SERVICE LIFE – DURABILITY OF CONCRETE STRUCTURE
The nominal service life of new structures is equal to the initiation period.
Continuous penetration of water / humidity in concrete is “hidden” during initiation
phase
Damage
Collapse 4
Cracking 2
Depassivation 1
Time
8
THE MOST IMPORTANT RULES IN WATERPROOFING
Project requirements
Conceptual design
Select the appropriate system
for each case Tender and Detailed Design
9
DURABILITY / RELIABILITY IN RELATION TO WATER HEAD
Double layer PVC or FPO
high
vacuum system
PVC or FPO membrane compartment
system with integrated control and
injection back-up
Durability – Reliability
mean
Watertight
Pre-applied fully bondedconcrete system
(high quality concrete, detailing, application)
membranes
BitumenLoose
Bitumen 1-layer 2-layerlaid PVC, TPO, EPDM
Torch-on
Torch-on membranes membranes
membranes High quality
without coatings (PU,
compartments)
low
Bitumen PUA...)
Bentonite Membranes
Self-adhesive
membranes
Bituminous
coatings
very low
Cement renders
Certification
Plastics
welding by temperature
Compatible Incompatible
with bitumen with bitumen PE-LLD PE-VLD
Significant lab test for plastic membranes
Membrane thickness
watertable 0.00m seepage water
1.50mm
Membrane thickness
1.50mm
10.00m dept
Membrane thickness
water pressure
2.00mm to membrane
20.00m depth
Membrane thickness
3.00mm
Sikaplan® Membranes are approved and certified
according to:
Geotextile 100g/m²
Protection screed,
Compacted subgrade
Compartment System of Waterproofing
Control/injection-pipes
Sika® Waterbar
How Compartment Systems Work
Shotcrete layer, or
concrete, one side formworked Waterproofing membrane
fixed at retaining wall
Driven steel profiles Driven steel beams with
concrete elements Open cut
Temporary fixing
Permenant fixing
Typical detail between raft and wall
temporary fixing
Secant Pile
Shotcrete
Fixing disc
Compacted subgrade
Typical detail at construction joint at raft
SikaFuko VT1
Protection screed 50mm
Compacted subgrade
- No ingress of water
to the construction
- Sealing of adjacent
imperfections also possible
Injection hose systems
Typical expansion joint detail at raft
Waterproofing membrane
Compacted soil
Fixing disc
R.C. wall
Sika Injectoflex System, type HPM
Protection Protection
panel(i.e.concrete,mortar) Protection panel(i.e.concrete,mortar)
Protection layer:geotextile panel(i.e.concrete,mortar) Protection layer:geotextile
approx.350g/m² Flashing:profiled metal sheet,fixed approx.350g/m²
Waterproofing:Sikaplan with screws Waterproofing and
waterproofing membrane,hot air Protection layer:geotextile flashing:Sikaplan waterproofing
welded at Sika Waterbar approx.350g/m² membrane,hot air welded at Sika-
Sika Waterbar(type AR) Waterproofing:Sikaplan waterproofing Trocal PVC-coated metal profile
Reinforced concrete membrane Sika Backing Rope and Sikaflex
Sika Backing Rope and Sikaflex sealant
sealant Reinforced concrete
Reinforced concrete
Membrane Termination
Compression pile head detail
Sika Waterbar Sikadur 42 PC
Sikaplan WP
Sikacrete 114
Tension pile head detail
Sika® WT Tape (TPO) and Sika Dilatec Tape
(PVC-P)
1.00 m
1.00 m
Accessories
Geotextile protection layers: PVC-P waterbars:
01/99STI QC01.doc
QUALITY CONTROL
Annex 2
Quality control of Sika-Trocal waterproofing works: Inspection of substrate
Project:................................................ Main contractor:................................... Membrane installer: ................................
............................................................. Sub contractor:.................................... ...................................................................
Part / Lot: ........................................... Kind of substrate Condition of substrate
Inspection Weather Surface of Remarks Substrate Measurements Signatures
conditions, air substrate complies to for
Plastering
Brickwork
Shotcrete
Concrete
temperature conditions: dry, requirement refurbishment
Others
Gunite
Mortar
clean, humid, and cleaning
Wood
Date Time yes no Resisdent Membr.
Steel
wet, ponding engineer installer
water, ice
01/99STI QC02.doc
QUALITY CONTROL
Annex 3
Quality control of Sika-Trocal waterproofing works: WORK REPORT
Project:................................................ Begin of works:.............................................. Membrane installer:..............................................
............................................................. Completion of works:..................................... Name of responsible supervisor:..........................
Part / project-lot:................................ Install. area: Kind and type of applied product
Installation Climate Substrate Slabs, walls, Protect. Waterpr. Protect. Sliding Compart Control- Others Remarks
works conditions: conditions: dry, penetrations, layer layer layer layer ment: and i.e.
(air temp. humid. wet, clean, niches, alcoves, injection- fixings
Date Hours weather) ponding water etc. pipe
01/99STI QC03.doc
QUALITY CONTROL
Annex 4
Quality control of Sika-Trocal waterproofing works: EXTERNAL WORK REPORT
Project:................................................ Begin of works:.............................................. Contractor:............................................................
............................................................. Completion of works:..................................... Name of responsible side engineer:.....................
