OCT NOV DIC ENE NOV DIC ENE 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

semana 02 semana 03 semana 04 semana 05


VIGAS
LOSA ALIGERADA
CONCRETO EN LOSAS ALIGERADAS (CEM TIPO IP) f´c=280 kg/cm2 C 0 137.46 243.95 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
BLOQUE 1 42.81 64.11 0% 100% - 64.11 14 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 2 24.8 36.55 0% 100% - 36.55 7 1 1 1 1 1 1 1
BLOQUE 3 19.15 26.08 0% 100% - 26.08 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 4 8.84 13.74 100% 13.74 - 0
BLOQUE 5 16.01 29.67 100% 29.67 - 3 1 1 1
BLOQUE 6 7.92 12.56 0% 100% - 12.56 7 1 1 1 1 1 1 1
BLOQUE 7 25.02 33.62 0% 100% - 33.62 11 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 8 12.61 16.6 100% 16.60 - 0
BLOQUE 9 16.92 27.19 100% 27.19 - 4 1 1 1 1
BLOQUE 10 11.45 15.19 0% 100% - 15.19 - 0
BLOQUE 11 28.37 31.25 0% 100% - 31.25 10 1 1 1 1 1 1 1 1 1 1
BLOQUE 12 31.77 39.78 0% 100% - 39.78 13 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 13 28 35.07 100% 35.07 - 0
BLOQUE 14 28.08 38.85 - - 0
BLOQUE 15 47.24 37.45 - - 0
BLOQUE 16 2.47 48.25 - - 0
ARQUITECTURA 0
TARRAJEO EN MUROS INTERIORES 0 0 1069.016 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
BLOQUE 1 1848.32 - - - 0
BLOQUE 2 1241.15 - - - 0
BLOQUE 3 882.818 - - - 0
BLOQUE 4 233.84 100% - - 233.84 13 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 5 508.2 - - - 7 1 1 1 1 1 1 1
BLOQUE 6 241.24 - - - 0
BLOQUE 7 957.76 - - - 0
BLOQUE 8 330.441 100% - - 330.44 13 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 9 472.29 - - - 5 1 1 1 1 1
BLOQUE 10 504.735 100% - - 504.74 13 1 1 1 1 1 1 1 1 1 1 1 1 1
BLOQUE 11 1008.36 - - - 0
BLOQUE 12 1211.56 - - - 0
BLOQUE 13 1081.464 - - - 10 1 1 1 1 1 1 1 1 1 1
BLOQUE 14 829.98 - 0 - 0
BLOQUE 15 938.205 - 0 - 0
BLOQUE 16 1104.83 - 0 - 0

VEREDAS BLOQUES 04, 05, 08, 09, 10, 13


CONTRAPISOS BLOQUES 04, 05, 08, 09, 10, 13
FALSO PISO BLOQUES 04, 05, 08, 09, 10, 13
TANQUE ELEVADO 30%
TIJERALES METALICOS PARA T 30%
CISTERNA DE PETROLEO 100%
CISTERNA DE AGUA 100%
CERCO PERIMETRICO ZAPATAS, COLUMNAS Y CIMIENTOS CORRIDOS
CRONOGRAMA VALORIZADO ACTUALIZADO A LA FECH

: MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL ESTABLECIMI


Proyecto
SAN ANTONIO DE PUTINA
Propietario : PRONIS - PROGRAMA NACIONAL DE INVERSIONES EN SALUD
Ubicación : PUTINA -SAN ANTONIO DE PUTINA-PUNO
Fecha : 31 de Diciembre de 2017
15
CRONOGRAMA VALORIZADO PROGRAMADO DE AVANC
VAL. N° 01
Item Epecialidad Costo Directo Sep-17

01 ESTRUCTURAS 7,188,871.80 174,404.79


02 ARQUITECTURA 6,281,813.68 -
03 INSTALACIONES SANITARIAS 1,323,695.06 -
04 INSTALACIONES ELECTRICAS 1,620,084.45 4,735.46
05 INSTALACINOES ELECTROMECANICAS 1,201,182.24 -
06 INSTALACIONES DE COMUNICACIONES 2,395,355.07 -

COSTO DIRECTO 20,011,002.30 179,140.25


GASTOS GENERALES 12.074% 2,416,190.87 21,629.95
UTILIDADES 10.000% 2,001,100.23 17,914.03

SUB-TOTAL 24,428,293.40
### 218,684.23
FACTOR DE RELACION 0.900000 21,985,464.06 196,815.81
IMPUESTOS 18% 3,957,383.53 35,426.85

PRESUPUESTO CONTRATADO 25,942,847.59 232,242.65


Avance Promedio Porcentual 0.90%
0.90%

CRONOGRAMA VALORIZADO EJECUTADO DE AVANCE

Item Epecialidad Costo Directo Sep-17

01 ESTRUCTURAS 7,188,871.80 297,588.78


02 ARQUITECTURA 6,281,813.68 -
03 INSTALACIONES SANITARIAS 1,323,695.06 -
04 INSTALACIONES ELECTRICAS 1,620,084.45 -
05 INSTALACINOES ELECTROMECANICAS 1,201,182.24 -
06 INSTALACIONES DE COMUNICACIONES 2,395,355.07 -

COSTO DIRECTO 20,011,002.30 297,588.78


GASTOS GENERALES 12.074% 2,416,190.87 35,931.80
UTILIDADES 10.000% 2,001,100.23 29,758.88

SUB-TOTAL 24,428,293.40
### 363,279.46
FACTOR DE RELACION 0.900000 21,985,464.06 326,951.52
IMPUESTOS 18% 3,957,383.53 58,851.27
PRESUPUESTO CONTRATADO 25,942,847.59 385,802.79
Avance Promedio Porcentual 1.49%
Avance Promedio Porcentual Acumulado 1.49%
TUALIZADO A LA FECHA DE INICIO DE OBRA

D RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD ESTRATÉGICO DE PUTINA, PROVINCIA DE


SAN ANTONIO DE PUTINA – REGIÓN PUNO
E INVERSIONES EN SALUD

31 29 31 30 14
DO PROGRAMADO DE AVANCE DE OBRA
VAL. N° 02 VAL. N° 03 VAL. N° 04 VAL. N° 05 VAL. N° 06
Oct-17 Nov-17 Dec-17 Jan-18 Feb-18

697,071.49 847,272.65 1,088,069.79 1,071,658.54 739,239.87


27,468.19 274,470.10 281,755.73 278,033.86 313,146.97
18,346.69 66,036.66 112,771.51 189,168.81 244,864.08
49,654.96 47,921.25 53,419.41 145,679.38 370,283.84
- - - 16,267.19 56,031.43
- - - 21,809.90 147,405.52

792,541.33 1,235,700.66 1,536,016.44 1,722,617.68 1,870,971.70


95,693.91 149,202.35 185,463.42 207,994.23 225,906.96
79,254.13 123,570.07 153,601.64 172,261.77 187,097.17

967,489.37 1,508,473.08 1,875,081.50 2,102,873.68 2,283,975.83


870,740.43 1,357,625.77 1,687,573.35 1,892,586.31 2,055,578.25
156,733.28 244,372.64 303,763.20 340,665.54 370,004.08

1,027,473.71 1,601,998.41 1,991,336.55 2,233,251.84 2,425,582.33


3.96% 6.18% 7.68% 8.61% 9.35%
4.86% 11.03% 18.71% 27.32% 36.66%

ADO EJECUTADO DE AVANCE DE OBRA

Oct-17 Nov-17 Dec-17 Jan-18 Feb-18

700,957.52 796,123.61 750,900.65 1,730,845.74


- 232,688.74 467,142.91 290,708.20
- 8,184.28 25,967.53 50,000.00
- - 51,967.77 70,000.00
- - - -
- - - -

700,957.52 1,036,996.63 1,295,978.86 2,141,553.94


84,635.80 125,210.21 156,480.53 258,577.91
70,095.75 103,699.66 129,597.89 214,155.39

855,689.07 1,265,906.50 1,582,057.28 2,614,287.24


770,120.16 1,139,315.85 1,423,851.55 2,352,858.51
138,621.63 205,076.85 256,293.28 423,514.53
908,741.79 1,344,392.71 1,680,144.83 2,776,373.04
3.50% 5.18% 6.48% 10.70%
4.99% 10.17% 16.65% 27.35%
OBRA : MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL ESTABL
PROCESO : LP N° 01-2017-PRONIS
CONTRATISTA : CONSORCIO HOSPITAL DEL SUR

PARTIDA DESCRIPCIÓN

04 INSTALACIONES SANITARIAS
04.01 APARATOS SANITARIOS Y ACCESORIOS
04.01.01 SUMINISTRO DE APARATOS SANITARIOS
04.01.01.01 SUMINISTRO DE INODORO TIPO (C-3) DE LOZA VITRIFICADA CON TANQUE BAJO P
04.01.01.02 SUMINISTRO DE INODORO TIPO (C-4) DE LOZA VITRIFICADA CON TANQUE BAJO
04.01.01.03 SUMINISTRO DE INODORO TIPO (C-4a) DE LOZA VITRIFICADA CON TANQUE B
04.01.01.04 SUMINISTRO DE URINARIO TIPO (C-9) DE LOZA VITRIFICADA, DE PARED
04.01.01.05 SUMINISTRO DE LAVATORIO TIPO (A-2a) DE LOZA VITRIFICADA CON GRIFERIA
04.01.01.06 SUMINISTRO DE LAVATORIO TIPO (A-3) DE LOZA VITRIFICADA CON GRIFERIA CO
04.01.01.07 SUMINISTRO DE LAVATORIO TIPO (A-3a) DE LOZA VITRIFICADA CON GRIFERIA C
04.01.01.08 SUMINISTRO DE LAVATORIO TIPO (A-4) DE LOZA VITRIFICADA CON GRIFERIA
04.01.01.09 SUMINISTRO DE LAVATORIO TIPO (A-7) INC. GRIFERIA Y ACCESORIOS
04.01.01.10 SUMINISTRO DE LAVATORIO TIPO (A-7a) INC. GRIFERIA Y ACCESORIOS
04.01.01.11 SUMINISTRO DE LAVATORIO TIPO (A-16) DE LOZA VITRIFICADA PARA MINUSVALID
04.01.01.12 SUMINISTRO DE LAVADERO TIPO (B-1) DE ACERO INOXIDABLE, UNA POZA, AGUA F
04.01.01.13 SUMINISTRO DE LAVADERO TIPO (B-1a) DE ACERO INOXIDABLE, UNA POZA, AGUA
04.01.01.14 SUMINISTRO DE LAVADERO TIPO (B-9a) DE ACERO INOXIDABLE, UNA POZA, UN
04.01.01.15 SUMINISTRO DE LAVADERO TIPO (B-15) DE ACERO INOXIDABLE, DOS POZAS,
04.01.01.16 SUMINISTRO DE LAVADERO TIPO 134X68 CM (B-17a) DE ACERO INOXIDABLE, D
04.01.01.17 SUMINISTRO DE LAVADERO TIPO (B-23) DE ACERO INOXIDABLE, DOS POZAS C
04.01.01.18 SUMINISTRO DE LAVADERO TIPO (B-102) PARA CIRUJANO, DE ACERO INOXIDA
04.01.01.19 SUMINISTRO E INSTALACION DE LAVADERO TIPO (B-62)
04.01.01.20 SUMINISTRO E INSTALACION DE LAVADERO TIPO (B-66) REVESTIDO CON CERAMI
04.01.01.21 SUMINISTRO E INSTALACION DE LAVADERO TIPO (B-67)
04.01.01.22 SUMINISTRO E INSTALACION DE BOTADERO CLINICO DE ACERO INOXIDABLE CON
04.01.01.23 SUMINISTRO DE DUCHA CON MEZCLADORA (F-1) I/GRIFERIA
04.01.01.24 SUMINISTRO DE DUCHA TELEFONO CON MEZCLADORA (F-4) I/GRIFERIA
04.01.01.25 SUMINISTRO DE DUCHA TELEFONO CON MEZCLADORA (F-4a) I/GRIFERIA
04.01.01.26 SUMINISTRO DE MEZCLADORA (G-10) CON MANGUERA Y PISTOLA A PRESION, AG
04.01.02 SUMINISTRO DE ACCESORIOS
04.01.02.01 SUMINISTRO DE TOALLERO TIPO GANCHO (H-3) DE LOZA VITRIFICADA
04.01.02.02 SUMINISTRO DE JABONERA C/DISPENSADOR DE JABON LIQUIDO (H-4) DE ACERO
04.01.02.03 SUMINISTRO DE JABONERA PARA DUCHA (H-5) DE LOZA VITRIFICADA
04.01.02.04 SUMINISTRO DE PORTA ROLLO PARA PAPEL HIGIENICO (H-6) DE LOZA VITRIFICA
04.01.02.05 SUMINISTRO DE TUBO PARA CORTINA DE DUCHA (H-7) DE ALUMINIO
04.01.02.06 SUMINISTRO DE BARRA DE APOYO PARA INODORO (H-12) DE ACERO INOXIDABLE
04.01.03 INSTALACION DE APARATOS SANITARIOS
04.01.03.01 COLOCACION DE APARATOS SANITARIOS
04.01.04 INSTALACION DE ACCESORIOS SANITARIOS
04.01.04.01 COLOCACION DE ACCESORIOS SANITARIOS
04.02 SISTEMA DE AGUA FRIA
04.02.01 SALIDA DE AGUA FRIA
04.02.01.01 SALIDA DE AGUA FRIA PARA LAVADERO Y/O LAVATORIO PVC C-10 DE 1/2"
04.02.01.02 SALIDA DE AGUA FRIA PARA URINARIO PVC C-10 DE 3/4"
04.02.01.03 SALIDA DE AGUA FRIA PARA INODORO PVC C-10 DE 1/2"
04.02.01.04 SALIDA DE AGUA FRIA PARA DUCHA PVC C-10 DE 1/2"
04.02.01.05 SALIDA DE AGUA FRIA PVC C-10 DE 1/2"
04.02.01.06 SALIDA DE AGUA FRIA PARA THERMA PVC C-10 DE 1/2"
04.02.02 REDES DE DISTRIBUCION
04.02.02.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1/2" AGUA FRIA UNION ESP
04.02.02.02 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 3/4" AGUA FRIA UNION ESP
04.02.02.03 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1" AGUA FRIA UNION ESPI
04.02.02.04 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1 1/4" AGUA FRIA UNION E
04.02.02.05 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1 1/2" AGUA FRIA UNION E
04.02.02.06 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 2" AGUA FRIA UNION ESPI
04.02.02.07 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 2 1/2" AGUA FRIA UNION E
04.02.03 ACCESORIOS PARA REDES DE AGUA FRIA
04.02.03.01 SUMINISTRO DE CODO PVC C-10 1/2" x 90° UNION ESPIGA
04.02.03.02 SUMINISTRO DE CODO PVC C-10 3/4" x 90° UNION ESPIGA
04.02.03.03 SUMINISTRO DE CODO PVC C-10 1" x 90° UNION ESPIGA
04.02.03.04 SUMINISTRO DE CODO PVC C-10 1 1/4" x 90° UNION ESPIGA
04.02.03.05 SUMINISTRO DE CODO PVC C-10 1 1/2" x 90° UNION ESPIGA
04.02.03.06 SUMINISTRO DE CODO PVC C-10 2" x 90° UNION ESPIGA
04.02.03.07 SUMINISTRO DE CODO PVC C-10 2 1/2" x 90° UNION ESPIGA
04.02.03.08 SUMINISTRO DE TEE PVC C-10 1/2" UNION ESPIGA
04.02.03.09 SUMINISTRO DE TEE PVC C-10 3/4" UNION ESPIGA
04.02.03.10 SUMINISTRO DE TEE PVC C-10 1" UNION ESPIGA
04.02.03.11 SUMINISTRO DE TEE PVC C-10 1 1/4" UNION ESPIGA
04.02.03.12 SUMINISTRO DE TEE PVC C-10 1 1/2" UNION ESPIGA
04.02.03.13 SUMINISTRO DE TEE PVC C-10 2" UNION ESPIGA
04.02.03.14 SUMINISTRO DE TEE PVC C-10 2 1/2" UNION ESPIGA
04.02.03.15 SUMINISTRO DE REDUCCION PVC C-10 DE 3/4" A 1/2" UNION ESPIGA
04.02.03.16 SUMINISTRO DE REDUCCION PVC C-10 DE 1" A 3/4" UNION ESPIGA
04.02.03.17 SUMINISTRO DE REDUCCION PVC C-10 DE 1 1/4" A 1" UNION ESPIGA
04.02.03.18 SUMINISTRO DE REDUCCION PVC C-10 DE 1 1/2" A 1 1/4" UNION ESPIGA
04.02.03.19 SUMINISTRO DE REDUCCION PVC C-10 DE 2" A 1 1/2" UNION ESPIGA
04.02.03.20 SUMINISTRO DE REDUCCION PVC C-10 DE 2 1/2" A 2" UNION ESPIGA
04.02.03.21 SUMINISTRO DE UNION UNVERSAL DE PVC 3/4"
04.02.03.22 SUMINISTRO DE UNION UNVERSAL DE PVC 1"
04.02.03.23 SUMINISTRO DE UNION UNVERSAL DE PVC 1 1/4"
04.02.03.24 SUMINISTRO DE UNION UNVERSAL DE PVC 1 1/2"
04.02.03.25 SUMINISTRO DE UNION UNVERSAL DE PVC 2"
04.02.03.26 SUMINISTRO DE UNION UNVERSAL DE PVC 2 1/2"
04.02.03.27 SUMINISTRO DE ADAPTADOR PVC 3/4"
04.02.03.28 SUMINISTRO DE ADAPTADOR PVC 1"
04.02.03.29 SUMINISTRO DE ADAPTADOR PVC 1 1/4"
04.02.03.30 SUMINISTRO DE ADAPTADOR PVC 1 1/2"
04.02.03.31 SUMINISTRO DE ADAPTADOR PVC 2"
04.02.03.32 SUMINISTRO DE ADAPTADOR PVC 2 1/2"
04.02.04 LLAVES Y VALVULAS
04.02.04.01 SUMINISTRO E INSTALACION DE VALVULA ESFERICA DE BRONCE DE 1/2"
04.02.04.02 SUMINISTRO E INSTALACION DE VALVULA ESFERICA DE BRONCE DE 3/4"
04.02.04.03 SUMINISTRO E INSTALACION DE VALVULA ESFERICA DE BRONCE DE 1"
04.02.04.04 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 3/4"
04.02.04.05 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1"
04.02.04.06 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1 1/4"
04.02.04.07 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1 1/2"
04.02.04.08 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 2"
04.02.04.09 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 2 1/2"
04.02.04.10 CAJA PARA VALVULAS CON MARCO Y TAPA METALICA - EN PISO
04.02.04.11 CAJA METALICA C/TAPA PARA VALVULA EN PARED
04.02.05 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
04.02.05.01 PRUEBAS HIDRAULICAS REDES DE AGUA
04.02.05.02 DESINFECCION DE REDES DE AGUA
04.02.05.03 PRUEBAS HIDRAULICAS DEL SISTEMA EN CASETA DE BOMBEO
04.02.06 TRABAJOS PRELIMINARES
04.02.06.01 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.02.06.02 CONEXION A RED PUBLICA DE AGUA
04.02.07 MOVIMIENTO DE TIERRAS
04.02.07.01 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL PARA REDES DE AGUA H
04.02.07.02 REFINE Y NIVELACION EN TERRENO NORMAL
04.02.07.03 PREPARACION DE CAMA DE APOYO CON ARENA GRUESA e=0.10 m (RED DE AGUA)
04.02.07.04 RELLENO Y COMPACTACION MANUAL DE ZANJAS CON MATERIAL PROPIO SELECC
04.02.07.05 ACARREO INTERNO DE MATERIAL EXCEDENTE, DISTANCIA HASTA 1.50M
04.02.07.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.03 SISTEMA DE AGUA CALIENTE
04.03.01 SALIDA DE AGUA CALIENTE
04.03.01.01 SALIDA DE AGUA CALIENTE EN CPVC DE 1/2"
04.03.01.02 SALIDA DE AGUA CALIENTE EN CPVC DE 3/4"
04.03.02 REDES DE DISTRIBUCION DE AGUA CALIENTE
04.03.02.01 SUMINISTRO E INSTALACIÓN DE TUBERIA CPVC DE 1/2"
04.03.02.02 SUMINISTRO E INSTALACIÓN DE TUBERIA CPVC DE 3/4"
04.03.03 ACCESORIOS DE REDES DE AGUA CALIENTE
04.03.03.01 SUMINISTRO DE CODO CPVC DE 1/2" X 90°
04.03.03.02 SUMINISTRO DE CODO CPVC DE 3/4" X 90°
04.03.03.03 SUMINISTRO DE TEE CPVC DE 1/2"
04.03.03.04 SUMINISTRO DE TEE CPVC DE 3/4"
04.03.03.05 SUMINISTRO DE REDUCCION CPVC DE 3/4" A 1/2"
04.03.04 VALVULAS
04.03.04.01 SUMINISTRO E INSTALACION DE VALVULA ESFERICA DE BRONCE DE 1/2"
04.03.04.02 SUMINISTRO E INSTALACION DE VALVULA ESFERICA DE BRONCE DE 3/4"
04.03.04.03 CAJA METALICA C/TAPA PARA VALVULA EN PARED
04.03.05 EQUIPOS DE PROTECCION DE AGUA CALIENTE
04.03.05.01 SUMINISTRO E INSTALACION DE CALENTADOR ELECTRICO DE 80 LT
04.03.05.02 SUMINISTRO E INSTALACION DE CALENTADOR ELECTRICO DE 110 LT
04.03.05.03 SUMINISTRO E INSTALACION DE CALENTADOR ELECTRICO DE 150 LT
04.03.05.04 SUMINISTRO E INSTALACION DE CALENTADOR ELECTRICO DE 200 LT
04.03.06 PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
04.03.06.01 PRUEBAS HIDRAULICAS REDES DE AGUA
04.03.06.02 DESINFECCION DE REDES DE AGUA
04.03.07 TRABAJOS PRELIMINARES
04.03.07.01 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.03.08 MOVIMIENTO DE TIERRAS
04.03.08.01 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL PARA REDES DE AGUA H
04.03.08.02 REFINE Y NIVELACION EN TERRENO NORMAL
04.03.08.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO e=0.1
04.03.08.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL CON MATERIAL PROPIO SELEC
04.03.08.05 ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACIONES, DEMOLICIO
04.03.08.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.04 SISTEMA DE DRENAJE PLUVIAL
04.04.01 RED DE RECOLECCION
04.04.01.01 TRABAJOS PRELIMINARES
04.04.01.01.0 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.04.01.02 MOVIMIENTO DE TIERRAS
04.04.01.02.0 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL PARA REDES SANITARIA
04.04.01.02.0 REFINE Y NIVELACION DE ZANJAS (MANUAL)
04.04.01.02.0 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO e=0
04.04.01.02.0 RELLENO Y COMPACTACION MANUAL DE ZANJAS CON MATERIAL PROPIO SELE
04.04.01.02.0 ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACIONES, DEMOLIC
04.04.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.04.01.03 SUMINISTRO E INSTALACION DE TUBERIAS, CANALETAS Y MONTANTE PLUVIAL
04.04.01.03.0 SUMINISTRO E INSTALACION DE MONTANTE DE DRENAJE PLUVIAL PVC SAP 4"
04.04.01.03.0 SUMINISTRO E INSTALACION DETUBERIA DE DRENAJE PLUVIAL PVC 6" SAP
04.04.01.04 ACCESORIOS DE RED PLUVIAL
04.04.01.04.0 SUMINISTRO DE CODO DE PVCSAP 4" X 90°
04.04.01.04.0 SUMINISTRO DE CODO DE PVC SAP 4" X 45° (DESAGUE Y VENTILACION)
04.04.01.04.0 SUMINISTRO E INSTALACION DE REGISTRO DE BRONCE DE 4"
04.04.01.05 BUZONES Y CAMARAS DE INSPECCION PLUVIALES
04.04.01.05.0 CAJA DE REGISTRO PLUVIAL 45 X 60 CM DE CONCRETO
04.05 DESAGUE Y VENTILACION
04.05.01 SALIDAS DE DESAGUE Y VENTILACION
04.05.01.01 SALIDA DE DESAGUE PVC SAP DE 2" P/LAVATORIO Y/O LAVADERO
04.05.01.02 SALIDA DE DESAGUE PVC SAP DE 2" P/URINARIO
04.05.01.03 SALIDA DE DESAGUE PVC 4" PARA INODORO
04.05.01.04 SALIDA DE DESAGUE PVC SAP 2" EN PARED Y PISO, P/LAVADERO B67
04.05.01.05 SALIDA DE DESAGUE PVC PARA DUCHA DE 2" (G-1)
04.05.01.06 SALIDA DE DESAGUE PVC PARA SUMIDERO DE 2"
04.05.01.07 SALIDA DE DESAGUE PVC PARA SUMIDERO DE 4"
04.05.01.08 SALIDA DE DESAGUE PVC PARA REGISTRO DE 2"
04.05.01.09 SALIDA DE DESAGUE PVC PARA REGISTRO DE 4"
04.05.01.10 SALIDA DE DESAGUE PVC SAP DE 2"
04.05.01.11 SALIDA DE DESAGUE PVC SAP DE 3"
04.05.01.12 SALIDA DE VENTILACION PVC 2" CON REJILLA
04.05.02 REDES COLECTORAS
04.05.02.01 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 2" SAP
04.05.02.02 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 3" SAP
04.05.02.03 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 4" SAP
04.05.02.04 SUMINISTRO E INSTALACION DE TUBERIA DE DESAGUE PVC 6" SAP
04.05.02.05 SUMINISTRO E INSTALACION DE TUBERIA PARA VENTILACION DE PVC SAL 2"
04.05.02.06 SUMINISTRO E INSTALACION DE TUBERIA PARA VENTILACION DE PVC SAL 3"
04.05.02.07 SUMINISTRO E INSTALACION DE TUBERIA PARA VENTILACION DE PVC SAL 4"
04.05.02.08 TUBERIA DE COBRE TIPO "L" DE 2"
04.05.03 ACCESORIOS DE REDES COLECTORAS
04.05.03.01 SUMINISTRO DE CODO PVC SAP 2" x 90° (DESAGUE Y VENTILACION)
04.05.03.02 SUMINISTRO DE CODO PVC SAP 2" x 45° (DESAGUE Y VENTILACION)
04.05.03.03 SUMINISTRO DE CODO PVC SAP 4" x 90° (DESAGUE Y VENTILACION)
04.05.03.04 SUMINISTRO DE CODO PVC SAP 4" x 45° (DESAGUE Y VENTILACION)
04.05.03.05 SUMINISTRO DE CODO DE VENTILACION PVC SAP 4" x 2" (DESAGUE Y VENTILACIO
04.05.03.06 SUMINISTRO DE YEE DE PVC SAP 2" X 2" (DESAGUE Y VENTILACION)
04.05.03.07 SUMINISTRO DE YEE DE PVC SAP 4" X 4" (DESAGUE Y VENTILACION)
04.05.03.08 SUMINISTRO DE YEE DE PVC SAP 4" X 2" (DESAGUE Y VENTILACION)
04.05.03.09 SUMINISTRO DE TEE DE PVC SAP 3" X 2" (DESAGUE Y VENTILACION)
04.05.03.10 SUMINISTRO DE TEE DE PVC SAP 2" X 2" (DESAGUE Y VENTILACION)
04.05.03.11 SUMINISTRO E INSTALACION DE REGISTRO DE BRONCE DE 2"
04.05.03.12 SUMINISTRO E INSTALACION DE REGISTRO DE BRONCE DE 4"
04.05.03.13 SUMINISTRO E INSTALACION DE SUMIDERO DE BRONCE 2" PARA DUCHA G-1
04.05.03.14 SUMINISTRO E INSTALACION DE SUMIDERO DE BRONCE DE 2" EN PISO
04.05.03.15 SUMINISTRO E INSTALACION DE SUMIDERO DE BRONCE DE 4" EN PISO
04.05.03.16 CODO DE COBRE DE 2"
04.05.03.17 TEE DE COBRE DE 2"
04.05.04 PRUEBA HIDRAULICA REDES DE DESAGUE
04.05.04.01 PRUEBAS HIDRAULICAS DE REDES DE DESAGUE
04.05.05 BUZONES Y CAMARAS DE INSPECCION
04.05.05.01 CAJA DE REGISTRO DE ALBAÑILERIA 12"x24" C/TAPA DE CONCRETO
04.05.05.02 CAJA DE REGISTRO DE ALBAÑILERIA 18"x24" C/TAPA DE CONCRETO
04.05.05.03 CAJA DE REGISTRO DE ALBAÑILERIA 24"x24" C/TAPA DE CONCRETO
04.05.05.04 BUZON TIPO I D=1.20M HASTA H=1.50M
04.05.06 TRABAJOS PRELIMINARES
04.05.06.01 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.05.06.02 CONEXION A RED PUBLICA DE DESAGUE
04.05.07 MOVIMIENTO DE TIERRAS
04.05.07.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL PARA REDES SANITARIAS
04.05.07.02 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
04.05.07.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO e=0.
04.05.07.04 RELLENO Y COMPACTACION DE ZANJAS MANUAL CON MATERIAL PROPIO SELECION
04.05.07.05 ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACIONES, DEMOLICIO
04.05.07.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.05.08 INSTALACIONES HIDRAULICAS CISTERNA Y TANQUE ELEVADO
04.05.08.01 INSTALACION HIDRAULICA CISTERNA (EE.SS. PUTINA)
04.05.08.02 INSTALACION HIDRAULICA DE TANQUE ELEVADO
04.06 REDES EXTERIORES DE AGUA
04.06.01 LINEA DE ADUCCION - ALIMENTACION
04.06.01.01 TRABAJOS PRELIMINARES
04.06.01.01.0 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.06.01.02 MOVIMIENTO DE TIERRAS
04.06.01.02.0 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL PARA REDES DE AGUA
04.06.01.02.0 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
04.06.01.02.0 PREPARACION DE CAMA DE APOYO CON ARENA GRUESA e=0.10 m (RED DE AGU
04.06.01.02.0 RELLENO Y COMPACTACION MANUAL DE ZANJAS CON MATERIAL PROPIO SELE
04.06.01.02.0 ACARREO INTERNO DE MATERIAL EXCEDENTE, DISTANCIA HASTA 1.50M
04.06.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.06.01.03 REDES DE DISTRIBUCION
04.06.01.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 2" AGUA FRIA UNION ESP
04.06.01.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 2 1/2" AGUA FRIA UNION
04.06.01.04 ACCESORIOS PARA REDES DE AGUA FRIA
04.06.01.04.0 VALVULA COMPUERTA DE BRONCE DE 2"
04.06.01.04.0 VALVULA COMPUERTA DE BRONCE DE 2 1/2"
04.06.01.04.0 SUMINISTRO DE CODO PVC C-10 2" x 90° UNION ESPIGA
04.06.01.04.0 SUMINISTRO DE CODO PVC C-10 2 1/2" x 90° UNION ESPIGA
04.06.01.04.0 SUMINISTRO DE TEE PVC C-10 2" UNION ESPIGA
04.06.01.04.0 SUMINISTRO DE TEE PVC C-10 2 1/2" UNION ESPIGA
04.06.01.04.0 SUMINISTRO DE REDUCCION PVC C-10 DE 2 1/2" A 2" UNION ESPIGA
04.06.01.04.0 CAJA PARA VALVULAS CON MARCO Y TAPA METALICA
04.06.01.05 PRUEBA HIDRAULICA Y DESINFECCION DE REDES
04.06.01.05.0 PRUEBAS HIDRAULICAS REDES DE AGUA
04.06.01.05.0 DESINFECCION DE REDES DE AGUA
04.06.02 LINEA DE IMPULSION
04.06.02.01 TRABAJOS PRELIMINARES
04.06.02.01.0 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.06.02.02 MOVIMIENTO DE TIERRAS
04.06.02.02.0 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL PARA REDES DE AGUA
04.06.02.02.0 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
04.06.02.02.0 PREPARACION DE CAMA DE APOYO CON ARENA GRUESA e=0.10 m (RED DE AGU
04.06.02.02.0 RELLENO Y COMPACTACION MANUAL DE ZANJAS CON MATERIAL PROPIO SELE
04.06.02.02.0 ACARREO INTERNO DE MATERIAL EXCEDENTE, DISTANCIA HASTA 1.50M
04.06.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.06.02.03 REDES DE DISTRIBUCION
04.06.02.03.0 SUMINISTRO E INSTALACION DE TUBERIA DE ACERO ISO 65-ASTM 53 SERIE PESA
04.06.02.04 ACCESORIOS PARA REDES DE AGUA FRIA
04.06.02.04.0 VALVULA COMPUERTA DE BRONCE DE 2 1/2"
04.06.02.04.0 CODO DE FoFo 90 DE 2 1/2" - BB
04.06.02.04.0 TEE DE FoFo DE 2 1/2" - BB
04.06.02.04.0 CAJA PARA VALVULAS CON MARCO Y TAPA METALICA
04.06.02.05 PRUEBA HIDRAULICA Y DESINFECCION DE REDES
04.06.02.05.0 PRUEBAS HIDRAULICAS REDES DE AGUA
04.06.02.05.0 DESINFECCION DE REDES DE AGUA
04.06.03 SISTEMA DE AGUA PARA RIEGO
04.06.03.01 TRABAJOS PRELIMINARES
04.06.03.01.0 TRAZO Y REPLANTEO(TUBERIAS Y/O CANALETAS)
04.06.03.02 MOVIMIENTO DE TIERRAS
04.06.03.02.0 EXCAVACION DE ZANJAS MANUAL EN TERRENO NORMAL PARA REDES DE AGUA
04.06.03.02.0 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL
04.06.03.02.0 PREPARACION DE CAMA DE APOYO CON ARENA GRUESA e=0.10 m (RED DE AGU
04.06.03.02.0 RELLENO Y COMPACTACION MANUAL DE ZANJAS CON MATERIAL PROPIO SELE
04.06.03.02.0 ACARREO INTERNO DE MATERIAL EXCEDENTE, DISTANCIA HASTA 1.50M
04.06.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL Y VOLQUETE 4M3
04.06.03.03 REDES DE DISTRIBUCION
04.06.03.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1/2" AGUA FRIA UNION E
04.06.03.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 3/4" AGUA FRIA UNION E
04.06.03.03.0 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC C-10 DE 1" AGUA FRIA UNION ESP
04.06.03.04 ACCESORIOS PARA REDES DE AGUA FRIA
04.06.03.04.0 SUMINISTRO DE CODO PVC C-10 1/2" x 90° UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE CODO PVC C-10 3/4" x 90° UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE CODO PVC C-10 1" x 90° UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE TEE PVC C-10 3/4" UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE TEE PVC C-10 1" UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE REDUCCION PVC C-10 DE 3/4" A 1/2" UNION ESPIGA
04.06.03.04.0 SUMINISTRO DE REDUCCION PVC C-10 DE 1" A 3/4" UNION ESPIGA
04.06.03.04.0 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE BRONCE DE 1"
04.06.03.04.0 SUMINISTRO E INSTALACION DE VALVULA CHECK DE BRONCE DE 1"
04.06.03.05 PRUEBA HIDRAULICA Y DESINFECCION DE REDES
04.06.03.05.0 PRUEBAS HIDRAULICAS REDES DE AGUA
04.06.03.05.0 DESINFECCION DE REDES DE AGUA
04.06.03.06 VARIOS
04.06.03.06.0 SUMINISTRO E INSTALACION DE GRIFO DE RIEGO DE 1/2" I/MURETE Y VALVULA
04.06.03.06.0 CAJA PARA VALVULAS CON MARCO Y TAPA METALICA

TOTAL COSTO DIRECTO


GASTOS GENERALES 12.074%
UTILIDAD 10.000%

SUB-TOTAL (A + B + C)
FACTOR DE RELACION 0.900000
I.GV. 18.00%

TOTAL (A + B +C) + D

RESIDENTE
INSTALACIONES SANITARIAS
VALORIZACION DE OBRA Nº 4
(del 1 de diciembre al 31 de diciembre del 2017)
ESOLUTIVA DEL ESTABLECIMIENTO DE SALUD ESTRATÉGICO DE PUTINA, PROVINCIA DE SAN ANTONIO DE PUT
PRESUPUESTO BASE :
MONTO DEL CONTRATO :
PRESUPUESTO BASE AVA
P.UNIT. PRESUP. ANTERIOR
UNIDAD METRADO
S/. S/. METRADO VALOR S/.

