Sei sulla pagina 1di 20

Logo Cliente / Customer logo CP / PC

BO1001
BO1000
BO1002
Proyecto / Project:

Termoeléctrica del Sur, Warnes & Entre Ríos


Código contenido / Contents Code
Responsable / Responsible Party
61810
DCC Doc. Class. Code.

Suministrador / Supplier MEC102


TSK
Código de Documento Siemens / Siemens Document Number: Index/ Rev Version
01 -
BO1001-61810-MEC102-449051946

Código de documento Suministrador / Supplier Document Number Número de página Format


Page Number

000570-00-TUB-ET-0021 1/20 A4
Título del documento / Document Title: Unid

SPECIAL PIECES AND WELDING REQUIREMENTS 449051946


Manejo / Handling
Restricted
AL: ECCN:
Export Control Classification
N N

Cambios / Changes:

01 2017-03-15 RAG RMG CSM ESV detail


- 2016-12-21 RAG RMG CSM First Issue
Date Prepared by Reviewed by Approved by Remarks
Rev.
Fecha Realizado Revisado Aprobado Comentarios

© This document must not be copied or disclosed to third parties without TSK consent.
Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 2/20

TABLE OF CONTENTS:

1 INTRODUCTION ..................................................................................................3

1.1 GENERAL PROJECT DESCRIPTION.................................................................................... 3

1.2 PURPOSE................................................................................................................................ 3

1.3 CONFIDENTIALITY................................................................................................................. 3

1.4 RESPONSIBILITIES AND ALTERNATIVES .......................................................................... 4

2 SCOPE OF SUPPLY............................................................................................5

2.1 GENERAL CONSIDERATIONS .............................................................................................. 5

2.2 EQUIPMENTS AND COMPONENTS...................................................................................... 6

2.3 SERVICES ............................................................................................................................... 6

2.4 DEVIATIONS FROM THE SPECIFICATION .......................................................................... 7

3 CODES, STANDARDS AND REFERENCE DOCUMENTATION........................8

3.1 APPLICABLE STANDARDS................................................................................................... 8

3.2 REFERENCE DRAWINGS, SPECIFICATIONS AND DOCUMENTS .................................... 9

3.3 OTHER CONSIDERATIONS ................................................................................................. 10

4 TECHNICAL REQUIREMENTS .........................................................................11

4.1 TRANSITION PIECES ........................................................................................................... 11

4.2 WELDING REQUIREMENTS ................................................................................................ 14

5 INSPECTIONS AND TESTS. .............................................................................17

6 QUALITY REQUIREMENTS ..............................................................................18

6.1 QUALITY CONTROL PLAN.................................................................................................. 18

6.2 INFORMATION TO BE PROVIDED WITH THE OFFER ...................................................... 19

6.3 INFORMATION AFTER THE CONTRACT ........................................................................... 19

7 PROJECT CONTROL AND DOCUMENTATION ..............................................20

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 3/20

1 INTRODUCTION

1.1 GENERAL PROJECT DESCRIPTION


The Consortium formed by Siemens and TSK has been selected to execute, under EPC modality, three (3)
Thermoelectric Power Plants in Bolivia:

- Termoeléctrica de Warnes, that will be located near Warnes (Santa Cruz), and will consist on Two (2)
blocks of Combined Cycle Power Plants on 2x1 configuration + Two (2) blocks of Steam Tailing
Power Plants on 2x1 configuration, all of them based on a Wet Cooling Technology shall be left out
in the transformer specification.

- Termoeléctrica del Sur, that will be located near Yaguacua (Yacuiba), and will consist on Two (2) blocks
of Combined Cycle Power Plants on 2x1 configuration + Two (2) blocks of Steam Tailing Power
Plants on 2x1 configuration, all of them based on a Dry Cooling Technology shall be left out in the
transformer specification.

- Termoeléctrica de Entre Ríos, that will be located near Entre Ríos (Cochabamba), and will consist on
Three (3) blocks of Combined Cycle Power Plants on 2x1 configuration, all of them based on a Wet
Cooling Technology shall be left out in the transformer specification.