Part / project-lot:................................ Area of installed waterproofing: Remarks: Signature
of side-
engineer
Installation Names of Substrate Membrane quality of slabs, walls, Quality of welded
works membrane conditions: dry, penetrations, niches, alcoves, etc. seams:
installer team wet, clean,
Date Hours ponding water
01/99STI QC04.doc
Thermal welding of membranes with hot air
welding machine
(TRIAC PID / TRIAC S)
400°C
a
Thermal welding of membranes with hot air
welding machine
pressure Parameters:
roller -temperature
-pressure
hot air -welding-speed
a = 30-45
a
Testing of welded seams
Vacuum testing of watertightness of welded seams
-Vacuum bell
-Vacuum pump
-Vacuum -0.8 bar for 10
minutes with closed
pump
-Soap solution
Double wedge welding machine
(Leister Twinny S/T)
³30 mm
Welding speed:
approx. 2 m/min.*
Welding temperature:
400°C - 450°C*
* welding test with specimen is required
Section view of a combi-wedge welding machine
Air Pressure Test For Double Seam Weld
Welding of Waterbar AR type on installed membrane
for compartments (Leister Triac Drive)
Quality control of completed waterproofing works
WELDING WELDING TECHNIQUE QUALITY CONTROL
METHOD OF WELDED SEAMS
SINGLE SEAM Manual welding -visual (search for capillaries and voids)
-visual with screw driver
-visual with vacuum bell
-tensile shear test of specimen
(membrane should fail beside the seam)
Automatic welding -visual (search for capillaries and voids)
-heat welding by hot air -visual with screw driver
-hot wedge -visual with vacuum bell
-tensile shear test of specimen
DOUBLE SEAM Automatic welding -visual (search for capillaries and voids)
-heat welding by hot air -tensile shear test of specimen
-hot wedge -compressed air in testing channel
(2 bar over 10 minutes:
pressure loss < 20%)
QC Video
PRACTICAL APPLICATION
Application: Jewel of the Creek
Application: Dammam Underpass
Application: Dammam Underpass
Application: Dammam Underpass
Application: Khobar Underpass
Application: Khobar Underpass
Application: CMA Towers- Riyadh
Application: CMA Towers- Riyadh
Application: CMA Towers- Riyadh
Application: Galleria Mall- Jeddah
Application: Galleria Mall- Jeddah
Application: Galleria Mall- Jeddah
Application: Galleria Mall- Jeddah
Application: The University Hospital
Application: The Gate District Towers
Application: The Gate District Towers
Application: VCU Project - Doha
Application: Doha Convention Center
Application: Doha Convention Center
Application: Doha Convention Centre
Application: Doha Convention Center
Application: Doha Convention Centre
Application: Golden Mile
Project: The Business Village
The Business Village
Project: SHAMS ABU DHABI
Central Park / Dubai
Project: Emirates Financial Towers
Emirates Financial Towers
REFERENCE PROJECTS
Reference projects in the GCC
2010 Al- Jasra & Al-Baraha Towers Sikaplan WP1100- 25,000m2 BMC, Qatar
20HL2
2010 WCMCQ Tunnel – Sidra Medical and Sikaplan WP1100- 15,000m2 CRE-TEC, Qatar
Research Center 20HL
2010 Lusail Transit System LRT Sikaplan WP1100- 170,000m2 BMC, Qatar
22HL
2010 Barwa Financial District Sikaplan WP1100- 80,000m2 BMC, Qatar
20HL2
Reference projects in the GCC
2006 Hafr El Baten WTB, KSA Sikaplan 9.6 15,000m2 MBM, KSA
2006 Basement Khubar Villas, Khubar,KSA Sikaplan 9.6 2,000m2 BMC, KSA
2008 Capital Tower,Basement waterproofing, Sikaplan WP1100- 12,000m2 MAK, Kuwait
Kuwait 20HL
2008 Sitra Underpass, Sitra, Bahrain Sikaplan WP1100- 11,000m2 Honesty, Bahrain
20HL
2009 VCU Sikaplan WP1100- 5,000m2 BMC, Qatar
20HL
2009 Doha Convention Center & Tower Sikaplan WP1100- 150,000m2 BMC, Qatar
20HL2
Reference projects in the GCC
District Cooling Plant Saqer Contracting Arif & Bin Toak 7,000 m 2 Dubai − UAE
The Platinum Tower Al Shafar Transport DAR Consultant 5,500 m 2 Dubai − UAE
Bay Square Al Shafar General Khatib & Alami 65,000 m 2 Dubai − UAE
Contracting
Reference projects in the GCC
The Bay Gate Al Nekhrah Contracting Witby and Bird 18,000 m 2 Dubai − UAE
Golden Mile 1/2 Al Shafar General LC/DSA 100,000 m 2 Palm Island – Dubai
Contracting
Majestic Tower TAV CAB 5,000 m 2 Sharjah – UAE
Zayed Sport City Tunnel Mabani Parsons 20,000 m 2 Abu Dhabi – UAE
Reference projects in the UAE
Danet Abu Dhabi Saif Bin Darwish Ewan 8,000 m 2 Abu Dhabi – UAE
Gate District Towers ACC Khatib & Alami 150,000 m 2 Abu Dhabi – UAE
ISTPI Project Al Kharafi National ILF Consultant 3,500 m 2 Abu Dhabi – UAE
Ghobbash Offices Belhasa Contracting Badri & Bin Souda 7,000 m 2 Dubai − UAE
Rihan Heights Silver Coast / Sunway ARKAN 55,000 m 2 Abu Dhabi – UAE
3B+G+44 Commercial
Al Shafar National Arkiplan 16,000 m 2 Dubai − UAE
Tower
Dubawi Island Resort Laing O’Rourke GHD 11,000 m 2 Palm Island – Dubai
Mixed Use
Saif Bin Darwish Al Burj 40,000 m 2 Abu Dhabi – UAE
Development
Hospital University Laing O’Rourke GHD 45,000 m 2 Dubai − UAE
Meena Plaza Zelan Tamouh 40,000 m 2 Abu Dhabi – UAE
THANK YOU FOR YOUR ATTENTION