und 1.00 450.00 450.00


und 80.00 531.22 42,497.60
und 4.00 550.00 2,200.00
und 15.00 523.19 7,847.85
und 46.00 664.14 30,550.44
und 20.00 383.57 7,671.40
und 15.00 463.23 6,948.45
und 1.00 1,494.29 1,494.29
und 27.00 250.00 6,750.00
und 4.00 300.00 1,200.00
und 4.00 677.39 2,709.56
und 1.00 1,237.11 1,237.11
und 11.00 1,268.42 13,952.62
und 13.00 1,405.36 18,269.68
und 2.00 3,601.40 7,202.80
und 1.00 4,501.75 4,501.75
und 2.00 6,826.23 13,652.46
und 1.00 7,500.00 7,500.00
und 1.00 1,995.52 1,995.52
und 2.00 562.85 1,125.70
und 11.00 762.09 8,382.99
und 4.00 5,631.59 22,526.36
und 39.00 423.42 16,513.38
und 17.00 358.40 6,092.80
und 4.00 358.40 1,433.60
und 4.00 250.00 1,000.00
-
und 103.00 11.90 1,225.70
und 105.00 24.65 2,588.25
und 38.00 23.94 909.72
und 81.00 25.65 2,077.65
und 34.00 14.11 479.74
und 15.00 360.85 5,412.75
-
und 327.00 62.13 20,316.51
-
und 376.00 24.85 9,343.60
-
-
pto 166.00 73.94 12,274.04
pto 15.00 88.47 1,327.05
pto 85.00 72.74 6,182.90
pto 64.00 83.64 5,352.96
pto 2.00 73.94 147.88
pto 22.00 77.64 1,708.08
-
m 1,084.67 19.38 21,020.90
m 396.91 20.04 7,954.08
m 312.52 21.29 6,653.55
m 28.94 22.34 646.52
m 159.14 23.39 3,722.28
m 146.18 24.23 3,541.94
m 20.79 25.70 534.30
-
und 802.00 1.50 1,203.00
und 173.00 2.00 346.00
und 8.00 3.00 24.00
und 1.00 4.00 4.00
und 3.00 4.00 12.00
und 2.00 4.00 8.00
und 1.00 4.00 4.00
und 108.00 4.00 432.00
und 112.00 2.50 280.00
und 31.00 5.00 155.00
und 7.00 4.25 29.75
und 23.00 4.25 97.75
und 20.00 7.00 140.00
und 2.00 8.00 16.00
und 138.00 1.22 168.36
und 70.00 1.16 81.20
und 38.00 1.50 57.00
und 31.00 1.50 46.50
und 12.00 3.50 42.00
und 2.00 4.00 8.00
und 2.00 3.00 6.00
und 8.00 3.50 28.00
und 2.00 11.20 22.40
und 6.00 11.20 67.20
und 2.00 16.61 33.22
und 3.00 25.00 75.00
und 2.00 3.00 6.00
und 8.00 3.50 28.00
und 2.00 5.00 10.00
und 6.00 5.00 30.00
und 2.00 10.00 20.00
und 3.00 7.00 21.00
-
und 142.00 131.97 18,739.74
und 32.00 155.72 4,983.04
und 4.00 186.22 744.88
und 1.00 146.72 146.72
und 4.00 141.79 567.16
und 1.00 251.22 251.22
und 3.00 281.22 843.66
und 1.00 318.98 318.98
und 3.00 1,322.22 3,966.66
und 13.00 173.06 2,249.78
und 178.00 76.06 13,538.68
-
m 2,134.29 2.40 5,122.30
m 2,134.29 0.75 1,600.72
glb 1.00 270.83 270.83
-
m 2,134.02 1.61 3,435.77
und 1.00 1,500.00 1,500.00
-
m 1,767.12 20.45 36,137.60
m 1,767.12 2.39 4,223.42
m 1,767.12 6.50 11,486.28
m 1,744.09 23.85 41,596.55
m3 157.43 14.32 2,254.40
m3 157.45 32.74 5,154.91
-
-
pto 164.00 96.15 15,768.60
pto 15.00 88.42 1,326.30
-
m 568.94 18.32 10,422.98
m 133.79 22.94 3,069.14
-
und 335.00 1.50 502.50
und 44.00 3.50 154.00
und 74.00 1.50 111.00
und 59.00 3.50 206.50
und 38.00 1.00 38.00
-
und 80.00 131.97 10,557.60
und 16.00 155.72 2,491.52
und 96.00 76.06 7,301.76
-
und 2.00 1,247.82 2,495.64
und 5.00 1,597.82 7,989.10
und 8.00 2,346.71 18,773.68
und 7.00 4,146.71 29,026.97
-
m 702.73 2.40 1,686.55
m 702.73 0.75 527.05
-
m 813.19 1.61 1,309.24
-
m 637.84 20.45 13,043.83
m 637.84 2.39 1,524.44
m 637.84 4.54 2,895.79
m 637.84 17.89 11,410.96
m3 54.28 14.32 777.29
m3 53.64 32.74 1,756.17
-
-
-
m 1,458.85 1.61 2,348.75
-
m 1,110.85 23.85 26,493.77
m 1,110.85 2.39 2,654.93
m 1,110.85 6.04 6,709.53
m 1,110.85 23.85 26,493.77
m3 177.74 14.32 2,545.24
m3 177.74 32.74 5,819.21
-
m 1,458.85 72.07 105,139.32
m 42.70 50.61 2,161.05
-
und 56.00 5.50 308.00
und 80.00 5.00 400.00
und 9.00 37.35 336.15
-
und 6.00 207.03 1,242.18
-
-
pto 169.00 97.11 16,411.59 36.00
pto 19.00 97.11 1,845.09
pto 90.00 51.98 4,678.20
pto 11.00 136.64 1,503.04 8.00
pto 38.00 54.57 2,073.66
pto 87.00 54.57 4,747.59
pto 2.00 58.08 116.16
pto 122.00 46.96 5,729.12
pto 60.00 52.16 3,129.60
pto 5.00 97.11 485.55
pto 2.00 103.23 206.46
pto 84.00 86.22 7,242.48
-
m 700.48 29.96 20,986.38 120.00
m 57.86 30.66 1,773.99
m 1,286.54 30.56 39,316.66
m 44.91 52.78 2,370.35
m 1,110.21 25.31 28,099.42
m 83.21 27.58 2,294.93
m 2.07 29.05 60.13
m 14.66 134.89 1,977.49
-
und 776.00 2.00 1,552.00
und 117.00 2.00 234.00
und 1.00 5.50 5.50
und 1.00 5.00 5.00
und 87.00 4.21 366.27
und 168.00 3.50 588.00
und 85.00 9.50 807.50
und 127.00 7.50 952.50
und 21.00 7.50 157.50
und 157.00 2.60 408.20
und 131.00 24.65 3,229.15
und 60.00 37.35 2,241.00
und 35.00 24.65 862.75
und 81.00 20.65 1,672.65
und 6.00 44.65 267.90
und 9.00 87.89 791.01
und 3.00 85.38 256.14
-
m 3,339.29 3.24 10,819.30
-
und 147.00 214.21 31,488.87
und 22.00 266.25 5,857.50
und 8.00 284.65 2,277.20
und 9.00 2,539.51 22,855.59
-
m 3,339.21 1.61 5,376.13
und 2.00 800.00 1,600.00
-
m 2,132.07 23.85 50,849.87
m 2,128.37 2.39 5,086.80
m 2,128.37 9.06 19,283.03
m 2,128.37 23.85 50,761.62
m3 167.99 14.32 2,405.62
m3 167.99 32.74 5,499.99
-
glb 1.00 19,640.23 19,640.23
glb 1.00 4,596.78 4,596.78
-
-
-
m 139.19 1.61 224.10
-
m 122.19 20.45 2,498.79
m 122.19 2.39 292.03
m 122.19 6.50 794.24
m 122.19 23.85 2,914.23
m3 9.78 14.32 140.05
m3 9.78 32.74 320.20
-
m 114.51 24.23 2,774.58
m 7.68 25.70 197.38
-
pza 2.00 280.15 560.30
pza 1.00 363.39 363.39
und 4.00 4.00 16.00
und 3.00 4.00 12.00
und 1.00 7.00 7.00
und 2.00 8.00 16.00
und 1.00 4.00 4.00
und 3.00 173.06 519.18
-
m 139.19 2.40 334.06
m 139.19 0.75 104.39
-
-
m 41.31 1.61 66.51
-
m 27.31 20.45 558.49
m 27.31 2.39 65.27
m 27.31 6.50 177.52
m 27.31 23.85 651.34
m3 2.18 14.32 31.22
m3 2.18 32.74 71.37
-
m 41.31 78.00 3,222.18
-
pza 1.00 363.39 363.39
und 6.00 156.59 939.54
und 1.00 242.59 242.59
und 1.00 173.06 173.06
-
m 41.31 2.40 99.14
m 41.31 0.75 30.98
-
-
m 720.00 1.61 1,159.20
-
m 720.00 20.45 14,724.00
m 720.00 2.39 1,720.80
m 720.00 6.50 4,680.00
m 720.00 23.85 17,172.00
m3 57.60 14.32 824.83
m3 57.60 32.74 1,885.82
-
m 179.85 19.38 3,485.49
m 112.25 20.04 2,249.49
m 409.90 21.29 8,726.77
-
und 32.00 1.50 48.00
und 2.00 2.00 4.00
und 15.00 3.00 45.00
und 2.00 2.50 5.00
und 17.00 5.00 85.00
und 8.00 1.22 9.76
und 17.00 1.16 19.72
und 2.00 141.79 283.58
pza 2.00 108.92 217.84
-
m 720.00 2.40 1,728.00
m 720.00 0.75 540.00
-
und 28.00 268.81 7,526.68
und 2.00 173.06 346.12

(A) 1,323,695.06 0.00


(B) 159,827.07 0.00
(C) 132,369.51 0.00
=========== ===========
1,615,891.64 0.00
1,454,302.48 0.00
(D) 261,774.45 0.00
=========== ===========
1,716,076.93 0.00

SUPERVISOR
RIAS

del 2017)
NCIA DE SAN ANTONIO DE PUTINA – REGIÓN PUNO
ASE : 28,825,386.21 F.R. = 0.900000
TRATO : 25,942,847.59
AVANCES
SALDOS
ACTUAL ACUMULADO
METRADO VALOR S/. METRADO VALOR S/. % METRADO

0.00 0.00 0.00 0.00% 1.00


0.00 0.00 0.00 0.00% 80.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 15.00
0.00 0.00 0.00 0.00% 46.00
0.00 0.00 0.00 0.00% 20.00
0.00 0.00 0.00 0.00% 15.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 27.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 11.00
0.00 0.00 0.00 0.00% 13.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 11.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 39.00
0.00 0.00 0.00 0.00% 17.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 4.00

0.00 0.00 0.00 0.00% 103.00


0.00 0.00 0.00 0.00% 105.00
0.00 0.00 0.00 0.00% 38.00
0.00 0.00 0.00 0.00% 81.00
0.00 0.00 0.00 0.00% 34.00
0.00 0.00 0.00 0.00% 15.00

0.00 0.00 0.00 0.00% 327.00

0.00 0.00 0.00 0.00% 376.00

0.00 0.00 0.00 0.00% 166.00


0.00 0.00 0.00 0.00% 15.00
0.00 0.00 0.00 0.00% 85.00
0.00 0.00 0.00 0.00% 64.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 22.00

0.00 0.00 0.00 0.00% 1,084.67


0.00 0.00 0.00 0.00% 396.91
0.00 0.00 0.00 0.00% 312.52
0.00 0.00 0.00 0.00% 28.94
0.00 0.00 0.00 0.00% 159.14
0.00 0.00 0.00 0.00% 146.18
0.00 0.00 0.00 0.00% 20.79

0.00 0.00 0.00 0.00% 802.00


0.00 0.00 0.00 0.00% 173.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 3.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 108.00
0.00 0.00 0.00 0.00% 112.00
0.00 0.00 0.00 0.00% 31.00
0.00 0.00 0.00 0.00% 7.00
0.00 0.00 0.00 0.00% 23.00
0.00 0.00 0.00 0.00% 20.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 138.00
0.00 0.00 0.00 0.00% 70.00
0.00 0.00 0.00 0.00% 38.00
0.00 0.00 0.00 0.00% 31.00
0.00 0.00 0.00 0.00% 12.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 6.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 3.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 6.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 3.00

0.00 0.00 0.00 0.00% 142.00


0.00 0.00 0.00 0.00% 32.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 3.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 3.00
0.00 0.00 0.00 0.00% 13.00
0.00 0.00 0.00 0.00% 178.00

0.00 0.00 0.00 0.00% 2,134.29


0.00 0.00 0.00 0.00% 2,134.29
0.00 0.00 0.00 0.00% 1.00

0.00 0.00 0.00 0.00% 2,134.02


0.00 0.00 0.00 0.00% 1.00

0.00 0.00 0.00 0.00% 1,767.12


0.00 0.00 0.00 0.00% 1,767.12
0.00 0.00 0.00 0.00% 1,767.12
0.00 0.00 0.00 0.00% 1,744.09
0.00 0.00 0.00 0.00% 157.43
0.00 0.00 0.00 0.00% 157.45
0.00 0.00 0.00 0.00% 164.00
0.00 0.00 0.00 0.00% 15.00

0.00 0.00 0.00 0.00% 568.94


0.00 0.00 0.00 0.00% 133.79

0.00 0.00 0.00 0.00% 335.00


0.00 0.00 0.00 0.00% 44.00
0.00 0.00 0.00 0.00% 74.00
0.00 0.00 0.00 0.00% 59.00
0.00 0.00 0.00 0.00% 38.00

0.00 0.00 0.00 0.00% 80.00


0.00 0.00 0.00 0.00% 16.00
0.00 0.00 0.00 0.00% 96.00

0.00 0.00 0.00 0.00% 2.00


0.00 0.00 0.00 0.00% 5.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 7.00

0.00 0.00 0.00 0.00% 702.73


0.00 0.00 0.00 0.00% 702.73

0.00 0.00 0.00 0.00% 813.19

0.00 0.00 0.00 0.00% 637.84


0.00 0.00 0.00 0.00% 637.84
0.00 0.00 0.00 0.00% 637.84
0.00 0.00 0.00 0.00% 637.84
0.00 0.00 0.00 0.00% 54.28
0.00 0.00 0.00 0.00% 53.64

0.00 0.00 0.00 0.00% 1,458.85

0.00 0.00 0.00 0.00% 1,110.85


0.00 0.00 0.00 0.00% 1,110.85
0.00 0.00 0.00 0.00% 1,110.85
0.00 0.00 0.00 0.00% 1,110.85
0.00 0.00 0.00 0.00% 177.74
0.00 0.00 0.00 0.00% 177.74

0.00 0.00 0.00 0.00% 1,458.85


0.00 0.00 0.00 0.00% 42.70

0.00 0.00 0.00 0.00% 56.00


0.00 0.00 0.00 0.00% 80.00
0.00 0.00 0.00 0.00% 9.00

0.00 0.00 0.00 0.00% 6.00

50.00 4,855.50 86.00 4,855.50 29.59% 83.00


0.00 0.00 0.00 0.00% 19.00
10.00 519.80 10.00 519.80 11.11% 80.00
10.00 1,366.40 18.00 1,366.40 90.91% -7.00
0.00 0.00 0.00 0.00% 38.00
0.00 0.00 0.00 0.00% 87.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 122.00
0.00 0.00 0.00 0.00% 60.00
0.00 0.00 0.00 0.00% 5.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 84.00

100.00 2,996.00 220.00 2,996.00 14.28% 480.48


0.00 0.00 0.00 0.00% 57.86
150.00 4,584.00 150.00 4,584.00 11.66% 1,136.54
0.00 0.00 0.00 0.00% 44.91
250.00 6,327.50 250.00 6,327.50 22.52% 860.21
0.00 0.00 0.00 0.00% 83.21
0.00 0.00 0.00 0.00% 2.07
0.00 0.00 0.00 0.00% 14.66

25.00 50.00 25.00 50.00 3.22% 751.00


10.00 20.00 10.00 20.00 8.55% 107.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 1.00
15.00 63.15 15.00 63.15 17.24% 72.00
10.00 35.00 10.00 35.00 5.95% 158.00
10.00 95.00 10.00 95.00 11.76% 75.00
10.00 75.00 10.00 75.00 7.87% 117.00
0.00 0.00 0.00 0.00% 21.00
10.00 26.00 10.00 26.00 6.37% 147.00
10.00 246.50 10.00 246.50 7.63% 121.00
0.00 0.00 0.00 0.00% 60.00
0.00 0.00 0.00 0.00% 35.00
0.00 0.00 0.00 0.00% 81.00
0.00 0.00 0.00 0.00% 6.00
0.00 0.00 0.00 0.00% 9.00
0.00 0.00 0.00 0.00% 3.00

0.00 0.00 0.00 0.00% 3,339.29

0.00 0.00 0.00 0.00% 147.00


0.00 0.00 0.00 0.00% 22.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 9.00

0.00 0.00 0.00 0.00% 3,339.21


0.00 0.00 0.00 0.00% 2.00

0.00 0.00 0.00 0.00% 2,132.07


0.00 0.00 0.00 0.00% 2,128.37
0.00 0.00 0.00 0.00% 2,128.37
0.00 0.00 0.00 0.00% 2,128.37
0.00 0.00 0.00 0.00% 167.99
0.00 0.00 0.00 0.00% 167.99

0.00 0.00 0.00 0.00% 1.00


0.00 0.00 0.00 0.00% 1.00

0.00 0.00 0.00 0.00% 139.19

0.00 0.00 0.00 0.00% 122.19


0.00 0.00 0.00 0.00% 122.19
0.00 0.00 0.00 0.00% 122.19
0.00 0.00 0.00 0.00% 122.19
0.00 0.00 0.00 0.00% 9.78
0.00 0.00 0.00 0.00% 9.78
0.00 0.00 0.00 0.00% 114.51
0.00 0.00 0.00 0.00% 7.68

0.00 0.00 0.00 0.00% 2.00


0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 4.00
0.00 0.00 0.00 0.00% 3.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 3.00

0.00 0.00 0.00 0.00% 139.19


0.00 0.00 0.00 0.00% 139.19

0.00 0.00 0.00 0.00% 41.31

0.00 0.00 0.00 0.00% 27.31


0.00 0.00 0.00 0.00% 27.31
0.00 0.00 0.00 0.00% 27.31
0.00 0.00 0.00 0.00% 27.31
0.00 0.00 0.00 0.00% 2.18
0.00 0.00 0.00 0.00% 2.18

0.00 0.00 0.00 0.00% 41.31

0.00 0.00 0.00 0.00% 1.00


0.00 0.00 0.00 0.00% 6.00
0.00 0.00 0.00 0.00% 1.00
0.00 0.00 0.00 0.00% 1.00

0.00 0.00 0.00 0.00% 41.31


0.00 0.00 0.00 0.00% 41.31

0.00 0.00 0.00 0.00% 720.00

0.00 0.00 0.00 0.00% 720.00


0.00 0.00 0.00 0.00% 720.00
0.00 0.00 0.00 0.00% 720.00
0.00 0.00 0.00 0.00% 720.00
0.00 0.00 0.00 0.00% 57.60
0.00 0.00 0.00 0.00% 57.60

0.00 0.00 0.00 0.00% 179.85


0.00 0.00 0.00 0.00% 112.25
0.00 0.00 0.00 0.00% 409.90

0.00 0.00 0.00 0.00% 32.00


0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 15.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 17.00
0.00 0.00 0.00 0.00% 8.00
0.00 0.00 0.00 0.00% 17.00
0.00 0.00 0.00 0.00% 2.00
0.00 0.00 0.00 0.00% 2.00

0.00 0.00 0.00 0.00% 720.00


0.00 0.00 0.00 0.00% 720.00

0.00 0.00 0.00 0.00% 28.00


0.00 0.00 0.00 0.00% 2.00

21,259.85 21,259.85
2,566.91 2,566.91
2,125.99 2,125.99
=========== =========== ===========
25,952.75 25,952.75
23,357.48 23,357.48
4,204.35 4,204.35
=========== =========== ===========
0.00% 27,561.83 1.61% 27,561.83 1.61%

