sqm.

Per sft. = Tk. 4,200.00


5% = Tk. 210.00
Per % sft. = Tk. 7,560.30
Total = Tk. 11,970.30
10.00% = Tk. 1,197.03

aqa (1-40) - 125


3.00% = Tk. 359.11
Tk. 13,526.44
23.00% = Tk. 3,111.08
Grand total = Tk. 16,637.52
Rate per sft. = Tk. 166.38
Rate per sqm = Tk. 1,790.91

.00 Per sqm.

Per sft. = Tk. 4,500.00


5% = Tk. 225.00
Per % sft. = Tk. 7,560.30
Total = Tk. 12,285.30
10.00% = Tk. 1,228.53
3.00% = Tk. 368.56
Tk. 13,882.39
23.00% = Tk. 3,192.95
Grand total = Tk. 17,075.34
Rate per sft. = Tk. 170.75
Rate per sqm = Tk. 1,837.95

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

O. 38 - I

Per % sft. = Tk. 7,560.30

Per sft. = Tk. 4,800.00


5% = Tk. 240.00
Per % sft. = Tk. 7,560.30
Total = Tk. 12,600.30
10.00% = Tk. 1,260.03
3.00% = Tk. 378.01
Tk. 14,238.34
23.00% = Tk. 3,274.82
Grand total = Tk. 17,513.16
Rate per sft. = Tk. 175.13
Rate per sqm = Tk. 1,885.10

.00 Per sqm.

Per sft. = Tk. 5,400.00


5% = Tk. 270.00
Per % sft. = Tk. 7,560.30
Total = Tk. 13,230.30
10.00% = Tk. 1,323.03
3.00% = Tk. 396.91
Tk. 14,950.24
23.00% = Tk. 3,438.56
Grand total = Tk. 18,388.80
Rate per sft. = Tk. 183.89
Rate per sqm = Tk. 1,979.39

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 126


O. 38 - II

Per % sft. = Tk. 7,560.30

Per sft. = Tk. 8,800.00


5% = Tk. 440.00
Per % sft. = Tk. 7,560.30
Total = Tk. 16,800.30
10.00% = Tk. 1,680.03
3.00% = Tk. 504.01
Tk. 18,984.34
23.00% = Tk. 4,366.40
Grand total = Tk. 23,350.74
Rate per sft. = Tk. 233.51
Rate per sqm = Tk. 2,513.50

.00 Per sqm.

Per sft. = Tk. 10,350.00


5% = Tk. 517.50
Per % sft. = Tk. 7,560.30
Total = Tk. 18,427.80
10.00% = Tk. 1,842.78
3.00% = Tk. 552.83
Tk. 20,823.41
23.00% = Tk. 4,789.38
Grand total = Tk. 25,612.79
Rate per sft. = Tk. 256.13
Rate per sqm = Tk. 2,756.98

.00 Per sqm.

Per sft. = Tk. 11,500.00


5% = Tk. 575.00
Per % sft. = Tk. 7,560.30
Total = Tk. 19,635.30
10.00% = Tk. 1,963.53
3.00% = Tk. 589.06
Tk. 22,187.89
23.00% = Tk. 5,103.21
Grand total = Tk. 27,291.10
Rate per sft. = Tk. 272.91
Rate per sqm = Tk. 2,937.60

.00 Per sqm.

Per sft. = Tk. 6,000.00


5% = Tk. 300.00
Per % sft. = Tk. 7,560.30
Total = Tk. 13,860.30
10.00% = Tk. 1,386.03
3.00% = Tk. 415.81
Tk. 15,662.14
23.00% = Tk. 3,602.29
Grand total = Tk. 19,264.43
Rate per sft. = Tk. 192.64
Rate per sqm = Tk. 2,073.58

aqa (1-40) - 127


.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

O. 38 - III

Per % sft. = Tk. 7,560.30

Per sft. = Tk. 9,000.00


5% = Tk. 450.00
Per % sft. = Tk. 7,560.30
Total = Tk. 17,010.30
10.00% = Tk. 1,701.03
3.00% = Tk. 510.31
Tk. 19,221.64
23.00% = Tk. 4,420.98
Grand total = Tk. 23,642.62
Rate per sft. = Tk. 236.43
Rate per sqm = Tk. 2,544.93

.00 Per sqm.

Per sft. = Tk. 9,600.00


5% = Tk. 480.00
Per % sft. = Tk. 7,560.30
Total = Tk. 17,640.30
10.00% = Tk. 1,764.03
3.00% = Tk. 529.21
Tk. 19,933.54
23.00% = Tk. 4,584.71
Grand total = Tk. 24,518.25
Rate per sft. = Tk. 245.18
Rate per sqm = Tk. 2,639.12

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 128


9(a)

Per bag = Tk. 869.55


Per % cft. = Tk. 210.90
Per kg = Tk. 60.30

each = Tk. 1,500.00


each = Tk. 1,200.00
each = Tk. 1,650.00
each = Tk. 1,350.00
L.S. = Tk. 450.000
Sub-total = Tk. 7,290.75
Per sft. = Tk. 5,000.00
5% = Tk. 250.00
Total = Tk. 12,540.75
10.00% = Tk. 1,254.08
3.00% = Tk. 376.22
Tk. 14,171.05
23.00% = Tk. 3,259.34
Grand total = Tk. 17,430.39
Rate per sft. = Tk. 174.30
Rate per sqm = Tk. 1,876.17

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

Per bag = Tk. 869.55


Per % cft. = Tk. 210.90
Per kg = Tk. 60.30

each = Tk. 1,500.00


each = Tk. 1,200.00
each = Tk. 1,650.00
each = Tk. 1,350.00
L.S. = Tk. 450.000
Sub-total = Tk. 7,290.75
Per sft. = Tk. 6,000.00
5% = Tk. 300.00
Total = Tk. 8,317.40
10.00% = Tk. 831.74
3.00% = Tk. 249.52
Tk. 9,398.66
23.00% = Tk. 2,161.69
Grand total = Tk. 11,560.35
Rate per sft. = Tk. 115.60
Rate per sqm = Tk. 1,244.32

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

40

Per bag = Tk. 467.50

aqa (1-40) - 129


Per % cft. = Tk. 210.90
Per kg = Tk. 60.30

each = Tk. 1,500.00


each = Tk. 1,200.00
each = Tk. 1,650.00
each = Tk. 1,350.00
L.S. = Tk. 450.00
Sub-total = Tk. 2,017.40
Per sft. = Tk. 7,500.00
5% = Tk. 375.00
Total = Tk. 9,892.40
10.00% = Tk. 989.24
3.00% = Tk. 296.77
Tk. 11,178.41
23.00% = Tk. 2,571.03
Grand total = Tk. 13,749.44
Rate per sft. = Tk. 137.49
Rate per sqm = Tk. 1,479.94

.00 Per sqm.

Per sqm = Tk. 14.36


Per sqm = Tk. 28.73
Per sqm = Tk. 43.09

aqa (1-40) - 130


A. BU
1. EARTH WORKS, MASS
Item No.

1.

(a)
(b)

(c)

(d)

(e)

2.(a)

(b)
(c)
3.(a)

(i)
(ii)

3.(b)

(i)

(ii)

4.

(a)

(b)

5(a)

(b)

aqa MS(1-40) - 1
Item No.

(c)

(d)

6.

2. SIT
7.

(a)
(b)
(c)
(d)

3. BRICK WOR
8.

9.

(a)
(b)
(c)
(d)
10.

(a)
(b)
(c)
(d)
11.

(a)
aqa MS(1-40) - 2
Item No.

(b)
(c)
(d)
12(a)

(i)
(ii)
(iii)

(iv)

12.(b)

(i)
(ii)
(iii)
(iv)
12(c)

(i)
(ii)
(iii)
(iv)
12(d)

(i)
(ii)
(iii)
(iv)
13.

14.(a)

(i)
(ii)
(iii)
(iv)
14 (b)

(i)
(ii)
(iii)
aqa MS(1-40) - 3
Item No.

