Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Page 1|8
DESCRIPTION
DISTRIBUTION
Original to: Copy to:
Contractor ☐ Employer ☐ Quantity Surveyor ☐ Architect’s File ☐ Other:
DESCRIPTION
PARTICULARS E VG G P ACTION DATE
Safety Officer
Competency of Site Safety Representative
First Aider
Availability of First Aider
At Deep Excavations
Safety Shoes
Page 1 of 22
DESCRIPTION
PARTICULARS E VG G P ACTION DATE
Goggles
Gloves
Ear Protection
Nose mask
Safety Harness
Housekeeping
to be
General Standard of Site Cleanliness All the times
maintained
Regularity of Debris Removal from Site
Excavations
Safety Barriers
At Deep Excavations
De-Nailing area
Power Connection
Fire Extinguishers
Heavy Equipment
Lifting Equipment
SIGNATURES
Received By: Date :
Page 3 of 22
HSE Audit Report
Audit Objective:
A review of ECC’s Health and Safety Management Systems and Environmental Management Systems was
conducted on 3rd of April 2017 in Mulberry Project at Park heights to determine the contractor’s level of HSE
performance measured against the criteria OHSAS 18001 and ISO 14001 standards.
Audit Scope
4.4.4 Documentation
The systems were assessed on the basis of information provided to the auditor by the contractor’s
representatives through documentation and personnel interviews, in addition to information available on the
post-contract documents.
The audit was conducted at Mulberry Phase 1 and 2. Although the auditor did not visit all of the departments,
the auditor has made the assumption that the activities observed and the information gathered from
personnel at the aforementioned audit areas are indicative of all disciplines.
For the objective of this audit, it should be noted that failure to address critical issues on immediate time frame
will lead to the issuance of a non-conformity.
I. Competency In-house and Third Party Trainings and certification for required various trades as stipulated in the
HSE Plan are conducted.
II. Standard fundamental welfare facilities are provided to ensure optimal well-being of the workers are catered.
i.e. Canteen, Toilets, Rest areas, Drinking Stations, etc.
III. Storage rooms are provided separately for MEP and Construction Materials and Equipment’s. Tools are
segregated as per their size, usage, source of power, Prevalence of use etc.
IV. Safety Inductions and Toolbox talks are conducted covering relevant HSE Topics in accordance to the site
activities and conditions.
V. Well established traffic access routes at site to warrant logistical efficiency.
VI. Provisions of lifting equipment’s in aid of eliminating common musculoskeletal disorders caused by manual
handling.
Part 2 – Observations
I. Documentation
a) Relevant internal and external Documents are not Identified and Maintained in mandatory places/locations
such as the HSE office. The referred documents are listed below but not limited to;
These documents must be reviewed and updated on regular intervals as defined in the documented
procedure with signature of the authorized personnel.
i. HSE Objectives are not established in the project (Clause 4.3.3 Objectives and Programs)
ii. It was found that PTW for Access to Working at Heights/Roofs and Electrical Works as required and
stipulated in the HSE plan is not implemented since project mobilization. (Clause 4.4.6 Operational
Control)
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 2|22
iii. No Certified Lifting Supervisor designated in the project in compliance to the requirement of HSE
plan. Consequently, Lifting Permits are not effectuated. (Refer to HSE plan, Item 5. Training, Clause
4.4.6 Operational Control)
iv. Lifting Operations – HSE Plan, Item 6.1; Crane Lifting Pre-Use Inspections are not carried out as per
required frequency. Clause 4.4.6 Operational Control)
v. Method Statements and Risk Assessments Registers are not reviewed, maintained and updated in
consideration of the actual site activities and conditions (Clause 4.3.1 Hazard Identification, Risk
Assessment, & Determining Controls)
vi. No objective evidence that Method Statements and Risk Assessments are communicated to the Site
Supervision team (Clause 4.3.1 Hazard Identification, Risk Assessment, & Determining Controls)
vii. Internal Audits are not performed on required frequency in contradictory to the established policy
(Clause 4.5.5 Internal Audit)
viii. Safety Advisory Notes are not carried out as necessary and communicated to the top management
representatives in the project. (Clause 4.5.3.2 Nonconformity, Corrective and Preventive Action)
ix. Training Matrix for the workforce is not projected and prepared. (Clause 4.2.2: Competency, Training
and Awareness)
x. Site Logistics Layout Plan is not updated to incorporate latest changes administered.
xi. List of all external providers (sub-contractors, suppliers) and evidence of pre-qualification scheme
implementation is not available (4.4.6 Operational Control, 4.5.1 Performance Measurement and
Monitoring)
xii. Evaluation of Performance of relevant parties, individuals, and controls is not exercised. (Clause
4.5.1 Performance Measurement and Monitoring)
xiii. Fire Drill has not been conducted since project mobilization (Clause 4.4.7 Emergency Preparedness
and Response
xiv. Close out of NCR’s have taken so much time that the locations where the NC have been observed
have progressed and altered.
xv. First Aid procedure doesn’t implement a regular inspection of the medical stock inventory as per DM
requirement.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 3|22
Isolate pedestrians from live traffic routes. Provide Barriers around to enclose perimeter of pedestrian access and egress.
Standard Signage’s to be displayed
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 4|22
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 5|22
Mechanical and Electrical powered machines need PAT or Fitness Certificates. Internal regular Inspection by
qualified expert must be done. Tag and Inspection log to be readily available.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 6|22
Saw dusts, wood wastage in the carpentry workshop must be disposed of immediately to eliminate fire
hazard.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 7|22
Electrical Distribution Panels and Generator sets must be regularly inspected. Inspection log to be filled up as
required by appointed qualified electrician. Barrication must be provided to avoid adverse collisions.
Earthling must cable must be provided.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 8|22
Chemical Spillage, improper stacking and open lids are evident in the chemical storage room. Temperature
is not maintained due to AC not working. Identify where the key is held and the authorized personnel for
access. Indicate in the store where the eye washing area is located.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 9|22
Portable hand held devices are not inspected by a qualified and trained expert on regular frequency
Damaged Equipment’s are not labeled and segregated in the storage room.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 10|22
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 11|22
Fire Emergency Access Route and Fire Fighting location layout must be displayed in the store bulletin.
Provision for Emergency lights must be provided for both MEP and Civil Storage romms.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 12|22
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 13|22
Waste Segregation Area – Cast blinding on substrate to prevent waste from contact with ground. Install Solid
partitions to eliminate waste contamination.
Edge protection and Ladders used as access should be tied to rigid structure with 1 to 4 angle and
overlapping 1m from landing point.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 14|22
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 15|22
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 16|22
Diesel tank bund wall opening as evident in the picture voids the whole purpose of bunding. Bund
walls must be impervious as per DM Technical Guideline 3 - Bunding of Storage Tanks and Transfer
Facilities. Remove all materials inside the bunding i.e electrical equipment which can be
considered as ignition source.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 17|22
Improper Stacking of materials at site makes logistics operation unsafe and inefficient. Workers who operate
near the area have difficulty of access.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 – MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 – SAFETY AUDIT REPORT No. 16
16.03.2017Rev 00/ Page 18|22
Operative working on an incomplete scaffold. Suggestion: Use mobile aluminum scaffold with castor wheels.
All fiberglass water tanks have unsafe working platform and access. Erect a proper scaffolding structure.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates