Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :13 de Abril del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR MES ACTUAL ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.25 475.53 100.00 0.25 475.53 100.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 1626.09 1382.18 85.40 277.99 236.29 14.60 1904.08 1618.47 100.00
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 1083.27 5513.84 94.21 66.60 338.99 5.79 1149.87 5852.84 100.00
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 18.29 392.32 100.00 18.29 392.32 100.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 28.17 604.25 100.00 0.00 0.00 0.00 28.17 604.25 100.00
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 4.73 99.52 100.00 4.73 99.52 100.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1568.94 5695.25 100.00 0.00 0.00 0.00 1568.94 5695.25 100.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1568.94 8942.96 100.00 0.00 0.00 0.00 1568.94 8942.96 100.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.29 100.00 0.00 0.00 0.00 305.70 2268.29 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 1165.00 2539.70 100.00 0.00 0.00 0.00 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 4.64 21.72 1.26 369.64 1729.92 100.00
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 315.00 1234.80 85.22 54.64 214.19 14.78 369.64 1448.99 100.00
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 315.00 1795.50 85.22 54.64 311.45 14.78 369.64 2106.95 100.00
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 1195.00 2760.45 84.05 226.70 523.68 15.95 1421.70 3284.13 100.00
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 430.00 3186.30 91.21 41.44 307.07 8.79 471.44 3493.37 100.00
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 345.00 1614.60 78.81 92.76 434.12 21.19 437.76 2048.72 100.00
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 345.00 1352.40 78.81 92.76 363.62 21.19 437.76 1716.02 100.00
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 345.00 1966.50 78.81 92.76 528.73 21.19 437.76 2495.23 100.00
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 75.00 174.00 5.28 1346.70 3124.34 94.72 1421.70 3298.34 100.00
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 608.48 3322.30 55.46 608.48 3322.30 55.46
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 608.48 31860.01 55.46 608.48 31860.01 55.46
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.66 24.41 1.44 15.00 554.85 32.81 15.66 579.26 34.25
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.26 73.17 0.42 16.40 4615.45 26.78 16.66 4688.62 27.21
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 4.73 1352.21 100.00 4.73 1352.21 100.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 3.94 145.74 100.00 3.94 145.74 100.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.86 256.80 25.07 0.86 256.80 25.07
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 6.86 184.26 100.00 6.86 184.26 100.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 170.63 5141.08 100.00 0.00 0.00 0.00 170.63 5141.08 100.00
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 22.47 6070.72 87.81 0.00 0.00 0.00 22.47 6070.72 87.81
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 341.78 10000.48 65.23 0.00 0.00 0.00 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.96 30.36 41.56 0.00 0.00 0.00 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 2.80 83.66 25.93 2.60 77.69 24.07 5.40 161.35 50.00
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 179.09 351.02 100.00 179.09 351.02 100.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 72.30 2440.85 100.00 0.00 0.00 0.00 72.30 2440.85 100.00
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 241.00 2458.20 100.00 0.00 0.00 0.00 241.00 2458.20 100.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 10.00 167.90 50.00 10.00 167.90 50.00 20.00 335.80 100.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 228.62 907.62 100.00 228.62 907.62 100.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 95.70 373.23 100.00 95.70 373.23 100.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 191.00 618.84 100.00 191.00 618.84 100.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 12.00 152.28 100.00 12.00 152.28 100.00
12.02 SEÑALIZACION VERTICAL
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 1.00 384.08 100.00 1.00 384.08 100.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 1.00 358.52 100.00 1.00 358.52 100.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 3.00 1635.48 100.00 0.00 0.00 0.00 3.00 1635.48 100.00
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 2.00 798.06 100.00 2.00 798.06 100.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 2000.00 1320.00 100.00 2000.00 1320.00 100.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 471.20 7077.42 100.00 0.00 0.00 0.00 471.20 7077.42 100.00
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 4.05 116.44 51.72 3.78 108.68 48.28 7.83 225.11 100.00
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 466.10 862.29 98.92 5.10 9.44 1.08 471.20 871.72 100.00
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 411.40 1896.55 87.31 39.00 179.79 8.28 450.40 2076.34 95.59
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 434.40 6502.97 92.19 36.80 550.90 7.81 471.20 7053.86 100.00
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 2.20 2550.61 55.00 1.00 1159.37 25.00 3.20 3709.98 80.00
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.80 5117.38 96.00 0.20 213.22 4.00 5.00 5330.60 100.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 4.00 253.08 22.22 15.00 949.05 83.33
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 1.00 344.68 100.00 1.00 344.68 100.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 3.00 189.81 60.00 1.00 63.27 20.00 4.00 253.08 80.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 3.00 1270.08 50.00 0.00 0.00 0.00 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 3.00 181.74 50.00 0.00 0.00 0.00 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 20.00 848.00 37.04 0.00 0.00 0.00 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 3.00 280.47 50.00 0.00 0.00 0.00 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 3.00 344.43 50.00 0.00 0.00 0.00 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 89370.68 45.97% 55172.43 28.38% 144543.11 74.35%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 61852.38 86.21% 2882.42 4.02% 64734.80 90.23%
SUB TOTAL 266153.41 151223.06 58054.85 209277.91
GASTOS GENERALES 7% 18630.74 10585.61 4063.84 14649.45
UTILIDADES 5% 13307.67 7561.15 2902.74 10463.90
SUB TOTAL 298091.82 169369.83 65021.44 234391.26
IMPUESTO IGV 19 % 56637.45 32180.27 12354.07 44534.34
TOTAL GENERAL 354729.27 201550.09 56.82% 77375.51 21.81% 278925.60 78.63%
0.00 0.00
0.00 0.00 0.00
SALDO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 1626.09 1382.18 85.40 0.00 0.00 0.00 1626.09 1382.18 85.40
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 933.67 4752.38 81.20 149.60 761.46 13.01 1083.27 5513.84 94.21
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 28.17 604.25 100.00 0.00 0.00 0.00 28.17 604.25 100.00
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1568.94 5695.25 100.00 0.00 0.00 0.00 1568.94 5695.25 100.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1568.94 8942.96 100.00 0.00 0.00 0.00 1568.94 8942.96 100.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.27 100.00 0.00 0.00 0.00 305.70 2268.27 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 1165.00 2539.70 100.00 0.00 0.00 0.00 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 0.00 0.00 0.00 365.00 1708.20 98.74
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 315.00 1234.80 85.22 0.00 0.00 0.00 315.00 1234.80 85.22
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 315.00 1795.50 85.22 0.00 0.00 0.00 315.00 1795.50 85.22
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 1195.00 2760.45 84.05 0.00 0.00 0.00 1195.00 2760.45 84.05
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 230.00 1704.30 48.79 200.00 1482.00 42.42 430.00 3186.30 91.21
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 150.00 702.00 34.27 195.00 912.60 44.54 345.00 1614.60 78.81
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 195.00 764.40 44.54 150.00 588.00 34.27 345.00 1352.40 78.81
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 195.00 1111.50 44.54 150.00 855.00 34.27 345.00 1966.50 78.81
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 75.00 174.00 5.28 0.00 0.00 0.00 75.00 174.00 5.28
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.66 24.41 1.44 0.66 24.41 1.44
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.26 73.17 0.42 0.26 73.17 0.42
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 0.00 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 170.63 5141.08 100.00 0.00 0.00 0.00 170.63 5141.08 100.00
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 22.34 6035.60 87.30 0.13 35.12 0.51 22.47 6070.72 87.81
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 341.78 10000.48 65.23 0.00 0.00 0.00 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.96 30.36 41.56 0.00 0.00 0.00 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 2.80 83.66 25.93 0.00 0.00 0.00 2.80 83.66 25.93
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 45.77 1545.20 63.31 26.53 895.65 36.69 72.30 2440.85 100.00
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 102.04 1040.81 42.34 138.96 1417.39 57.66 241.00 2458.20 100.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 10.00 167.90 50.00 0.00 0.00 0.00 10.00 167.90 50.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 3.00 1635.48 100.00 0.00 0.00 0.00 3.00 1635.48 100.00
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 471.20 7077.42 100.00 0.00 0.00 0.00 471.20 7077.42 100.00
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 4.05 116.44 51.72 0.00 0.00 0.00 4.05 116.44 51.72
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 466.10 862.29 98.92 0.00 0.00 0.00 466.10 862.29 98.92
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 411.40 1896.55 87.31 0.00 0.00 0.00 411.40 1896.55 87.31
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 434.40 6502.97 92.19 0.00 0.00 0.00 434.40 6502.97 92.19
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 1.50 1739.06 37.50 0.70 811.56 17.50 2.20 2550.61 55.00
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.45 4744.23 89.00 0.35 373.14 7.00 4.80 5117.38 96.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 0.00 0.00 0.00 11.00 695.97 61.11
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 3.00 189.81 60.00 0.00 0.00 0.00 3.00 189.81 60.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 3.00 1270.08 50.00 0.00 0.00 0.00 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 3.00 181.74 50.00 0.00 0.00 0.00 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 20.00 848.00 37.04 0.00 0.00 0.00 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 3.00 280.47 50.00 0.00 0.00 0.00 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 3.00 344.43 50.00 0.00 0.00 0.00 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 82325.84 42.35% 7044.82 3.62% 89370.65 45.97%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 60667.68 84.56% 1184.70 1.65% 61852.38 86.21%
SUB TOTAL 266153.41 142993.52 8229.52 151223.04
GASTOS GENERALES 7% 18630.74 10009.55 576.07 10585.61
UTILIDADES 5% 13307.67 7149.68 411.48 7561.15
SUB TOTAL 298091.82 160152.74 9217.06 169369.80
IMPUESTO IGV 19 % 56637.45 30429.02 1751.24 32180.26
TOTAL GENERAL 354729.27 190581.76 53.73% 10968.30 3.09% 201550.06 56.82%
4.73 1352.21
3.94 145.74 100.00
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :03de Marzo del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR MES ACTUAL ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 856.09 727.68 44.96 770.00 654.50 40.44 1626.09 1382.18 85.40
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 916.22 4663.56 79.68 167.05 850.28 14.53 1083.27 5513.84 94.21
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 12.53 268.77 44.48 15.64 335.48 55.52 28.17 604.25 100.00
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1460.00 5299.80 93.06 108.94 395.45 6.94 1568.94 5695.25 100.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1460.00 8322.00 93.06 108.94 620.96 6.94 1568.94 8942.96 100.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.29 100.00 0.00 0.00 0.00 305.70 2268.29 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 60.80 132.54 5.22 1104.20 2407.16 94.78 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 0.00 0.00 0.00 365.00 1708.20 98.74
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 270.00 1058.40 73.04 45.00 176.40 12.17 315.00 1234.80 85.22
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 270.00 1539.00 73.04 45.00 256.50 12.17 315.00 1795.50 85.22
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 30.00 69.30 2.11 1165.00 2691.15 81.94 1195.00 2760.45 84.05
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 0.00 0.00 0.00 430.00 3186.30 91.21 430.00 3186.30 91.21
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 0.00 0.00 0.00 345.00 1614.60 78.81 345.00 1614.60 78.81
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 0.00 0.00 0.00 345.00 1352.40 78.81 345.00 1352.40 78.81
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 0.00 0.00 0.00 345.00 1966.50 78.81 345.00 1966.50 78.81
VALORIZACION DE AVANCE FISICO Nº 02 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL 28/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :03de Marzo del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR MES ACTUAL ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 0.00 0.00 0.00 75.00 174.00 5.28 75.00 174.00 5.28
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.66 24.41 1.44 0.66 24.41 1.44
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.26 73.17 0.42 0.26 73.17 0.42
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 0.00 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 78.68 2370.63 46.11 91.95 2770.45 53.89 170.63 5141.08 100.00
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 13.97 3774.27 54.59 8.50 2296.45 33.22 22.47 6070.72 87.81
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 275.39 8057.91 52.56 66.39 1942.57 12.67 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.48 15.18 20.78 0.48 15.18 20.78 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 1.40 41.83 12.96 1.40 41.83 12.96 2.80 83.66 25.93
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 0.00 0.00 0.00 72.30 2440.85 100.00 72.30 2440.85 100.00
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 0.00 0.00 0.00 241.00 2458.20 100.00 241.00 2458.20 100.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 0.00 0.00 0.00 10.00 167.90 50.00 10.00 167.90 50.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 02 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL 28/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :03de Marzo del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR MES ACTUAL ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 2.00 1090.32 66.67 1.00 545.16 33.33 3.00 1635.48 100.00
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 409.40 6149.19 86.88 61.80 928.24 13.12 471.20 7077.42 100.00
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 2.70 77.63 34.48 1.35 38.81 17.24 4.05 116.44 51.72
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 463.10 856.74 98.28 3.00 5.55 0.64 466.10 862.29 98.92
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 408.40 1882.72 86.67 3.00 13.83 0.64 411.40 1896.55 87.31
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 431.40 6458.06 91.55 3.00 44.91 0.64 434.40 6502.97 92.19
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 02 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL 28/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :03de Marzo del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR MES ACTUAL ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 1.50 1739.06 37.50 0.70 811.56 17.50 2.20 2550.61 55.00
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.35 4637.62 87.00 0.45 479.75 9.00 4.80 5117.38 96.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 0.00 0.00 0.00 11.00 695.97 61.11
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 2.00 126.54 40.00 1.00 63.27 20.00 3.00 189.81 60.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 2.00 846.72 33.33 1.00 423.36 16.67 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 2.00 121.16 33.33 1.00 60.58 16.67 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 17.00 720.80 31.48 3.00 127.20 5.56 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 2.00 186.98 33.33 1.00 93.49 16.67 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 2.00 229.62 33.33 1.00 114.81 16.67 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 59912.82 30.82% 29457.86 15.15% 89370.68 45.97%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 58647.02 81.75% 3205.36 4.47% 61852.38 86.21%
SUB TOTAL 266153.41 118559.84 32663.22 151223.06
GASTOS GENERALES 7% 18630.74 8299.19 2286.43 10585.61
UTILIDADES 5% 13307.67 5927.99 1633.16 7561.15
SUB TOTAL 298091.82 132787.02 36582.80 169369.83
IMPUESTO IGV 19 % 56637.45 25229.53 6950.73 32180.27
TOTAL GENERAL 354729.27 158016.56 44.55% 43533.54 12.27% 201550.09 56.82%
4.73 1352.21
3.94 145.74 100.00
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 1626.09 1382.18 85.40 0.00 0.00 0.00 1626.09 1382.18 85.40
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 933.67 4752.38 81.20 0.00 0.00 0.00 933.67 4752.38 81.20
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 28.17 604.25 100.00 0.00 0.00 0.00 28.17 604.25 100.00
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1568.94 5695.25 100.00 0.00 0.00 0.00 1568.94 5695.25 100.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1568.94 8942.96 100.00 0.00 0.00 0.00 1568.94 8942.96 100.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.27 100.00 0.00 0.00 0.00 305.70 2268.27 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 1165.00 2539.70 100.00 0.00 0.00 0.00 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 0.00 0.00 0.00 365.00 1708.20 98.74
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 315.00 1234.80 85.22 0.00 0.00 0.00 315.00 1234.80 85.22
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 315.00 1795.50 85.22 0.00 0.00 0.00 315.00 1795.50 85.22
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 1195.00 2760.45 84.05 0.00 0.00 0.00 1195.00 2760.45 84.05
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 230.00 1704.30 48.79 0.00 0.00 0.00 230.00 1704.30 48.79
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 150.00 702.00 34.27 0.00 0.00 0.00 150.00 702.00 34.27
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 195.00 764.40 44.54 0.00 0.00 0.00 195.00 764.40 44.54
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 195.00 1111.50 44.54 0.00 0.00 0.00 195.00 1111.50 44.54
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 75.00 174.00 5.28 0.00 0.00 0.00 75.00 174.00 5.28
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 0.00 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 170.63 5141.08 100.00 0.00 0.00 0.00 170.63 5141.08 100.00
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 22.34 6035.60 87.30 0.00 0.00 0.00 22.34 6035.60 87.30
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 341.78 10000.48 65.23 0.00 0.00 0.00 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.96 30.36 41.56 0.00 0.00 0.00 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 2.80 83.66 25.93 0.00 0.00 0.00 2.80 83.66 25.93
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 15.16 511.80 20.97 30.61 1033.39 42.34 45.77 1545.20 63.31
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 0.00 0.00 0.00 102.04 1040.81 42.34 102.04 1040.81 42.34
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 0.00 0.00 0.00 18.00 302.22 90.00 18.00 302.22 90.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 2.50 1362.90 83.33 0.50 272.58 16.67 3.00 1635.48 100.00
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 531.80 7987.64 112.86 0.00 0.00 0.00 531.80 7987.64 112.86
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 4.05 116.44 51.72 0.00 0.00 0.00 4.05 116.44 51.72
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 466.10 862.29 98.92 0.00 0.00 0.00 466.10 862.29 98.92
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 411.40 1896.55 87.31 0.00 0.00 0.00 411.40 1896.55 87.31
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 434.40 6502.97 92.19 0.00 0.00 0.00 434.40 6502.97 92.19
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL15/02/2010 AL 20/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :20de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA III ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 1.85 2144.83 46.25 0.70 811.56 17.50 2.55 2956.39 63.75
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.45 4744.23 89.00 0.00 0.00 0.00 4.45 4744.23 89.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 0.00 0.00 0.00 11.00 695.97 61.11
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 3.00 189.81 60.00 0.00 0.00 0.00 3.00 189.81 60.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 3.00 1270.08 50.00 0.00 0.00 0.00 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 3.00 181.74 50.00 0.00 0.00 0.00 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 20.00 848.00 37.04 0.00 0.00 0.00 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 3.00 280.47 50.00 0.00 0.00 0.00 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 3.00 344.43 50.00 0.00 0.00 0.00 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 79811.16 41.05% 2649.00 1.36% 82460.16 42.42%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 61983.67 86.40% 811.56 1.13% 62795.23 87.53%
SUB TOTAL 266153.41 141794.83 3460.56 145255.39
GASTOS GENERALES 7% 18630.74 9925.64 242.24 10167.88
UTILIDADES 5% 13307.67 7089.74 173.03 7262.77
SUB TOTAL 298091.82 158810.21 3875.83 162686.04
IMPUESTO IGV 19 % 56637.45 30173.94 736.41 30910.35
TOTAL GENERAL 354729.27 188984.15 53.28% 4612.24 1.30% 193596.38 54.58%
4.73 1352.21
3.94 145.74 100.00
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA II ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 1456.09 1237.68 76.47 170.00 144.50 8.93 1626.09 1382.18 85.40
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 933.67 4752.38 81.20 0.00 0.00 0.00 933.67 4752.38 81.20
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 17.97 385.46 63.79 10.20 218.79 36.21 28.17 604.25 100.00
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1535.00 5572.05 97.84 33.94 123.20 2.16 1568.94 5695.25 100.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1535.00 8749.50 97.84 33.94 193.46 2.16 1568.94 8942.96 100.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.27 100.00 0.00 0.00 0.00 305.70 2268.27 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 1165.00 2539.70 100.00 0.00 0.00 0.00 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 0.00 0.00 0.00 365.00 1708.20 98.74
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 315.00 1234.80 85.22 0.00 0.00 0.00 315.00 1234.80 85.22
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 315.00 1795.50 85.22 0.00 0.00 0.00 315.00 1795.50 85.22
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 1195.00 2760.45 84.05 0.00 0.00 0.00 1195.00 2760.45 84.05
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 230.00 1704.30 48.79 0.00 0.00 0.00 230.00 1704.30 48.79
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 150.00 702.00 34.27 0.00 0.00 0.00 150.00 702.00 34.27
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 150.00 588.00 34.27 45.00 176.40 10.28 195.00 764.40 44.54
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 150.00 855.00 34.27 45.00 256.50 10.28 195.00 1111.50 44.54
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL06/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA II ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 0.00 0.00 0.00 75.00 174.00 5.28 75.00 174.00 5.28
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 0.00 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 126.85 3821.99 74.34 43.78 1319.09 25.66 170.63 5141.08 100.00
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 15.69 4238.97 61.31 6.65 1796.63 25.99 22.34 6035.60 87.30
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 341.78 10000.48 65.23 0.00 0.00 0.00 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.96 30.36 41.56 0.00 0.00 0.00 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 2.80 83.66 25.93 0.00 0.00 0.00 2.80 83.66 25.93
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 0.00 0.00 0.00 15.16 511.80 20.97 15.16 511.80 20.97
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL06/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA II ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 2.00 1090.32 66.67 0.50 272.58 16.67 2.50 1362.90 83.33
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 531.80 7987.64 112.86 0.00 0.00 0.00 531.80 7987.64 112.86
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 4.05 116.44 51.72 0.00 0.00 0.00 4.05 116.44 51.72
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 466.10 862.29 98.92 0.00 0.00 0.00 466.10 862.29 98.92
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 411.40 1896.55 87.31 0.00 0.00 0.00 411.40 1896.55 87.31
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 434.40 6502.97 92.19 0.00 0.00 0.00 434.40 6502.97 92.19
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 01/02/2010 AL06/02/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA II ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 1.85 2144.83 46.25 0.00 0.00 0.00 1.85 2144.83 46.25
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.35 4637.62 87.00 0.10 106.61 2.00 4.45 4744.23 89.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 0.00 0.00 0.00 11.00 695.97 61.11
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 3.00 189.81 60.00 0.00 0.00 0.00 3.00 189.81 60.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 3.00 1270.08 50.00 0.00 0.00 0.00 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 3.00 181.74 50.00 0.00 0.00 0.00 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 20.00 848.00 37.04 0.00 0.00 0.00 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 3.00 280.47 50.00 0.00 0.00 0.00 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 3.00 344.43 50.00 0.00 0.00 0.00 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 74624.20 38.38% 5186.95 2.67% 79811.16 41.05%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 61877.06 86.25% 106.61 0.15% 61983.67 86.40%
SUB TOTAL 266153.41 136501.26 5293.57 141794.83
GASTOS GENERALES 7% 18630.74 9555.09 370.55 9925.64
UTILIDADES 5% 13307.67 6825.06 264.68 7089.74
SUB TOTAL 298091.82 152881.41 5928.79 158810.21
IMPUESTO IGV 19 % 56637.45 29047.47 1126.47 30173.94
TOTAL GENERAL 354729.27 181928.88 51.29% 7055.26 1.99% 188984.15 53.28%
4.73 1352.21
3.94 145.74 100.00
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA I ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.25 109.46 100.00 0.00 0.00 0.00 0.25 109.46 100.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1904.10 1656.57 100.00 0.00 0.00 0.00 1904.10 1656.57 100.00
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 856.09 727.68 44.96 600.00 510.00 31.51 1456.09 1237.68 76.47
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 916.22 4663.56 79.68 17.45 88.82 1.52 933.67 4752.38 81.20
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 46.08 234.09 100.00 0.00 0.00 0.00 46.08 234.09 100.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 59.80 1282.71 100.00 0.00 0.00 0.00 59.80 1282.71 100.00
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 12.53 268.77 44.48 5.44 116.69 19.31 17.97 385.46 63.79
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 133.80 2400.37 100.00 0.00 0.00 0.00 133.80 2400.37 100.00
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 1460.00 5299.80 93.06 75.00 272.25 4.78 1535.00 5572.05 97.84
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 1460.00 8322.00 93.06 75.00 427.50 4.78 1535.00 8749.50 97.84
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 1421.70 3241.48 100.00 0.00 0.00 0.00 1421.70 3241.48 100.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 305.70 2268.29 100.00 0.00 0.00 0.00 305.70 2268.29 100.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 251.00 1174.68 100.00 0.00 0.00 0.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 251.00 961.33 100.00 0.00 0.00 0.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 251.00 1430.70 100.00 0.00 0.00 0.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 60.80 132.54 5.22 1104.20 2407.16 94.78 1165.00 2539.70 100.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 398.08 2949.77 100.00 0.00 0.00 0.00 398.08 2949.77 100.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 365.00 1708.20 98.74 0.00 0.00 0.00 365.00 1708.20 98.74
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 270.00 1058.40 73.04 45.00 176.40 12.17 315.00 1234.80 85.22
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 270.00 1539.00 73.04 45.00 256.50 12.17 315.00 1795.50 85.22
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 30.00 69.30 2.11 1165.00 2691.15 81.94 1195.00 2760.45 84.05
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 0.00 0.00 0.00 230.00 1704.30 48.79 230.00 1704.30 48.79
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 0.00 0.00 0.00 150.00 702.00 34.27 150.00 702.00 34.27
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 0.00 0.00 0.00 150.00 588.00 34.27 150.00 588.00 34.27
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 0.00 0.00 0.00 150.00 855.00 34.27 150.00 855.00 34.27
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 02/01/2010 AL 30/01/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA I ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00 0.00 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00 0.00 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 78.68 2370.63 46.11 48.17 1451.36 28.23 126.85 3821.99 74.34
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 13.97 3774.27 54.59 1.72 464.69 6.72 15.69 4238.97 61.31
VEREDAS
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 336.80 474.89 64.27 0.00 0.00 0.00 336.80 474.89 64.27
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 405.50 1865.30 77.39 0.00 0.00 0.00 405.50 1865.30 77.39
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 12.57 368.43 100.00 0.00 0.00 0.00 12.57 368.43 100.00
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 275.39 8057.91 52.56 66.39 1942.57 12.67 341.78 10000.48 65.23
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.48 15.18 20.78 0.48 15.18 20.78 0.96 30.36 41.56
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 1.40 41.83 12.96 1.40 41.83 12.96 2.80 83.66 25.93
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 02/01/2010 AL 30/01/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA I ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 2.00 1090.32 66.67 0.00 0.00 0.00 2.00 1090.32 66.67
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 6.00 83.94 100.00 0.00 0.00 0.00 6.00 83.94 100.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 6.00 77.76 100.00 0.00 0.00 0.00 6.00 77.76 100.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 6.00 105.36 100.00 0.00 0.00 0.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 6.00 67.86 100.00 0.00 0.00 0.00 6.00 67.86 100.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 471.20 7077.42 100.00 3.00 45.06 0.64 474.20 7122.48 100.64
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 2.70 77.63 34.48 1.35 38.81 17.24 4.05 116.44 51.72
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 463.10 856.74 98.28 3.00 5.55 0.64 466.10 862.29 98.92
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 471.20 2172.23 100.00 3.00 13.83 0.64 474.20 2186.06 100.64
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 230.89 1475.39 100.00 0.00 0.00 0.00 230.89 1475.39 100.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 431.40 6458.06 91.55 3.00 44.91 0.64 434.40 6502.97 92.19
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 01 FEBRERO 2010 - II ETAPA
DEL 02/01/2010 AL 30/01/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :06de Febrero del 2010
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial MES ANTERIOR SEMANA I ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 1.50 1739.06 37.50 0.35 405.78 8.75 1.85 2144.83 46.25
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 4.35 4637.62 87.00 0.00 0.00 0.00 4.35 4637.62 87.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 11.00 695.97 61.11 0.00 0.00 0.00 11.00 695.97 61.11
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 2.00 126.54 40.00 1.00 63.27 20.00 3.00 189.81 60.00
03.03 SUMIDEROS
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 2.00 846.72 33.33 1.00 423.36 16.67 3.00 1270.08 50.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 2.00 121.16 33.33 1.00 60.58 16.67 3.00 181.74 50.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 395.00 27954.15 100.00 0.00 0.00 0.00 395.00 27954.15 100.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 17.00 720.80 31.48 3.00 127.20 5.56 20.00 848.00 37.04
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 412.00 482.04 87.44 0.00 0.00 0.00 412.00 482.04 87.44
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 2.00 186.98 33.33 1.00 93.49 16.67 3.00 280.47 50.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 2.00 229.62 33.33 1.00 114.81 16.67 3.00 344.43 50.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 59912.82 30.82% 14711.40 7.57% 74624.22 38.38%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 59864.77 83.44% 1436.65 2.00% 61301.42 85.45%
SUB TOTAL 266153.41 119777.58 16148.06 135925.64
GASTOS GENERALES 7% 18630.74 8384.43 1130.36 9514.79
UTILIDADES 5% 13307.67 5988.88 807.40 6796.28
SUB TOTAL 298091.82 134150.89 18085.82 152236.72
IMPUESTO IGV 19 % 56637.45 25488.67 3436.31 28924.98
TOTAL GENERAL 354729.27 159639.57 45.00% 21522.13 6.07% 181161.70 51.07%
4.73 1352.21
3.94 145.74 100.00
PAVIMENTO
ALMACEN Y
CASETA DE
PARTIDA MOVILIZACION Y CARTEL DE
TRAZO Y
CORTE DE TERRENO CORTE DE TERRENO CORTE DE
TRAZO Y REPLANTEO ROTURA DE
GUARD.