1.2 PURPOSE
The purpose of this document is:

 To specify the requirements for transicion pieces in changes of material specification, as could be
Terminal Points.

 To specify the requirements for the design, manufacturing, cleaning, painting, shop testing, delivery,
transport including insurance of special pieces needed on site.

 To Specify special erection requirements to take into account during the project.

1.3 CONFIDENTIALITY
Any document exchanged, whether in digital format or on paper, (including this specification) shall be kept in
strict confidentiality by the VENDOR. It is strictly forbidden to extract or reproduce any part of said documents.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 4/20

1.4 RESPONSIBILITIES AND ALTERNATIVES


VENDOR shall be responsible not only for fulfilment of the requirements specified herein, but also for the design,
adequate selection of materials and, when apply, an appropriate manufacture, erection, commissioning and
tests for a safe and reliable operation in accordance with the legally applicable codes, standards and
requirements at European, Bolivian, regional and local level, as well as with the specifications and associated
documentation.

The VENDOR, based on its experience and provided it guarantees the functional requirements established in
the Technical Specification, may submit an alternative offer that improves the competitiveness of the Supply.

Should say alternatives modify the requirements, the deviation from the baseline shall be quantified and duly
supported.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 5/20

2 SCOPE OF SUPPLY

2.1 GENERAL CONSIDERATIONS


The complete supply of the equipment within the battery limits defined in the project is required.

The scope shall include the execution and supply by the VENDOR of all the work, materials or services in
general, including those not expressly indicated in the text but necessary for the proper operation of the facility’s
equipment and systems. The VENDOR shall supply all components or services required for the satisfactory
operation of the facility, without any additional cost for the Buyer. The VENDOR shall take care that the scope
of supply includes all the components necessary for a proper and safe operation.

All the items of equipment shall be new and shall incorporate state-of-the-art technology in its area that has
been duly tested in similar uses (no prototypes shall be accepted).

The Supply shall comply with the terms and conditions figuring in this Technical Specification relating to
operational requirements, design and construction criteria, guarantees and delivery times. All the requirements
or recommendations commonly established for the design, material selection, manufacture, inspections, tests,
preparation for shipment and commissioning of this type of equipment and facilities shall be observed in
accordance with good practice and are included in the VENDOR’s scope.

The Tender shall include and quote all the works, materials and services in general that are not expressly
mentioned in the text, but that are necessary for the proper operation of the facility.

In case of contradiction among the various requirements included in this technical specification (and annexes),
the other contractual technical specification and/or the applicable standards or regulations, the one to be applied
is the most restrictive one, the one which gives better performance or benefit to the Purchaser. In any case, the
Purchaser reserves the right to decide which of the different requirements are to be fulfilled. In case of
contradiction, only the purchaser by a written statement is able to decide which is the compulsory requirement
to be finally applied.

The supply shall follow the local region and Bolivian laws, regulations or instructions by the authorities whenever
deemed to do so, specially those related to Health, Safety and Environment. When there is not any explicit
Directive the Codes and Standards listed in the Technical Specification shall be applied. The Contractor shall
provide any document or certification requested by the authorities related to these requirements.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 6/20

2.2 EQUIPMENTS AND COMPONENTS


The components are:

- Transition Pieces HP Steam (Terminal Point NEM-TSK TP1301, 1302 & 1303 )

- Transition Pieces LP Steam (Terminal Point NEM-TSK TP5301, 5302 & 5303)

- Transition Pieces Auxiliary Steam (P91 to P11).

- Concentric reducers 12”x10” P22 HP Steam (Terminal Point SIE-TSK TPS001).

2.3 SERVICES
In base of the differents tasks described in this specification, the services could be:

Material Supply

In case of material supply:

- Engineering, including calculation and detail drawings.

- Manufacturing.

- Material Certificates 3.1

- Testing.

- NDT.