(iv)
14 (c)

(i)
(ii)
(iii)
(iv)
15 (a)

(i)
(ii)
(iii)
(iv)
15 (b)
(i)
(ii)
(iii)
(iv)
15 (c)

(i)
(ii)
(iii)
(iv)
16

(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
(c)
(i)
(ii)
(iii)
(iv)

aqa MS(1-40) - 4
Item No.

17.

(a)
(b)

(c)
18 (a)

18(b)

4. FLOORI
19

20 (a)

(i)
(ii)
(iii)
(iv)
b
(i)
(ii)
(iii)
(iv)
c
(i)
(ii)
(iii)
(iv)
d
(i)
(ii)
(iii)
(iv)
(e)

(i)
(ii)
(iii)
(iv)

aqa MS(1-40) - 5
Item No.

(f)
(i)
(ii)
(iii)
(iv)
5.
21.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii

(i)
(ii)
(iii)
(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii

(i)
(ii)
(iii)
(iv)
(c)-i

(i)
(ii)
(iii)
(iv)
(c)-ii

(i)
(ii)
(iii)
(iv)
(d)-i

(i)
(ii)
(iii)
(iv)
(d)-ii

aqa MS(1-40) - 6
Item No.

(i)
(ii)
(iii)
(iv)
22.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii

(i)
(ii)
(iii)
(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii

(i)
(ii)
(iii)
(iv)
(c)-i

(i)
(ii)
(iii)
(iv)
(c)-ii

(i)
(ii)
(iii)
(iv)
(d)-i

(i)
(ii)
(iii)
(iv)
(d)-ii

(i)

aqa MS(1-40) - 7
Item No.

(ii)
(iii)
(iv)
23.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii

(i)
(ii)
(iii)

(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii

(i)
(ii)
(iii)
(iv)
(c)-i

(i)
(ii)
(iii)
(iv)
(c)-ii

(i)
(ii)
(iii)
(iv)
(d)-i

(i)
(ii)
(iii)
(iv)

aqa MS(1-40) - 8
Item No.

(d)-ii

(i)
(ii)
(iii)
(iv)
24

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii

(i)
(ii)
(iii)
(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii

(i)
(ii)
(iii)
(iv)
(c)-i

(i)
(ii)
(iii)
(iv)
(c)-ii

(i)
(ii)
(iii)
(iv)
(d)-i

aqa MS(1-40) - 9
Item No.

(i)
(ii)
(iii)
(iv)
(d)-ii

(i)
(ii)
(iii)
(iv)
25

a
(i)
(ii)
(iii)
(iv)
b

(i)
(ii)
(iii)
(iv)
26

a
(i)
(ii)
(iii)
(iv)
b

(i)
(ii)
(iii)
(iv)
27

a-i

(i)
(ii)
(iii)
aqa MS(1-40) - 10
Item No.

(iv)
a-ii

(i)
(ii)
(iii)
(iv)
b-i

(i)
(ii)
(iii)
(iv)
b-ii

(i)
(ii)
(iii)
(iv)
c-i

(i)
(ii)
(iii)
(iv)
c-ii

(i)
(ii)
(iii)
(iv)
d-i

(i)
(ii)
(iii)
(iv)
d-ii

(i)
(ii)
(iii)
(iv)
28

a-i

(i)
(ii)
(iii)
(iv)

aqa MS(1-40) - 11
Item No.

a-ii

(i)
(ii)
(iii)
(iv)
b-i

(i)
(ii)
(iii)
(iv)
b-ii

(i)
(ii)
(iii)
(iv)
c-i

(i)
(ii)
(iii)
(iv)
c-ii

(i)
(ii)
(iii)
(iv)
d-i

(i)
(ii)
(iii)
(iv)
d-ii

(i)
(ii)
(iii)
(iv)
29

(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)

aqa MS(1-40) - 12
Item No.

(ii)
(iii)
(iv)
30

(a)
(i)
(ii)
(iii)
(iv)
(b)

(i)
(ii)
(iii)
(iv)
(c)
(i)
(ii)
(iii)
(iv)
(d)
(i)
(ii)
(iii)
(iv)
6. GLAZED TIL
31

(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
(c)
(i)
(ii)
(iii)
(iv)

aqa MS(1-40) - 13
Item No.

32

(i)
(ii)
(iii)
(iv)
33

(i)
(ii)
(iii)
(iv)
34

(i)
(ii)
(iii)
(iv)
35

(i)
(ii)
(iii)
(iv)
36

(i)
(a)
(b)
(c)
(ii)
(iii)
(iv)
37

(i)
(a)
(b)

aqa MS(1-40) - 14
Item No.

(c)
(ii).
(iii)
(iv)
38-I

(i)
(a)
(b)
(ii)
(iii)
(iv)
38-II

(i)
(a)
(b)
(c)
(d)
(ii)
(iii)
(iv)
38-III

(i)
(a)
(b)
(ii)
(iii)
(iv)
39(a)

i)
ii)
iii)
iv)
39(b)

i)
ii)
iii)
iv)
40

i)
ii)
iii)
iv)

aqa MS(1-40) - 15
A. BUILDING WORKS
1. EARTH WORKS, MASS CONCRETE, DPC & PLINTH FILLING
Description of items

Earth work in excavation in all kinds of soil for foundation trenches in/c. layout, providing center lines, bench-mark pillars, leveling, ramming and preparing the
base, fixing bamboo spikes & marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking the
excavated earth at a safe distance of up to 60 m lead, removing the spoils etc. all complete as per direction of engineer-in-charge (rate is excluding the cost of
bench mark pillars).

Excavation upto 1.50 m depth and 60 m lead in/c checking levels and stacking the earth.
Extra rate for each additional 1 m depth beyond 1.5 m and upto 60 m lead in/c checking levels and stacking the earth.

Extra rate for each 30 m additional lead beyond 60 m in/c checking levels and stacking the earth.

Extra rate for earth-work in excavation in foundation trenches, all around protected by palisading and de-watering/bailing-out water up to 1.5 m depth and
60 m lead (condition and quantity of the soil must be supported by sub-soil investigation report and approved by concerned S.E. before commencing the excavation
work).

Extra rate for earth work in excavation in foundation trenches, all around protected by palisading and de-watering/bailing-out water for depth exceeding 1.5 m
(condition and quantity of the soil must be supported by sub-soil investigation report and approved by concerned S.E. before commencing the excavation work).

One layer of brick flat soling in foundation or in floor with 1st class or picked jhama bricks in/c preparation of bed and filling the interstices with local sand,
leveling in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete as per direction of the engineer-in-charge.

One layer of Herring bone bond brick soling -do-


Brick on end edging -do-
Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.1.2) and picked jhama chips including breaking chips, screening, mixing, laying,
compacting to levels and curing for at least 7 days in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete in/c as per
direction of engineer-in-charge

Mass concrete in foundation (1:3:6) with brick chips & local sand of F.M. 1.2
Mass concrete in floor (1:3:6) with brick chips & local sand of F.M. 1.2

Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M.1.2) and picked jhama chips including breaking chips, screening, mixing, laying,
compacting to levels and curing for at least 7 days in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete as per
direction of engineer-in-charge.

Mass concrete in foundation (1:2:4) with brick chips & local sand of F.M. 1.2

Mass concrete in floor (1:2:4) with brick chips & local sand of F.M. 1.2

75 mm thick damp proof course (1:1.5:3) in cement concrete with cement, sand (F.M. 1.2) and picked jhama or stone chips in/c. breaking chips, screening,
centering, shuttering, casting, curing and finished with a coat of bitumen in/c the supply of water, electricity and other charges and costs of tools and plants etc. all
complete as per direction of the engineer-in-charge.

75 mm or 3" thick damp proof course (1:1.5:3) with brick chips and 50% Sylhet sand (F.M. 2.5) & 50% local sand (F.M. 1.2)

75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips.

Sand filling in foundation trenches and plinth with fine local sand having minimum F.M. 0.80 in 150 mm layers including leveling, watering and consolidating
each layer up to finished level etc. all complete as per direction of the engineer-in-charge.

