Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Primavera P6
Installation Instructions
For Windows 10 Users
The following is provided for your convenience only. Ten Six Consulting do not
offer technical support for the installation process of P6 Professional. If you are
experiencing difficulties downloading or installing Primavera P6 Professional
evaluation software, please contact Oracle.
https://edelivery.oracle.com/
See the Ten Six instructions for downloading the correct media files from Oracle
at the following URL:
https://tensix.com/wp-content/uploads/2015/08/Downloading-Primavera-P6-Professional-
Revision-3.0.pdf
3. Click the Extract All tab to extract the Primavera P6 Professional installation files.
5. Click Extract.
7. The P6 installation files will be in a folder named P6_Pro_152. For example, if you chose to
extract it to your downloads directory it would be located in a folder like the following:
C:\Users\username\Downloads\V77752-01\P6_Pro_152
You have now unzipped the Primavera P6 Professional installation files and can proceed to the next
steps that show you how to install the program.
2. Select the Open option from the menu. You can also double-click to start the installer.
3. Depending on your UAC (User Account Control) setting, you may be prompted to allow the
program to make changes to your system. Click Yes to allow.
Note: to find the UAC settings in Windows 10, do a search in the Settings dialog for UAC.
The installer may also prompt you to install certain prerequisite programs on your machine.
These include Java, the DHTML Editing Component and Microsoft .NET Framework 4 (x86 and
x64). If prompted, allow the installer to proceed with these installations.
4. When the main Primavera P6 Professional R15.2 Setup Wizard dialog appears, click Next>.
5. Click Install.
6. If you do not already have Java on your machine, you will be prompted to install it. Click Install.
8. After all other necessary prerequisites are installed, the Primavera P6 Installation will start. Click
Next.
9. In the Choose Setup Type dialog, click the Typical button. You are going to perform a
standalone installation.
10. In the Ready to install Primavera P6 Professional dialog, click the Install button.
12. When prompted to Configure P6 Professional Standalone Connection, select the ‘Add a new
standalone database and connection’ option.
16. In the next you will need to confirm the location of the SQLite database and make sure you also
check the Load Sample Data option.
17. In the Sample Data dialog, check the option to load the sample data as part of your P6
installation.
Training Note: If you are loading this in order to participate in a Ten Six online or
on-site training class, the sample data must be loaded.
18. Click Next.
We also recommend that you Right-click on the P6 Professional R15.2 (x64) menu item and Pin it to your
Start menu or Taskbar. This will make the program easier to access in the future.
Now run the application to be sure the installation has worked correctly. To do so click on the P6
Professional R15.2 (x64) menu item in the Start menu or Taskbar.
When prompted, add your login name (admin) and the admin password you specified during
installation.
Upon the first login, you will be prompted to set the appropriate industry for your organization. You will
need to make this change in the Admin Preferences area of P6 Professional as show in the following
figures.
In the ‘Admin Preferences’ dialog, click on the ‘Industry’ tab and select your desired industry sector
option.
This will determine the terminology and default settings P6 uses for subsequent sessions.
Training Note: If you are participating in a Ten Six Primavera P6 Professional online or on-site training
class, please select the ‘Engineering and Construction’ option.