- Verification of requirements.

- Quality assurance.

- Contractual documentation in base of BO1001-61810-MEC102-448219644 Technical specification of


carbon steel pipes and accessories; and/or BO1001-61810-MEC102-448219651 Technical
specification of alloy pipes and accessories.

Erection on site and/or pieces manufacturing:

Follow the erection/welding requirements indicated in this specification.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 7/20

2.4 DEVIATIONS FROM THE SPECIFICATION


In accordance with the provisions figuring in Section 1.4, the VENDOR may propose deviations to the Technical
Specification. Such deviations shall be expressly identified, justified and accepted in writing by the Buyer.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 8/20

3 CODES, STANDARDS AND REFERENCE DOCUMENTATION

3.1 APPLICABLE STANDARDS


As a general rule, the latest versions of the industrial standards shall be followed. They shall be applied provided
that they do not contradict legally binding local regulations. Nevertheless, they can be replaced by other
equivalent international standards of recognized prestige. In this case, the VENDOR shall inform the Buyer and
the latter reserves the right to include said additional requirements.

The design, materials, manufacture, construction, tests, cleaning, coating, packaging, etc. of all equipment and
components included in the scope of this document shall comply with the applicable standards, published by
the standardization associations listed below. Should there be any discrepancy between the standards; the most
stringent criterion shall always be applied.

 ASME B31.1 Power Piping

 ASME B16.25 Buttwelding Ends.

 ASME IX Welding and Brazing Qualifications

 ASME V Nondestructive Examination

The last edition of the standard in force on the date that the NTP agreement shall apply. Should there be any
discrepancy between the standards and this specification, or between sections of this specification, the
VENDOR shall inform the Buyer in order to settle it.

Should there be any conflict, it shall be reported and the most stringent criterion selected, unless otherwise
expressly indicated by the Buyer.

The VENDOR shall be responsible to be well informed about the codes and standards referenced above. Should
any change or modification to the equipment be required in order to comply with the standards, it shall be to the
account of the VENDOR.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 9/20

3.2 REFERENCE DRAWINGS, SPECIFICATIONS AND DOCUMENTS

 BO1001-61810-MEC102-448219644 Technical Specification of Carbon Steel Pipes and Accessories.

 BO1001-61810-MEC102-448219651 Technical Specification of Alloy Pipes and Accessories.

 BO1001-11630-MEC102- 448000006 PIPING DESIGN CRITERIA

 BO1001-21110-MEC102-447999707 PAINTING TECHNICAL SPECIFICATION

 BO1001-61810-MEC102-448000105 Piping Class. SUR

 BO1000-61810-MEC102-448223184 Piping Class. WARNES

 BO1002-61810-MEC102-448223207 Piping Class. ENTRE RÍOS.

 BO1002-00LB-MFB103-448000037 P&ID for Steam and By Pass system. SUR.

 BO1002-00LB-MFB103-448222644 P&ID for Steam and By Pass system. WARNES.

 BO1002-00LB-MFB103-448422556 P&ID for Steam and By Pass system. ENTRE RÍOS.

 BO1001-00LB-MPB111-448000358 LINE LIST MAIN STEAM AND BYPASS SUR

 BO1000-00LB-MPB111- 448222811 LINE LIST MAIN STEAM AND BYPASS WARNES

 BO1002-00LB-MPB111- 448422808 LINE LIST MAIN STEAM AND BYPASS ENTRE RÍOS

 BO1001-10MA-MMA106-448409359 INTERFACE LIST STEAM TURBINE. SUR.

 BO1000-10MA-MMA106-448411963 INTERFACE LIST STEAM TURBINE. WARNES

 BO1002-10MA-MMA106-CODE PTE INTERFACE LIST STEAM TURBINE. ENTRE RÍOS

 BO1001-HA-MMA020-504027541 TERMINAL POINT LIST HRSG. SUR, WARNES, ENTRE


RÍOS

 BO1001-10MAA-MTB101-448445111_-_HP ESV DRAWING.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 10/20

3.3 OTHER CONSIDERATIONS


The following criteria shall be considered for this project:

 Language: English.