DESMOVILIZAC. DE IDENTIFIC. DE C/MAQUINARIA HASTA C/MAQUINARIA TERRENO
REPLANTEO DURANTE LA VEREDAS
EQUIPO OBRA S-R MEJORAMIENTO MANUAL
EJECUCION
FECHA 01.01 01.02 01.03 02.01 02.02 02.03 03.01.01 03.01.02 03.01.03
5/11/2009 3600.00 8.22 7.20
5/12/2009
5/13/2009 3200.00 18.90
5/14/2009 5.40
5/15/2009 18.90
5/16/2009 492.00
5/17/2009
5/18/2009 624.00 5.40
5/19/2009 6.29
5/20/2009
5/21/2009 7.20
5/22/2009 821.00
5/23/2009 377.00
5/24/2009
5/25/2009 5.40
5/26/2009
5/27/2009
5/28/2009 3.60
5/29/2009
5/30/2009 1.80
5/31/2009 0.70
EJECUTADO DEL MES 0.70 0.00 0.00 6800.00 0.00 8.22 2314.00 0.00 80.09
EJEC. ANTERIOR #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
EJEC. ACUMULADO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROGRAMADO 2.50 1.00 1.00 8436.68 8436.68 8.22 3308.71 628.48 196.86
SALDO 1.80 1.00 1.00 1636.68 8436.68 0.00 994.71 628.48 116.77
AVANCE FISICO DIARIO DE OBRA MAYO - 2009
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
PAVIMENTO
CARGUIO SELECCION DE
EXCAVACION EXCAVACION ACARREO ESCARIFICADO EXTRACCION DE
EXCAVACION (ELIMINACION DE TRANSPORTE (ELIM. MATERIAL P/ MEJ CARGUIO DE TRANSPORTE (MEJ.
MANUAL PARA MANUAL PARA INTERNO DE PERFILADO/COMPACT MATERIAL P/MEJ. SUB
MANUAL EN BADEN MATERIAL MAT. EXCEDENTE) DE SUB (MEJ. S-R) S-R)
CUNETA SARDINEL MATERIAL ADO RASANTE
EXCEDENTE) RASANTE
03.01.04 03.01.05 03.01.06 03.02.01 03.02.02 03.02.03 03.02.04 04.01.01 04.01.02 04.01.03 04.01.04
288.00 288.00
480.00 480.00
465.00 465.00
650.00 650.00
165.00 165.00
40.00 40.00
0.00 0.00 0.00 106.79 2088.00 2088.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
61.23 98.85 15.91 458.10 5182.73 5182.73 6014.35 1355.14 1258.35 1258.35 1258.35
61.23 98.85 15.91 351.31 3094.73 3094.73 6014.35 1355.14 1258.35 1258.35 1258.35
FORMULA DE CARGUÍO
DIFERENCIA DE 796 M3
AVANCE FISICO DIARIO DE OBRA MAYO - 2009
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
PAVIMENTO
04.01.05 04.02.01 04.02.02 04.02.03 04.02.04 04.02.05 04.03.01 04.03.02 04.03.03 04.03.04
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2688.00 1684.02 1563.73 1563.73 1563.73 6014.35 1897.28 1761.76 1761.76 1761.76
2688.00 1684.02 1563.73 1563.73 1563.73 6014.35 1897.28 1761.76 1761.76 1761.76
AVANCE FISICO DE OBRA DIARIO - MAYO 20
OLG. PUNO - AV. CENTENARIO) OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAM
PAVIMENTO
09.01.01 09.01.02 09.02.01 09.02.02 09.02.03 09.02.04 10.01 10.02 12.01 13.01
126.00 126.00
54.00 54.00
0.00 0.00 180.00 180.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
668.62 100.29 1523.30 1523.30 1523.30 42.10 5.01 23.40 599.54 274.00
668.62 100.29 1343.30 1343.30 1523.30 42.10 5.01 23.40 599.54 274.00
AVANCE FISICO DE OBRA DIARIO - MAYO 2009
A: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
PAVIMENTO
13.02 13.03 14.01.01 14.01.02 14.01.03 14.01.04 14.01.05 14.02.01 14.02.02 14.02.03
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
915.61 150.00 502.59 250.99 502.59 16.00 200.00 2.00 1.00 4.00
915.61 150.00 502.59 250.99 502.59 16.00 200.00 2.00 1.00 4.00
AVANCE FISICO DE OBRA DIARIO - MAYO 2009
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
DESAGUE PLUVIAL
16.01 16.02 17.01 17.02 17.03 17.04 18.01 01.01 02.01.01 02.01.02
54.00 20
20
14
1.99
1.99
0.00 0.00 9.00 0.00 2.00 2.00 0.00 68.00 7.96 68.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4.00 4.00 41.00 41.00 41.00 41.00 7200.00 360.00 27.88 575.94
4.00 4.00 32.00 41.00 39.00 39.00 7200.00 292.00 19.92 507.94
AVANCE FISICO DE OBRA DIARIO - MAYO 2009
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
02.01.03 02.01.04 02.02.01 02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.04.01 02.04.02 02.04.03
54.00 54.00
14.00 14.00
0.00 68.00 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16.97 575.94 575.94 282.21 262.05 262.05 262.05 575.94 53.81 53.81 53.81
16.97 507.94 507.94 282.21 262.05 262.05 262.05 575.94 53.81 53.81 53.81
AVANCE FISICO DE OBRA DIARIO - MAYO 2009
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA I ETAPA TRAMO: (PROLG. PUNO - AV. CENTENARIO)
DESAGUE PLUVIAL
CONSTRUC.
