Pipe Profiling

Machine
Grease Schedule
Includes Types: SPC & TPC
500, 600, 1000L
1 GREASE TYPES

On the following pages you will find the greasing schedule of the pipe profiling machine. The following
grease types will be used:

I Hotemp 2000 spray


II Microlube GL 261 spray
III Microlube GL 261 grease
IV Stabutherm GH 461
V Hydro oil 46
VI Glygoyle 30

These products are especially chosen for the maintanance of the pipe profiling machine. These
products can not be replaced by other products. Please contact HGG Profiling Equipment BV if you
have problems in ordering these products as described above.
2 MAIN DRIVE UNIT

Grease Description No. Grease Operating Maint.


point no type hours Schedule
2.1 Pump new grease into the 3 nipples at the front of the 3 IV 500 3 months
chuck
2.2 Remove the claws, clean and put on new grease 3 IV 500 3 months
2.3 Remove current collector, clean and put on new 1 IV 100 2 weeks
grease
2.4 Open cover and put new grease on pinion and spiral 1 IV 1000 6 months
plate, rotate spiral plate by opening chuck
2.5 Change the oil of the main drive unit gearbox 1 VI 8000 4 years
2.6 Clean and grease the vertical rails 2 III 50 1 week
2.7 Pump new grease into the vertical sliders 4 III 500 3 months

2.2 2.1

2.4

2.5

2.3 2.6

2.7
3 PIPE TROLLEY

Grease Description No. Grease Operating Maint.


point no type hours Schedule
3.1 Set pipe trolley to top position, check pump oil level 2 IV 1000 6 months

3.1
4 CUTTING TROLLEY

Grease Description No. Grease Operating Maint.


point no type hours Schedule
4.1 Set cutting trolley at top position, clean and grease the 2 II 200 2 week.
vertical rails
4.2 Pump new grease into the vertical sliders 4 III 500 3 months
4.3 Clean and grease the vertical spindle 1 I 1000 6 months
4.4 Pump new grease into the horizontal sliders of 4 III 1000 6 months
mounting plate gearbox
4.5 Pump new grease into the horizontal sliders beam 4 III 500 3 months
4.6 Clean and grease roller balls of arm 2 I 50 2 weeks

4.3

4.6

4.1 4.2 4.4 4.5


5 CUTTING HEAD

Grease Description No. Grease Operating Maint.


point no type hours Schedule
5.1 Clean and grease gear 2 IV 500 3 Months
5.2 Clean and grease burner rotation point 1 I 500 3 Months

5.1

5.2
6 MACHINE FRAME

Grease Description No. Grease Operating Maint.


point no type hours Schedule
6.1 Clean and grease the pipe trolley rails 2 I 200 3 months
6.2 Clean and grease the horizontal rails and tooth gear 2 II 50 1 week