Purpose : Explanation of different types of SAP projects .

1. SAP Implementation Project. :

Company wants to implement SAP Module( Ex :HCM/MM/SD/FI/CO etc) for the first time. In
implementation projects consultant from various modules do configuration based on company
requirements. Role of consultants are configuration, integration of several modules, Data migration from
Legacy system to SAP system, prepare interfaces/RFC's to interact with sap/3rd party systems,testings,
document preparation, end user training etc Methodology suggests by SAP for implementation is ASAP.

There are 5 stages in the ASAP methodology

1. Project Initial Preparation

2. Business Blueprint - Preparation of AS-IS and TO BE documents , MoM , workshops....

3. Realization - complete configuration settings in backend

4. Final Preparation- Unit testing, integration testing, UAT and end user training

5. Golive And Support: data migrations

2. SAP Support Project.

After implementation of SAP modules customer/business need assistance of consultants in their day to
day business operations using SAP software. The end user raises their concerns, issues, errors etc
through a ticket handling tool. A ticket handing tool is must for a support project, it helps to track the
status of tickets. Basically there is no phase in it. Roles of a consultant Accept /Acknowledge the tickets,
analysis the issue, document it , solve, provide solutions to client, Get confirmation from the user & close
the ticket.

Change request and service request is the main roles in support projects.

There is a different tools to update the tickets like SM7, USD or ticket tools and so on.

3. SAP Roll-Out Project.

Company has upgraded/implemented SAP HR & wants to rollout country specific changes in different
countries.
4. SAP Up gradation Project.

Customers are moving from the older versions to new versions. It is called as SAP Migration Projects.

Example: Company migrating from older versions like 4.5,4.6b, 4.6c to ECC 5.0 / ECC 6.0 . SAP HR EHP3
to SAP HR EHP 5.

TESTING METHODS IN SAP PROJECTS:

1. Development Unit Testing This is done by developer .Unit test is executed in development system. This
tests alone pieces of functionality.

For example, you have configured the absence quotas, special absences(maternity leave or military
leaves) , custom pcrs or FMLA in development system, you don’t know whether the output is coming
correct or not , for that you have to login another client in same development system , do the copy from
client by using transaction code SCC1 ,here you have to give your transport request and execute ,
whatever you have configured in main system all objects are copied to testing client, Now hire the
employee , run the time level and test the output .

2. Security Testing Security testing ensures the SAP security roles and authorization roles provided based
on the requirements. Test IDs will be created of different job roles and used to both confirm what a user
can do and what a user cannot do. The tester will perform both Positive and Negative testing of the of
job roles that are assigned to user test ids.

3. Integration Testing In a multiple plat form environment integration testing is mandatory .All integrated
areas need to test by a tester. It is testing of SAP transactions (for example, Hr is integrated with Sales
and distribution (creation of order and raise a invoice for billable resources, HR is integrated with
Controlling or Project system, you need to test all accordingly.

4. Parallel testing during parallel testing all the existing data in the legacy system will transfer to SAP
system & perform same process in both systems. A successful Parallel test shows identical results when
both the legacy system and new system results are compared. Tester will run the programs / transaction
repeatedly in both systems, resolve issues with the help of other team if any issues, continue perform
tests till gets the identical results in both. Example: Parallel payroll process. Run payrolls in SAP & legacy
system for 2-3 months & analyze the payroll results

5. User Acceptance Testing (UAT) User Acceptance testing is conducted in by a group of business end
users to validate that the new developed SAP system meets all requirements. During User acceptance
testing the system end users separately execute test cases & find out the results are as expected. The
test team will guide the UAT team in their testing activities. UAT will ensure that the system is acceptable
from the user’s perspective, performing as per the requirement & if the users are satisfied they provide a
sign off.