SUPERVISOR
SALDOS

VALOR S/. %

450.00 100.00%
42,497.60 100.00%
2,200.00 100.00%
7,847.85 100.00%
30,550.44 100.00%
7,671.40 100.00%
6,948.45 100.00%
1,494.29 100.00%
6,750.00 100.00%
1,200.00 100.00%
2,709.56 100.00%
1,237.11 100.00%
13,952.62 100.00%
18,269.68 100.00%
7,202.80 100.00%
4,501.75 100.00%
13,652.46 100.00%
7,500.00 100.00%
1,995.52 100.00%
1,125.70 100.00%
8,382.99 100.00%
22,526.36 100.00%
16,513.38 100.00%
6,092.80 100.00%
1,433.60 100.00%
1,000.00 100.00%

1,225.70 100.00%
2,588.25 100.00%
909.72 100.00%
2,077.65 100.00%
479.74 100.00%
5,412.75 100.00%

20,316.51 100.00%

9,343.60 100.00%

12,274.04 100.00%
1,327.05 100.00%
6,182.90 100.00%
5,352.96 100.00%
147.88 100.00%
1,708.08 100.00%

21,020.90 100.00%
7,954.08 100.00%
6,653.55 100.00%
646.52 100.00%
3,722.28 100.00%
3,541.94 100.00%
534.30 100.00%

1,203.00 100.00%
346.00 100.00%
24.00 100.00%
4.00 100.00%
12.00 100.00%
8.00 100.00%
4.00 100.00%
432.00 100.00%
280.00 100.00%
155.00 100.00%
29.75 100.00%
97.75 100.00%
140.00 100.00%
16.00 100.00%
168.36 100.00%
81.20 100.00%
57.00 100.00%
46.50 100.00%
42.00 100.00%
8.00 100.00%
6.00 100.00%
28.00 100.00%
22.40 100.00%
67.20 100.00%
33.22 100.00%
75.00 100.00%
6.00 100.00%
28.00 100.00%
10.00 100.00%
30.00 100.00%
20.00 100.00%
21.00 100.00%

18,739.74 100.00%
4,983.04 100.00%
744.88 100.00%
146.72 100.00%
567.16 100.00%
251.22 100.00%
843.66 100.00%
318.98 100.00%
3,966.66 100.00%
2,249.78 100.00%
13,538.68 100.00%

5,122.30 100.00%
1,600.72 100.00%
270.83 100.00%

3,435.77 100.00%
1,500.00 100.00%

36,137.60 100.00%
4,223.42 100.00%
11,486.28 100.00%
41,596.55 100.00%
2,254.40 100.00%
5,154.91 100.00%
15,768.60 100.00%
1,326.30 100.00%

10,422.98 100.00%
3,069.14 100.00%

502.50 100.00%
154.00 100.00%
111.00 100.00%
206.50 100.00%
38.00 100.00%

10,557.60 100.00%
2,491.52 100.00%
7,301.76 100.00%

2,495.64 100.00%
7,989.10 100.00%
18,773.68 100.00%
29,026.97 100.00%

1,686.55 100.00%
527.05 100.00%

1,309.24 100.00%

13,043.83 100.00%
1,524.44 100.00%
2,895.79 100.00%
11,410.96 100.00%
777.29 100.00%
1,756.17 100.00%

2,348.75 100.00%

26,493.77 100.00%
2,654.93 100.00%
6,709.53 100.00%
26,493.77 100.00%
2,545.24 100.00%
5,819.21 100.00%

105,139.32 100.00%
2,161.05 100.00%

308.00 100.00%
400.00 100.00%
336.15 100.00%

1,242.18 100.00%

11,556.09 70.41%
1,845.09 100.00%
4,158.40 88.89%
136.64 9.09%
2,073.66 100.00%
4,747.59 100.00%
116.16 100.00%
5,729.12 100.00%
3,129.60 100.00%
485.55 100.00%
206.46 100.00%
7,242.48 100.00%

17,990.38 85.72%
1,773.99 100.00%
34,732.66 88.34%
2,370.35 100.00%
21,771.92 77.48%
2,294.93 100.00%
60.13 100.00%
1,977.49 100.00%

1,502.00 96.78%
214.00 91.45%
5.50 100.00%
5.00 100.00%
303.12 82.76%
553.00 94.05%
712.50 88.24%
877.50 92.13%
157.50 100.00%
382.20 93.63%
2,982.65 92.37%
2,241.00 100.00%
862.75 100.00%
1,672.65 100.00%
267.90 100.00%
791.01 100.00%
256.14 100.00%

10,819.30 100.00%

31,488.87 100.00%
5,857.50 100.00%
2,277.20 100.00%
22,855.59 100.00%

5,376.13 100.00%
1,600.00 100.00%

50,849.87 100.00%
5,086.80 100.00%
19,283.03 100.00%
50,761.62 100.00%
2,405.62 100.00%
5,499.99 100.00%

19,640.23 100.00%
4,596.78 100.00%

224.10 100.00%

2,498.79 100.00%
292.03 100.00%
794.24 100.00%
2,914.23 100.00%
140.05 100.00%
320.20 100.00%
2,774.58 100.00%
197.38 100.00%

560.30 100.00%
363.39 100.00%
16.00 100.00%
12.00 100.00%
7.00 100.00%
16.00 100.00%
4.00 100.00%
519.18 100.00%

334.06 100.00%
104.39 100.00%

66.51 100.00%

558.49 100.00%
65.27 100.00%
177.52 100.00%
651.34 100.00%
31.22 100.00%
71.37 100.00%

3,222.18 100.00%

363.39 100.00%
939.54 100.00%
242.59 100.00%
173.06 100.00%

99.14 100.00%
30.98 100.00%

1,159.20 100.00%

14,724.00 100.00%
1,720.80 100.00%
4,680.00 100.00%
17,172.00 100.00%
824.83 100.00%
1,885.82 100.00%

3,485.49 100.00%
2,249.49 100.00%
8,726.77 100.00%

48.00 100.00%
4.00 100.00%
45.00 100.00%
5.00 100.00%
85.00 100.00%
9.76 100.00%
19.72 100.00%
283.58 100.00%
217.84 100.00%

1,728.00 100.00%
540.00 100.00%

7,526.68 100.00%
346.12 100.00%

1,033,718.53
124,811.18
103,371.85
===========
1,261,901.56
1,135,711.40
204,428.05
===========
1,340,139.45 78.09%
OBRA : MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL ESTABL
PROCESO : LP N° 01-2017-PRONIS
CONTRATISTA : CONSORCIO HOSPITAL DEL SUR

PARTIDA DESCRIPCIÓN

05 INSTALACIONES ELECTRICAS
05.01 SALIDAS DE ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DEBILES
05.01.01 SALIDA DE ALUMBRADO
05.01.01.01 SALIDA DE ALUMBRADO DE TECHO (C/TUB 20 MM CABLE Y ACCESORIOS)
05.01.01.02 SALIDA DE ALUMBRADO EN FALSO CIELO RASO (C/TUB RIGIDA Y FLEXIBLE 20MM
05.01.01.03 SALIDA DE ALUMBRADO EN PARED (C/TUB 20MM CABLE Y ACCESORIOS)
05.01.02 SALIDA DE ALUMBRADO EXTERNO
05.01.02.01 SALIDA DE ALUMBRADO EXTERNO EN PARED (C/TUB 20MM CABLE Y ACCESORIOS
05.01.02.02 SALIDA DE ALUMBRADO EXTERNO EN POSTE DE FIERRO (C/TUBERIA 20MM, CAB
05.01.02.03 SALIDA DE ALUMBRADO EXTERNO EN PISO
05.01.02.04 SALIDA DE ALUMBRADO EXTERNO EN BANCA
05.01.02.05 SALIDA DE ALUMBRADO EXTERNO EN TECHO (C/TUB 20MM CABLE Y ACCESORIOS
05.01.03 SALIDA PARA INTERRUPTOR
05.01.03.01 SALIDA PARA INTERRUPTOR SIMPLE (C/INTERRUPTOR)
05.01.03.02 SALIDA PARA INTERRUPTOR DOBLE (C/INTERRUPTOR)
05.01.03.03 SALIDA PARA INTERRUPTOR CONMUTACION SIMPLE (C/INTERRUPTOR)
05.01.03.04 SALIDA PARA INTERRUPTOR UV (C/INTERRUPTOR)
05.01.04 SALIDA PARA TOMACORRIENTES
05.01.04.01 SALIDA PARA TOMACORRIENTE DOBLE TIPO MIXTO: TRES EN LINEA - SCHUKO 16
05.01.04.02 SALIDA PARA TOMACORRIENTE DOBLE TIPO SCHUKO 16A, SISTEMA ESTABILIZAD
05.01.04.03 SALIDA PARA TOMACORRIENTE DOBLE TIPO MIXTO: TRES EN LINEA - SCHUKO 16
05.01.04.04 SALIDA PARA TOMACORRIENTE DOBLE TIPO SCHUKO 16A, SISTEMA ESTABILIZAD
05.01.05 SALIDA ELECTRICA PARA THERMA
05.01.05.01 SALIDA ELECTRICA PARA THERMA HASTA 100L (C/TUBERIA, CAJAS, INTERRUPTO
05.01.05.02 SALIDA ELECTRICA PARA THERMA HASTA 200L (C/TUBERIA, CAJAS, INTERRUPTO
05.01.06 SALIDA DE FUERZA
05.01.06.01 SALIDA DE FUERZA PARA AIRE ACONDICIONADO HASTA 3KW (C/CAJAS, TUBERIA
05.01.06.02 SALIDA DE FUERZA PARA AIRE ACONDICIONADO HASTA 7KW (C/CAJAS, TUBERIA
05.01.06.03 SALIDA DE FUERZA PARA EQUIPOS DE VENTILACION HASTA 3KW (C/CAJAS, TUB
05.01.06.04 SALIDA DE FUERZA PARA EQUIPOS DE VENTILACION HASTA 5KW (C/CAJAS, TUB
05.01.07 SALIDA PARA ELECTROBOMBAS
05.01.07.01 SALIDA PARA ELECTROBOMBAS HASTA 10HP (SOLO TUBERIA, CABLE, CAJAS Y A
05.01.08 SALIDAS VARIAS
05.01.08.01 SALIDA ELECTRICA P/ESTERILIZADOR HASTA 3KW(C/TOMACORRIENTE, INTERRU
05.01.08.02 SALIDA ELECTRICA P/ESTERILIZADOR HASTA 5KW(C/TOMACORRIENTE, INTERRU
05.01.08.03 SALIDA ELECTRICA P/BAÑO MARIA (C/TOMACORRIENTE, INTERRUPTOR, TUBERIA
05.01.08.04 SALIDA ELECTRICA P/UNIDAD DENTAL (C/INTERRUPTOR, TUBERIAS, CAJA, CABL
05.01.08.05 SALIDA ELECTRICA PARA RAYOS X ODONTOLOGICO (C/INTERRUPTOR, TUBERIAS
05.01.08.06 SALIDA ELECTRICA PARA RAYOS X ESTACIONARIO(C/INTERRUPTOR, TUBERIAS,
05.01.08.07 SALIDA ELECTRICA P/DESTILADOR HASTA 3KW (C/TOMACORRIENTE, INTERRUPT
05.01.08.08 SALIDA ELECTRICA P/TANQUE DE COMPRESAS CALIENTES (C/TOMACORRIENTE,
05.01.08.09 SALIDA ELECTRICA P/TANQUE DE COMPRESAS FRIAS (C/TOMACORRIENTE, INTE
05.01.08.10 SALIDA ELECTRICA P/TANQUE DE PARAFINA (C/TOMACORRIENTE, INTERRUPTOR,
05.01.08.11 SALIDA ELECTRICA PARA UNIDAD DE TRATAMIENTO DE RESIDUOS SOLIDOS HOS
05.01.08.12 SALIDA ELECTRICA PARA UPS HASTA 10 KVA (C/TUBERIAS, CAJA, CABLES Y ACCE
05.01.08.13 SALIDA ELECTRICA PARA UPS HASTA 20 KVA (C/TUBERIAS, CAJA, CABLES Y ACCE
05.01.09 CANALIZACIONES, CONDUCTOS O TUBERIAS
05.01.09.01 TUBERIA DE Ø20 MM PVC-P
05.01.09.02 TUBERIA DE Ø25 MM PVC-P
05.01.09.03 TUBERIA DE Ø35 MM PVC-P
05.01.09.04 TUBERIA DE Ø40 MM PVC-P
05.01.09.05 TUBERIA DE Ø50 MM PVC-P
05.01.09.06 TUBERIA DE Ø65 MM PVC-P
05.01.09.07 TUBERIA DE Ø80 MM PVC-P
05.01.10 BUZONES ELECTRICOS
05.01.10.01 BUZON PARA ALIMENTADORES ELECTRICOS 600mmX600mm (TIPO 1)
05.01.10.02 BUZON PARA ALIMENTADORES ELECTRICOS 600mmX600mm (TIPO 2)
05.01.10.03 BUZON PARA ALIMENTADORES ELECTRICOS 600mmX600mm (TIPO 3)
05.01.11 CAJAS
05.01.11.01 CAJA DE FoGo DE 100x100x55 mm
05.01.11.02 CAJA DE FoGo DE 150x150x100 mm
05.01.11.03 CAJA DE FoGo DE 200x200x100 mm
05.01.11.04 CAJA DE FoGo DE 250x250x100 mm
05.01.11.05 CAJA DE FoGo DE 300x300x100 mm
05.01.11.06 CAJA DE FoGo DE 350x350x100 mm
05.01.11.07 CAJA DE FoGo DE 350x350x125 mm
05.01.11.08 CAJA DE FoGo DE 400x400x100 mm
05.01.11.09 CAJA DE FoGo DE 450x450x100 mm
05.01.11.10 CAJA DE FoGo DE 450x450x125 mm
05.01.11.11 CAJA DE FoGo DE 600x400x250 mm
05.01.12 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
05.01.12.01 ALIMENTADOR 3x4mm2 + 1x4mm2 (N) + 1x4mm2 (T) (LSOH)
05.01.12.02 ALIMENTADOR 3x6mm2 + 1x6mm2 (N) + 1x4mm2 (T) (LSOH)
05.01.12.03 ALIMENTADOR 3x10mm2 + 1x10mm2 (N) + 1x4mm2 (T) (LSOH)
05.01.12.04 ALIMENTADOR 3x16mm2 + 1x16mm2 (N) + 1x6mm2 (T) (LSOH)
05.01.12.05 ALIMENTADOR 3x25mm2 + 1x25mm2 (N) + 1x10mm2 (T) (LSOH)
05.01.12.06 ALIMENTADOR 3x35mm2 + 1x35mm2 (N) + 1x16mm2 (T) (LSOH)
05.01.12.07 ALIMENTADOR 3x50mm2 + 1x50mm2 (N) + 1x16mm2 (T) (LSOH)
05.01.12.08 ALIMENTADOR 3x70mm2 + 1x70mm2 (N) + 1x25mm2 (T) (LSOH)
05.01.12.09 ALIMENTADOR 3x95mm2 + 1x95mm2 (N) + 1x35mm2 (T) (LSOH)
05.01.12.10 ALIMENTADOR 3x120mm2 + 1x120mm2 (N) + 1x50mm2 (T) (LSOH)
05.01.12.11 ALIMENTADOR 3x150mm2 + 1x150mm2 (N) + 1x50mm2 (T) (LSOH)
05.01.12.12 ALIMENTADOR 3x240mm2 + 1x240mm2 (N) + 1x70mm2 (T) (LSOH)
05.01.13 TABLEROS PRINCIPALES
05.01.13.01 TABLERO ELECTRICO TRIFASICO AUTOSOPORTADO DE 54 POLOS (TABLERO GEN
05.01.13.02 TABLERO ELECTRICO TRIFASICO AUTOSOPORTADO DE 48 POLOS (TABLERO GE
05.01.13.03 TABLERO ELECTRICO ESTABILIZADO TRIFASICO AUTOSOPORTADO DE 36 POLOS
05.01.13.04 TABLERO ELECTRICO EMPOTRADO TRIFASICO 54 POLOS
05.01.13.05 TABLERO ELECTRICO EMPOTRADO TRIFASICO 48 POLOS
05.01.13.06 TABLERO ELECTRICO EMPOTRADO TRIFASICO 42 POLOS
05.01.13.07 TABLERO ELECTRICO EMPOTRADO TRIFASICO 36 POLOS
05.01.13.08 TABLERO ELECTRICO EMPOTRADO TRIFASICO 24 POLOS
05.01.13.09 TABLERO ELECTRICO EMPOTRADO TRIFASICO 18 POLOS
05.01.13.10 TABLERO ELECTRICO EMPOTRADO TRIFASICO 12 POLOS
05.01.13.11 TABLERO ELECTRICO ESTABILIZADO EMPOTRADO TRIFASICO 36 POLOS
05.01.13.12 TABLERO ELECTRICO ESTABILIZADO EMPOTRADO TRIFASICO 24 POLOS
05.01.13.13 TABLERO ELECTRICO ESTABILIZADO EMPOTRADO TRIFASICO 18 POLOS
05.01.13.14 TABLERO ELECTRICO ESTABILIZADO EMPOTRADO TRIFASICO 12 POLOS
05.01.14 INTERRUPTORES TERMOMAGNETICOS
05.01.14.01 INTERRUPTOR TERMOMAGNETICO 2X20 A
05.01.14.02 INTERRUPTOR TERMOMAGNETICO 2X30 A
05.01.14.03 INTERRUPTOR TERMOMAGNETICO 2X40 A
05.01.14.04 INTERRUPTOR TERMOMAGNETICO 3X15 A
05.01.14.05 INTERRUPTOR TERMOMAGNETICO 3X20 A
05.01.14.06 INTERRUPTOR TERMOMAGNETICO 3X30 A
05.01.14.07 INTERRUPTOR TERMOMAGNETICO 3X40 A
05.01.14.08 INTERRUPTOR TERMOMAGNETICO 3X60 A
05.01.14.09 INTERRUPTOR TERMOMAGNETICO 3X100 A
05.01.14.10 INTERRUPTOR TERMOMAGNETICO 3X150 A
05.01.14.11 INTERRUPTOR TERMOMAGNETICO 3X200 A
05.01.14.12 INTERRUPTOR TERMOMAGNETICO 3X300 A
05.01.14.13 INTERRUPTOR TERMOMAGNETICO 3X1000 A
05.02 INSTALACION DE PARARRAYOS
05.02.01 INSTALACION DE PARARRAYOS TIPO PDC IONIZANTE EN POSTE (INC. POZO A TIERR
05.03 INSTALACION DE PUESTA A TIERRA
05.03.01 SISTEMA ENMALLADO DE POZO DE PUESTA A TIERRA P/TABLEROS (<5 OHMS)
05.03.02 POZO DE PUESTA A TIERRA (5 OHMS)
05.03.03 POZO DE PUESTA A TIERRA (15 OHMS)
05.04 ARTEFACTOS
05.04.01 LAMPARAS
05.04.01.01 ARTEFACTO TIPO A
05.04.01.02 ARTEFACTO TIPO Ae
05.04.01.03 ARTEFACTO TIPO F
05.04.01.04 ARTEFACTO TIPO Fe
05.04.01.05 ARTEFACTO TIPO R
05.04.01.06 ARTEFACTO TIPO Z
05.04.01.07 ARTEFACTO TIPO G4
05.04.01.08 ARTEFACTO TIPO G4e
05.04.01.09 ARTEFACTO TIPO G5
05.04.01.10 ARTEFACTO TIPO HR
05.04.01.11 ARTEFACTO TIPO U
05.04.01.12 ARTEFACTO TIPO C
05.04.01.13 ARTEFACTO TIPO J
05.04.01.14 ARTEFACTO TIPO P
05.04.01.15 ARTEFACTO TIPO AP
05.04.01.16 ARTEFACTO TIPO W1
05.04.01.17 ARTEFACTO TIPO E
05.04.01.18 ARTEFACTO TIPO EP
05.04.01.19 ARTEFACTO TIPO FAROLA
05.04.01.20 ARTEFACTO TIPO CINTA LED
05.04.01.21 ARTEFACTO DE LUZ DE EMERGENCIA AUTONOMO C/2 LAMP 50W
05.05 EQUIPOS ELECTRICOS Y MECANICOS
05.05.01 GRUPOS ELECTROGENOS
05.05.01.01 GRUPO ELECTROGENO DE 200KW TIPO COMPACTO INSONORO (INC. TABLERO DE
05.05.01.02 ESTABILIZADOR CON TRANSFORMADOR DE AISLAMIENTO DE 100 KVA TRIFASICO
05.05.01.03 BANCO DE CONDENSADORES DE 150KVA TRIFASICO 380/220V
05.05.01.04 UPS DE 20KVA
05.06 VARIOS
05.06.01 MOVIMIENTO DE TIERRAS
05.06.01.01 EXCAVACION DE ZANJAS 0.60 x 0.60 PARA DUCTOS ELECTRICOS Y COMUNICACIO
05.06.01.02 RELLENO COMPACTADO MANUAL CON TIERRA CERNIDA
05.06.02 TRABAJOS COMPLEMENTARIOS
05.06.02.01 SUMNISTRO E INSTALACION DE CINTA SEÑALIZADORA DE SEGURIDAD ELECTRICA
05.06.02.02 SOLADO DE CONCRETO PARA TUBERIAS DE ALIMENTADORES
05.06.02.03 DADO DE CONCRETO PARA PROTECCION DE TUBERIAS
05.06.02.04 DUCTO DE CONCRETO DE 2 VIAS
05.06.02.05 DUCTO DE CONCRETO DE 4 VIAS
05.06.03 SISTEMA DE DISTRIBUCION EN MEDIA TENSION
05.06.03.01 SUB ESTACION ELECTRICA 400 KVA
05.06.04 PRUEBAS ELECTRICAS DEL SISTEMA PROYECTADO
05.06.04.01 EMPALME A RED ELECTRICA (INCL. INST DE MEDIDOR TRIFASICO)
05.06.04.02 PRUEBAS ELECTRICAS SISTEMA PROYECTADO