Sand filling in foundation trenches and plinth with coarse sand having min. F.M. 1.20 in 150 mm layers including leveling, watering and consolidating each layer
up to finished level (to be used when required as per design supplied by the design office only) etc. all complete as per direction of the engineer-in-charge.

aqa MS(1-40) - 16
Description of items

Sand filling in foundation trenches and plinth with coarse sand having min. F.M 2.50 in 150 mm layers including leveling , watering and consolidating each layer
up to finished level (to be when required used as pre-requirement of design office only) etc. all complete as per direction of the engineer-in-charge.

3/4" down graded picked jhama chips Khoa consolidation in foundation, mixing the same with best quality local sand (F.M. 1.2) in Khoa : sand (2:1) proportion
in/c breaking & screening chips, laying & spreading in 6" layers uniformly, compacting the same up to the desired mark as suggested by design engineer, spreading
water etc. all complete as per direction of the engineer-in-charge.

Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site, watering, leveling and consolidating each
layer up to finished level etc. all complete as per direction of the engineer-in-charge.

2. SITE IMPROVEMENTS
Site improvement / earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means loading &
unloading at both ends to be supplied at the contractor’s own cost in/c. leveling, watering and consolidating including local carriage each layer up to finished
level. in/c cost of water & test (carried from beyond 300 m) etc. all complete as per direction of the engineer-in-charge.

For Dhaka Metropolitan area


For Narayangonj District
For Chittagong Metropolitan Area
For all districts except Dhaka & Chittagong Metropolitan Area & Narayangonj district

3. BRICK WORK & FANCY SCREEN WORK


Brick work with 1st class bricks in cement mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar racking out the joints, cleaning
and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete (F.M. of sand 1.2) including cost of water, electricity & other
charges as per direction of the engineer-in-charge.

Brick walls of width one brick or one and a half brick length with 1st class bricks in cement sand (F.M. 1.2) mortar (1:6) in super structure in/c raking out
joints, filling the interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at
least for 7 days etc. all complete including cost of water, electricity & other charges (measurement to given as 250 mm width for one brick length and 375 mm for
one brick and a half brick length) as per direction of engineer-in-charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor 10th floor & above
Brick work with 1st class bricks in cement sand (F.M. 1.2) mortar (1:4) in exterior walls in/c filling the interstices with mortar, raking out joints, cleaning and
socking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water,
electricity & other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length). as per direction of the
engineer-in-charge.

Ground Floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for10th floor & above
Exposed brick work (for exterior wall without outside plaster) with special quality sorted out 1st class bricks, very carefully laid in cement sand (F.M.1.2)
mortar (1:4)) in superstructure with uniform width and depth joints, true to vertical and horizontal lines in/c raking out joints scaffolding, soaking the bricks at
least for 24 hours before use, washing & screening of sand. Curing at least for 7 days and high class flush pointing with cement sand (F.M.1.2) mortar (1:1)
including cost of water, electricity & other charges etc all complete as per direction of the engineer-in-charge. (payment will not be made unless the brick is found
to be water proof)

Ground floor
aqa MS(1-40) - 17
Description of items

Add for each additional floor up to 5th floor


Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for10th floor & above
Brick work with 10 holes machine made bricks of approved size (9.5" x 4.5" x 2.75") having uniform color carefully laid in cement sand (F.M.1.2) mortar (1:4)
in superstructure with uniform width and depth joints, true to vertical and horizontal lines in/c raking out joints, filling the interstices with mortar, cleaning and
soaking bricks at least for 24 hours before use and washing & screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement sand
(F.M.1.2) mortar (1:2) including cost of water, electricity & other charges etc. complete as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor

Add for each additional floor for 10th floor & above

Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4) -do- - do-

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face/textured klinker facing bricks (1:4) -do - -do -

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4) -do- -do-

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Extra brick-work rate over the rate of ground floor (or any floor as the case may be) for each additional meter free height of brick wall beyond 4 m from the
respective floor in auditorium, go-down, overhead water tank etc. as description of the item No. in 9, 10, 11 & 12. including cost of water, electricity & other
charges etc. all complete as per direction of the engineer-in-charge. (extra rate shall be admissible only when both sides of wall is uninterruptedly free beyond
4.00 meter)

Providing brick work for 200 x 100 mm facing in superstructure with 200 x 100 x 50 mm machine made klinker hard pressed facing bricks of approved
quality in cement sand (F.M.1.2) mortar (1:4), in/c. racking out joints, cutting the bricks to required size wherever necessary in/c high class recessed pointing,
cleaning and soaking the bricks at least for 24 hours before use and washing & screening of sand, necessary scaffolding, curing at least for 7 days for all floors up to
4th floor including cost of water, electricity & other charges etc. all complete as per direction of engineer-in-charge. (100 x 200 mm face should be placed for facing).

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Providing brick work in facing for 200 x 50 mm in superstructure with 200 x 50 x 50 mm machine made hard pressed klinker facing bricks of approved
quality pressed with 20 mm thick cement sand (F.M.1.2) mortar (1:4), 10 mm thick cement mortar in adjacent sites in/c racking out joints and cutting the bricks to
required sizes wherever necessary with high class recessed pointing, cleaning and soaking the bricks for at least 24 hours before use and washing of sand necessary
scaffolding, curing at least for 7 days for all floors up to 4th floor including cost of water, electricity & other charges etc. all complete as per direction of engineer-in-
charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
aqa MS(1-40) - 18
Description of items

Add for each additional floor for 10th floor & above
Providing brick work for 200 x 62 mm facing in superstructure with 200 x 62 x 25 mm machine made hard pressed klinker facing strips of approved quality with
20 mm thick cement sand (F.M.1.2) mortar (1:3) in adjacent side wall, column, drop wall etc. and racking out joints, cutting the bricks to required sizes wherever
necessary with high class recessed pointing, cleaning and soaking the bricks at least for 24 hours before use washing & screening of sand and necessary scaffoldings,
curing at least 7 days including cost of water, electricity & other charges etc. all complete as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
125 mm brick work with 1st class bricks in cement sand (F.M.1.2) mortar (1:6) and making bond with connected walls in/c necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water, electricity & other
charges etc. all complete as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
125 mm thick brick work with 1st class bricks in cement mortar (1:4) -do-
Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Providing 125 mm thick (Partition wall) in superstructure brick work (1:4) in cement sand (F.M.1.2) mortar with 10 hole machine made ceramic bricks of
approved size having uniform color, carefully laid in cement mortar and depth joints true to vertical and horizontal lines in/c. racking out joints, filling the interstices
with same mortar, making bond with connected walls, cleaning, soaking brick at least 24 hours and washing of sand, curing 7 days in all floors, including cost of
water, electricity & other charges as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Fancy screen work with different size hollow machine made design blocks with uniform color, carefully laid in colored cement sand (F.M.1.2) mortar (1:3) in all
floors in wall with uniform mortar joints, true to vertical and horizontal line in/c racking out joints, cleaning and soaking the blocks for minimum 24 hours before use
in/c washing & screening of sand, scaffolding, curing etc. complete in all respect in/c supply of all necessary materials in/c cost of water, electricity & other charges as
per direction of the engineer-in-charge.

With design block No. 3 (MCW) size: 4" x 4" x 4"


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
With design block No. 2 (MCW) size: 6.5" x 4.75" x 4"
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with design block No. 20 (MCW) size: 6" x 6" x 4"
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa MS(1-40) - 19
Description of items

Klinker paving bricks work in floor/ pavement with machine made pressed bricks of approved quality in cement sand (F.M.1.2) mortar (1:4) on minimum 12
mm thick cement sand (F.M.1.2) mortar (1:4) in/c raking out joints, cutting the bricks to required size soaking the same 24 hours before use wherever necessary
in/c high class flush pointing in cement mortar (1:2), cleaning, curing at least for 7 days etc. in/c washing and screening of sand, cost of water, electricity & other
charges complete and standard practice as per direction of the engineer-in-charge.

100 mm thick brick on edge pavement with 200 x 100 x 50 mm


50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks in 1:4 cement sand mortar having 200 x 100 mm face at top

50 mm thick brick pavement with 200 x 50 x 5 mm klinker facing bricks


115 mm thick brick pavement/flooring with 1st class brick on edge in cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2)
mortar (1:4) in/c cutting the bricks as per requirement, cleaning and racking out joints, finishing with flush pointing with cement sand (F.M. 1.2) mortar (1:2) and
curing for at least 7 days etc. in/c cost of water, washing and screening of sand (F.M. 1.2), electricity & other charges complete and standard practice as per
direction of the engineer-in-charge.