CONSTRUCCION DE CONSTRUCCION DE CONSTRUCCION DE DADOS DE DADOS DE TENDIDO DE TENDIDO DE
ENCIMADO CONSTRUCCION DE CONSTRUCCION DE
BUZON H BUZON H BUZON H CONCRETO F'C= CONCRETO F'C= TUBERIA UPVC TUBERIA UPVC
BUZON H= 0.45m. SUMIDERO CAJA RECEPTOR
=1.200m =1.40m =1.50m 140KG/CM² 140KG/CM² U/F S-25 D=12" U/F S-25 D=10"
S.M.yTAPA
03.01.01 03.01.02 03.01.03 03.01.04 03.02.01 03.02.02 03.03.01 03.03.02 04.01 04.02
14.00
0.60 0.60 3.00
0.60 0.60 0.00 0.00 0.00 3.00 0.00 0.00 0.00 14.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1.00 1.00 5.00 18.00 1.00 5.00 13.00 13.00 350.84 103.00
0.40 0.40 5.00 18.00 1.00 2.00 13.00 13.00 350.84 89.00
DIARIO - MAYO 2009
OLG. PUNO - AV. CENTENARIO)
DESAGUE PLUVIAL
54.00
68.00
GE CHUCOS DE LA CRUZ
GE CHUCOS DE LA CRUZ
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 32.63 699.91 100.00 0.00 0.00 0.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 357.60 5371.15 75.89 51.80 778.04 10.99 409.40 6149.19 86.88
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 411.30 760.91 87.29 51.80 95.83 10.99 463.10 856.74 98.28
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 356.60 1643.93 75.68 51.80 238.80 10.99 408.40 1882.72 86.67
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 150.00 513.00 69.96 0.00 0.00 0.00 150.00 513.00 69.96
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 150.00 624.00 69.96 0.00 0.00 0.00 150.00 624.00 69.96
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 150.00 828.00 69.96 0.00 0.00 0.00 150.00 828.00 69.96
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 379.60 5682.61 80.56 51.80 775.45 10.99 431.40 6458.06 91.55
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 48.55 653.48 100.00 0.00 0.00 0.00 48.55 653.48 100.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 48.55 190.32 100.00 0.00 0.00 0.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 48.55 276.74 100.00 0.00 0.00 0.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 02 ENERO 2010 - II ETAPA
DEL 18/01/2010 AL 23/01/2010
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHECO
4.73 1352.21
3.94 145.74 100.00
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :01 de Diciembre del 2009
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial ANTERIOR NOVIEMBRE ACTUAL DICIEMBRE ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
01.00 OBRAS PROVISIONALES
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 0.25 437.84 109.46 0.10 43.78 40.00 0.00 0.00 0.00 0.10 43.78 40.00
01.02 CARTEL DE IDENTIFICACION DE OBRA UND 0.25 1,902.11 475.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.00 OBRAS PRELIMINARES 0.00
02.01 TRAZO Y REPLANTEO M2 1,904.10 0.87 1,656.57 1000.00 870.00 52.52 0.00 0.00 0.00 1000.00 870.00 52.52
02.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION M2 1,904.08 0.85 1,618.47 400.00 340.00 21.01 0.00 0.00 0.00 400.00 340.00 21.01
02.03 ROTURA DE VEREDAS M3 0.48 42.58 20.44 0.48 20.44 100.00 0.00 0.00 0.00 0.48 20.44 100.00
03.00 EXPLANACIONES
03.01 MOVIMIENTO DE TIERRAS
03.01.01 CORTE DE TERRENO DE SUB RASANTE M3 1,149.87 5.09 5,852.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02 CORTE PARA MEJORAM. DE SUB BASE M3 46.08 5.08 234.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.03 CORTE DE TERRENO MANUAL M3 59.80 21.45 1,282.71 25.76 552.55 43.08 0.00 0.00 0.00 25.76 552.55 43.08
03.01.04 EXCAVACION MANUAL PARA CUNETA M3 18.29 21.45 392.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.05 EXCAVACION MANUAL PARA SARDINEL M3 28.17 21.45 604.25 2.34 50.19 8.31 0.00 0.00 0.00 2.34 50.19 8.31
03.01.06 EXCAVACION MANUAL EN BADEN M3 4.73 21.04 99.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE
03.02.01 ACARREO INTERNO DE MATERIAL M3 133.80 17.94 2,400.37 33.68 604.22 25.17 0.00 0.00 0.00 33.68 604.22 25.17
03.02.02 CARGUIO (ELIM.DE MATERIAL EXCEDENTE) M3 1,568.94 3.63 5,695.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 1,568.94 5.70 8,942.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.04 ESCARIFICADO PERFILADO/COMPACTADO M2 1,421.70 2.28 3,241.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.00 PAVIMENTOS
04.01 MEJORAMIENTO DE SUB RASANTE 0.00
04.01.01 EXTRACCION DE MATERIAL P/MEJ. SUB RASANTE M3 305.70 7.42 2,268.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02 SELECCION DE MATERIAL P/ MEJ DE SUB RASANTE M3 251.00 4.68 1,174.68 0.00 0.00 0.00 251.00 1174.68 100.00 251.00 1174.68 100.00
04.01.03 CARGUIO DE (MEJ. S-R) M3 251.00 3.83 961.33 0.00 0.00 0.00 251.00 961.33 100.00 251.00 961.33 100.00
04.01.04 TRANSPORTE (MEJ. S-R) M3 251.00 5.70 1,430.70 0.00 0.00 0.00 251.00 1430.70 100.00 251.00 1430.70 100.00
04.01.05 EXT. RIEGO Y COMPC. P/MEJ DE SUB RASANTE M2 1,165.00 2.18 2,539.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02 SUB BASE GRANULAR
04.02.01 EXTRACCION DE MATERIAL PARA SUB BASE M3 398.08 7.41 2,949.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.02 SELECCION DE MATERIAL P/ SUB BASE GRANULAR M3 369.64 4.68 1,729.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03 CARGUIO DE S-B M3 369.64 3.92 1,448.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04 TRANSPORTE DE S.B. M3 369.64 5.70 2,106.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05 EXT. RIEGO Y COMPC. DE SUB BASE E= 0.20m. M2 1,421.70 2.31 3,284.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 BASE GRANULAR
04.03.01 EXTRACCION DE MATERIAL PARA BASE M3 471.44 7.41 3,493.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.02 SELECCION DE MATERIAL P/ BASE GRANULAR M3 437.76 4.68 2,048.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.03 CARGUIO DE B. M3 437.76 3.92 1,716.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.04 TRANSPORTE DE B. M3 437.76 5.70 2,495.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE AVANCE FISICO Nº 02 DICIEMBRE 2009 - II ETAPA
DEL 1/12/2009 AL 30/12/2009
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHE
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :01 de Diciembre del 2009
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial ANTERIOR NOVIEMBRE ACTUAL DICIEMBRE ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
04.03.05 EXT. RIEGO Y COMPC. DE BASE E= 0.20m. M2 1,421.70 2.32 3,298.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04 CARPETA ASFALTICA
04.04.01 IMPRIMACION ASFALTICA M2 1,097.20 5.46 5,990.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CARPETA ASFALTICA EN CALIENTE E= 3" M2 1,097.20 52.36 57,449.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 DRENAJE
05.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS M2 45.72 36.99 1,691.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02 CUNETAS CONCRETO F'C=175 KG/CM2 M3 61.23 281.43 17,231.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.00 BADEN
06.01 BADEN CONCRETO F'C=210 KG/CM2 M3 4.73 285.88 1,352.21 0.00 0.00
06.02 BADEN ENCOFRADO Y DESENCOFRADO M2 3.94 36.99 145.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.00 SARDINEL INEXPUESTO
07.01 SARDINEL INEXP. CONCRETO F'C=210 KG/CM2 M3 3.43 298.61 1,024.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 SARDINEL INEXP. ENCOFRADO Y DESENCOFRADO M2 6.86 26.86 184.26 0.00 0.00
08.00 ACERA PEATONAL
08.01 SARDINEL EXPUESTO
08.01.01 SARDINEL EXP. ENCOFRADO Y DESENCOFRADO M2 170.63 30.13 5,141.08 15.60 470.03 9.14 0.00 0.00 0.00 15.60 470.03 9.14
08.01.02 SARDINEL EXP. CONCRETO F'C=175 KG/CM2 M3 25.59 270.17 6,913.65 2.34 632.20 9.14 0.00 0.00 0.00 2.34 632.20 9.14
VEREDAS 0.00
08.02.01 REFINE Y NIVELACION M2 524.00 1.41 738.84 64.35 90.73 12.28 0.00 0.00 0.00 64.35 90.73 12.28
08.02.02 RELLENO Y COMPACTADO DE VEREDA M2 524.00 4.60 2,410.40 64.35 296.01 12.28 0.00 0.00 0.00 64.35 296.01 12.28
08.02.03 VEREDA ENCOFRADO Y DESENCOFRADO M2 12.57 29.31 368.43 2.15 63.02 17.10 0.00 0.00 0.00 2.15 63.02 17.10
08.02.04 VEREDAS CONCRETO F'C=175 KG/CM2 M2 524.00 29.26 15,332.24 64.35 1882.88 12.28 0.00 0.00 0.00 64.35 1882.88 12.28
9.00 RAMPAS
9.01 ENCOFRADO Y DESENCOFRADO RAMPA M2 2.31 31.63 73.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.02 RAMPA CONCRETO F'C=175 KG/CM2 M2 10.80 29.88 322.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.00 JUNTAS
10.01 RELLENO DE JUNTAS M 179.09 1.96 351.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.00 AREAS VERDES
11.01 SUMINISTRO DE TIERRA AGRICOLA M3 72.30 33.76 2,440.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02 COLOCACION DE GRASS M2 241.00 10.20 2,458.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03 COLOCACION DE PLANTONES UND 20.00 16.79 335.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.00 SEÑALIZACION
