Closed Cooling System Check List

CUSTOMER : Taken by:

SYSTEM : Date:

S Y S T E M D A T A - for average cooling tower load


Package F=25,819 L ,Package H=71,209.71 L
System volume m3

Recirculation m3/h
Delta T=9 °C
Delta T (inlet & outlet) °C PPPP

Operating hours h/a Operating hours/day Operating days/year

Construction materials tick off C-steel

Water lost m3/h

Make up m3/h
MAKE UP and SYSTEM WATER ANALYSIS
unit MAKE UP SYSTEM WATER
<3000
Conductivity µS/cm
8.5 TO 10.5
pH -Value

Water Temp. Maximum °C

Total Hardness ppm


<100
Ca -Hardness ppm
<250
Alkalinity (m-Value) ppm
<150
Chloride Cl ppm

Phosphate PO4 ppm

Sulfate SO4 ppm

OPERATING SUPPLIES
water supply mixing rate COST value

soft / decarbon. / demi % content /m3

well water / tap water % content /m3

waste water/blow down /m3


applied chemicals dosage value COST value

Product ppm /kg

Product ppm /kg

Biocid ppm /kg

ppm /kg

Acid ppm /kg


Bold and Italics printed data is absolut necessary for complete calculation model !