JHA fo r PIPE WORK

Hazards analysis and precautio ns


ACTIVITY BASED RISK ASSESSMENT FOR PIPE WORK
Maurel& Prom Ref.: GR-HSE-FRM-011

HSE Forms Rev.: 0 of 30/12/2014

Job Safety Analysis Page 1 of 7


Facility: Mnazi Bay MB3 Date: 09-01-2015 Pages: 7
Leader: LUO Participants :LUO,SUN,LIN,ZHANG,LU,KANG
Description of work: Pipe work at MB3
Initial risk Residual risk Completion
# Task Hazards / Risks / Scenario Action taken to limit danger Action by: Target date
S P E S P E date
-Prior to any activity on work site, set up
wind direction indicator and watchman.
-Check all safety means are available on
site.
-Set trash bins at worksite.
-Fire or explosion
-Provide banks man to guide the vehicle
-Traffic accident. Supervisor,
Mobilization when poor access or reverse driving.
-Collision between vehicles. - Safety Supervisor,
1 (machinery equipment) 4 3 T -Organize circulation .segregate vehicles 4 1 A
Collision with pedestrians - vehicle driver
and pedestrians activities when
Damages to M&P installations
reasonably possible.
-Falling of goods during
-Put barricades to protect critical
transportation.
installations (well head)
-Driver to check and make sure all goods
are loaded and secured properly
Post relevant safety signs.
Poor Weather - Rain - Site Supervisor to instruct all men to Site Supervisor,
2 3 2 T 3 1 A
Condition - Personal injury stop work and take shelter. Safety Supervisor.
-Driver has to ensure the materials
stacking properly onto the trailer / on the
ground.
-Falling object
Lifting Crew,
Materials loading and -Injury to workers, body
3 3 3 T -Only competent person to rig the 3 1 A Driver.
unloading on trailer injuries, fractures, sprains
materials & equipment. Safety Supervisor
dislocations
-designated responsible for the
coordination of offloading/loading
activities.

-Equipment and tools shall be checked


and are in good condition prior to
working.
-All staff must wear proper PPE during
work.
-Post relevant safety signs and warning
tape.
-Construction specification must be
followed strictly.
-Personal injury by polisher, -Welder and polisher must use welding
Fit-up the pipe and pipe, welding machine mask. Safety Supervisor
4 4 3 T 4 1 A
welding -Fire or explosion -Fire-extinguisher must be put near the Site Supervisor
welding area.
-Flashback must be put for the oxygen
and acetylene cylinder.
-A shelter must be used for the welding
machine.
-The distance between oxygen and
acetylene cylinder should be more than
5m,and 10m from the welding area.
-Provide guardian to guide the welding
area.
-Get valid Excavation permit,
mandatory prior to start excavation
work.
-Designated watchman during Request M&P to
-hit buried network excavation. issue excavation
Pedestrian hit by excavator -Design with safety tape a safety area clearance and
5 Trench Excavation 4 3 T 4 1 A
Fall into excavations around the excavator. PTW.
(mechanical or hand) Safety Supervisor
Injuries by hand tools. -Nobody allowed in the safety area of
the excavator, except the watchman. Site Supervisor
-Organize hand excavation if more than
one people is in the trench.
-Set up safety fence along the excavation.
-Equipment and tools shall be checked
and are in good condition prior to
working.
-Operation instruction shall be carried
out severely, three rules are not allowed
to against (command against
- Pipes rolling down rules/operation against rules/labor
-Personal injury/pipe damage discipline against rules),and to ensure Lifting Crew,
-Landslide that crane operator and rigger are M&P
Laying of pipeline to certificated qualified to do the job.
-Personal injury by representative
6 the pipe trench. 4 3 T -Lifting must be completed prior to 4 1 A
equipment, vehicles. Driver.
work, lifting is not permit to work in the Safety Supervisor
-Vehicles/crane overturn
adverse weather.
-Object and equipment Site Supervisor
-All staff must wear proper PPE during
damage
work.
-Post relevant safety signs and warning
tape.
-Construction specification must be
followed strictly.
-Ensure that no unauthorized people
enter the lifting area
-Equipment and tools shall be checked
and are in good condition prior to
working.
-Always operate the crane with out-
riggers and load repartition plates.
-Operation instruction shall be carried
out severely, three rules are not allowed
to against (command against
-Collision between vehicles rules/operation against rules/labor
-Personal injury by discipline against rules),and to ensure
Lifting Crew,
equipment, vehicles. that crane operator and rigger are
Lifting of pipeline to the Driver.
7 -Vehicles/crane overturn 4 3 T certificated qualified to do the job. 4 1 A
pipe rack Safety Supervisor
-Object and equipment -Lifting must be completed prior to
Site Supervisor
damage work, lifting is not permit to work in the
adverse weather.
-All staff must wear proper PPE during
work.
-Post relevant safety signs and warning
tape.
-Construction specification must be
followed strictly.
-Ensure that no unauthorized people
enter the lifting area
-Equipment and tools shall be checked
and are in good condition prior to
working.
-All staff must wear proper PPE during
work.
-Post relevant safety signs and warning
tape.
-Construction specification must be
followed strictly.
-Personal injury by polisher, -Welder and polisher must use welding
Fit-up the pipe and pipe, welding machine mask. Site Supervisor,
8 4 3 T 4 1 A
welding -Fire or explosion -Fire-extinguisher must be put near the Safety Supervisor.
welding area.
-Flashback must be put for the oxygen
and acetylene cylinder.
-A shelter must be used for the welding
machine.
-The distance between oxygen and
acetylene cylinder should be more than
5m,and 10m from the welding area.
-Provide guardian to guide the welding
area.
-Design safety area-around excavator
Trench backfilling - Machinery injury working range.
Site Supervisor,
9 (excavator, shovels, - Personal injury Damages to 3 3 T -Only the designated bandsman inside 3 1 A
whacker plate) installation the safety area of the excavator. Safety Supervisor.
-Hand tools in good condition.

- Check and Cleaning. Site Supervisor,


- Pollution
10 Demobilization 2 2 A -Continue to pay attention. 2 1 A
Trips hazards Safety Supervisor.
- Recovery.
Risk analysis validation: Name Position: Date: Name/Sign Ops Name/Sign Supervisor