12.01 SEÑALIZACION HORIZONTAL
12.01.01 PINTURA LINEAL EN BORDE DE VIA M 228.62 3.97 907.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 PINTURA LINEAL CONTINUA EN EJE DE VIA M 95.70 3.90 373.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 PINTURA LINEAL DISCONTINUA EN EJE DE VIA M 191.00 3.24 618.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 PINTURA DE SIMBOLOS Y FLECHAS M2 12.00 12.69 152.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02 SEÑALIZACION VERTICAL
VALORIZACION DE AVANCE FISICO Nº 02 DICIEMBRE 2009 - II ETAPA
DEL 1/12/2009 AL 30/12/2009
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHE
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :01 de Diciembre del 2009
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial ANTERIOR NOVIEMBRE ACTUAL DICIEMBRE ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
12.02.01 SEÑALES TIPO R (90cM x 60cm) UND 1.00 384.08 384.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.02.02 SEÑALES TIPO F UND 1.00 358.52 358.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 EQUIPAMIENTO
13.01 MOVILIARIO URBANO UND 3.00 545.16 1,635.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.02 SUMINISTRO Y COLOCACION DE TACHOS DE BASURA UND 2.00 399.03 798.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.00 RECONEXIONES
14.01 RECONEXIONES DE PUNTOS DE AGUA PTO 6.00 13.99 83.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.02 RECONEXION DE CAJA MEDIDOR DE AGUA PTO 6.00 12.96 77.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.03 RECONEXION DE INSTALACIONES DE DESAGUE PTO 6.00 17.56 105.36 0.00 0.00 0.00 6.00 105.36 100.00 6.00 105.36 100.00
14.04 RECONEXION DE CAJA DE REGISTRO DE DESAGUE PTO 6.00 11.31 67.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.00 VARIOS
15.01 LIMPIEZA FINAL DE OBRA M2 2,000.00 0.66 1,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DESAGUE PLUVIAL
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 32.63 21.45 699.91 0.00 0.00 0.00 32.63 699.91 100.00 32.63 699.91 100.00
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 471.20 15.02 7,077.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03 EXCAVACION PARA SUMIDEROS M3 7.83 28.75 225.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04 REFINE Y NIVELACION EN ZANJAS M 471.20 1.85 871.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 471.20 4.61 2,172.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 230.89 6.39 1,475.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 214.40 3.42 733.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03 CARGUIO P/ RELLENO M3 214.40 4.16 891.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04 TRANSPORTE P/ RELLENO M3 214.40 5.52 1,183.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 471.20 14.97 7,053.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 48.55 13.46 653.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 48.55 3.92 190.32 0.00 0.00 0.00 48.55 190.32 100.00 48.55 190.32 100.00
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 48.55 5.70 276.74 0.00 0.00 0.00 48.55 276.74 100.00 48.55 276.74 100.00
03.00 OBRAS DE CONCRETO ARMADO
03.01 CONSTRUCCION DE BUZONES
VALORIZACION DE AVANCE FISICO Nº 02 DICIEMBRE 2009 - II ETAPA
DEL 1/12/2009 AL 30/12/2009
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : AV. GIRALDEZ - PROLONG. PUNO RESIDENTE : ING. MIRIAM VILLAFUERTE PACHE
Departamento : JUNIN Provincia : HUANCAYO Distrito : HUANCAYO Fecha de Presentacion :01 de Diciembre del 2009
PRESUPUESTO REFERENCIAL AVANCES
ITEM DESCRIPCION Unidad Metrado Precio Parcial ANTERIOR NOVIEMBRE ACTUAL DICIEMBRE ACUMULADO
METRADO VALORIZA. S/. % METRADO VALORIZ. S/. % METRADO VALORIZ. S/. %
03.01.01 CONSTRUCCION DE BUZON H =1..50m UND 4.00 1159.37 4,637.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02 CONSTRUCCION DE BUZON H =1.70m UND 5.00 1,066.12 5,330.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.03 DADOS DE CONCRETO F'C= 140KG/CM² UND 18.00 63.27 1,138.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 1.00 344.68 344.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 DADOS DE CONCRETO F'C= 140KG/CM² UND 5.00 63.27 316.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03 SUMIDEROS 0.00
03.03.01 CONSTRUCCION DE SUMIDERO UND 6.00 423.36 2,540.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.02 CONSTRUCCION DE CAJA RECEPTOR UND 6.00 60.58 363.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.01 TENDIDO DE TUBERIA UPVC U/F S-25 D=12" M 395.00 70.77 27,954.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=10" M 22.20 54.39 1,207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 54.00 42.40 2,289.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04 SUMINISTRO Y COLOCACION DE ACCESORIOS UND 6.00 15.35 92.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 471.20 1.17 551.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.00 CARPINTERIA METALICA
06.01 VENTANA DE SUMIDERO 0.70x0.80M UND 6.00 93.49 560.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02 REJILLA DE CAJA UND 6.00 114.81 688.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE 194411.37 5916.05 3.04% 3672.07 1.89% 9588.12 4.93%
COSTO DIRECTO 02 DESAGUE PLUVIAL 71742.04 0.00 0.00% 1166.96 1.63% 1166.96 1.63%
SUB TOTAL 266153.41 5916.05 4839.03 10755.09
GASTOS GENERALES 7% 18630.74 414.12 338.73 752.86
UTILIDADES 5% 13307.67 295.80 241.95 537.75
SUB TOTAL 298091.82 6625.98 5419.72 12045.70
IMPUESTO IGV 19 % 56637.45 1258.94 1029.75 2288.68
TOTAL GENERAL 354729.27 7884.92 2.22% 6449.47 1.82% 14334.38 4.04%
GE CHUCOS DE LA CRUZ
GE CHUCOS DE LA CRUZ
4.73 1352.21
3.94 145.74 100.00
GE CHUCOS DE LA CRUZ
GE CHUCOS DE LA CRUZ
OBRA : "MEJORAMIENTO DE PISTAS Y VEREDAS DE AV. JOSE OLAYA TRAMO : JR. LOS ANGELES -AV. SAN AGUSTIN
CODIGO : 15-036-074-2063804-2164992-190
: PAVIMENTACION FLEXIBLE
CLIENTE : MUNICIPALIDAD PROVINCIAL DE HUANCAYO
Departamento : JUNIN
PRESUPUESTO REFERENCIAL
ITEM DESCRIPCION Unidad Metrado
18.00 VARIOS
18.01 LIMPIEZA FINAL DE OBRA M2 103.76
METRADOS ADICIONALES
02.00 MOVIMIENTO DE TIERRAS
02.01 EXCAVACIONES
02.01.01 EXCAVACION PARA BUZONES M3 23.90
02.01.02 EXCAVACION DE ZANJAS - MANUAL M 104.98
02.01.04 REFINE Y NIVELACION EN ZANJAS M 104.98
02.02 CAMAS DE APOYO
02.02.01 PREPARACION DE CAMAS DE APOYO M 104.98
02.03 RELLENOS
02.03.01 EXTRACCION DE MAT. P/RELLENO M3 30.86
02.03.02 SELECCIÓN DE MATERIAL P/RELLENO M3 28.66
02.03.03 CARGUIO P/ RELLENO M3 28.66
02.03.04 TRANSPORTE P/ RELLENO M3 28.66
02.03.05 RELLENO Y COMPACTADO DE ZANJA M 104.98
02.04 ELIMINACION DE MATERIAL EXCEDENTE
02.04.01 ACARREO INTERNO DE MATERIAL M3 28.66
02.04.02 CARGUIO (ELIM. MAT. EXCEDENTE) M3 28.66
02.04.03 TRANSPORTE (ELIM. MAT. EXCEDENTE) M3 28.66
03.00 OBRAS DE CONCRETO ARMADO
03.02 ENCIMADO DE BUZONES
03.02.01 CONST. ENCIM.BUZON H= 0.45m. S.M.yTAPA UND 6.00
04.00 SUMINISTRO Y TENDIDO DE TUBERIA
04.02 TENDIDO DE TUBERIA UPVC U/F S-25 D=8" M 10.00
05.00 PRUEBA HIDRAULICA
05.01 PRUEBA A ZANJA TAPADA P/TUBERIA M 10.00
COSTO DIRECTO 01 PAVIMENTACION FLEXIBLE
COSTO DIRECTO 02 DESAGUE PLUVIAL
SUB TOTAL
IMPUESTO IGV 19 %
TOTAL GENERAL
LORIZACION DE AVANCE FISICO Nº06 POR MAYORES METRADOS DICIEMBRE 2
0.00
0.66 68.48 0.00 0.00 0.00 0.00 0.00
S DICIEMBRE ACUMULADO
TERRENO MANUAL
IDENTIFICAC. DE
C/MAQUINARIA
MANUAL PARA
PARTIDA
GUARDIANIA.
DURANTE LA
EXCAVACION
REPLANTEO
REPLANTEO
HASTA S - R
ALMACEN Y
ROTURA DE
EJECUCION
CARTEL DE
CASETA DE
MEJORAM.
C/MAQUIN.
CORTE DE
CORTE DE
CORTE DE
TERRENO
TERRENO
VEREDAS
TRAZO Y
TRAZO Y
CUNETA
OBRA
FECHA 01.01 1.02 02.01 02.02 02.03 03.01.01 03.01.02 03.01.03 03.01.04
12/1/2009 0.03
12/2/2009 0.03 1.03
12/3/2009 0.03 5.45
12/4/2009 0.03
12/5/2009 0.03 10.20
12/6/2009 0.03
12/7/2009 0.03 100.00
12/8/2009 0.03
12/9/2009 0.03
12/10/2009 0.03
12/11/2009 0.03
12/12/2009 0.03
12/13/2009 0.03
12/14/2009 0.03 153.00
12/15/2009 0.03
12/16/2009 0.03
12/17/2009 0.03 409.60 46.08
12/18/2009 0.03
12/19/2009 0.03
12/20/2009 0.03
12/21/2009 0.03
12/22/2009 0.03
12/23/2009 0.03
12/24/2009 0.03
12/25/2009 0.03
12/26/2009 0.03
12/27/2009 0.03
12/28/2009 0.03
12/29/2009 0.03 120.00
12/30/2009 0.03
12/31/2009 0.03
EJECUTADO DEL MES 1.00 0.00 0.00 0.00 0.00 792.80 46.08 6.48 0.00
EJEC. ANTERIOR 0.10 0.00 1000.00 400.00 0.48 0.00 0.00 25.76 0.00
EJEC. ACUMULADO 1.10 0.00 1000.00 400.00 0.48 792.80 46.08 32.24 0.00
PROGRAMADO 0.25 0.25 1904.10 1904.08 0.48 1149.87 46.08 59.80 18.29
SALDO -0.85 0.25 904.10 1504.08 0.00 357.07 0.00 27.56 18.29
O DE OBRA DICIEMBRE - 2009
AV. GIRALDEZ)
PAVIMENTO
CARGUIO DE (MEJ.
