Managing Construction
Claims”
Productivity Factor =
Actual Productivity
Baseline or Planned
Productivity
100
80
% Effficiency
60
40
20
0
-20 -10 0 10 20 30 40 50 60 70 80 90 100
Eff ti Temperature
Effective T t (F)
Efficiency
Eff ti Temperature
Effective T t Range
R °F
%
+40 to 80 100
-20 to +20 20 – 95
80 to 100 85 - 60
100
90
% Prroductive
80
70
60
50
40
30
1 2 3 4 5 6 7 8 9 10 11 12
Weeks
Calvey Consulting, LLC 440-740-1132
Overtime Impact on Productivity
Actual Production
32,668
30,000
er Percent
Manhours pe
20,000
60% Complete: 14,762 Manhours
10,000
100%
80%
90%
10%
20%
30%
40%
50%
60%
70%
Calvey Consulting, LLC 440-740-1132
Percent based on Foundation Concrete
Court Case (A) – Clark Concrete Contractors,
I
Inc., 99-1
99 1 BCA ¶30,280
¶30 280 [1]
“[The
[ Government]] is correct in asserting g that the work
performed during the periods compared by [the
Contractor] was not identical in each period. We
would be surprised to learn that work performed in
periods being compared is ever identical on a
construction project, however. And it need not be; the
ascertainment off damages for
f labor inefficiency
ff is not
susceptible to absolute exactness. (Citation omitted).
We will accept
p a comparison
p if it is between kinds of
work which are reasonably alike, such that the
approximations it involves will be meaningful.”