 Engineering Units: International System of Units (SI)

 Pipe diameter: Inch (“)

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 11/20

4 TECHNICAL REQUIREMENTS

4.1 TRANSITION PIECES


The inside diameters of piping components to be butt welded shall be aligned as accurately as is practicable
within existing commercial tolerances on diameters, wall thicknesses, and out-of-roundness according to
chapter 5 (ASME B31.1).

When the internal misalignment exceeds 1/in. (2.0 mm), it is preferred that the component with the wall extending
internally, be internally trimmed (see Figure 1). However, trimming shall result in a piping component thickness
not less than the minimum design thickness, and the change in contour shall not exceed 30 deg (Figure 1). In
adittion the bevels shall be satisfied the ASME B16.25 requirements.

Figure 1: Butt Welding of Piping Components with Internal Misalignment.

Pieces

HP Steam LBA20 BR005 (TP NEM-TSK TP1301, 1302 & 1303).

NEM Side: 8”sch 120 P22

TSK Side: 8” Sch 80 P91

In order to fulfil with the below requirements, in HP Steam TP´s is necessary a transition piece (8” Sch120 P91)
between NEM piping (8”sch 120 P22) and TSK piping (8” Sch 80 P91), when this requirements:

- Length: 300mm

- Diameter: 8” Sch120

- Other considerations:

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 12/20

 Trimmed 2,5mm (internal diameter according to fig.1) in side 8”sch 80 P91.

 Transition piece and first piping spool shall be welded in the workshop.

Transition Piece
tri

8” Sch 120 P22 8” Sch 120 P91 8” Sch 80 P91

Trimmed

Figure 2: Detail arrangement HP Steam transition piece

LP Steam LBA90 BR010 (TP NEM-TSK TP5301, 5302 & 5303).

NEM Side: 10”sch STD A-106GrB

TSK Side: 10” Sch 20 A-106GrB

In order to fulfil with the below requirements, in LP Steam TP´s is necessary a transition piece (10” Sch STD A-
106) between NEM piping (10”sch STD A-106) and TSK piping (10” Sch 20 A-106), when this requirements:

- Length: 300mm

- Diameter: 10” Sch STD

- Other considerations:

 Trimmed 2,5mm (internal diameter according to fig.1) in side 10” Sch 20 A-106.

 Transition piece and first spool shall be welded in the workshop.

Transition Piece
tri

10” Sch STD A106 10” Sch STD A106


10” Sch 20 A106

Trimmed

Figure 3: Detail arrangement LP Steam transition piece

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 13/20
Auxiliary Steam (P91 to P11)

E1D (P91) Side: 2 1/2”sch 80 (Downstream to TPS077)

B1D (P11) Side: 2 1/2” Sch 40

In order to avoid any damage in P11 (See below Special requirements for Gr.91 to Gr 11) , in Auxiliary Steam
is necessary a transition piece when this requirements:

- Length: 300mm

- Diameter: 2 1/2” Sch 40

- Material: SA 335 P22

Concentric reducer 12”x10” P22 HP Steam. (TP S001)

Siemens Valve (ESV): 10” Sch 160 G17CrMoV510.

TSK Side: 12” Sch 80 P91

In order to avoid any damage in valve material, in TP is necessary a reducer transition piece (12” x 10”) between
Siemens valve and TSK piping, when this requirements:

- Length: 203mm ( an other length shall be justified).

- Material: ASTM A234 WP22

- Schedule: Variable thickness (side TSK Sch 80 & side Siemens Sch 160) according to figure 5.

- The end preparations between pipe and reducer shall be satisfied the ASME B31.1 (127.3 Preparation
for Welding) and ASME B16.25 requirements.

- 12” Sch 80 P91 10” Sch 160 G17CrMoV510


-
-
-
-
- Figure 4: Detail arrangement HP Steam concentric reducer

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 14/20

- Figure 5: Welding end transition detail of ESV valve.