TOTAL COSTO DIRECTO


GASTOS GENERALES 12.074%
UTILIDAD 10.00%

SUB-TOTAL (A + B + C)
FACTOR DE RELACION 0.900000
I.GV. 18.00%

TOTAL (A + B +C) + D

RESIDENTE
INSTALACIONES ELECTRICAS
VALORIZACION DE OBRA Nº 4
(del 1 de diciembre al 31 de diciembre del 2017)

ESOLUTIVA DEL ESTABLECIMIENTO DE SALUD ESTRATÉGICO DE PUTINA, PROVINCIA DE SAN ANTONIO DE PUT
PRESUPUESTO BASE :
MONTO DEL CONTRATO :
PRESUPUESTO BASE AV
P.UNIT. PRESUP. ANTERIOR
UNIDAD METRADO
S/. S/. METRADO VALOR S/.

-
pto 630.00 105.49 66,458.70 0.00
pto 24.00 110.03 2,640.72 0.00
pto 38.00 102.98 3,913.24 0.00
-
pto 11.00 105.28 1,158.08 0.00
pto 5.00 531.15 2,655.75 0.00
pto 74.00 153.93 11,390.82 0.00
pto 9.00 167.57 1,508.13 0.00
pto 125.00 105.49 13,186.25 0.00
-
pto 322.00 85.71 27,598.62 0.00
pto 2.00 95.91 191.82 0.00
pto 58.00 91.71 5,319.18 0.00
pto 1.00 104.01 104.01 0.00
-
pto 645.00 191.88 123,762.60 0.00
pto 6.00 206.08 1,236.48 0.00
pto 1.00 221.88 221.88 0.00
pto 157.00 206.08 32,354.56 0.00
-
pto 9.00 180.24 1,622.16 0.00
pto 13.00 192.24 2,499.12 0.00
-
pto 4.00 264.54 1,058.16 0.00
pto 1.00 281.26 281.26 0.00
pto 4.00 264.54 1,058.16 0.00
pto 4.00 281.26 1,125.04 0.00
-
pto 2.00 224.40 448.80 0.00
-
pto 3.00 428.78 1,286.34 0.00
pto 2.00 257.57 515.14 0.00
pto 2.00 375.17 750.34 0.00
pto 1.00 411.29 411.29 0.00
pto 1.00 342.86 342.86 0.00
pto 1.00 893.67 893.67 0.00
pto 1.00 428.78 428.78 0.00
pto 1.00 428.78 428.78 0.00
pto 1.00 428.78 428.78 0.00
pto 1.00 428.78 428.78 0.00
pto 1.00 435.59 435.59 0.00
pto 3.00 306.59 919.77 0.00
pto 2.00 440.59 881.18 0.00
-
m 38.00 9.36 355.68 0.00
m 296.00 12.27 3,631.92 0.00
m 93.00 18.11 1,684.23 0.00
m 12.00 18.74 224.88 0.00
m 101.00 21.70 2,191.70 0.00
m 125.00 30.91 3,863.75 0.00
m 10.00 36.61 366.10 0.00
-
und 2.00 812.88 1,625.76 0.00
und 8.00 699.96 5,599.68 0.00
und 9.00 699.96 6,299.64 0.00
-
und 45.00 13.36 601.20 0.00
und 9.00 17.76 159.84 0.00
und 2.00 30.52 61.04 0.00
und 2.00 27.50 55.00 0.00
und 4.00 40.06 160.24 0.00
und 1.00 42.06 42.06 0.00
und 1.00 43.06 43.06 0.00
und 1.00 47.06 47.06 0.00
und 3.00 55.06 165.18 0.00
und 1.00 55.06 55.06 0.00
und 1.00 98.82 98.82 0.00
-
m 52.00 21.69 1,127.88 0.00
m 160.00 26.53 4,244.80 0.00
m 363.00 37.97 13,783.11 0.00
m 731.00 46.66 34,108.46 0.00
m 255.00 60.52 15,432.60 0.00
m 228.00 66.79 15,228.12 0.00
m 147.00 85.34 12,544.98 0.00
m 197.00 113.54 22,367.38 0.00
m 564.00 154.24 86,991.36 0.00
m 278.00 203.59 56,598.02 0.00
m 130.00 238.79 31,042.70 0.00
m 58.00 342.19 19,847.02 0.00
-
und 1.00 12,413.33 12,413.33 0.00
und 1.00 11,783.33 11,783.33 0.00
und 1.00 11,483.33 11,483.33 0.00
und 3.00 645.34 1,936.02 0.00
und 2.00 620.34 1,240.68 0.00
und 2.00 580.34 1,160.68 0.00
und 7.00 460.34 3,222.38 0.00
und 4.00 425.34 1,701.36 0.00
und 5.00 405.34 2,026.70 0.00
und 6.00 375.34 2,252.04 0.00
und 1.00 460.34 460.34 0.00
und 1.00 425.34 425.34 0.00
und 2.00 405.34 810.68 0.00
und 2.00 375.34 750.68 0.00
-
und 239.00 55.08 13,164.12 0.00
und 11.00 56.95 626.45 0.00
und 2.00 80.95 161.90 0.00
und 1.00 88.95 88.95 0.00
und 5.00 88.95 444.75 0.00
und 38.00 95.31 3,621.78 0.00
und 12.00 95.31 1,143.72 0.00
und 5.00 126.03 630.15 0.00
und 16.00 220.03 3,520.48 0.00
und 5.00 537.03 2,685.15 0.00
und 3.00 640.03 1,920.09 0.00
und 3.00 1,538.62 4,615.86 0.00
und 1.00 4,759.22 4,759.22 0.00
-
und 1.00 10,194.94 10,194.94 0.00
-
und 1.00 7,455.02 7,455.02 0.00
und 2.00 1,432.08 2,864.16 0.00
und 2.00 1,291.08 2,582.16 0.00
-
-
und 376.00 241.06 90,638.56 0.00
und 4.00 259.84 1,039.36 0.00
und 106.00 493.06 52,264.36 0.00
und 15.00 221.06 3,315.90 0.00
und 38.00 346.84 13,179.92 0.00
und 21.00 312.84 6,569.64 0.00
und 175.00 179.84 31,472.00 0.00
und 5.00 239.84 1,199.20 0.00
und 50.00 524.84 26,242.00 0.00
und 34.00 274.84 9,344.56 0.00
und 2.00 200.84 401.68 0.00
und 6.00 784.84 4,709.04 0.00
und 13.00 1,414.84 18,392.92 0.00
und 14.00 400.53 5,607.42 0.00
und 16.00 2,114.84 33,837.44 0.00
und 4.00 109.84 439.36 0.00
und 14.00 619.84 8,677.76 0.00
und 58.00 709.84 41,170.72 0.00
und 5.00 2,614.84 13,074.20 0.00
m 62.00 97.84 6,066.08 0.00
und 66.00 122.85 8,108.10 0.00
-
-
und 1.00 162,400.32 162,400.32 0.00
und 1.00 18,043.31 18,043.31 0.00
und 1.00 50,023.31 50,023.31 0.00
und 1.00 45,337.30 45,337.30 0.00
-
-
m 520.00 9.54 4,960.80 0.00
m3 187.00 36.78 6,877.86 0.00
-
m 520.00 4.41 2,293.20 0.00
m2 312.00 23.63 7,372.56 0.00
m3 6.80 299.50 2,036.60 0.00
m 160.00 53.97 8,635.20 0.00
m 160.00 58.97 9,435.20 0.00
-
glb 1.00 159,737.50 159,737.50 0.00
-
und 1.00 942.11 942.11 0.00
glb 1.00 3,500.00 3,500.00 0.00

(A) 1,620,084.45 0.00


(B) 195,614.05 0.00
(C) 162,008.45 0.00
=========== =========
1,977,706.95 0.00
1,779,936.26 0.00
(D) 320,388.53 0.00
=========== ===========
2,100,324.79 0.00

SUPERVISOR
TRICAS
º4
del 2017)

INCIA DE SAN ANTONIO DE PUTINA – REGIÓN PUNO


SE : 28,825,386.21 F.R. = 0.900000
RATO : 25,942,847.59
AVANCES
SALDOS
ACTUAL ACUMULADO
METRADO VALOR S/. METRADO VALOR S/. % METRADO

200.00 21,098.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
100.00 1,227.00
0.00
0.00
30.00 651.00
30.00 927.30
0.00

0.00
0.00
0.00

15.00 200.40
1.00 17.76
1.00 30.52
1.00 27.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

24,179.48 0.00
2,919.43 0.00
2,417.95 0.00
========= =========== ==========
29,516.86 0.00
26,565.17 0.00
4,781.73 0.00
=========== =========== ==========
0.00% 31,346.90 1.49% 0.00 0.00%

SUPERVISOR
SALDOS

VALOR S/. %
0.00
0.00
0.00
===========
0.00
0.00
0.00
===========
0.00 0.00%
ARQUITECTURA
VALORIZACION DE OBRA Nº 4
(del 1 de diciembre al 31 de diciembre del 2017)

