Installation Period 28.

89 days 2% 11/19/2017 8:00


Boiler 14.33 days 10% 11/28/2017 8:00
Foundation 4 days 0% 11/29/2017 8:00
Plinth (Multstruct) 4 days 0% 11/29/2017 8:00
Roof work 3 days 100% 11/28/2017 8:00
roof working and clading 3 days 100% 11/28/2017 8:00
Assembleling 9.44 days 0% 12/3/2017 13:00
Lift in place 4.44 days 0% 12/3/2017 13:00
Move and assemble componets 4 days 0% 12/3/2017 13:00
Steam pipes prefabrication 7 days 0% 12/3/2017 13:00
Steam pipe Installation 4 days 0% 12/8/2017 8:00
Electrical installatiom cable and panels 3 days 0% 12/9/2017 9:00
Pressure Testing the steam lines 1 day 0% 12/13/2017 8:00
Precommission of boiler 0 days 0% 12/14/2017 9:00
Allow precommissining of Boiler 0 days 0% 12/14/2017 9:00
WITHERING 28.89 days 0% 11/19/2017 8:00
Un Staff the Containers 11 days 0% 11/19/2017 8:00
un saff the 11 containers at njombe kabambe factory 11 days 0% 11/19/2017 8:00
Move 4 Cointeiners from Logoda to Njombe Factory 7 days 0% 11/19/2017 8:00
Unstaff the 4 Containers 4 days 0% 11/26/2017 8:00
Dis assembleling the equipment in Lugoda and transport to 9.89 days? 0% 11/19/2017 8:00
Dis assemlble of CTC,CFU,ROTERVANE and DRIER 7 days 0% 11/19/2017 8:00
Move the Items to Njombe Factory 0.89 days? 0% 11/26/2017 16:00
Off loading the items ffrom Lugoda 2 days 0% 11/27/2017 16:00
Group and sort parts 9.78 days 0% 11/20/2017 8:00
Group and sort all parts as per equipment 9.78 days 0% 11/20/2017 8:00
Assemle the Equipments 24.44 days 0% 11/24/2017 8:00
assemble the Conveyors 4 days 0% 11/24/2017 8:00
Assemble the CPW both Line 9 days 0% 11/27/2017 8:00
Welding of Mezzananie platform on CPW 3 days 0% 12/8/2017 8:00
Assemble of CCW Single line 9 days 0% 12/11/2017 11:00
Installation of steam lines to the equipment 7 days 0% 12/8/2017 8:00
Cable Tray and electrical installation 11 days 0% 12/3/2017 8:00
Bulk offloading installation 8 days 0% 12/3/2017 8:00
Sifters installation 2 days 0% 12/3/2017 8:00
Converyors installation 7 days 0% 12/5/2017 10:00
Completion and Pre-hand over of withering 0 days 0% 12/15/2017 16:00
precamission and handover 0 days 0% 12/15/2017 16:00

POWER 14 days 0% 11/30/2017 8:00


Transformer 11.67 days 0% 11/30/2017 8:00
Plith Casting 2 days 0% 11/30/2017 8:00
Place Transformer to foundation 3 days 0% 12/3/2017 8:00
Connect HT cable 3 days 0% 12/6/2017 11:00
Connect LV cable 3 days 0% 12/9/2017 15:00
Power Room 10 days 0% 11/30/2017 8:00
Instalation of panels 3 days 0% 11/30/2017 8:00
Wiring and connection 7 days 0% 12/3/2017 11:00
Generator Set 4 days 0% 12/11/2017 10:00
Lift the Generator to its place 2 days 0% 12/11/2017 10:00
Connect to the main control panel 2 days 0% 12/13/2017 13:00
Completion and Pre-hand over 0 days 0% 12/15/2017 15:00
precamission and handover 0 days 0% 12/15/2017 15:00
12/21/2017 12:00
12/14/2017 9:00
12/3/2017 12:00
12/3/2017 12:00
12/1/2017 11:00
12/1/2017 11:00
12/14/2017 9:00
12/8/2017 12:00
12/7/2017 17:00
12/11/2017 11:00
12/12/2017 12:00
12/12/2017 12:00
12/14/2017 9:00
12/14/2017 9:00
12/14/2017 9:00
12/21/2017 12:00
12/1/2017 11:00
12/1/2017 11:00
11/26/2017 16:00
11/30/2017 12:00
11/30/2017 9:00
11/26/2017 16:00
11/27/2017 16:00
11/30/2017 9:00
11/30/2017 17:00
11/30/2017 17:00
12/21/2017 12:00
11/28/2017 12:00
12/7/2017 9:00
12/11/2017 11:00
12/21/2017 12:00
12/15/2017 16:00
12/15/2017 11:00
12/11/2017 17:00
12/5/2017 10:00
12/13/2017 9:00
12/15/2017 16:00
12/15/2017 16:00

12/15/2017 15:00
12/13/2017 9:00
12/2/2017 10:00
12/6/2017 11:00
12/9/2017 15:00
12/13/2017 9:00
12/11/2017 10:00
12/3/2017 11:00
12/11/2017 10:00
12/15/2017 15:00
12/13/2017 12:00
12/15/2017 15:00
12/15/2017 15:00
12/15/2017 15:00