Sl. excluding 13.615% Blasting Toal Cost per
Description of Metal Source of Supply Lead in Kms Initial cost crushing
No contractors profit & charges Cum
charges
OH charges
Quarry in Km 69/400
1 150 mm IRC Soling stone of EGKRoad 100.00 998.11 95.00 70.00 - 1163.11
7 25 mm SS-5 HBG M/C metal -- do -- 100.00 998.11 994.00 70.00 248.50 2310.61
8 20 mm SS-5 HBG M/C metal -- do -- 100.00 998.11 1036.00 70.00 259.00 2363.11
9 12 mm SS-5 HBG M/C metal -- do -- 100.00 998.11 822.00 70.00 205.50 2095.61
10 10 mm SS-5 HBG M/C metal -- do -- 100.00 998.11 692.00 70.00 173.00 1933.11
11 6 mm SS-5 HBG M/C metal -- do -- 100.00 998.11 532.00 70.00 133.00 1733.11
Quarry in Km 1/2 of
12 Sand for Mortor PS Road 100.00 998.11 165.00 1163.11
-- do --
13 Sand for Concrete 100.00 998.11 95.00 - - 1093.11
-- do --
14 Sand for filling 100.00 998.11 95.00 - - 1093.11
Quarry in Km 42/100
15 Gravel of E-J Road 16.00 195.92 103.00 - - 298.92
Conveyance charges
Machine
Sl. excluding 13.615% Blasting Toal Cost per
Description of Metal Source of Supply Lead in Kms Initial cost crushing
No contractors profit & charges Cum
charges
OH charges
G.O.Rt No.207 of
16 HYSD Steel TR&B dated 04- - - - 37500.00
07-2017
17 6mm MS Rods - - - 38000.00
18 Mild Steel - - - 40000.00
19 Structural Steel - - - 40000.00
20 Cement - - - 5000.00
Note :- Seigniorage charges adopted as per GO Ms.No.100 Industries & Commerce Dept
Dt.31-10-2015.
Name of the work: WIDENING AND STRENGTHENING OF PEDENA-
NIZVID-VISANNAPETA ROAD FROM KM 7/000 TO
KM 58/920 KM KRISHNA DISTRICT, AP (PHASE1B0
PACKAGE-PNV-08)
Sl.
Description of item No. L B D Quantity Unit Rate
No
1 2 3 4 5 6 7 8 9
(3.142/12*(7.85^2+6.14^2+7.85*6.14)*1.7)+3.14
2/4*6.14^2*0.6
Bulb Quantity (3.142*8/6*((8*8)/8)+((8/6)^2/6)) 2 33.81 67.62
Piers P1 1 37.98 37.98
(3.142/12*(5.85^2+4.6^2+5.85*4.6)*1.3)+3.142/4
*4.6^2*0.6
Bulb Quantity (3.142*6/6*((6*6)/8)+((6/6)^2/6)) 1 14.31 14.31
286.78
say 287.00 Cum 8802.00
Height up to 5m
Bed blocks over Piers(Hammer head 1 9.250 2.500 0.750 17.34
(9.28+2.5)/2 =5.875 1 5.875 2.500 0.750 11.02
Pier (3.142/4*2.5^2) 1 4.909 1.191 5.85
34.21 cum
Say 35.00 cum 9629.39
14 Vibrated reinforced cement concrete M 35 grade using 20mm &
10mm HBG crushed stone aggregate (Coarse aggregate
conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and
labour charges, centering, machine mixing, laying, vibrating,
curing etc., including other incidental hire and operational charges
of all T&P as per approved drawings and as directed during
execution but excluding cost of steel and its fabrication charges
for Bearing Pedestal.
Height upto 5 m
T-BEAM GIRDER SLABS 2 116.93 233.86
233.86
say 234.00 Cum 9682.20
Well curb for Abutments & Piers 1 74.14 72.00 Kg/cum 5.34
Well steining Piers & Abutments 1 484.75 13.00 Kg/cum 6.30
Well Cap for Pier 1 42.39 80.00 Kg/cum 3.39
Well Cap for Abutment 1 150.72 80.00 Kg/cum 12.06
27.09
say 27.10 MT 52812.00
Hammer head bed blocks over piers 1 34.21 100.00 Kg/cum 3.42
Bearing pedastals 1 0.91 100.00 Kg/cum 0.09
Abutments 1 87.32 80.00 Kg/cum 6.99
Pier 1 34.21 80.00 Kg/cum 2.74
13.23
say 13.30 MT 52812.00
23 Providing HYSD bars (Fe-415) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of
steel to site and all labour charges for fabrication of reinforcement
including cutting, bending, binding rods, tying grills, placing them
in position etc., complete including cost and conveyance of
binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete
for all R.C.C items for finished item of work as per standard
drawings, for Super structure of R.C.C items including 5%
wastage
143993.64
7191.32
646947.00
726165.00
4695867.00
2526174.00
2974723.92
334476.00
1878346.80
110904.00
258776.00
36968.00
36968.00
36968.00
36968.00
7393.60
55452.00
129388.00
18484.00
18484.00
18484.00
18484.00
10351.04
852033.6
337028.65
9629.20
76800
2265634.80
52688.00
74623.32
174279.60
251737.20
1431205.20
702399.60
2503288.80
40049.1
17586.42
37760.58
68919.66
207023.04
18128
26758.08
1200.14
23876731.00
1193836.55
230875.00
200000.00
100000.00
100000.00
127169.25
25828611.80
N.W:- WIDENING AND STRENGTHENING OF PEDENA-NIZVID-VISANNAPETA ROAD FROM KM 7/000 TO KM 58/920 KM KRISHNA DISTRICT, AP
(PHASE1B0 PACKAGE-PNV-08)
Seignorage Charges
a) Earth/ Gravel = 1024.00 x 30.00 Cum = 30720.00
b) Sand = 1867.85 x 50.00 Cum = 93392.61
b) Metal = 1403.30 x 75.00 Cum = 105247.82
d) Stone = 20.20 x 75.00 Cum = 1515.00
Rs 230875.43
Say Rs 230875.00
HNA DISTRICT, AP
GENERAL ABSTRACT
1 Cost of Bridge Proper (2V of 18.40 M eff span) without foot 25828612
paths - Bridge at Km 48.67
Total $25,828,612