OBRA : MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD ESTRATÉGICO DE PUTINA, PROVINCIA DE SAN ANTONIO DE PUTINA – REGIÓN PUNO
PROCESO : LP N° 01-2017-PRONIS PRESUPUESTO BASE : 28,825,386.21 F.R. = 0.900000
CONTRATISTA : CONSORCIO HOSPITAL DEL SUR MONTO DEL CONTRATO : 25,942,847.59
PRESUPUESTO BASE AVANCES
SALDOS
PARTIDA DESCRIPCIÓN P.UNIT. PRESUP. ANTERIOR ACTUAL ACUMULADO
UNIDAD METRADO
S/. S/. METRADO VALOR S/. METRADO VALOR S/. METRADO VALOR S/. % METRADO VALOR S/. %
03 ARQUITECTURA
03.01 MUROS Y TABIQUES
03.01.01 MURO DE LADRILLO KK CABEZA m2 6,403.51 154.64 990,238.79 0.00 710.17 109,820.57 710.17 109,820.57 11.09%
03.01.02 MURO DE LADRILLO KK SOGA m2 1,243.83 93.81 116,683.69 0.00 301.11 28,246.72
03.01.03 MURO DE LADRILLO KK CANTO m2 24.90 64.42 1,604.06 0.00 0.00 0.00 0.00 0.00%
03.02 REVOQUES Y REVESTIMIENTOS - 0.00
03.02.01 TARRAJEO EN MUROS INTERIORES m2 13,484.01 25.02 337,369.93 0.00 1,069.02 26,746.78 1,069.02 26,746.78 7.93%
03.02.02 TARRAJEO EN MUROS EXTERIORES C:A 1:5 e=1.5cm m2 3,117.09 25.21 78,581.84 0.00 500.00 12,605.00
03.02.03 TARRAJEO DE VIGAS m2 68.16 35.56 2,423.77 0.00 0.00
03.02.04 TARRAJEO DE COLUMNAS m2 57.26 29.16 1,669.70 0.00 0.00
03.02.05 TARRAJEO DE TANQUE ELEVADO m2 330.01 33.06 10,910.13 0.00 0.00
03.02.06 TARRAJEO CON BARITINA EN MUROS m2 78.63 250.85 19,724.34 0.00 0.00
03.02.07 TARRAJEO IMPERMEABILIZADO m2 1,238.84 32.84 40,683.51 0.00 600.00 19,704.00
03.02.08 TARRAJEO IMPERMEABILIZADO (Interior Tanque elevado, Cisterna y Cuarto de Bombas) m2 179.23 32.84 5,885.91 0.00 0.00
03.02.09 VESTIDURA DE DERRAMES A=0.25m m 3,177.93 15.08 47,923.18 0.00 0.00
03.02.10 VESTIDURA DE DERRAMES A=0.15m m 726.10 13.47 9,780.57 0.00 0.00
03.02.11 BRUÑAS 1 cm x 1 cm m 8,569.63 5.83 49,960.94 0.00 0.00
03.03 CIELO RASO - 0.00
03.03.01 CIELO RASO CON MEZCLA C:A 1:5 E=1.5cm m2 5,177.44 29.57 153,096.90 0.00 443.19 13,105.13
03.03.02 FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 1.22m x 2.44m x 6mm m2 96.53 69.09 6,669.26 0.00 0.00
03.04 CONTRAPISOS, PISOS Y PAVIMENTOS - 0.00
03.04.01 CONTRAPISO E=48mm m2 697.41 30.62 21,354.69 0.00 0.00
03.04.02 CONTRAPISO E=42.5mm / 42.8mm m2 3,386.94 29.29 99,203.47 0.00 1,000.00 29,290.00
03.04.03 CONTRAPISO E=30 mm m2 787.81 23.77 18,726.24 0.00 0.00
03.04.04 CONTRAPISO CON IMPERMEABILIZANTE EN DUCHAS m2 49.15 33.30 1,636.70 0.00 0.00
03.04.05 PISO DE PORCELANATO MATE 0.60 x 0.60m COLOR CLARO m2 3,383.26 102.38 346,378.16 0.00 500.00 51,190.00
03.04.06 PISO DE LOSETA GRES CERAMICO 0.30 x 0.30 m. m2 52.83 127.00 6,709.41 0.00 0.00
03.04.07 PISO DE CEMENTO PULIDO Y BRUÑADO C/METRO AMBOS SENTIDOS m2 278.12 46.42 12,910.33 0.00 0.00
03.04.08 PISO VINILICO FLEXIBLE EN ROLLO m2 620.63 181.13 112,414.71 0.00 0.00
03.04.09 PISO VINILICO CONDUCTIVO FLEXIBLE EN ROLLO - CONDUCTIVO m2 35.85 296.90 10,643.87 0.00 0.00
03.04.10 SARDINEL EN DUCH A REVESTIDO CON CERAMICO H=0.30 m m 10.80 101.68 1,098.14 0.00 0.00
03.04.11 RAMPA - ACABADO CON CEMENTO PULIDO BRUÑADO CADA 0.10m, CON IMPERMEA m2 351.13 74.19 26,050.33 0.00 0.00
03.04.12 VEREDA- ACABADO CON CEMENTO FROTACHADO Y BRUÑADO CADA 1.00 m m2 1,704.87 67.86 115,692.48 0.00 0.00
03.04.13 CANALETAS / BANCAS / JARDINERAS / - ACABADO CON CMENTO PULIDO IMPERMEAm2 1,258.44 31.55 39,703.78 0.00 0.00
03.04.14 PISO DE BALDOSAS DE PIEDRA PULIDA m2 517.13 104.59 54,086.63 0.00 0.00
03.04.15 BANDAS DE CEMENTO PULIDO ANCHO 0.10m EN PISO m 268.03 4.56 1,222.22 0.00 0.00
03.04.16 POYO BASE DE CONCRETO PARA CLOSET Y MUEBLES e=10cm m2 32.70 54.07 1,768.09 0.00 0.00
03.04.17 SARDINEL ACABADO CON CEMENTO PULIDO E IMPERMEABILIZADO m 412.85 41.91 17,302.54 0.00 0.00
03.04.18 PISO DE ALFOMBRA (FELPUDO) m2 40.93 166.91 6,831.63 0.00 0.00
03.05 CONTRAZOCALOS - 0.00
03.05.01 CONTRAZOCALO DE CERAMICO VITRIFICADO DE 0.20m x 0.30m H=0.20m m 1,228.70 18.76 23,050.41 0.00 0.00
03.05.02 CONTRAZOCALO SANITARIO DE TERRAZO PULIDO HECHO EN OBRA H=0.10m m 1,676.23 28.11 47,118.83 0.00 0.00
03.05.03 CONTRAZOCALO FLEXIBLE PVC H=0.10m m 520.74 23.29 12,128.03 0.00 0.00
03.05.04 CONTRAZOCALO DE CEMENTO PULIDO H=20cm m 405.22 17.21 6,973.84 0.00 0.00
03.05.05 CONTRAZOCALO DE CEMENTO PULIDO H=40cm m 1,069.28 18.07 19,321.89 0.00 0.00
03.05.06 CONTRAZOCALO COVE FORMER (PISOS Y MUROS) m 33.50 31.88 1,067.98 0.00 0.00
03.06 ZOCALOS - 0.00
03.06.01 ZOCALO DE BALDOAS CERAMICA 0.30 x 0.30m. m2 2,165.46 89.78 194,415.00 0.00 0.00
03.06.02 ZOCALO DE VINILICO FLEXIBLE EN ROLLO PARA PARED e=2.00mm m2 1,666.80 62.21 103,691.63 0.00 0.00
03.06.03 ZOCALO DE CEMENTO PULIDO m2 82.13 36.28 2,979.68 0.00 0.00
03.06.04 REVESTIMIENTO CON TERRAZO PULIDO COLOR CLARO m2 76.47 133.31 10,194.22 0.00 0.00
03.06.05 REVESTIMIENTO CON TERRAZO PULIDO COLOR OSCURO m2 34.66 133.31 4,620.52 0.00 0.00
03.06.06 REVESTIMIENTO CON ENCHAPE DE PIEDRA TIPO FACHALETA m2 101.23 109.12 11,046.22 0.00 0.00
03.07 ESCALERAS Y GRADAS - 0.00
03.07.01 ACABADO DE GRADAS (PASOS Y CONTRAPASOS) CON CEMENTO PULIDO Y BRUÑA m2 52.82 40.11 2,118.61 0.00 0.00
03.08 CUBIERTAS - 0.00
03.08.01 CUBIERTA DE LADRILLO PASTELERO CON MEZCLA IMPERMEABILIZANTE m2 74.57 44.93 3,350.43 0.00 0.00
03.08.02 COBERTURAS, CUMBRERAS Y ACCESORIOS - PLANCHA TERMOACUSTICA - 0.00
03.08.02.01 COBERTURA DE PLANCHA TERMOCUSTICA ONDULADA COLOR ROJO m2 5,035.23 74.21 373,664.42 0.00 0.00
03.08.02.02 CUMBRERA DE PLANCHA TERMOCUSTICA ONDULADA COLOR ROJO m 683.74 65.95 45,092.65 0.00 0.00
03.08.02.03 CANALETA DE PLANCHA GALVANIZADA m 1,255.67 80.87 101,546.03 0.00 0.00
03.08.02.04 BORDE PARAPETO DE PLANCHA GALVANIZADA m2 481.25 80.87 38,918.69 0.00 0.00
03.08.03 COBERTURAS, CUMBRERAS Y ACCESORIOS - POLICARBONATO - 0.00
03.08.03.01 COBERTURA DE POLICARBONATO ALVEOLAR 16mm m2 577.05 76.24 43,994.29 0.00 0.00
03.08.03.02 CUMBRERA DE PLANCHA LISA DE ALUMINIO m 26.25 61.00 1,601.25 0.00 0.00
03.09 CARPINTERIA DE MADERA - 0.00
03.09.01 PUERTAS - 0.00
03.09.01.01 PUERTA TIPO P-1 m2 258.66 304.85 78,852.50 0.00 0.00
03.09.01.02 PUERTA TIPO P-2 m2 3.24 368.20 1,192.97 0.00 0.00
03.09.01.03 PUERTA TIPO P-3 m2 11.88 314.01 3,730.44 0.00 0.00
03.09.01.04 PUERTA TIPO P-4 m2 54.00 361.65 19,529.10 0.00 0.00
03.09.01.05 PUERTA TIPO P-5 m2 290.90 307.18 89,358.66 0.00 0.00
03.09.01.06 PUERTA TIPO P-7 m2 6.09 619.51 3,772.82 0.00 0.00
03.09.01.07 PUERTA TIPO P-8 m2 5.04 682.86 3,441.61 0.00 0.00
03.09.01.08 PUERTA TIPO P-9 m2 2.43 314.14 763.36 0.00 0.00
03.09.01.09 PUERTA TIPO P-11 m2 37.80 304.85 11,523.33 0.00 0.00
03.09.01.10 PUERTA TIPO P-12 m2 35.10 368.20 12,923.82 0.00 0.00
03.09.01.11 PUERTA TIPO P-13 m2 8.64 314.01 2,713.05 0.00 0.00
03.09.01.12 PUERTA TIPO P-15 m2 39.69 418.31 16,602.72 0.00 0.00
03.09.01.13 PUERTA TIPO P-16 m2 9.72 326.72 3,175.72 0.00 0.00
03.09.01.14 PUERTA TIPO P-17 m2 9.72 606.31 5,893.33 0.00 0.00
03.09.01.15 PUERTA TIPO Pd-1 m2 6.48 264.66 1,715.00 0.00 0.00
03.09.01.16 PUERTA TIPO Pd-3 m2 23.76 276.24 6,563.46 0.00 0.00
03.09.02 MUEBLES - 0.00
03.09.02.01 MUEBLE TIPO MF-03 und 20.00 702.80 14,056.00 0.00 0.00
03.09.02.02 MUEBLE TIPO MF-04 und 1.00 621.99 621.99 0.00 0.00
03.09.02.03 MUEBLE TIPO MF-05 und 7.00 670.79 4,695.53 0.00 0.00
03.09.02.04 MUEBLE TIPO MF-06 und 31.00 758.41 23,510.71 0.00 0.00
03.09.02.05 MUEBLE TIPO MF-11 und 10.00 548.95 5,489.50 0.00 0.00
03.09.02.06 MUEBLE TIPO MF-11a und 3.00 287.80 863.40 0.00 0.00
03.09.02.07 MUEBLE TIPO MF-13 und 4.00 548.95 2,195.80 0.00 0.00
03.09.02.08 MUEBLE TIPO MF-16 und 31.00 551.36 17,092.16 0.00 0.00
03.09.02.09 MUEBLE TIPO MF-24 und 4.00 570.16 2,280.64 0.00 0.00
03.09.02.10 MUEBLE TIPO MF-25 und 4.00 610.96 2,443.84 0.00 0.00
03.09.02.11 MUEBLE TIPO MF-30 und 6.00 405.52 2,433.12 0.00 0.00
03.09.02.12 MUEBLE TIPO MF-36 und 5.00 717.98 3,589.90 0.00 0.00
03.09.02.13 MUEBLE TIPO MF-37 und 4.00 948.59 3,794.36 0.00 0.00
03.09.02.14 MUEBLE TIPO MF-38 und 7.00 716.90 5,018.30 0.00 0.00
03.09.02.15 MUEBLE TIPO MF-39 und 7.00 891.59 6,241.13 0.00 0.00
03.09.02.16 MUEBLE TIPO MF-40 und 9.00 837.27 7,535.43 0.00 0.00
03.09.02.17 MUEBLE TIPO MF-41 und 1.00 1,128.28 1,128.28 0.00 0.00
03.09.02.18 MUEBLE TIPO MF-42 und 4.00 752.53 3,010.12 0.00 0.00
03.09.02.19 MUEBLE TIPO MF-43 und 6.00 873.39 5,240.34 0.00 0.00
03.09.02.20 MUEBLE TIPO MF-63 und 2.00 1,604.72 3,209.44 0.00 0.00
03.09.02.21 MUEBLE TIPO MF-66 und 20.00 119.29 2,385.80 0.00 0.00
03.09.02.22 MUEBLE TIPO MF-81 und 2.00 1,108.84 2,217.68 0.00 0.00
03.09.02.23 MUEBLE TIPO MF-82 und 16.00 960.59 15,369.44 0.00 0.00
03.09.02.24 MUEBLE TIPO MF-83 und 3.00 641.45 1,924.35 0.00 0.00
03.09.02.25 MUEBLE TIPO MF-05 m 1.04 745.31 775.12 0.00 0.00
03.09.02.26 MUEBLE TIPO MF-06 m 0.90 842.59 758.33 0.00 0.00
03.09.02.27 MUEBLE TIPO MF-7a m 0.60 426.16 255.70 0.00 0.00
03.09.02.28 MUEBLE TIPO MF-36 m 1.63 1,196.66 1,950.56 0.00 0.00
03.09.02.29 MUEBLE TIPO MF-65 m 10.10 983.55 9,933.86 0.00 0.00
03.09.02.30 MUEBLE TIPO MF-66 m 5.75 132.54 762.11 0.00 0.00
03.09.02.31 TABLERO DE ATENCION DE MADERA CON SOPORTE METALICO I/ACABADO m 4.20 132.54 556.67 0.00 0.00
03.10 CARPINTERIA METALICA Y HERRERIA - 0.00
03.10.01 CARPINTERIA DE FIERRO - 0.00
03.10.01.01 VENTANA METALICA Vr-1, Vr-2, Vr-3 m2 16.41 226.64 3,719.16 0.00 0.00
03.10.01.02 PUERTA METALICA Pr-1, Pr-2 m2 74.52 550.60 41,030.71 0.00 0.00
03.10.01.03 REJA METALICA m2 33.01 111.99 3,696.79 0.00 0.00
03.10.01.04 BARANDA METALICA EN RAMPAS m 46.65 209.80 9,787.17 0.00 0.00
03.10.01.05 BARANDA METALICA EN ESCALERAS m 38.60 209.80 8,098.28 0.00 0.00
03.10.01.06 REJILLA METALICA PARA CANALETA m 74.54 127.43 9,498.63 0.00 0.00
03.10.01.07 ESCALERA DE GATO und 3.00 899.49 2,698.47 0.00 0.00
03.10.01.08 ESCALERA METALICA H=16m und 1.00 4,800.00 4,800.00 0.00 0.00
03.10.01.09 TAPA METALICA (CISTERNA, TANQUE ELEVEDO Y CTO. BOMBAS, I/ACABADO) und 5.00 227.64 1,138.20 0.00 0.00
03.10.01.10 MUEBLE TIPO MF-08 und 91.00 300.00 27,300.00 0.00 0.00
03.10.01.11 MUEBLE TIPO MF-08a und 38.00 250.00 9,500.00 0.00 0.00
03.10.01.12 MUEBLE TIPO MF-08b und 2.00 280.00 560.00 0.00 0.00
03.10.01.13 MUEBLE TIPO MF-17 und 4.00 300.00 1,200.00 0.00 0.00
03.10.01.14 MUEBLE TIPO MF-23 und 13.00 320.00 4,160.00 0.00 0.00