-do- with 10 hole machine made ceramic bricks.

4. FLOORING AND FLOOR FINISH


75 mm thick cement concrete (1:3:6) with cement in flooring best quality coarse sand & 19 mm down graded picked chips in/c breaking chips, screening, mixing,
laying, compacting, washing and screening of sand of F.M 1.2 and curing at least for 7 days etc. in/c cost of water, electricity & other charges all complete as per
direction of the engineer-in-charge.

25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and
50% best local sand of FM 1.2) & 12 mm down well graded brick chips in/c breaking chips, screening, laying the concrete in alternate panels, compacting and
finishing the top with neat cement and curing at least 7 days in all floors in/c cost of water, electricity & other charges all floors as per direction of the engineer-in-
charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
-do- 38 mm thick with 12 mm down graded brick chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
-do- 25 mm thick with 12 mm down well graded crushed stone chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
-do- 38 mm thick with 12 mm down well graded crushed stone chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
25 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and
50% best local sand of FM 1.2) & 12 mm down well graded stone chips in/c breaking chips, screening, laying the concrete in alternate panels, compacting and
finishing the top with neat cement and curing at least 7 days in all floors in/c cost of water, electricity & other charges all floors as per direction of the engineer-in-
charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa MS(1-40) - 20
Description of items

38 mm thick artificial patent stone (1:1.5:3) - do - - do -


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
5. MOSAIC WORK
10 mm thick finished and 12 mm laying thickness situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly
washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) in/c. preparation of mix. and laying the same over
minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80,
No.120)/cutting with mosaic machine and finishing with Minar stone & spreading oxalic acid in/c breaking brick chips, screening, washing mosaic chips and
supply of all necessary materials& water, electricity & other charges in all respect with cement as per direction of the engineer-in-charge.

10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 :
1)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey
cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement =
9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey
cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement :
Grey cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 :
1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey
cement = 9 : 1)

aqa MS(1-40) - 21
Description of items

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work in floor with one part of 10 mm machine crushed well graded dust free and
properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) in/c preparation of mix and laying the same
over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No. 40,
No. 80, No. 120)/ mosaic cutting machine and finishing with Minar stone in/c breaking brick chips screening, spreading oxalic acid, washing mosaic chips and
supply of all necessary materials & water, electricity & other charges in all respect as per direction of the engineer-in-charge.

12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 :
1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey
cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement =
9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey
cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement :
Grey cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey
cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White
cement : Grey cement = 9: 1)

Ground floor

aqa MS(1-40) - 22
Description of items

Add for each additional floor upto 5th floor


Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished laying thickness 12.5 mm silver grey situ mosaic work on floor with one part of 10 mm machine crushed well graded, dust free and
properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) in/c preparation of mix and laying the same
over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No. 40,
No. 80, No. 120) and finishing with Minar stone in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials in/c & water,
electricity & other charges in all respect as per direction of the engineer-in-charge.

10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS:
(White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor

Add for 10th floor and above


10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS:
(White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-
CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
-do- 10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-
CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa MS(1-40) - 23
Description of items

-do- 10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with
STONE-CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick finished laying thickness 14.5 mm silver grey cast in situ mosaic work in floor with one part of 10 mm machine crushed well graded dust free and
properly washed marble chips and one part of mixture containing white cement dust free and properly washed marble chips and one part of mixture containing white
cement and grey with cement in proportion (1:1) in/c. preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making
suitable panels, compacting, curing at least for 7 days, cutting with pumic stone (No. 40. No. 80, No. 120) and finishing with Minar stone in /c breaking brick chips,
screening, washing mosaic chips and supply of all necessary materials & water, electricity & other charges in all respect as per direction of the engineer-in-charge.

12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS:
(White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-
CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-
CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White
cement : Grey cement = 1:1)

aqa MS(1-40) - 24
Description of items

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-
CHIPS: (White cement : Grey cement = 1:1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished and laying thickness 12.5 mm situ mosaic work on wall with one part of 10 mm machine crushed well graded dust free and properly washed
marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) including preparation of mix and laying the same on 12 mm thick
cement plaster (1:4) to wall, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No. 120) including finishing the corners and edges and
also finishing with Minar stone and supplying all necessary materials in & water, electricity & other charges in all respect as per direction of the engineer-in-charge.

10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 9:1)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 9 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished laying thickness silver grey situ mosaic work on wall with one part of 10 mm machine crushed well graded, dust free and properly washed
marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix. and laying the same on 12 mm thick
cement plaster (1:4) to wall, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No 120) including finishing the corners and edges and
also finishing with Minar stone and supplying all necessary materials in & water, electricity & other charges in all respect as per direction of the engineer-in-charge

10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1 : 1)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 1 : 1)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished laid in 12.5 mm thickness colored situ mosaic work with one part of 10 mm machine crushed well graded, dust free and properly washed
marble chips and one part of mixture containing white and grey cement in proportion (1:9) and necessary quantity of approved coloring materials including
preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting
with pumic stone (No. 40, No. 80, No. 120) and finishing with Minar stone in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary
materials in all respects & water, electricity & other charges in all respect as per direction of the engineer-in-charge.

10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
aqa MS(1-40) - 25
Description of items

Add for 10th floor and above


10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick finished and laying thickness 14 mm colored situ mosaic on floor with one part of 10 mm machine crushed well graded, dust free and properly
washed marble chips and one part of mixture containing white cement & grey cement in proportion (9:1) and necessary quantity of approved colorings materials in/c
preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days,
cutting with pumic stone (No. 40, No. 80, No. 120) and finishing with Minar stone including breaking brick chips, screening, washing mosaic chips and supply of all
necessary materials in all respects & water, electricity & other charges in all respect as per direction of the engineer-in-charge.

12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa MS(1-40) - 26
Description of items

12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1: 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5: 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished and laying thickness 12.5 mm colored situ mosaic on walls with one part of 10 mm machine crushed well graded, dust free and properly
washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) and necessary quantity of approved coloring materials
including preparation of mix and laying the same on 12 mm thick cement sand (F.M.1.2) plaster (1:4) to walks including compacting, curing at least for 7 days, cutting
with pumic stone (No. 40, No. 80, No. 120) including finishing the corners and edges and also finishing with Minar stone and supply of all necessary materials etc. &
water, electricity & other charges complete in all respect as per direction of the engineer-in-charge.

10 mm thick (finished) coloured mosaic on wall with Indian chips


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick (finished) coloured mosaic on wall with Pakistani chips
Ground floor

aqa MS(1-40) - 27
Description of items

Add for each additional floor upto 5th floor


Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
200 x 200 x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top with one part of 10 mm machine crushed well graded dust free and
properly washed marble chips and one part of mixture containing white cement and grey cement and supply of all necessary materials etc. & water, electricity & other
charges complete in all respect as per direction of the engineer-in-charge. in proportion (9:1) including preparation of mix machine pressed on 12 mm thick cement
sand (F.M.1.2) mortar base (1:2) including preparing the base, setting the tiles on 40 mm thick cement sand (F.M.1.2) mortar/slurry (lime & surki) base in proportion
of (1:3) compacting, cutting with pumic stone (No. 40, No. 80, No. 120) and finishing the corners and edges and also finishing with minar stone in/c screening,
washing mosaic chips and supply of all necessary materials etc. & water, electricity & other charges complete in all respect as per direction of the engineer-in-charge.

200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Indian chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Pakistani chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Machine made pre-polished double layer terraazo tiles: 10" x 10" Silver mixed.
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Machine made pre-polished double layer terraazo tiles: 10" x 10" White special
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
6. GLAZED TILES & MARBLE STONE WORK
Marble stone flooring with 20 mm /18 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality, texture & size over 25 mm thick cement
sand (F.M.1.2) mortar (1:2) in/c. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in
position in proper level filling the gaps with white cement and coloring pigments including supplying all necessary equipments/materials and finishing the top by
pumic stone and necessary auxiliary materials & water, electricity & other charges complete in all respect as per direction of the engineer-in-charge.

20 mm thick
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
18 mm thick
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Machine made prepolished reconstituted homogenious natura marble slab 325 x 325 mm
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa MS(1-40) - 28
Description of items

Marble stone flooring with 16 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size over 25 mm thick cement sand
(F.M.1.2) mortar (1:2) in/c. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting on position in
proper level filling the gaps with white cement and coloring pigments including supplying all necessary equipments/ materials and finishing the top by pumic stone
and necessary auxiliary materials & water, electricity & other charges complete in all respect as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Supplying and setting 12 mm thick De carrara/Ariston/ Venous marble stone (Italy) of approved quality/texture & size on wall over 12 mm thick cement sand
(F.M.1.2) mortar (1:2) in/c. cutting the marble stone to desired size, grinding and finishing the edges, setting on position keeping correct horizontal and vertical
alignment filling the joints with white cement and coloring pigments including supplying all necessary equipments/ materials and finishing the top by pumic stone and
necessary auxiliary materials & water, electricity & other charges complete in all respect as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Marble stone flooring with 20 mm thick grey/colored marble stone (India/Pakistan) of approved quality, texture & size over 25 mm thick cement sand (F.M.1.2)
mortar (1:2) in/c placing cement slurry below the stone, cutting the marble stone to desired size, grinding, polishing and finishing the edges setting in position in
proper level, filling the gaps with white cement and coloring pigments including supplying all necessary equipments/materials and finishing the top by pumic stone
and necessary auxiliary materials & water, electricity & other charges all complete in all respect as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Supplying and setting 20 mm thick grey/colored marble stone (India/Pakistan) of approved quality, textured & size on walls over 12 mm thick cement sand
(F.M.1.2) mortar (1:2) including cutting and grinding the marble stone slab/tile setting in position keeping horizontal and vertical alignment correct, filling the joints
with white cement, cutting and grinding the top surface, finishing etc in/c. water, electricity & other charges complete in all respect as per direction of the engineer-in-
charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Supplying, fitting and fixing glazed wall tiles (Local made) with on 20 mm thick cement sand (F.M.1.2) mortar (1:3) base and raking out the joints with white cement
including cutting, laying & hire charge of machine and finishing with care etc. in/c water, electricity & other charges complete all respect as per direction of the
engineer-in-charge.

Ground floor
White wall tiles of different sizes
Coloured wall tiles of different sizes
Special design coloured wall tiles
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing glazed floor tiles (Local made) with cement sand (F.M.1.2) mortar (1:3) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge.

Ground floor
White floor tiles of different sizes
Coloured floor tiles of different sizes

aqa MS(1-40) - 29
Description of items

Special design coloured floor tiles


Add for each additional floor upto 5th floor for items I(a)-(i)
Add for each additional floor from 6th floor to 9th floor for items I(a)-(i)
Add for each additional floor for 10th floor and above for items I(a)-(i)
Supplying, fitting and fixing unglazed homogeneous floor tiles (local made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2) base and raking out the joints with
white cement and colored pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge.

Ground floor
GP (Homogeneous) 305 x 305 mm floor tiles
GP (Homogeneous) 400 x 400 mm floor tiles
Add for each additional floor upto 5th floor for items I(a)-(i)
Add for each additional floor from 6th floor to 9th floor for items I(a)-(i)
Add for each additional floor for 10th floor and abovefor items I(a)-(i)
Supplying, fitting and fixing mirror polished floor tiles (local made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2) base and raking out the joints with
white cement and colored pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-
charge.

Ground floor
GP (Mirror polished) 300 x 300 mm floor tiles
GP (Mirror polished) 396 x 396 mm floor tiles
GP (Mirror polished) 300 x 600 mm floor tiles
GP 305 x 305 mm floor (stair) tiles
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing acid proof floor tiles (local made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2) base and raking out the joints with white cement
and colored pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge.

Ground floor
140 x 140 x 8.5 mm BISF acid proof
100 x 100 x 8.5 mm BISF acid proof
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing homogeneous quartz floor tiles (Local made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2) base and racking out the joints with
white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing homogeneous embossed (non-skid) floor tiles (Local made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2) base and racking
out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-
charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing (300 x 300 mm/400 x 400 mm) special quality fibrous floor tiles (foreign made) on 20 mm thick cement sand (F.M.1.2) mortar (1:2)
base and racking out the joints with white cement and colored pigment including cutting and laying tiles in proper way and finishing with care etc. all complete as per
directing of the engineer-in-charge.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above

aqa MS(1-40) - 30
NG WORKS
RETE, DPC & PLINTH FILLING

Unit Unit Rate

cum Tk. 321.00

cum Tk. 70.00

cum Tk. 26.00

cum Tk. 290.00

cum Tk. 565.00

sqm Tk. 621.00


sqm Tk. 981.00
rm Tk. 157.00

cum Tk. 9,724.00

cum Tk. 9,445.00

cum Tk. 11,094.00

cum Tk. 10,815.00

sqm Tk. 1,346.00

sqm Tk. 1,492.00

cum Tk. 1,109.00

cum Tk. 2,129.00

aqa MS(1-40) - 31
Unit Unit Rate

cum Tk. 3,087.00

cum Tk. 6,342.00

cum Tk. 340.00


OVEMENTS

cum Tk. 1,397.00


cum Tk. 521.00
cum Tk. 504.00
cum Tk. 495.00

NCY SCREEN WORK

cum Tk. 8,984.00

cum Tk. 9,634.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 10,039.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 11,606.00


aqa MS(1-40) - 32
Unit Unit Rate
cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,582.00


cum Tk. 235.61

cum Tk. 329.85

cum Tk. 376.98

cum Tk. 7,972.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,668.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,891.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 242.00

sqm Tk. 1,447.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,652.00


sqm Tk. 43.09
sqm Tk. 57.45
aqa MS(1-40) - 33
Unit Unit Rate
sqm Tk. 71.81

sqm Tk. 2,332.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,392.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,430.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,253.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 2,337.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,770.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,852.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

aqa MS(1-40) - 34
Unit Unit Rate

sqm Tk. 2,004.00

sqm Tk. 1,358.00


sqm Tk. 1,521.00

sqm Tk. 1,642.00

sqm Tk. 1,408.00

D FLOOR FINISH

sqm Tk. 831.00

sqm Tk. 530.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 658.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 578.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 731.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 602.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

aqa MS(1-40) - 35
Unit Unit Rate

sqm Tk. 765.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81
C WORK

sqm Tk. 1,309.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,376.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 897.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 947.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,155.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,205.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 815.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 36
Unit Unit Rate
sqm Tk. 865.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 971.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,021.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 964.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,014.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 889.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 939.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 882.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 932.00

aqa MS(1-40) - 37
Unit Unit Rate
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 858.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 908.00


sqm Tk. 14.36

sqm Tk. 28.73


sqm Tk. 43.09

sqm Tk. 852.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 902.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 777.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 826.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 770.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 38
Unit Unit Rate

sqm Tk. 820.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 909.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 958.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 902.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 951.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 827.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 876.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 39
Unit Unit Rate
sqm Tk. 820.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 869.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,761.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,755.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,716.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,710.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,363.00


sqm Tk. 14.36
sqm Tk. 28.73
aqa MS(1-40) - 40
Unit Unit Rate
sqm Tk. 43.09

sqm Tk. 1,412.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 933.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 983.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,191.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,241.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 851.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 901.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,007.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 41
Unit Unit Rate

sqm Tk. 1,057.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,000.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,050.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 925.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 975.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 918.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 968.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,797.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,790.00

aqa MS(1-40) - 42
Unit Unit Rate
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,594.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,588.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,599.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,755.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09
ARBLE STONE WORK

sqm Tk. 9,275.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 8,677.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,470.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 43
Unit Unit Rate

sqm Tk. 8,078.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,531.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,181.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,382.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,656.00


sqm Tk. 1,719.00
sqm Tk. 1,751.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,728.00


sqm Tk. 1,791.00

aqa MS(1-40) - 44
Unit Unit Rate
sqm Tk. 1,838.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,885.00


sqm Tk. 1,979.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,514.00


sqm Tk. 2,757.00
sqm Tk. 2,938.00
sqm Tk. 2,074.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,545.00


sqm Tk. 2,639.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,876.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,244.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,480.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa MS(1-40) - 45
ANNEXURE - A
SHORT
A
1. EARTH WORKS, M

Item No.