DE SUB RASANTE
MATERIAL P/ MEJ
(ELIMINACION DE
MATERIAL P/MEJ.
EXTRACCION DE
ESCARIFICADO
SELECCION DE
MANUAL PARA
SUB RASANTE
COMPACTADO
TRANSPORTE
EXCAVACION
EXCAVACION
EXCEDENTE)
EXCEDENTE)
INTERNO DE
PERFILADO/
MANUAL EN
(ELIM. MAT.
SARDINEL
MATERIAL
MATERIAL
ACARREO
CARGUIO
BADEN
S-R)
03.01.05 03.01.06 03.02.01 03.02.02 03.02.03 03.02.04 04.01.01 04.01.02 04.01.03
2.88 4.70
1.98 8.92
30.00
12.24
260.00 260.00
50.00
120.00 120.00
1168.00
120.00 120.00
210.00 210.00
240.00
180.00 180.00
CARGUIO DE S-B
COMPC. P/MEJ DE
BASE E= 0.20m.
BASE GRANULAR
MATERIAL P/ SUB
TRANSPORTE DE
EXTRACCION DE
EXTRACCION DE
MATERIAL PARA
MATERIAL PARA
COMPC. DE SUB
SELECCION DE
SUB RASANTE
PARTIDA
TRANSPORTE
EXT. RIEGO Y
EXT. RIEGO Y
SUB BASE
(MEJ. S-R)
BASE
S.B.
FECHA 04.01.04 04.01.05 04.02.01 04.02.02 04.02.03 04.02.04 04.02.05 04.03.01
12/1/2009
12/2/2009
12/3/2009
12/4/2009 30.00
12/5/2009
12/6/2009
12/7/2009
12/8/2009
12/9/2009
12/10/2009
12/11/2009
12/12/2009
12/13/2009
12/14/2009
12/15/2009
12/16/2009
12/17/2009
12/18/2009
12/19/2009 120.00
12/20/2009
12/21/2009 210.00
12/22/2009
12/23/2009 350.00
12/24/2009
12/25/2009
12/26/2009 180.00
12/27/2009
12/28/2009 150.00
12/29/2009
12/30/2009
12/31/2009
EJECUTADO DEL MES 690.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00
EJEC. ANTERIOR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ACUMULADO 690.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00
PROGRAMADO 545.77 64.51 398.08 369.64 369.64 369.64 1421.70 471.44
-144.23 64.51 48.08 369.64 369.64 369.64 1421.70 471.44
AVANCE FISICO DIARIO DE OBRA NOV
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA TRAMO: (JR. LOS ANGELES - AV. SAN AGUSTIN)
PAVIMENTO
PARTIDA
TRANSPORTE DE S.B.
CARGUIO DE S-B
BASE GRANULAR
SUB RASANTE
E= 0.20m.
SUB BASE
BASE
FECHA 04.01.04 04.01.05 04.02.01 04.02.02 04.02.03 04.02.04 04.02.05 04.03.01
11/23/2009
11/24/2009
11/25/2009
11/26/2009
11/27/2009
11/28/2009
11/29/2009
11/30/2009
EJECUTADO DEL MES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ANTERIOR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ACUMULADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PROGRAMADO 545.77 64.51 398.08 369.64 369.64 369.64 1421.70 471.44
545.77 64.51 398.08 369.64 369.64 369.64 1421.70 471.44
RIO DE OBRA DICIEMBRE - 2009
OLONGACION PUNO)
PAVIMENTO
BADEN CONCRETO
CONCRETO F'C=175
BASE GRANULAR
COMPC. DE BASE
TRANSPORTE DE
E=
DESENCOF. DE
DESENCOF. DE
CARGUIO DE B.
SELECCION DE
ENCOFRADO Y
ENCOFRADO Y
ASFALTICA EN
IMPRIMACION
F'C=210 KG/CM2
EXT. RIEGO Y
MATERIAL P/
ASFALTICA
CALIENTE
CARPETA
CUNETAS
CUNETAS
E= 0.20m.
BADEN
KG/CM2
3"
B.
04.03.02 04.03.03 04.03.04 04.03.05 04.04.01 04.04.02 05.01 05.02 6.01 6.02
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
437.76 437.76 437.76 1421.70 1097.20 1097.20 45.72 61.23 4.73 3.94
437.76 437.76 437.76 1421.70 1097.20 1097.20 45.72 61.23 4.73 3.94
IO DE OBRA NOVIEMBRE - 2009
AV. SAN AGUSTIN)
PAVIMENTO
ENCOFRADO Y DESENCOF. DE
IMPRIMACION ASFALTICA
TRANSPORTE DE B.
CARGUIO DE B.
GRANULAR
CUNETAS
E= 3"
BADEN
0.20m.
04.03.02 04.03.03 04.03.04 04.03.05 04.04.01 04.04.02 05.01 05.02 6.01 6.02
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
437.76 437.76 437.76 1421.70 1097.20 1097.20 45.72 61.23 4.73 3.94
437.76 437.76 437.76 1421.70 1097.20 1097.20 45.72 61.23 4.73 3.94
AVANCE FISICO DIARIO DE OBRA DICIEMB
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA TRAMO: (PROLONG. PUNO - AV. GIRALDEZ)
CONCRETO F'C=210
CONCRETO F'C=175
CONCRETO F'C=175
COMPACTADO DE
SARDINEL INEXP.
INEXP.ENCOF. Y
SARDINEL EXP.
SARDINEL EXP.
ENCOFRADO Y
ENCOFRADO Y
PARTIDA
NIVELACION
DESENCOF.
DESENCOF.
RELLENO Y
DESENCOF
SARDINEL
VEREDAS
REFINE Y
VEREDA
VEREDA
KG/CM2
KG/CM2
KG/CM2
FECHA 07.01 07.02 08.01.01 08.01.02 08.02.01 08.02.02 08.02.03 08.02.04
12/1/2009
12/2/2009 19.20 2.88 80.48 80.48 2.64 80.48
12/3/2009
12/4/2009 13.20 1.98 54.45 54.45 1.82 54.45
12/5/2009 68.70
12/6/2009
12/7/2009 9.60 1.44 54.00 54.00 1.32 3.96
12/8/2009
12/9/2009 48.00 48.00
12/10/2009
12/11/2009
12/12/2009
12/13/2009
12/14/2009
12/15/2009
12/16/2009
12/17/2009
12/18/2009
12/19/2009
12/20/2009
12/21/2009
12/22/2009
12/23/2009
12/24/2009
12/25/2009
12/26/2009
12/27/2009
12/28/2009
12/29/2009
12/30/2009
12/31/2009
EJECUTADO DEL MES 0.00 0.00 42.00 6.30 236.93 305.63 5.78 138.89
0.00 0.00 0.00 15.60 2.34 64.35 64.35 64.35 2.15
EJEC. ACUMULADO 0.00 0.00 57.60 8.64 301.28 369.98 70.13 141.04
PROGRAMADO 3.43 6.86 170.63 25.59 524.00 524.00 12.57 524.00
3.43 6.86 113.03 16.95 222.72 154.02 -57.56 382.96
RELLENO Y COMPACTADO DE
SARDINEL INEXP.ENCOF. Y
PARTIDA
REFINE Y NIVELACION
DESENCOF.