4.2 WELDING REQUIREMENTS


Welding electrodes and filler metal, including consumable inserts, shall conform to the requirements of the
ASME Boiler and Pressure Vessel Code, Section II, Part C. An electrode or filler metal not conforming to the
above may be used provided the WPS and the welders and welding operators who will follow the WPS have
been qualified as required by ASME Section IX. (QW404.12 “Requirements of filler metal classification).

Piping systems shall be constructed in accordance with the requirements of ASME B31.1 chapter V, para. 127.2.

These requirements apply to all fabrication, assembly, and erection operations, whether performed in a shop or
at a construction site.

The approval of this material shall be provided by the Contractor (PQR/WPS). Generally the A - number shall
be used for procedure qualification see QW442.

Storage and drying of welding consumables shall be temperature and humidity controlled. The instructions and
recommendations of the consumable supplier shall be considered. A procedure for handling of consumables
shall be provided.

Requirements for dissimilar metal welds:

 For P91 to Stainless steel piping, using a Ni-based electrode (suggestion of Siemens): ERNiCr-3 such
as Böhler Nibas 70/20-IG for GTAW using Argon shielding gas.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 15/20

 For carbon steel to stainless steel welded connections <=350°C (design temperature), a 309-Filler as
minimum shall be considered (Siemens suggestion) based on an approved PQR incl. proof of
resistance against corrosion.

 For carbon steel to stainless steel welded connections >350°C (design temperature), a Ni-base
electrode shall be considered, based on an approved PQR incl. proof of resistance against corrosion.

Special requirements for Gr.91/92:

 All welding consumables and flux shall be handled according to the suppliers recommendations.
SMAW-electrodes shall be used only out of a heated quiver (≥80°C) or from vacuum packs. Vacuum
packs shall be marked with the date and time of opening. Re-drying of electrodes is only allowed
once.

 If the flux handling gives reason to doubt in the effective moisture control the approval for SAW can be
withdrawn by Siemens immediately.

 Welding consumables shall be ordered with specific material test reports (EN 10204-3.1 or ISO
10474) at least for the chemical composition and shall be ordered from a minimum number of heats
for one project. The chemical composition shall show all significant elements, incl. [Ni] and [Mn] to
determine a safe upper limit for the PWHT-temperature. The lower limit for the AC1- temperature as
guaranteed by the manufacturer of the welding consumable shall be taken into account. Alternatively
the lower limit shall be estimated from the specific chemical composition of the welding consumable.

Special requirements for Gr.91 to Gr 11:

 In order to avoid any damage in P11 (with a critical temperature of 1430ºF/775ºC) when it is weld to
P91 due carbon migration and P91 PWHT temperature, it is recommended to use a intermediate
piece (pup piece) of P22.

Material ASME P- Design Limit T Minimun Critical T. PWHT


Grade Number
Farenheit Celcius Farenheit Celcius Farenheit Celcius

P11 P-No.4 1100 595 1430 775 1200-1300 650-700

P22 P-No.5A 1200 650 1480 805 1300-1400 700-760

P91 P-No.15E 1200 650 1525 830 1350-1425 730-775

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 16/20
In that case, a P22 piece of 300mm length between P11 and P91, welding directly P22 to P91 with a
electrode type B3.

Other solution (buttering P91 with a electrode type B2, before weld P91 to P11) should be approve in
written by BUYER.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 17/20

5 INSPECTIONS AND TESTS.


 See Technical Specification BO1001-61810-MEC102-448219644 TECHNICAL SPECIFICATION OF
CARBON STEEL PIPES AND ACCESSORIES for additional requirements, manufacture, supply,
inspection, testing, transport, packaging and insurance.