1.
(a)
(b)

(c)

(d)

(e)

2.(a)
(b)
(c)
3.(a)

(i)
(ii)

3.(b)
(i)

(ii)

4.

(a)

(b)

5(a)

(b)

(c)

(d)

6.

2
7.

(a)
(b)
(c)
(d)
3. BRICK
8.
9.

(a)
(b)
(c)

aqa SS(1-40) - 1
Item No. ANNEXURE - A

(d)
10.
(a)
(b)
(c)
(d)

11.

(a)
(b)
(c)
(d)
12(a)

(i)
(ii)
(iii)
(iv)
12.(b)
(i)
(ii)
(iii)
(iv)
12(c)

(i)
(ii)
(iii)
(iv)
12(d)

(i)
(ii)
(iii)
(iv)
13.

14.(a)

(i)
(ii)
(iii)
(iv)
14 (b)

(i)
(ii)
(iii)
(iv)
14 (c)

(i)
(ii)
(iii)
(iv)
15 (a)
(i)
(ii)

aqa SS(1-40) - 2
Item No. ANNEXURE - A

(iii)

(iv)

15 (b)
(i)
(ii)
(iii)
(iv)
15 (c)

(i)
(ii)
(iii)
(iv)

16
(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
(c)
(i)
(ii)
(iii)
(iv)
17.

(a)
(b)

(c)
18 (a)

18(b)
4.

19

20 (a)

(i)
(ii)
(iii)

(iv)
b
(i)
(ii)
(iii)
(iv)
c
(i)
(ii)
(iii)
(iv)

aqa SS(1-40) - 3
Item No. ANNEXURE - A

d
(i)
(ii)
(iii)
(iv)
(e)

(i)
(ii)
(iii)
(iv)
(f)
(i)
(ii)
(iii)
(iv)

21.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii
(i)
(ii)
(iii)
(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii
(i)
(ii)
(iii)
(iv)
(c)-i
(i)
(ii)
(iii)
(iv)
(c)-ii
(i)
(ii)
(iii)
(iv)
(d)-i
(i)
(ii)
(iii)
(iv)
(d)-ii
(i)
(ii)
(iii)

aqa SS(1-40) - 4
Item No. ANNEXURE - A

(iv)

22.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii
(i)
(ii)
(iii)
(iv)
(b)-i
(i)
(ii)
(iii)
(iv)
(b)-ii
(i)
(ii)

(iii)

(iv)
(c)-i
(i)
(ii)
(iii)
(iv)
(c)-ii
(i)
(ii)
(iii)
(iv)
(d)-i
(i)
(ii)
(iii)
(iv)
(d)-ii
(i)
(ii)
(iii)
(iv)
23.

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii
(i)
(ii)
(iii)
(iv)

aqa SS(1-40) - 5
Item No. ANNEXURE - A

(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii
(i)
(ii)
(iii)
(iv)
(c)-i
(i)
(ii)
(iii)
(iv)
(c)-ii
(i)
(ii)
(iii)
(iv)
(d)-i
(i)
(ii)
(iii)
(iv)
(d)-ii
(i)
(ii)
(iii)
(iv)
24

(a)-i

(i)
(ii)
(iii)
(iv)
(a)-ii
(i)
(ii)
(iii)
(iv)
(b)-i

(i)
(ii)
(iii)
(iv)
(b)-ii
(i)
(ii)
(iii)
(iv)
(c)-i
(i)
(ii)
(iii)
(iv)
(c)-ii
(i)

aqa SS(1-40) - 6
Item No. ANNEXURE - A

(ii)
(iii)
(iv)
(d)-i
(i)
(ii)
(iii)
(iv)
(d)-ii
(i)
(ii)
(iii)
(iv)
25

a
(i)
(ii)
(iii)
(iv)
b
(i)
(ii)
(iii)
(iv)
26

a
(i)
(ii)
(iii)
(iv)
b
(i)
(ii)
(iii)
(iv)
27
a-i

(i)
(ii)
(iii)
(iv)
a-ii

(i)
(ii)
(iii)
(iv)
b-i

(i)
(ii)
(iii)
(iv)
b-ii

(i)
aqa SS(1-40) - 7
Item No. ANNEXURE - A

(ii)
(iii)
(iv)
c-i

(i)
(ii)
(iii)
(iv)
c-ii

(i)
(ii)
(iii)
(iv)
d-i

(i)
(ii)
(iii)
(iv)
d-ii

(i)
(ii)
(iii)
(iv)
28

a-i

(i)
(ii)
(iii)
(iv)
a-ii

(i)
(ii)
(iii)
(iv)
b-i

(i)
(ii)
(iii)
(iv)
b-ii

(i)
(ii)
(iii)
(iv)
c-i

aqa SS(1-40) - 8
Item No. ANNEXURE - A

(i)
(ii)
(iii)
(iv)
c-ii

(i)
(ii)
(iii)
(iv)
d-i

(i)
(ii)
(iii)
(iv)
d-ii

(i)
(ii)
(iii)
(iv)
29

(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
30
(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
(c)

(i)
(ii)
(iii)
(iv)
(d)
(i)
(ii)
(iii)
(iv)
aqa SS(1-40) - 9
Item No. ANNEXURE - A

7. GLAZED T
31

(a)
(i)
(ii)
(iii)
(iv)
(b)
(i)
(ii)
(iii)
(iv)
(c)
(i)
(ii)
(iii)
(iv)
32

(i)
(ii)
(iii)
(iv)
33

(i)
(ii)
(iii)
(iv)
34

(i)
(ii)
(iii)
(iv)
35

(i)
(ii)
(iii)
(iv)

36

(i)
(a)
(b)
(c)
(ii)
(iii)
(iv)
37
(i)
aqa SS(1-40) - 10
Item No. ANNEXURE - A

(a)
(b)
(c)
(ii).
(iii)
(iv)
38-I

(i)
(a)
(b)
(ii)
(iii)
(iv)
38-II

(i)

(a)
(b)
(c)
(d)
(ii)
(iii)
(iv)
38-III

(i)
(a)
(b)
(ii)
(iii)
(iv)
39(a)

i)
ii)
iii)
iv)
39(b)

i)
ii)
iii)
iv)
40

i)
ii)
iii)
iv)

aqa SS(1-40) - 11
ANNEXURE - A
SHORT FORM OF SCHEDULE
A. BUILDING WORKS
1. EARTH WORKS, MASS CONCRETE, DPC & PLINTH FILLING

Description of items

Earth work in excavation in all kinds of soil for foundation trenches


Excavation upto 1.50 m depth and 60 m lead in/c checking levels and stacking the earth.
Excavation uptofor
1.50 m depth and 60 mdepth
lead in/c checking
1.5 mlevels
and and
uptostacking the in/c
earth.
Extra rate each additional 1m beyond 60 m lead checking levels and stacking the earth.

Extra rate for each 30 m additional lead beyond 60 m in/c checking levels and stacking the earth.

Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water up to 1.5 m depth and 60 m lead.

Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water for depth exceeding 1.5 m

One layer of brick flat soling in foundation or in floor with lst class or picked jhama bricks
One layer of Herring bone bond brick soling
Brick on end edging
Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.1.2) and picked jhama chips

Mass concrete in foundation (1:3:6) with brick chips & local sand of F.M. 1.2
Mass concrete in floor (1:3:6) with brick chips & local sand of F.M. 1.2

Mass concrete (1:2:4) in foundation or floor with cement, sand(F.M.1.2) and picked jhama chips
Mass concrete in foundation (1:2:4) with brick chips & local sand of F.M. 1.2

Mass concrete in floor (1:2:4) with brick chips & local sand of F.M. 1.2

75 mm thick damp proof course (1:1.5:3) in cement concrete with cement, sand (F.M. 1.2) and picked jhama or stone chips

75 mm or 3" thick damp proof course (1:1.5:3) with brick chips and 50% Sylhet sand (F.M. 2.5) & 50% local sand (F.M. 1.2)

75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips.