03.10.01.15 MUEBLE TIPO MF-23b und 1.00 280.00 280.00 0.00 0.00
03.10.01.16 TAPA DE PLANCHA METALICA (CANALETA G.E.) und 5.61 260.00 1,458.60 0.00 0.00
03.10.02 CARPINTERIA DE ALUMINIO - 0.00
03.10.02.01 PLATINA DE ALUMINIO PARA CAMBIO DE PISOS m 129.00 18.96 2,445.84 0.00 0.00
03.10.02.02 CANTONERA DE ALUMINIO m 16.00 36.71 587.36 0.00 0.00
03.10.02.03 DIVISIONES METALICAS PARA BAÑOS I/ACABADO m 57.50 662.84 38,113.30 0.00 0.00
03.10.02.04 TUBO DE ALUMINIO EN DUCHAS INC. CORTINA m 39.54 129.74 5,129.92 0.00 0.00
03.10.03 CARPINTERIA DE ALUMINIO-CRISTAL - 0.00
03.10.03.01 VENTANA V-1 m2 11.25 456.99 5,141.14 0.00 0.00
03.10.03.02 VENTANA V-2 m2 137.12 456.99 62,662.47 0.00 0.00
03.10.03.03 VENTANA V-3 m2 62.40 456.99 28,516.18 0.00 0.00
03.10.03.04 VENTANA V-4 m2 57.15 695.00 39,719.25 0.00 0.00
03.10.03.05 VENTANA V-5 m2 10.38 695.00 7,214.10 0.00 0.00
03.10.03.06 VENTANA V-6 m2 6.00 695.00 4,170.00 0.00 0.00
03.10.03.07 VENTANA V-8 m2 25.60 456.99 11,698.94 0.00 0.00
03.10.03.08 VENTANA V-12 m2 7.55 695.00 5,247.25 0.00 0.00
03.10.03.09 VENTANA V-14 m2 8.32 456.99 3,802.16 0.00 0.00
03.10.03.10 VENTANA MAMPARA VM-01 und 11.00 2,175.80 23,933.80 0.00 0.00
03.10.03.11 VENTANA MAMPARA VM-02 und 1.00 10,746.56 10,746.56 0.00 0.00
03.10.03.12 VENTANA MAMPARA VM-03 und 3.00 2,582.58 7,747.74 0.00 0.00
03.10.03.13 VENTANA MAMPARA VM-04 und 4.00 1,589.28 6,357.12 0.00 0.00
03.10.03.14 VENTANA MAMPARA VM-05 und 2.00 1,631.85 3,263.70 0.00 0.00
03.10.03.15 VENTANA MAMPARA VM-06 und 4.00 4,181.32 16,725.28 0.00 0.00
03.10.03.16 VENTANA FIJA CON CELOSIA DE ALUMINIO m2 1.20 300.00 360.00 0.00 0.00
03.11 VIDRIOS CRISTALES Y SIMILARES - 0.00
03.11.01 ESPEJO H-1 und 48.00 124.12 5,957.76 0.00 0.00
03.11.02 ESPEJO H-1 DISC. und 4.00 124.12 496.48 0.00 0.00
03.11.03 ESPEJO H-18 m2 30.25 213.08 6,445.67 0.00 0.00
03.11.04 MAMPARA M-01 und 1.00 38,347.20 38,347.20 0.00 0.00
03.11.05 MAMPARA M-02 und 4.00 13,737.60 54,950.40 0.00 0.00
03.11.06 MAMPARA M-03i und 1.00 3,916.80 3,916.80 0.00 0.00
03.11.07 MAMPARA M-03m und 1.00 4,896.00 4,896.00 0.00 0.00
03.11.08 MAMPARA M-04 und 1.00 24,105.60 24,105.60 0.00 0.00
03.11.09 MAMPARA M-05 und 2.00 7,200.00 14,400.00 0.00 0.00
03.11.10 MAMPARA M-06 und 1.00 8,164.80 8,164.80 0.00 0.00
03.11.11 MAMPARA M-07 und 4.00 21,340.80 85,363.20 0.00 0.00
03.11.12 MAMPARA M-08 und 1.00 11,570.40 11,570.40 0.00 0.00
03.11.13 MAMPARA M-09 und 4.00 5,832.00 23,328.00 0.00 0.00
03.11.14 MAMPARA M-10 und 2.00 12,348.00 24,696.00 0.00 0.00
03.11.15 MAMPARA M-11 und 4.00 4,176.00 16,704.00 0.00 0.00
03.11.16 MAMPARA M-12 und 1.00 26,712.00 26,712.00 0.00 0.00
03.11.17 MAMPARA M-13 und 1.00 4,435.20 4,435.20 0.00 0.00
03.11.18 VIDRIO EMPLOMADO und 1.00 18,814.61 18,814.61 0.00 0.00
03.12 CERRAJERIA - 0.00
03.12.01 CERRADURA TIPO A und 11.00 150.29 1,653.19 0.00 0.00
03.12.02 CERRADURA TIPO B und 91.00 78.29 7,124.39 0.00 0.00
03.12.03 CERRADURA TIPO D und 126.00 72.29 9,108.54 0.00 0.00
03.12.04 CERRADURA TIPO E und 9.00 67.29 605.61 0.00 0.00
03.12.05 CERRADURA TIPO F und 10.00 152.29 1,522.90 0.00 0.00
03.12.06 CERRADURA TIPO L1 und 2.00 1,337.29 2,674.58 0.00 0.00
03.12.07 CERRADURA TIPO L2 und 3.00 1,237.29 3,711.87 0.00 0.00
03.12.08 CERRADURA TIPO M und 18.00 133.70 2,406.60 0.00 0.00
03.12.09 CERRADURA TIPO O und 20.00 117.29 2,345.80 0.00 0.00
03.12.10 CERRADURA TIPO P-2 und 3.00 167.29 501.87 0.00 0.00
03.12.11 CERRADURA TIPO R2 und 11.00 187.29 2,060.19 0.00 0.00
03.12.12 ACCESORIO TIPO G: CIERRAPUERTA und 10.00 546.62 5,466.20 0.00 0.00
03.12.13 ACCESORIO TIPO I1: BARRA ANTIPANICO jgo 1.00 787.29 787.29 0.00 0.00
03.12.14 ACCESORIO TIPO I2: BARRA ANTIPANICO, DOBLE HOJA jgo 3.00 1,537.29 4,611.87 0.00 0.00
03.12.15 ACCESORIO TIPO J: PICAPORTE DE EMBUTIR jgo 14.00 89.09 1,247.26 0.00 0.00
03.12.16 ACCESORIO TIPO N: CIERRAPUERTA und 4.00 296.62 1,186.48 0.00 0.00
03.12.17 ACCESORIO TIPO S: PLACA DE EMPUJE und 10.00 223.31 2,233.10 0.00 0.00
03.12.18 ACCESORIO TIPO T: TOPE DE PUERTA und 292.00 45.54 13,297.68 0.00 0.00
03.12.19 BISAGRAS und 1,087.00 51.77 56,273.99 0.00 0.00
03.12.20 BISAGRAS PARA PUERTAS METALICAS und 114.00 23.77 2,709.78 0.00 0.00
03.13 PINTURA - 0.00
03.13.01 PINTURA OLEO MATE EN CIELORASO m2 5,177.44 20.65 106,914.14 0.00 0.00
03.13.02 PINTURA OLEO MATE EN MURO EXTERIOR m2 2,506.42 16.03 40,177.91 0.00 0.00
03.13.03 PINTURA OLEO MATE EN MURO INTERIOR m2 10,289.43 12.76 131,293.13 0.00 0.00
03.13.04 PINTURA LATEX ACRILICA SATINADA EN ZOCALOS Y C/Z m2 590.98 14.18 8,380.10 0.00 0.00
03.13.05 PINTURA EN MARCOS DE MADERA m2 397.45 15.14 6,017.39 0.00 0.00
03.13.06 PINTURA EN PAVIMENTOS m2 71.94 15.43 1,110.03 0.00 0.00
03.13.07 PINTURA EN SARDINELES m 412.85 15.43 6,370.28 0.00 0.00
03.13.08 PINTURA ASFALTICA m2 4,723.74 25.85 122,108.68 0.00 0.00
03.14 VARIOS - 0.00
03.14.01 PROTECTOR PARA CAMILLAS m 44.88 274.85 12,335.27 0.00 0.00
03.14.02 PROTECTOR DE ESQUINAS und 25.00 102.75 2,568.75 0.00 0.00
03.14.03 PUERTA PLEGABLE m2 17.15 218.03 3,739.21 0.00 0.00
03.14.04 PINTURA OLEO MATE EN FRANJA SEÑALETICA m 263.50 3.02 795.77 0.00 0.00
03.14.05 LOSA DE CONCRETO PARA OVALINES, ACABADO CON MICROCEMENTO m 31.25 902.37 28,199.06 0.00 0.00
03.14.06 BARRA METALICA TIPO ESQUINERO PARA DISCAPACITADOS (H-12) und 15.00 360.85 5,412.75 0.00 0.00
03.14.07 JUNTA DE DILATACION RELLENO CON MATERIAL BITUMINOSO m 355.31 55.99 19,893.81 0.00 0.00
03.14.08 JUNTA EN VEREDAS m 272.10 11.71 3,186.29 0.00 0.00
03.14.09 TAPAJUNTA RECTO m 233.10 25.43 5,927.73 0.00 0.00
03.14.10 TAPAJUNTA EN ESQUINA m 97.35 22.68 2,207.90 0.00 0.00
03.14.11 TAPAJUNTA EN TECHO m 92.05 31.59 2,907.86 0.00 0.00
03.14.12 RODON m 720.90 11.40 8,218.26 0.00 0.00
03.14.13 CELOSIA DE ACERO SEGUN DISEÑO und 1.00 32,163.90 32,163.90 0.00 0.00
03.14.14 GARGOLAS SEGUN DISEÑO und 6.00 49.57 297.42 0.00 0.00
03.14.15 LIMPIEZA PERMANENTE Y FINAL DE LA OBRA (OBRAS MENORES) glb 1.00 3,577.81 3,577.81 0.00 0.00
03.15 JARDINERIA (SUMINISTRO Y COLOCACION) - 0.00
03.15.01 SEMBRIO DE GRASS POR CHAMPAS O BLOQUES m2 2,667.38 19.11 50,973.63 0.00 0.00
03.15.02 SEMBRIO DE PLANTAS PEQUEÑAS und 632.00 35.59 22,492.88 0.00 0.00
03.15.03 SEMBRIO DE PLANTAS MEDIANAS und 258.00 74.55 19,233.90 0.00 0.00
03.15.04 SEMBRIO DE PLANTAS GRANDES und 42.00 117.27 4,925.34 0.00 0.00
03.16 CERCOS - 0.00
03.16.01 CERCO METALICO MODULAR H=2.10 m 234.50 254.29 59,631.01 0.00 0.00
03.16.02 CERCO DE PUAS m 564.90 70.34 39,735.07 0.00 0.00
03.16.03 CERCO METALICO TUBULAR - 0.00
03.16.03.01 ACABADO CEMENTO PULIDO E IMPERMEABILIZANTE EN SOBRECIMIENTO m2 408.86 39.82 16,280.81 0.00 0.00
03.16.03.02 ACABADO FROTACHADO EN COLUMNAS m2 271.29 29.16 7,910.82 0.00 0.00
03.16.03.03 CERCO PERIMETRAL CON TUBOS DE Fe 2", e=1/8" @0.10 I/ACABADO H=1.80m m 262.50 729.96 191,614.50 0.00 0.00
03.16.03.04 PINTURA ACRILICA SATINADA EN SOBRECIMIENTOS m2 395.05 14.18 5,601.81 0.00 0.00
03.16.03.05 PINTURA LATEX EN COLUMNAS m2 271.29 13.86 3,760.08 0.00 0.00
03.16.03.06 JUNTA DE DILATACION RELLENO CON MATERIAL BITUMINOSO m 578.00 55.99 32,362.22 0.00 0.00
03.16.03.07 JUNTA DE POLIESTIRENO EXPANDIDO E=0.03m m2 16.80 12.87 216.22 0.00 0.00
03.16.03.08 PUERTA METALICA P/CERCO glb 1.00 22,415.34 22,415.34 0.00 0.00
03.17 SEÑALETICA - 0.00
03.17.01 SEÑAL INDICATIVA CON BASE CELTEX 0.30m x 0.40m TIPO ADOSADA und 171.00 34.66 5,926.86 0.00 0.00
03.17.02 SEÑAL INDICATIVA CON BASE CELTEX 0.30m x 0.40m TIPO BANDERA und 7.00 66.02 462.14 0.00 0.00
03.17.03 SEÑAL INDICATIVA CON BASE CELTEX 0.30m x 0.30m TIPO ADOSADA und 66.00 32.66 2,155.56 0.00 0.00
03.17.04 SEÑAL ORIENTATIVA CON BASE CELTEX 1.20m x 0.30m TIPO COLGADA und 19.00 235.53 4,475.07 0.00 0.00
03.17.05 SEÑAL INDICATIVA CON BASE CELTEX 0.30m x 0.10m TIPO ADOSADA HABITACION und 24.00 14.33 343.92 0.00 0.00
03.17.06 SEÑAL INDICATIVA CON PLANCHA DE ACRILICO DE ALTA DUREZA 3MM 0.2m X 0.10 m und 25.00 12.33 308.25 0.00 0.00
03.17.07 SEÑAL DIRECTORIO PRINCIPAL DE 2.20Mx1.70M - EXTERIOR und 1.00 940.88 940.88 0.00 0.00
03.17.08 LETRERO LUMINOSO DE EMERGENCIA (4.10X0.85) und 1.00 906.45 906.45 0.00 0.00
03.17.09 LOGO PRONIS DE ACERO LAC C/ PINTURA EPOXICA (0.97X0.88) und 1.00 1,706.45 1,706.45 0.00 0.00
03.17.10 LOGO PRONIS DE ACERO LAC C/ PINTURA EPOXICA (1.78X1.62) und 5.00 3,006.45 15,032.25 0.00 0.00
03.17.11 LETRAS DE ACERO INOXIDABLE - PRONIS EN TANQUE ELEVADO und 3.00 706.45 2,119.35 0.00 0.00
03.17.12 LETRAS DE ACERO INOXIDABLE - CONSULTA EXTERNA und 1.00 4,706.45 4,706.45 0.00 0.00
03.17.13 LETRAS DE ACERO INOXIDABLE - EMERGENCIA und 2.00 2,706.45 5,412.90 0.00 0.00
03.17.14 LETRAS DE ACERO INOXIDABLE - MEDICINA FISICA und 1.00 3,206.45 3,206.45 0.00 0.00
03.17.15 LETRAS DE ACERO INOXIDABLE - HOSPITALIZACION und 1.00 1,206.45 1,206.45 0.00 0.00
03.17.16 LETRAS DE ACERO INOXIDABLE - INGRESO PRINCIPAL und 1.00 2,006.45 2,006.45 0.00 0.00
03.17.17 LETRAS DE ACERO INOXIDABLE - INGRESO EMERGENCIA und 1.00 2,106.45 2,106.45 0.00 0.00
03.17.18 LETRAS DE ACERO INOXIDABLE - INGRESO MEDICINA FISICA und 1.00 2,206.45 2,206.45 0.00 0.00
03.18 SEGURIDAD Y EVACUACION - 0.00
03.18.01 SEÑAL AUTOADHESIVA 0.26m X 0.40m und 220.00 22.50 4,950.00 0.00 0.00
03.18.02 SEÑAL AUTOADHESIVA 0.30m X 0.45m und 101.00 25.00 2,525.00 0.00 0.00
03.18.03 SEÑAL AUTOADHESIVA 0.30m X 0.20m und 43.00 25.00 1,075.00 0.00 0.00
03.18.04 SEÑAL AUTOADHESIVA 0.48m X 0.20m und 6.00 26.00 156.00 0.00 0.00
03.18.05 SUMINISTRO E INSTALACION DE EXTINTOR DE POLVO QUIMICO SECO (PQS) 10LB und 29.00 283.46 8,220.34 0.00 0.00
03.18.06 SUMINISTRO E INSTALACION DE EXTINTOR DE POLVO GAS CARBONICO (CO2) 10LB und 17.00 643.46 10,938.82 0.00 0.00
03.18.07 SUMINISTRO E INSTALACION DE EXTINTOR DE ACETATO DE POTASIO 2.5 GALONES und 27.00 928.46 25,068.42 0.00 0.00
03.18.08 SUMINISTRO E INSTALACION DE EXTINTOR DE AGUA PRESURIZADA (H2O) 6 LTS und 17.00 353.46 6,008.82 0.00 0.00
03.18.09 SEÑAL VERTICAL DE ZONA DE SEGURIDAD DE 0.30 X 0.45 M INC PARANTE und 9.00 117.29 1,055.61 0.00 0.00
03.18.10 PINTADO DE PAVIMENTO (ZONA DE SEGURIDAD) m2 63.63 21.41 1,362.32 0.00 0.00