 See Technical Specification BO1001-61810-MEC102-448219651 TECHNICAL SPECIFICATION OF


ALLOY PIPES AND ACCESSORIES for additional requirements, manufacture, supply, inspection,
testing, transport, packaging and insurance.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 18/20

6 QUALITY REQUIREMENTS
The product covered by this specification shall comply with the requirements figuring in said specification and
with those imposed by the operating conditions. Furthermore, it shall also comply with international best practice
of recognized prestige.

For this purpose, the VENDOR shall apply and document a quality system as per ISO 9001. The scope of this
system shall cover all the products, systems and services connected with the contract and, consequently, the
VENDOR shall be responsible of its application throughout the chain of subcontractors.

Furthermore, the VENDOR shall prepare and deliver an Inspection Points Program for the Supply, a
Manufacture and Quality Procedure and a Final Quality Control Report.

Purchaser reserves the right to verify and assess the application of the quality system defined, including that of
its subcontractors, at any time during the life of the contract. This right extends to the final customer and their
authorized representatives.

Should there be any deviation in the application of the quality system that entails any doubt or evidence regarding
product quality, the Purchaser reserves the right to carry out verifications or tests additional to those initially
scheduled either at the VENDOR’s premises or at those of its subcontractors.

Acceptance by the Purchaser of any document or activity associated with the product does not exempt the
VENDOR from its obligation to supply and install a product fully compliant with the specification and the service
conditions and requirements.

6.1 QUALITY CONTROL PLAN


Within a period not exceeding three (3) weeks from the NTP, the Contractor shall submit to the Purchaser, the
Project Quality Plan that shall define all processes to be done during the project, quality structure, document
control, etc; and additionally the Inspection and Test Plan which is applicable to the equipment manufacture.
This program shall include the detailed testings and their schedule.

Purchaser's inspectors and/or representatives shall verify the progress of the work by means of visits to
Contractor's premises. They shall verify that work is on schedule and that material and/or equipment is being
manufactured in accordance with the technical specifications, codes, standards and procedures detailed on the
purchase order and attachments thereto.

After contract award, the detailed list of tests must form the basis of an inspection test program from which
Purchaser will select tests to be witnessed by Purchaser's representatives. Tests must be recorded by issuing

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 19/20
tests certificates stating all significant test parameters. Test certificates are to be dispatched promptly to
Purchaser after test completion.

Witness and approval of tests by Purchaser's representatives will not relieve Contractor of any contractual
liabilities or responsibilities.

6.2 INFORMATION TO BE PROVIDED WITH THE OFFER


In case of material supply, check:

 BO1001-61810-MEC102-448219644 TECHNICAL SPECIFICATION OF CARBON STEEL PIPES


AND ACCESSORIES

 BO1001-61810-MEC102-448219651 TECHNICAL SPECIFICATION OF ALLOY PIPES AND


ACCESSORIES

6.3 INFORMATION AFTER THE CONTRACT


In case of material supply, check:

 BO1001-61810-MEC102-448219644 TECHNICAL SPECIFICATION OF CARBON STEEL PIPES


AND ACCESSORIES

 BO1001-61810-MEC102-448219651 TECHNICAL SPECIFICATION OF ALLOY PIPES AND


ACCESSORIES.

Project: Bolivia Combined Cycles Power Plants


Projectcode Document Title:
BO1001
BO1000
SPECIAL PIECES AND WELDING REQUIREMENTS
BO1002

Logo Originator Document Number Prep. By Checked by

RAG RMG
BO1001-61810-MEC102-449051946
Revision Page Number

01 20/20

7 PROJECT CONTROL AND DOCUMENTATION


 See Technical Specification BO1001-61810-MEC102-448219644 TECHNICAL SPECIFICATION OF
CARBON STEEL PIPES AND ACCESSORIES for documentation requirements (documentation
provided before and after NTP and Final Dossier).

 See Technical Specification BO1001-61810-MEC102-448219651 TECHNICAL SPECIFICATION OF


ALLOY PIPES AND ACCESSORIES for documentation requirements (documentation provided before
and after NTP and Final Dossier).

Project: Bolivia Combined Cycles Power Plants