Sand filling in foundation trenches and plinth with fine local sand having minimum F.M. 0.80 in 150 mm layers

Sand filling in foundation trenches and plinth with coarse sand having min. F.M. 1.20 in 150 mm layers.

Sand filling in foundation trenches and plinth with coarse sand having min. F.M 2.50 in 150 mm layers

3/4" down graded picked jhama chips khoa consilidation in foundation, mixing the same with best quality local sand (F.M. 1.2) in khoa : sand (2:1) proportion.

Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site.

2. SITE IMPROVEMENTS
Site improvement / earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means.

For Dhaka Metropolitan area


For Narayangonj District
For Chittagong Metropolitan Area
For all districts except Dhaka & Chittagong Metropolitan Area & Narayangonj district
3. BRICK WORK & FANCY SCREEN WORK
Brick work with 1st class bricks in cement mortar (1:6) in foundation and plinth.
Brick walls of width one brick or one and a half brick length with 1st class bricks in cement mortar (1:6) in super structure

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor

aqa SS(1-40) - 12
Description of items ANNEXURE - A

Add for each additional floor 10th floor & above


Brick work with lst class bricks in cement mortar (1:4) in exterior walls
Ground Floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for10th floor & above

Exposed brick work (for exterior wall without outside plaster) with special quality sorted out 1st class bricks, very carefully laid in cement mortar (1:4)) in
superstructure.
Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for10th floor & above
Brick work with 10 holes machine made bricks of approved size (9.5" x 4.5" x 2.75") having uniform colour carefully laid in cement mortar (1:4) in
superstructure
Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4) -do- - do-
Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face/textured klinker facing bricks (1:4) -do - -do -

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4) -do- -do-

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Extra brick-work rate over the rate of ground floor (or any floor as the case may be) for each additional meter free height of brick wall beyond 4 m from the
respective floor in auditorium, Godown, overhead water tank etc. as description of the item No.in 9, 10, 11 & 12.

Providing brick work for 200 x 100 mm facing in superstructure with 200 x 100 x 50 mm machine made klinker hard pressed facing bricks.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Providing brick work in facing for 200 x 50 mm in supertucture with 200 x 50 x 50 mm machine made hard pressed klinker facing bricks.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Providing brick work for 200 x 62 mm facing in superstructure with 200 x 62 x 25 mm machine made hard pressed klinker facing strips.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
125 mm brick work with 1st class bricks in cement mortar (1:6)
Ground floor
Add for each additional floor up to 5th floor

aqa SS(1-40) - 13
Description of items ANNEXURE - A

Add for each additional floor from 6th floor up to 9th floor

Add for each additional floor for 10th floor & above

125 mm thick brick work with 1st class bricks in cement mortar (1:4) -do-
Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above
Providing 125 mm thick (Partition wall) in superstructure brick work (1:4) in cement mortar with 10 hole machine made ceramic bricks.

Ground floor
Add for each additional floor up to 5th floor
Add for each additional floor from 6th floor up to 9th floor
Add for each additional floor for 10th floor & above

Fancy screen work with different size hollow machine made design blocks
With design block No. 3 (MCW) size: 4" x 4" x 4"
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
With design block No. 2 (MCW) size: 6.5" x 4.75" x 4"
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with design block No. 20 (MCW) size: 6``x 6``x4
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Klinker paving bricks work in floor/ pavement with machine made pressed bricks of approved quality in cement mortar (1:4) on minimum 12 mm thick cement
mortar (1:4)
100 mm thick brick on edge pavement with 200 x 100 x 50 mm
50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks in 1:4 cement sand mortar having 200 x 100 mm face at top

50 mm thick brick pavement with 200 x 50 x 5 mm klinker facing bricks


115 mm thick brick pavement/flooring with lst class brick on edge in cement mortar (1:4) on minimum 12 mm thick cement mortar (4:1)

-do- with 10 hole machine made ceramic bricks.


4. FLOORING AND FLOOR FINISH

75 mm thick cement concrete (1:3:6) with cement in flooring best quality coarse sand & 19 mm down graded picked chips

25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and
50% best local sand of FM 1.2) & 12 mm down well graded brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor

Add for 10th floor and above


-do- 38 mm thick with 12 mm down graded brick chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
-do- 25 mm thick with 12 mm down well graded crushed stone chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa SS(1-40) - 14
Description of items ANNEXURE - A

-do- 38 mm thick with 12 mm down well graded crushed stone chips


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
25 mm thick artificial patent stone (1:1.5:3) flooring with cement , best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and
50% best local sand of FM 1.2 & 12 mm down well graded stone chips

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
38 mm thick artificial patent stone (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
5. MOSAIC WORK
10 mm thick finished and 12 mm laying thickness situ mosaic work on minimum 25 mm thick artificial patent stone flooring with cement, sand and brick
chips in proportion (1:2:4)
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass divider

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Paksitani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian origin marble chips without glass dividers
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) do--- do ----
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips without glass divider
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor

aqa SS(1-40) - 15
Description of items ANNEXURE - A

Add for 10th floor and above

12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work on minimum 25 mm thick artificial patent stone flooring in propotion (1:2:4)
cement, sand, brick chips
with Indian (Indian, Deradun) origin marble chips and making suitable panel by 5 x 20 mm deep glass dividers

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and suitable panel by 5 mm x 20 mm deep glass dividers.
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor

Add for each additional floor from 6th floor to 9th floor

Add for 10th floor and above


with Indian (Indian, Deradun) origin marble chips without glass dividers
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips without glass divider
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished laying thickness 12.5 mm silver grey situ mosaic work on 25 mm thick artificial patent stone flooring with cemet, sand and brick chips
in prportion (1:2:4)
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5mm thick and 20mm deep glass dividers.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

aqa SS(1-40) - 16
Description of items ANNEXURE - A

with pakistani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian , Deradun) origin marble chips without glass dividers
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Pakistani mosaic origin marble chips without glass divider
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick finished laying thickness 14.5 mm silver grey cast in situ mosaic work on 25 mm thick artificial patent stone flooring in proportion(1:2:4)
cement, sand and brick chips
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone of cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian, Deradun) origin marble chips without glass dividers.
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor

aqa SS(1-40) - 17
Description of items ANNEXURE - A

Add for each additional floor upto 5th floor


Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips without glass dividers
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
on patent stone cement : sand : stone chip (1:1.5:3) - do - - do -
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished and laying thickness 12.5 mm situ mosaic work on wall on 12 mm thick cement plaster (1:4) to wall.

with Indian ( Indian, Deradun) origin marble chips


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Pakistani origin marble chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished laying thickness silver grey situ mosaic work on wall on 12 mm thick cement plaster (1:4) to wall.

with Indian ( Indian , Deradun) origin marble chips


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistan origin marble chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished and laid in 12.5 mm thickness coloured situ mosaic work
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:2:4)
with brick chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:1,5:3) with
brick chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips.

Ground floor
aqa SS(1-40) - 18
Description of items ANNEXURE - A

Add for each additional floor upto 5th floor


Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian ( Indian, Deradun) origin marble chips and without glass dividersin/c 25 mm thick patent stone (1:2:4) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian ( Indian, Deradun) origin marble chips and without glass dividersin/c 25 mm thick patent stone (1:1:5:3) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:2:4) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:1.5:3) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
12 mm thick finished and laying thickness 14 mm coloured situ mosaic on minimum 25 mm thick artficial patent stone flooring on proportion (1:2:4).

12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:1.5:3) with brick
chips

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian, Deradun) origin marble chips and without glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips.

aqa SS(1-40) - 19
Description of items ANNEXURE - A

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with Indian (Indian, Deradun) origin marble chips and without glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:2:4) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:1.5:3) with brick chips.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
10 mm thick finished and laying thickness 12.5 mm coloured situ mosaic on walls over 12 mm thick cement plaster (1:4)

with Indian (Indian, Deradun) origin marble chips


Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
200 x 200 x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top
with Indian (Indian, Deradun) origin marble chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
with pakistani origin marble chips
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Machine made per-polished double layer terraazo tiles (Conpac production): 10" x 10" silver mixed.