TOTAL COSTO DIRECTO (A) 6,281,813.68 0.00 290,708.20 136,567.35 0.00


GASTOS GENERALES 12.074% (B) 758,485.79 0.00 35,100.11 16,489.14 0.00
UTILIDAD 10.000% (C) 628,181.37 0.00 29,070.82 13,656.74 0.00
=========== =========== =========== =========== ===========
SUB-TOTAL (A + B + C) 7,668,480.84 0.00 354,879.13 166,713.23 0.00
FACTOR DE RELACION 0.900000 6,901,632.76 0.00 319,391.22 150,041.91 0.00
I.GV. 18.00% (D) 1,242,293.90 0.00 57,490.42 27,007.54 0.00
=========== =========== =========== =========== ===========
TOTAL (A + B +C) + D 8,143,926.66 0.00 0.00% 376,881.64 4.63% 177,049.45 2.17% 0.00 0.00%
RESIDENTE SUPERVISOR
ESTRUCTURAS
VALORIZACION DE OBRA Nº 4
(del 1 de diciembre al 31 de diciembre del 2017)
OBRA : MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL ESTABLECIMIENTO DE SALUD ESTRATÉGICO DE PUTINA, PROVINCIA DE SAN ANTONIO DE PUTINA – REGIÓN PUNO
PROCESO : LP N° 01-2017-PRONIS PRESUPUESTO BASE : 28,825,386.21 F.R. = 0.900000
CONTRATISTA : CONSORCIO HOSPITAL DEL SUR MONTO DEL CONTRATO : 25,942,847.59
PRESUPUESTO BASE AVANCES
SALDOS
PARTIDA DESCRIPCIÓN P.UNIT. PRESUP. ANTERIOR ACTUAL ACUMULADO
UNIDAD METRADO
S/. S/. METRADO VALOR S/. METRADO VALOR S/. METRADO VALOR S/. % METRADO VALOR S/. %
01 OBRAS PROVISIONALES,TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 OBRAS PROVISIONALES
01.01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA glb 1.00 16,320.00 16,320.00 1.00 16,320.00 0.00 1.00 16,320.00 100.00% 0.00 0.00 0.00%
01.01.01.02 SERVICIOS HIGIENICOS (URINARIO) mes 14.00 325.00 4,550.00 3.00 975.00 1.00 325.00 4.00 1,300.00 28.57% 10.00 3,250.00 71.43%
01.01.01.03 CARTEL DE OBRA DE 4.80x3.60 M SEGUN DETALLE und 1.00 1,803.76 1,803.76 1.00 1,803.76 0.00 1.00 1,803.76 100.00% 0.00 0.00 0.00%
01.01.01.04 CERCO PROVISIONAL DE OBRA CON TELA ARPILLERA Y PARANTES DE MADERA D=m 540.00 21.59 11,658.60 540.00 11,658.60 0.00 540.00 11,658.60 100.00% 0.00 0.00 0.00%
01.01.01.05 COMEDOR DE PERSONAL glb 1.00 9,600.00 9,600.00 1.00 9,600.00 0.00 1.00 9,600.00 100.00% 0.00 0.00 0.00%
01.01.02 INSTALACIONES PROVISIONALES 0.00 0.00 0.00
01.01.02.01 PAGO POR CONSUMO DE AGUA mes 14.00 250.00 3,500.00 3.00 750.00 1.00 250.00 4.00 1,000.00 28.57% 10.00 2,500.00 71.43%
01.01.02.02 PAGO POR CONSUMO DE ELECTRICIDAD mes 14.00 350.00 4,900.00 3.00 1,050.00 1.00 350.00 4.00 1,400.00 28.57% 10.00 3,500.00 71.43%
01.01.03 TRABAJOS PRELIMINARES 0.00 0.00 0.00
01.01.03.01 MOVILIZACION DE EQUIPO Y HERRAMIENTAS glb 1.00 5,372.45 5,372.45 0.93 4,969.52 0.00 0.93 4,969.52 92.50% 0.07 402.93 7.50%
01.01.03.02 TRANSPORTE DE MATERIALES glb 1.00 80,560.73 80,560.73 0.40 32,224.29 0.00 0.40 32,224.29 40.00% 0.60 48,336.44 60.00%
01.01.03.03 TRAZO Y REPLANTEO DE OBRA m2 17,216.83 1.97 33,917.16 6,721.00 13,240.37 2,500.00 4,925.00 9,221.00 18,165.37 53.56% 7,995.83 15,751.79 46.44%
01.01.04 DEMOLICIONES 0.00 0.00 0.00
01.01.04.01 DEMOLICION DE VIGAS DE CIMENTACION m3 27.09 166.11 4,499.92 27.09 4,499.92 0.00 27.09 4,499.92 100.00% 0.00 0.00 0.00%
01.01.04.02 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO ARMADO C/EQUIPO m3 29.10 104.57 3,042.99 29.10 3,042.99 0.00 29.10 3,042.99 100.00% 0.00 0.00 0.00%
01.01.04.03 DEMOLICION DE VEREDAS Y RAMPAS DE CONCRETO C/EQUIPO m3 39.99 107.51 4,299.32 39.99 4,299.32 0.00 39.99 4,299.32 100.00% 0.00 0.00 0.00%
01.01.04.04 DEMOLICION DE PISO DE CONCRETO E = 0.15 M m2 554.34 11.31 6,269.59 554.34 6,269.59 0.00 554.34 6,269.59 100.00% 0.00 0.00 0.00%
01.01.04.05 DEMOLICION DE COLUMNAS Y VIGAS DE CONCRETO ARMADO C/EQUIPO m3 26.78 166.11 4,448.43 26.78 4,448.43 0.00 26.78 4,448.43 100.00% 0.00 0.00 0.00%
01.01.04.06 DESMONTAJE Y ELIMINACION DE FIERRO CORRUGADO EXISTENTE kg 11,588.64 0.33 3,824.25 11,588.64 3,824.25 0.00 11,588.64 3,824.25 100.00% 0.00 0.00 0.00%
01.01.04.07 DESMONTAJE Y ELIMINACION DE ENCOFRADO EXISTENTE m2 213.72 4.78 1,021.58 213.72 1,021.58 0.00 213.72 1,021.58 100.00% 0.00 0.00 0.00%
01.01.05 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
01.01.05.01 ELIMINACION DE MATERIAL PROC. DEMOLICIONES C/VOLQUETE 10M3 Y CARGAD m3 288.56 12.97 3,742.62 288.56 3,742.62 0.00 288.56 3,742.62 100.00% 0.00 0.00 0.00%
01.02 SEGURIDAD Y SALUD 0.00 0.00 0.00
01.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 0.00 0.00 0.00
01.02.01.01 ELABORACION DEL PLAN DE SEGURIDAD EN EL TRABAJO glb 1.00 7,000.00 7,000.00 1.00 7,000.00 0.00 1.00 7,000.00 100.00% 0.00 0.00 0.00%
01.02.01.02 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.00 74,626.00 74,626.00 0.55 41,044.30 0.08 5,970.08 0.63 47,014.38 63.00% 0.37 27,611.62 37.00%
01.02.01.03 EQUIPOS DE PROTECCION COLECTVA glb 1.00 8,000.00 8,000.00 0.30 2,400.00 0.08 640.00 0.38 3,040.00 38.00% 0.62 4,960.00 62.00%
01.02.01.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 1,423.80 1,423.80 0.35 498.33 0.08 113.90 0.43 612.23 43.00% 0.57 811.57 57.00%
01.02.01.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 12,960.00 12,960.00 0.25 3,240.00 0.08 1,036.80 0.33 4,276.80 33.00% 0.67 8,683.20 67.00%
01.02.02 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL TRABAJO 0.00 0.00 0.00
01.02.02.01 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD D glb 1.00 2,100.00 2,100.00 0.40 840.00 0.08 168.00 0.48 1,008.00 48.00% 0.52 1,092.00 52.00%
02 ESTRUCTURAS 0.00 0.00 0.00
02.01 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
02.01.01 EXCAVACIONES 0.00 0.00 0.00
02.01.01.01 EXCAVACION DE ZANJAS Y ZAPATAS EN TERRENO NORMAL H=1.00m m3 99.79 35.78 3,570.49 0.00 0.00 0.00 0.00 0.00 0.00% 99.79 3,570.49 100.00%
02.01.01.02 EXCAVACION MASIVA DE TERRENO H=2.50m m3 4,169.58 4.51 18,804.81 3,085.90 13,917.41 0.00 3,085.90 13,917.41 74.01% 1,083.68 4,887.40 25.99%
02.01.01.03 EXCAVACION MASIVA CON EQUIPO PARA CISTERNA m3 443.37 4.51 1,999.60 300.00 1,353.00 0.00 300.00 1,353.00 67.66% 143.37 646.60 32.34%
02.01.02 CORTES 0.00 0.00 0.00
02.01.02.01 CORTE MASICO EN TERRENO NORMAL C/EQUIPO m3 9,352.90 5.56 52,002.12 8,213.51 45,667.12 0.00 8,213.51 45,667.12 87.82% 1,139.39 6,335.00 12.18%
02.01.03 RELLENOS 0.00 0.00 0.00
02.01.03.01 RELLENO COMPACTADO MATERIAL PROPIO CON EQUIPO LIVIANO m3 7,614.47 33.28 253,409.56 395.64 13,166.90 3,000.00 99,840.00 3,395.64 113,006.90 44.59% 4,218.83 140,402.66 55.41%
02.01.03.02 RELLENO COMPACTADO MATERIAL DE PRESTAMO AFIRMADO CON EQUIPO LIVIA m3 1,727.56 84.87 146,618.02 0.00 0.00 800.00 67,896.00 800.00 67,896.00 46.31% 927.56 78,722.02 53.69%
02.01.04 SUB BASE 0.00 0.00 0.00
02.01.04.01 SUB-BASE GRANULAR DE E=0.15 M CON EQUIPO LIVIANO m2 1,527.63 17.66 26,977.95 0.00 0.00 0.00 0.00 0.00 0.00% 1,527.63 26,977.95 100.00%
02.01.05 BASE 0.00 0.00 0.00
02.01.05.01 BASE GRANULAR DE E=0.15 M (CON EQUIPO PESADO) m2 1,527.63 15.17 23,174.15 0.00 0.00 0.00 0.00 0.00 0.00% 1,527.63 23,174.15 100.00%
02.01.05.02 BASE GRANULAR DE E=0.15 M (CON PLANCHA COMPACTADORA) m2 2,056.00 17.04 35,034.24 0.00 0.00 0.00 0.00 0.00 0.00% 2,056.00 35,034.24 100.00%
02.01.05.03 BASE GRANULAR DE E=0.10 M (CON PLANCHA COMPACTADORA) m2 4,608.79 11.43 52,678.47 0.00 0.00 0.00 0.00 0.00 0.00% 4,608.79 52,678.47 100.00%
02.01.06 ELIMINACION DE MATERIAL 0.00 0.00 0.00
02.01.06.01 ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACIONES m3 5,395.47 23.85 128,681.96 696.67 16,615.58 1,500.00 35,775.00 2,196.67 52,390.58 40.71% 3,198.80 76,291.38 59.29%
02.01.06.02 ELIMINACION DE MAT. PROC. DEMOLICIONES C/VOLQUETE 10M3 Y CARGADOR Dpm3 7,380.36 12.63 93,213.95 6,000.00 75,780.00 0.00 6,000.00 75,780.00 81.30% 1,380.36 17,433.95 18.70%
02.02 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00
02.02.01 CIMIENTOS CORRIDOS 0.00 0.00 0.00
02.02.01.01 CIMIENTOS CONCRETO (CEM IP) f´c=140 Kg/cm2 C/ADITIVO ANTICONGELANTE m3 338.15 256.95 86,887.64 24.12 6,197.63 58.81 15,111.23 82.93 21,308.86 24.52% 255.22 65,578.78 75.48%
02.02.02 SUBCIMIENTOS, SUBZAPATAS Y SOLADOS 0.00 0.00 0.00
02.02.02.01 FALSA ZAPATA CONCRETO 1:12, C/ADITIVO ANTICONGELANTE m3 1,102.66 222.27 245,088.24 511.51 113,692.22 40.00 8,890.80 551.51 122,583.02 50.02% 551.16 122,505.22 49.98%
02.02.02.02 SOLADO MEZCLA 1:12 C:H ESPESOR=2" m2 56.44 23.63 1,333.68 28.22 666.84 0.00 28.22 666.84 50.00% 28.22 666.84 50.00%
02.02.03 SOBRECIMIENTOS 0.00 0.00 0.00
02.02.03.01 SOBRECIMIENTOS- CONCRETO CICLOPEO C:H 1:8+ 25% P.M. m3 294.09 296.96 87,332.97 156.98 46,615.30 4.51 1,339.88 161.49 47,955.18 54.91% 132.60 39,377.79 45.09%
02.02.03.02 SOBRECIMIENTOS- ENCOFRADO Y DESENCONFRADO m2 2,629.52 35.84 94,242.00 1,336.35 47,894.78 36.85 1,320.56 1,373.20 49,215.34 52.22% 1,256.32 45,026.66 47.78%
02.02.04 FALSO PISO 0.00 0.00 0.00
02.02.04.01 FALSO PISO MEZCLA (CEM TIPO IP) fc=210 Kg/cm2 E=10 cm CON ADITIVO ANTIC m2 5,180.96 36.96 191,488.28 0.00 0.00 2,500.00 92,400.00 2,500.00 92,400.00 48.25% 2,680.96 99,088.28 51.75%
02.02.05 PAVIMENTO DE CONCRETO 0.00 0.00 0.00
02.02.05.01 PAVIMENTO DE CONCRETO (CEM IP) fc=210 Kg/cm2 E = 0.20 m CON ADITIVO ANT m2 1,442.83 87.07 125,627.21 0.00 0.00 0.00 0.00 0.00 0.00% 1,442.83 125,627.21 100.00%
02.02.05.02 PAVIMENTO - ENCOFRADO Y DESENCOFRADO m2 173.24 43.35 7,509.95 0.00 0.00 0.00 0.00 0.00 0.00% 173.24 7,509.95 100.00%
02.02.05.03 JUNTA CON ASFALTO - ARENA 1:3 E=0.025M EN LOSAS Y PISTAS I/REFUERZO C m 318.02 18.71 5,950.15 0.00 0.00 0.00 0.00 0.00 0.00% 318.02 5,950.15 100.00%
02.02.05.04 JUNTA CON ASFALTO - ARENA 1:3 E=0.025M EN LOSAS Y PISTAS I/REFUERZO Y T m 447.81 24.69 11,056.43 0.00 0.00 0.00 0.00 0.00 0.00% 447.81 11,056.43 100.00%
02.02.05.05 JUNTA CON ASFALTO - ARENA 1:3 E=0.025M m 463.83 15.21 7,054.85 0.00 0.00 0.00 0.00 0.00 0.00% 463.83 7,054.85 100.00%
02.02.06 RAMPAS 0.00 0.00 0.00
02.02.06.01 RAMPA DE CONCRETO (CEM IP) fc=210 Kg/cm2 E = 0.20 m CON ADITIVO ANTICON m2 84.80 87.07 7,383.54 0.00 0.00 0.00 0.00 0.00 0.00% 84.80 7,383.54 100.00%
02.02.06.02 RAMPA - ENCOFRADO Y DESENCOFRADO m2 21.27 36.39 774.02 0.00 0.00 0.00 0.00 0.00 0.00% 21.27 774.02 100.00%
02.02.07 VEREDAS 0.00 0.00 0.00
02.02.07.01 CONCRETO EN VEREDAS (CEM IP) fc=175 Kg/cm2 H = 0.15 m C/ADITIVO ANTICON m2 1,704.87 73.21 124,813.53 0.00 0.00 400.00 29,284.00 400.00 29,284.00 23.46% 1,304.87 95,529.53 76.54%
02.02.07.02 CONCRETO EN SARDINEL(CEM IP) fc=175 Kg/cm2 CON ADITIVO ANTICONGELANTEm3 30.96 377.18 11,677.49 0.00 0.00 0.00 0.00 0.00 0.00% 30.96 11,677.49 100.00%
02.02.07.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 206.43 43.35 8,948.74 0.00 0.00 0.00 0.00 0.00 0.00% 206.43 8,948.74 100.00%
02.02.07.04 CONCRETO EN RAMPAS (CEM IP) fc=175 Kg/cm2 H = 0.15 m C/ADITIVO ANTICONG m2 351.13 73.21 25,706.23 0.00 0.00 0.00 0.00 0.00 0.00% 351.13 25,706.23 100.00%
02.02.07.05 ENCOFRADO Y DESENCOFRADO DE RAMPAS m2 41.11 36.39 1,495.99 0.00 0.00 0.00 0.00 0.00 0.00% 41.11 1,495.99 100.00%
02.03 TRABAJOS EN CONCRETO ARMADO 0.00 0.00 0.00
02.03.01 ZAPATAS 0.00 0.00 0.00
02.03.01.01 CONCRETO EN ZAPATAS (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTICONGELAN m3 925.95 406.47 376,370.90 538.85 219,026.36 40.00 16,258.80 578.85 235,285.16 62.51% 347.10 141,085.74 37.49%
02.03.01.02 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 38,237.05 5.20 198,832.66 25,642.52 133,341.10 2,000.00 10,400.00 27,642.52 143,741.10 72.29% 10,594.53 55,091.56 27.71%
02.03.02 VIGAS DE CIMENTACION 0.00 0.00 0.00
02.03.02.01 CONCRETO EN VIGAS DE CIMENTACION (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIV m3 480.89 433.35 208,393.68 364.53 157,969.08 0.00 0.00 364.53 157,969.08 75.80% 116.36 50,424.60 24.20%
02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 3,117.32 43.35 135,135.82 2,114.15 91,648.40 0.00 0.00 2,114.15 91,648.40 67.82% 1,003.17 43,487.42 32.18%
02.03.02.03 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 52,431.83 5.20 272,645.52 39,716.97 206,528.26 0.00 0.00 39,716.97 206,528.26 75.75% 12,714.86 66,117.26 24.25%
02.03.03 COLUMNAS 0.00 0.00 0.00
02.03.03.01 CONCRETO EN COLUMNAS f´c=280 kg/cm2 C/ADITIVO ANTICONGELANTE m3 370.93 460.64 170,865.20 25.60 11,792.38 101.88 46,930.92 127.48 58,723.31 34.37% 243.45 112,141.89 65.63%
02.03.03.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 3,570.22 62.96 224,781.05 350.85 22,089.52 1,064.81 67,040.56 1,415.66 89,130.08 39.65% 2,154.56 135,650.97 60.35%
02.03.03.03 COLUMNAS - ACERO DE REFUERZO F'y=4200 kg/cm2 kg 64,279.14 5.20 334,251.53 37,943.08 197,304.02 3,000.00 15,600.00 40,943.08 212,904.02 63.70% 23,336.06 121,347.51 36.30%
02.03.04 COLUMNETAS 0.00 0.00 0.00
02.03.04.01 CONCRETO EN COLUMNAS f´c=210 kg/cm2 C/ADITIVO ANTICONGELANTE m3 232.39 451.97 105,033.31 3.75 1,694.89 35.98 16,261.88 39.73 17,956.77 17.10% 192.66 87,076.54 82.90%
02.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 2,242.69 62.96 141,199.76 30.02 1,890.06 392.59 24,717.47 422.61 26,607.53 18.84% 1,820.08 114,592.23 81.16%
02.03.04.03 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 21,176.32 5.20 110,116.86 10,057.23 52,297.60 8,569.85 44,563.22 18,627.08 96,860.82 87.96% 2,549.24 13,256.04 12.04%
02.03.05 VIGAS 0.00 0.00 0.00
02.03.05.01 CONCRETO EN VIGAS (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTICONGELANTE m3 418.18 460.64 192,630.44 0.00 0.00 179.84 82,841.50 179.84 82,841.50 43.01% 238.34 109,788.94 56.99%
02.03.05.02 VIGAS - ENCOFRADO Y DESENCOFRADO DE VIGAS m2 2,934.80 56.52 165,874.90 0.00 0.00 1,756.76 99,292.08 1,756.76 99,292.08 59.86% 1,178.04 66,582.82 40.14%
02.03.05.03 VIGAS - ACERO DE REFUERZO F'y=4200 kg/cm2 kg 51,258.09 5.20 266,542.07 3,000.26 15,601.35 21,834.04 113,537.00 24,834.30 129,138.35 48.45% 26,423.79 137,403.72 51.55%
02.03.06 VIGUETAS 0.00 0.00 0.00
02.03.06.01 CONCRETO EN VIGAS f´c=210 kg/cm2 C/ADITIVO ANTICONGELANTE m3 141.50 417.20 59,033.80 1.51 629.97 24.58 10,254.78 26.09 10,884.75 18.44% 115.41 48,149.05 81.56%
02.03.06.02 VIGAS - ENCOFRADO Y DESENCOFRADO DE VIGAS m2 1,132.00 56.52 63,980.64 20.55 1,161.49 267.89 15,141.14 288.44 16,302.63 25.48% 843.56 47,678.01 74.52%
02.03.06.03 VIGAS - ACERO DE REFUERZO F'y=4200 kg/cm2 kg 12,044.48 5.20 62,631.30 1,265.58 6,581.02 3,256.98 16,936.30 4,522.56 23,517.31 37.55% 7,521.92 39,113.99 62.45%
02.03.07 LOSAS MACIZAS 0.00 0.00 0.00
02.03.07.01 CONCRETO EN LOSAS MACIZAS (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTIC m3 1.90 461.71 877.25 0.00 0.00 1.90 877.25 1.90 877.25 100.00% 0.00 0.00 0.00%
02.03.07.02 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 17.24 56.52 974.40 0.00 0.00 17.24 974.40 17.24 974.40 100.00% 0.00 0.00 0.00%
02.03.07.03 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 89.47 5.20 465.24 0.00 0.00 89.47 465.24 89.47 465.24 100.00% 0.00 0.00 0.00%
02.03.08 LOSAS ALIGERADAS 0.00 0.00 0.00
02.03.08.01 CONCRETO EN LOSAS ALIGERADAS (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO AN m3 520.19 450.06 234,116.71 0.00 0.00 243.95 109,792.14 243.95 109,792.14 46.90% 276.24 124,324.57 53.10%
02.03.08.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA (1 SENTIDO) m2 4,728.99 48.46 229,166.86 0.00 0.00 2,218.50 107,508.51 2,218.50 107,508.51 46.91% 2,510.49 121,658.35 53.09%
02.03.08.03 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 17,885.59 5.20 93,005.07 0.00 0.00 5,880.29 30,577.51 5,880.29 30,577.51 32.88% 12,005.30 62,427.56 67.12%
02.03.08.04 LADRILLO DE ARCILLA 15x30x30 cm PARA LOSA ALIGERADA und 39,392.00 3.22 126,842.24 0.00 0.00 18,479.31 59,503.38 18,479.31 59,503.38 46.91% 20,912.69 67,338.86 53.09%
02.03.09 CISTERNA 0.00 0.00 0.00
02.03.09.01 CONCRETO EN CISTERNA (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTICONGELA m3 29.54 468.35 13,835.06 0.00 0.00 3.29 1,540.87 3.29 1,540.87 11.14% 26.25 12,294.19 88.86%
02.03.09.02 CISTERNA - ENCOFRADO Y DESENCOFRADO m2 191.64 56.52 10,831.49 105.00 5,934.60 7.99 451.59 112.99 6,386.19 58.96% 78.65 4,445.30 41.04%
02.03.09.03 CISTERNA - ACERO DE REFUERZO F'y=4200 kg/cm2 kg 2,703.43 5.52 14,922.93 1,855.61 10,242.97 847.82 4,679.97 2,703.43 14,922.93 100.00% 0.00 0.00 0.00%
02.03.10 TANQUE ELEVADO 0.00 0.00 0.00
02.03.10.01 CONCRETO EN TANQUE ELEVADO (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTI m3 54.85 492.76 27,027.89 0.00 0.00 16.46 8,108.37 16.46 8,108.37 30.00% 38.40 18,919.52 70.00%
02.03.10.02 ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO m2 284.81 68.66 19,555.05 0.00 0.00 85.44 5,866.52 85.44 5,866.52 30.00% 199.37 13,688.53 70.00%
02.03.10.03 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 5,319.83 5.20 27,663.12 0.00 0.00 1,595.95 8,298.93 1,595.95 8,298.93 30.00% 3,723.88 19,364.19 70.00%
02.03.11 CISTERNA PARA TANQUE DE PETROLEO 0.00 0.00 0.00
02.03.11.01 CONCRETO EN CISTERNA (CEM TIPO IP) f´c=280 kg/cm2 C/ADITIVO ANTICONGELA m3 28.17 468.35 13,193.42 0.00 0.00 19.72 9,235.39 19.72 9,235.39 70.00% 8.45 3,958.03 30.00%
02.03.11.02 CISTERNA - ENCOFRADO Y DESENCOFRADO m2 186.20 56.52 10,524.02 0.00 0.00 130.34 7,366.82 130.34 7,366.82 70.00% 55.86 3,157.20 30.00%
02.03.11.03 CISTERNA - ACERO DE REFUERZO F'y=4200 kg/cm2 kg 2,512.00 5.52 13,866.24 1,855.61 10,242.97 600.00 3,312.00 2,455.61 13,554.97 97.76% 56.39 311.27 2.24%
02.03.12 ESTRUCTURAS DE CONCRETO VARIOS 0.00 0.00 0.00
02.03.12.01 CONCRETO (CEM IP) f´c=210 kg/cm2 C/ADITIVO ANTICONGELANTE m3 14.10 439.58 6,198.08 0.00 0.00 0.00 0.00 0.00 0.00% 14.10 6,198.08 100.00%
02.03.12.02 CONCRETO (CEM IP) f´c=175 kg/cm2 C/ADITIVO ANTICONGELANTE m3 13.56 407.78 5,529.50 0.00 0.00 0.00 0.00 0.00 0.00% 13.56 5,529.50 100.00%
02.03.12.03 ENCOFRADO Y DESENCOFRADO m2 225.80 45.61 10,298.74 0.00 0.00 0.00 0.00 0.00 0.00% 225.80 10,298.74 100.00%
02.03.12.04 ACERO DE REFUERZO F'y=4200 kg/cm2 kg 1,213.50 5.20 6,310.20 0.00 0.00 0.00 0.00 0.00 0.00% 1,213.50 6,310.20 100.00%
02.04 ESTRUCTURAS METALICAS 0.00 0.00 0.00
02.04.01 TIJERALES METALICOS kg 76,776.07 11.12 853,749.90 0.00 0.00 38,388.04 426,874.95 38,388.04 426,874.95 50.00% 38,388.04 426,874.95 50.00%
02.04.02 PLANCHA DE ANCLAJE kg 730.89 12.14 8,873.00 0.00 0.00 0.00 0.00 0.00 0.00% 730.89 8,873.00 100.00%
02.04.03 PERNOS DE ANCLAJE PARA FIJACION DE 5/8"x50 cm C/RESINA EPOXICA und 893.00 37.94 33,880.42 0.00 0.00 0.00 0.00 0.00 0.00% 893.00 33,880.42 100.00%
02.05 VARIOS 0.00 0.00 0.00
02.05.01 CANALETAS DE CONCRETO EN PISO 0.00 0.00 0.00
02.05.01.01 CANALETA DE CONCRETO SIMPLE (CEM. TIPO IP) 0.25 M X 0.10 A 0.50 M CON AD m3 1,114.59 112.73 125,647.73 0.00 0.00 0.00 0.00 0.00 0.00% 1,114.59 125,647.73 100.00%
02.05.01.02 CANALETA DE CONCRETO SIMPLE (CEM. TIPO IP) 0.25 M X 0.10 A 0.50 M CON R m3 68.37 240.16 16,419.74 0.00 0.00 0.00 0.00 0.00 0.00% 68.37 16,419.74 100.00%
02.05.01.03 CANALETA DE CONCRETO SIMPLE (CEM. TIPO IP) 0.25 M X 0.10 A 0.50 M CON m3 36.00 121.06 4,358.16 0.00 0.00 0.00 0.00 0.00 0.00% 36.00 4,358.16 100.00%
02.05.01.04 CANALETA DE CONCRETO SIMPLE (CEM. TIPO IP) 0.25 M X 0.10 A 0.50 M CON TA m3 14.00 174.46 2,442.44 0.00 0.00 0.00 0.00 0.00 0.00% 14.00 2,442.44 100.00%

TOTAL COSTO DIRECTO (A) 7,188,871.80 1,706,305.66 1,730,845.74 3,437,151.40 3,751,720.40


GASTOS GENERALES 12.074% (B) 868,006.82 206,019.35 208,987.72 415,012.39 452,994.43
UTILIDAD 10.000% (C) 718,887.18 170,630.57 173,084.57 343,715.14 375,172.04
=========== =========== =========== =========== ===========
SUB-TOTAL (A + B + C) 8,775,765.80 2,082,955.58 2,112,918.03 4,195,878.93 4,579,886.87
FACTOR DE RELACION 0.900000 7,898,189.22 1,874,660.02 1,901,626.22 3,776,291.03 4,121,898.19
I.GV. 18.00% (D) 1,421,674.06 337,438.80 342,292.72 679,732.39 741,941.67
=========== =========== =========== =========== ===========
TOTAL (A + B +C) + D 9,319,863.28 2,212,098.82 23.74% 2,243,918.94 24.08% 4,456,023.42 47.81% 4,863,839.86 52.19%