DESENCOF
VEREDA
KG/CM2
KG/CM2
FECHA 07.01 07.02 08.01.01 08.01.02 08.02.01 08.02.02 08.02.03 08.02.04
11/23/2009
11/24/2009
11/25/2009
11/26/2009
11/27/2009
11/28/2009
11/29/2009
11/30/2009
EJECUTADO DEL MES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ACUMULADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PROGRAMADO 3.43 6.86 170.63 25.59 524.00 524.00 12.57 524.00
3.43 6.86 170.63 25.59 524.00 524.00 12.57 524.00
DE OBRA DICIEMBRE - 2009
AV. GIRALDEZ) RAMPA CONCRETO
TIERRA AGRICOLA
CONTINUA EN EJE
EN BORDE DE VIA
DISCONTINUA EN
COLOCACION DE
COLOCACION DE
DESENCOFRADO
PINTURA LINEAL
PINTURA LINEAL
PINTURA LINEAL
SUMINISTRO DE
ENCOFRADO Y
F'C=175 KG/CM2
RELLENO DE
PLANTONES
EJE DE VIA
JUNTAS
RAMPA
GRASS
DE VIA
9.01 9.02 10.01 11.01 11.02 11.03 12.01.01 12.01.02 12.01.03
COLOCACION DE PLANTONES
COLOCACION DE GRASS
RELLENO DE JUNTAS
EJE DE VIA
RAMPA
DE VIA
9.01 19.02 10.01 11.01 11.02 11.03 12.01.01 12.01.02 12.01.03
(90cM x 60cm)
CAJA MEDIDOR DE
COLOCACION DE
RECONEXION DE
RECONEXION DE
RECONEXION DE
SEÑALES TIPO R
SEÑALES TIPO F
INSTALACIONES
RECONEXIONES
DE PUNTOS DE
SUMINISTRO Y
PARTIDA
REGISTRO DE
DE DESAGUE
SIMBOLOS Y
PINTURA DE
MOVILIARIO
TACHOS DE
DESAGUE
FLECHAS
URBANO
CAJA DE
BASURA
AGUA
AGUA
FECHA 12.01.04 12.02.01 12.02.02 13.01 13.02 14.01 14.02 14.03 14.04
EJECUTADO DEL MES 0.00 0.00 0.00 0.00 0.00 5.00 5.00 9.00 6.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ACUMULADO 0.00 0.00 0.00 0.00 0.00 5.00 5.00 9.00 6.00
PROGRAMADO 12.00 1.00 1.00 3.00 2.00 6.00 6.00 6.00 6.00
12.00 1.00 1.00 3.00 2.00 1.00 1.00 -3.00 0.00
AVANCE FISICO DIARIO DE OBRA NOVIEMBR
OBRA: MEJORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA TRAMO: (JR. LOS ANGELES - AV. SAN AGUSTIN)
PAVIMENTO
RECONEXION DE INSTALACIONES
RECONEXION DE CAJA MEDIDOR
(90cM x
SUMINISTRO Y COLOCACION DE
RECONEXIONES DE PUNTOS DE
RECONEXION DE CAJA DE
REGISTRO DE DESAGUE
PARTIDA
MOVILIARIO URBANO
TACHOS DE BASURA
SEÑALES TIPO R
SEÑALES TIPO F
DE DESAGUE
DE AGUA
AGUA
60cm)
FECHA 12.01.04 12.02.01 12.02.03 13.01 13.02 14.01 14.02 14.03 14.04
11/23/2009
11/24/2009
11/25/2009
11/26/2009
11/27/2009
11/28/2009
11/29/2009
11/30/2009
EJECUTADO DEL MES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EJEC. ACUMULADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PROGRAMADO 12.00 1.00 1.00 3.00 2.00 6.00 6.00 6.00 6.00
12.00 1.00 1.00 3.00 2.00 6.00 6.00 6.00 6.00
OBRA DICIEMBRE - 2009
GIRALDEZ) OBRA: MEJORAMIENTO PISTA Y VERE
DESAGUE PLUVIAL
EXCAVACION PARA
EXCAVACION PARA
LIMPIEZA FINAL DE
ZANJAS - MANUAL
CAMAS DE APOYO
PREPARACION DE
TRAZO NIVELES Y
EXCAVACION DE
NIVELACION EN
REPLANTEO DE
PARTIDA
SUMIDEROS
BUZONES
REFINE Y
ZANJAS
ZANJA
OBRA
0.00 352.00 35.45 357.60 0.00 327.30 271.90 EJECUTADO DEL MES
0.00 0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ANTERIOR
0.00 352.00 35.45 357.60 0.00 327.30 271.90 EJEC. ACUMULADO
2000.00 395.00 32.63 471.20 7.83 471.20 471.20 PROGRAMADO
2000.00 43.00 -2.82 113.60 7.83 143.90 199.30
OBRA NOVIEMBRE - 2009
SAN AGUSTIN) OBRA: MEJORAMIENTO PISTA Y VERE
DESAGUE PLUVIAL
PREPARACION DE CAMAS DE
LIMPIEZA FINAL DE OBRA
PARTIDA
APOYO
ZANJA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 EJECUTADO DEL MES
0.00 0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ANTERIOR
0.00 0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ACUMULADO
2000.00 395.00 32.63 471.20 7.83 471.20 471.20 PROGRAMADO
2000.00 395.00 32.63 471.20 7.83 471.20 471.20
AVANCE FISICO DIARIO DE OBRA DICIEMBRE - 2009
JORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA TRAMO: (PROLONG. PUNO - AV. GIRALDEZ)
DESAGUE PLUVIAL
MAT. EXCEDENTE)
COMPACTADO DE
EXTRACCION DE
MAT. P/RELLENO
CONSTRUCCION
CONSTRUCCION
TRANSPORTE P/
CARGUIO (ELIM.
SELECCIÓN DE
H =1.70m
H =1.500m
TRANSPORTE
EXCEDENTE)
INTERNO DE
CARGUIO P/
P/RELLENO
RELLENO Y
(ELIM. MAT.
DE BUZON
DE BUZON
MATERIAL
MATERIAL
ACARREO
RELLENO
RELLENO
ZANJA
02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.04.01 02.04.02 02.04.03 03.01.01 03.01.02
69.60 2.00
15.00 15.00 15.00 0.75
36.00
50.00
30 30.00 30.00
30 30 30
36.7
36.00 0.6
0.00 150.00 150.00 150.00 231.30 48.55 50.00 50.00 1.50 2.60
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 150.00 150.00 150.00 231.30 48.55 50.00 50.00 1.50 2.60
230.89 214.40 214.40 214.40 471.20 48.55 48.55 48.55 4.00 5.00
230.89 64.40 64.40 64.40 239.90 0.00 -1.45 -1.45 2.50 2.40
AVANCE FISICO DIARIO DE OBRA NOVIEMBRE- 2009
JORAMIENTO PISTA Y VEREDAS AV. JOSE OLAYA TRAMO: (JR. LOS ANGELES - AV. SAN AGUSTIN)
DESAGUE PLUVIAL
RELLENO Y COMPACTADO DE
CONSTRUCCION DE BUZON
CONSTRUCCION DE BUZON
TRANSPORTE P/ RELLENO
SELECCIÓN DE MATERIAL
H =1.70m
H =1.500m
EXCEDENTE)
P/RELLENO
ZANJA
02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.04.01 02.04.02 02.04.03 03.01.01 03.01.02
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
230.89 214.40 214.40 214.40 471.20 48.55 48.55 48.55 4.00 5.00
230.89 214.40 214.40 214.40 471.20 48.55 48.55 48.55 4.00 5.00
IEMBRE - 2009 AVANCE FISICO DIARIO DE OBRA DIC
VIAL DESA
CAJA RECEPTOR
CONSTRUC. DE
CONSTRUC. DE
CONCRETO F'C=
CONCRETO F'C=
PARTIDA
S-25 D=10"
S-25 D=12"
TENDIDO DE
TENDIDO DE
CONSTRUC.
SUMIDERO
140KG/CM²
140KG/CM²
DADOS DE
DADOS DE
S.M.yTAPA
H= 0.45m.
12/1/2009
12/2/2009
12/3/2009
12/4/2009
12/5/2009
12/6/2009
2.00 3.6 12/7/2009
12/8/2009
12/9/2009
12/10/2009
12/11/2009
12/12/2009
12/13/2009
69.6 12/14/2009
3.00 12/15/2009
1.00 12/16/2009
54.00 12/17/2009
12/18/2009
12/19/2009
12/20/2009
12/21/2009
3.00 12/22/2009
12/23/2009
12/24/2009
12/25/2009
12/26/2009
12/27/2009
73.30 12/28/2009
72.00 12/29/2009
3 12/30/2009
12/31/2009
7.00 0.00 2.00 0.00 0.00 275.50 EJECUTADO DEL MES 0.00
0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ANTERIOR 0.00
7.00 0.00 2.00 0.00 0.00 275.50 EJEC. ACUMULADO 0.00
18.00 1.00 5.00 6.00 6.00 395.00 PROGRAMADO 22.20
11.00 1.00 3.00 6.00 6.00 119.50 22.20
VIEMBRE- 2009 AVANCE FISICO DIARIO DE OBRA NO
)
VIAL DESA
CONSTRUC. ENCIMADO BUZON H=
PARTIDA
0.45m. S.M.yTAPA
140KG/CM²
140KG/CM²
S-25 D=12"
S-25 D=10"
03.01.03 03.02.01 03.02.02 03.03.01 03.03.02 04.01 FECHA 04.02
11/23/2009
11/24/2009
11/25/2009
11/26/2009
11/27/2009
11/28/2009
11/29/2009
11/30/2009
0.00 0.00 0.00 0.00 0.00 0.00 EJECUTADO DEL MES 0.00
0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ANTERIOR 0.00
0.00 0.00 0.00 0.00 0.00 0.00 EJEC. ACUMULADO 0.00
18.00 1.00 5.00 6.00 6.00 395.00 PROGRAMADO 22.20
18.00 1.00 5.00 6.00 6.00 395.00 22.20
DIARIO DE OBRA DICIEMBRE-2009
DESAGUE PLUVIAL
TUBERIA UPVC U/F
REJILLA DE CAJA
PRUEBA A ZANJA
COLOCACION DE
SUMINISTRO Y
ACCESORIOS
VENTANA DE
TENDIDO DE
S-25 D=8"
P/TUBERIA
SUMIDERO
0.70x0.80M
TAPADA
DESAGUE PLUVIAL
REJILLA DE CAJA
ACCESORIOS
P/TUBERIA
S-25 D=8"