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
250 x 250 mm machine mad pre-polished doble layer white special -do- do-
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
aqa SS(1-40) - 20
Description of items ANNEXURE - A

7. GLAZED TILES AND MARBLE STONE WORKS


Marble stone flooring with 20 mm /18 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality, texture & size over 25 mm thick cement
mortar (1:2)
20 mm thick
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
18 mm thick
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Machine made prepolished reconstituted homogenious natura marble slab 325 x 325 mm
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Marble stone flooring with 16 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size over 25 mm thick cement mortar
(1:2) with cement
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Supplying and setting 12 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size on wall over 12 mm thick cement mortar
(1:2)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Marble stone flooring with 20 mm thick grey/coloured marble stone (India/Pakistan) of apprjoved quality, texture & size over 25 mm thick cement mortar (1:2)

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above
Sypplying and setting 20 mm thick grey/coloured marble stone (India/Pakistan) of apporoved quality, textured & size on walls over 12 mm thhick cement mortar
(1:2)
Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for 10th floor and above

Supplying, fitting and fixing glazed wall tiles (Local made) with on 20 mm thick cement mortar (1:3) base

Ground floor
White wall tiles of different sizes
Coloured wall tiles of different sizes
Special design coloured wall tiles
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing glazed floor tiles (Local made) with cement mortar (1:3) base
Ground floor
aqa SS(1-40) - 21
Description of items ANNEXURE - A

White floor tiles of different sizes


Coloured floor tiles of different sizes
Special design coloured floor tiles
Add for each additional floor upto 5th floor for items I(a)-(i)
Add for each additional floor from 6th floor to 9th floor for items I(a)-(i)
Add for each additional floor for 10th floor and abovefor items I(a)-(i)
Supplying, fitting and fixing unglazed homogeneous floor tiles (local made) on 20 mm thick cement mortar (1:2) base

Ground floor
GP (Homogeneous) 305 x 305 mm floor tiles
GP (Homogeneous) 400 x 400 mm floor tiles
Add for each additional floor upto 5th floor for items I(a)-(i)
Add for each additional floor from 6th floor to 9th floor for items I(a)-(i)
Add for each additional floor for 10th floor and abovefor items I(a)-(i)
Supplying, fitting and fixing mirror polished floor tiles (local made) on 20 mm thick cement mortar (1:2) base

Ground floor

GP (Mirror polished) 300 x 300 mm floor tiles


GP (Mirror polished) 396 x 396 mm floor tiles
GP (Mirror polished) 300 x 600 mm floor tiles
GP 305 x 305 mm floor (stair) tiles
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing acid proof floor tiles (local made) on 20 mm thick cement mortar (1:2) base

Ground floor
140 x 140 x 8.5 mm BISF acid proof
100 x 100 x 8.5 mm BISF acid proof
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing homogeneous quartz floor tiles (Local made) on 20 mm thick cement mortar (1:2) base

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing homogeneous embossed (non-skid) floor tiles (Local made) on 20 mm thick cement mortar (1:2) base

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above
Supplying, fitting and fixing (300 x 300 mm/400 x 400 mm) special quality fibrous floor tiles (foreign made) on 20 mm thick cement mortar (1:2) base

Ground floor
Add for each additional floor upto 5th floor
Add for each additional floor from 6th floor to 9th floor
Add for each additional floor for 10th floor and above

aqa SS(1-40) - 22
ANNEXURE - A
OF SCHEDULE
NG WORKS
CRETE, DPC & PLINTH FILLING

Unit Unit Rate

cum Tk. 321.00


cum Tk. 70.00

cum Tk. 26.00

cum Tk. 290.00

cum Tk. 565.00

sqm Tk. 621.00


sqm Tk. 981.00
rm Tk. 157.00

cum Tk. 9,724.00


cum Tk. 9,445.00

cum Tk. 11,094.00

cum Tk. 10,815.00

sqm Tk. 1,346.00

sqm Tk. 1,492.00

cum Tk. 1,109.00

cum Tk. 2,129.00

cum Tk. 3,087.00

cum Tk. 6,342.00

cum Tk. 340.00

ROVEMENTS

cum Tk. 1,397.00


cum Tk. 521.00
cum Tk. 504.00
cum Tk. 495.00
ANCY SCREEN WORK
cum Tk. 8,984.00

cum Tk. 9,634.00


cum Tk. 235.61
cum Tk. 329.85

aqa SS(1-40) - 23
Unit Unit Rate ANNEXURE - A

cum Tk. 376.98

cum Tk. 10,039.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 11,606.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,582.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 7,972.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,668.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98

cum Tk. 8,891.00


cum Tk. 235.61
cum Tk. 329.85
cum Tk. 376.98
cum Tk. 242.00

sqm Tk. 1,447.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,652.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 2,332.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,392.00


sqm Tk. 43.09

aqa SS(1-40) - 24
Unit Unit Rate ANNEXURE - A

sqm Tk. 57.45

sqm Tk. 71.81

sqm Tk. 1,430.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,253.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 2,337.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,770.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 1,852.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 2,004.00


sqm Tk. 1,358.00

sqm Tk. 1,521.00


sqm Tk. 1,642.00

sqm Tk. 1,408.00


ND FLOOR FINISH

sqm Tk. 831.00

sqm Tk. 530.00


sqm Tk. 43.09
sqm Tk. 57.45

sqm Tk. 71.81

sqm Tk. 658.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 578.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

aqa SS(1-40) - 25
Unit Unit Rate ANNEXURE - A

sqm Tk. 731.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 602.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81

sqm Tk. 765.00


sqm Tk. 43.09
sqm Tk. 57.45
sqm Tk. 71.81
IC WORK

sqm Tk. 1,309.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,376.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 897.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 947.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,155.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,205.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 815.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 865.00


sqm Tk. 14.36
sqm Tk. 28.73

aqa SS(1-40) - 26
Unit Unit Rate ANNEXURE - A

sqm Tk. 43.09

sqm Tk. 971.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,021.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 964.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,014.00


sqm Tk. 14.36

sqm Tk. 28.73

sqm Tk. 43.09

sqm Tk. 889.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 939.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 882.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 932.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 858.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 908.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa SS(1-40) - 27
Unit Unit Rate ANNEXURE - A

sqm Tk. 852.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 902.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 777.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 826.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 770.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 820.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 909.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 958.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 902.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 951.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 827.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 876.00

aqa SS(1-40) - 28
Unit Unit Rate ANNEXURE - A

sqm Tk. 14.36


sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 820.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 869.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,761.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,755.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,716.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,710.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,363.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,412.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 933.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 983.00


aqa SS(1-40) - 29
Unit Unit Rate ANNEXURE - A

sqm Tk. 14.36


sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,191.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,241.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 851.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 901.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,007.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,057.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,000.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,050.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa SS(1-40) - 30
Unit Unit Rate ANNEXURE - A

sqm Tk. 925.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 975.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 918.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 968.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,797.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,790.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,594.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,588.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,599.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,755.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09
aqa SS(1-40) - 31
Unit Unit Rate ANNEXURE - A

MARBLE STONE WORKS

sqm Tk. 9,275.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 8,677.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,470.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 8,078.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,531.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,181.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 7,382.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,656.00


sqm Tk. 1,719.00
sqm Tk. 1,751.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

aqa SS(1-40) - 32
Unit Unit Rate ANNEXURE - A

sqm Tk. 1,728.00


sqm Tk. 1,791.00
sqm Tk. 1,838.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,885.00


sqm Tk. 1,979.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,514.00


sqm Tk. 2,757.00
sqm Tk. 2,938.00
sqm Tk. 2,074.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 2,545.00


sqm Tk. 2,639.00
sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,876.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,244.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09

sqm Tk. 1,480.00


sqm Tk. 14.36
sqm Tk. 28.73
sqm Tk. 43.09