SUN OIL AND NATURAL GAS

(SUN PETROCHEMICALS PVT. LTD.)

Daily Morning Meeting MOM-Hazira Operations


Document No. SunPetro/SONG/Guj/Hazira/O&M/MM/2018/R/0 Time: 10:00 to 10:30 hrs Date : 18th Jan 2018
S.
Department Points Discussed Action/Status
No.
1 HAZ 09 well to be kept under observation.
2 Operations to raise MSR for instrument air Compressor.
Operations 3 Glycol added to DPCU in accumulator.
4 Offshore water injection pump run for 2 hrs yesterday.
5 MOC raised for forced meter run, HAZOP ongoing.
6 ISO OSHA’s annual audit to be done.
7 FW pipeline shifted. Fabrication work planned for today.
8 OHCP updates review ongoing.
HSE
9 Anery fabrication work at yard ongoing side by side for fire water line.
10 For medical agreement, certain clauses and wording has to be changed.
11 Gardener to be arranged on priority.
Permanent Cable shifting near gate proposed to be clubbed with New gate civil
13
works.
14 Custody calibration completed.

Maintenance 15 MSR being raised for electrical for new instrument air compressor.
16 NG compressor recycle valve connectivity for instrumentation ongoing.
17 Offshore CO2 flooding system battery to be replaced.
18 Instrumentation work ongoing for new instrument air compressor.
GEB Bill for LBDP has been issued based on average reading since the meter is burnt.
19 RK Singh will visit today to discuss with GEB officials whether bill can be changed to
minimum amount only.
21 Routine activities ongoing.
22 RO tendering bid received.
23 Gas lifting compressor bid received.
24 Turbocharger TC sent yesterday.
25 Quotations received for 3616.
Others 26 IAC pipe fitting TC sent today.
27 Civil quotations received for IAC.
28 Charcoal filter quantity yet to be decided, procurement under hold for now.
29 Anery IAC TC will be sent today.
30 Quotation for Lab equipments has been received.