Sei sulla pagina 1di 4

Sr. No.

Name Of Items
1 Excavation of foundation
2 Filling of earth under floor
3 Brick ballast
4 Brick Work
5 D.P.C 1:2:4.
6 Brick work in super structure
7 shetering (steel&roof filling)
8 roof plaster
9 walls plaster
10 column,beam,balcony etc
11 sand filling
12 Brick ballast
13 laying rain water down pipe
14 p.c.c 1:2:4 (2''thick)
15 tile,chips,marble etc
16 stairs
17 Providng/laying marbel pat
18 Providng/fixing steel windows with grill and wire gauze
19 providing and fixing steel chowkat of door
20 providing and fixing wooden(ply) leaf of door
21 door,window
22 4''brick work
23 whitewash on inside and outside
24 Paint on doors and windows
25 railing
26 lentel
27 floor casting
28 marble labour
29 cement
30 bricks(special)
31 bricks(A class)
32 bricks(B class)
33 bricks(c class)
34 sand
35 clay
36 crush
37 aluminium windows
38 safety grill
39 marble,granite
40 china virona
41 badal
42 flower
43 tile(maximum)
44 tile(minimum)
45 plywood door
46 lasani door
47 diyar door
48 iron window
49 paint(almensian)
50 paint(weather sheet)
51 tiles(various variety)
52 marbles
53 granite
54 master plumbing pipe25mm
55 master plumbing pipe40mm
56 p-trap
57 bathroom accessories(maximum)
58 bathroom accessories(minimum)
59 water set
60 vanity set
61 commode
62 basin,sink
63 kitchen(box,front doot front elevation
ü A+ GRADE 5 MARLA CONTRACTOR RATE WITH MATERIALS (1700
ü A GRADE 5 MARLA CONTRACTOR RATE WITH MATERIALS (1500P
ü B GRADE 5 MARLA CONTRACTOR RATE WITH MATERIALS (1300P
ü C GRADE 5 MARLA CONTRACTOR RATE WITH MATERIALS (1200P
ü A GRADE 5 MARLA CONTRACTOR RATE WITHOUT MATERIALS (1
ü B GRADE 5 MARLA CONTRACTOR RATE WITHOUT MATERIALS (1
ü C GRADE 5 MARLA CONTRACTOR RATE WITHOUT MATERIALS (1
Unit Of Rates Rates
cu.ft. 5/-
cu. Ft. 3/-
s.ft 5/-
s.ft 18-20/-
rft. 10/-
sft. 22-23/-
s.ft 20-30/-
s.ft 13/-
sft. 11-12/-
sft. 25-30/-
cft. 5/-
cft 5/-
per rft. 120/-
sft. 8-10/-
sft. 16-18/-
per step 300-400/-
per sft. 6/-
per sft. 500/-
per sft. 150/-
per sft. 200/-
sft. 25-30/-
sft. 16-18/-
sft. 350/-
sft. 800/-
rft. 950/-
ft 30/-
sft. 10-15/-
sft. 15-20/-
per bag 520/-
per trolly 25000/-
per trolly 20000/-
per trolly 15000/-
per trolly 10000/-
per trolly 2000/-
per trolly 1500/-
cft 340/-
sft. 400/-
sft. 80/-
ft 400/-
ft 250/-
ft 35/-
ft 50/-
per meter 35000/-
per meter 600/-
sft. 160/-
sft. 250-300/-
sft. 300-500/-
sft. 1500/-
per box 750-1500/-
per box 2000-3000/-
per meter 900-5000/-
per ft 20-150/-
per ft 350-600/-
13ft 300-400/-
13ft 1000-2000/-
per piece 500/-
3000-4000/-
1000-1500/-
per piece 10000-12000/-
per piece 3500-5000/-
per piece 8000-12000/-
per piece 1400-5000/-
sft. 120-200/-
OR RATE WITH MATERIALS (1700Pkr/SQFT)
R RATE WITH MATERIALS (1500Pkr/SQFT)
R RATE WITH MATERIALS (1300Pkr/SQFT)
R RATE WITH MATERIALS (1200Pkr/SQFT)
R RATE WITHOUT MATERIALS (180-200Pkr/SQFT)
R RATE WITHOUT MATERIALS (160-180Pkr/SQFT)
R RATE WITHOUT MATERIALS (140-160)Pkr/SQFT)