A survey on Lean Construction Techniques for In­house
Building, Drain and Road Works at the City Council of
Port Louis
Dear Respondent, 

This questionnaire survey is prepared in regards to my Msc Research Dissertation at the University of 
Mauritius. The goal of this research is to identify construction wastes processes, evaluate "The Last 
Planner System and Just in Time Delivery" Lean Techniques and use the findings to improve in­house 
project performance for drains, building and road works at the CCPL. 

 
The questionnaire will obtain your views on planning, construction, procurement stages, types of waste 
processes, barriers to lean, effectiveness of lean strategies, benefits of lean concepts and compulsory 
critical success factors for improved In­house project works.

 
I shall be highly grateful if you could please spare at least 10 mins to complete the questionnaire and 
learn more about Lean Techniques. There is no correct or incorrect answer to the questions. All your 
responses will be confidential and served only for academic purposes. If ever you have any queries, 
please feel free to email me on arshadmohanut07@gmail.com. Thank you very much for your time and 
participation.

 
Regards, 
Mr Mohanut Arshad 
MSc Project Management 
University of Mauritius 

* Required

SECTION 1:
1. 1. In which sector do you currently work? *
Mark only one oval.

 Public
 Private
 Parastatal
 Other

2. 2. What type of job do you perform? *
Mark only one oval.

 Technical / Engineering
 Accounting /Finance
 Management / Procurement
 Higher Administration
 Other

3. 3. Are you familiar with Municipal Infrastructural Building, Drain and Road works? *
Mark only one oval.

 Yes
 No
 Maybe

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 1/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
4. 4. According to you, please rate the performance of the following CCPL In­house projects
works: *
Mark only one oval per row.

Very Poor Below Average Average Good Excellent


Drain works
Building works
Road works

5. 5. Please select the items you believe mostly affect planning stages of In­house projects works:
*
(More than 1 choice possible)
Check all that apply.

 Unrealistic Expectations
 Poorly defined Master Schedule
 Incorrect Resource Allocation
 Ambiguous Contingency Plans
 Lack of Risk Assessment

6. 6. Constructions stages of CCPL In­house projects are usually affected by the waste processes
listed below, please rank them in order of importance: *
1­ Not Important, 5­ Most Important
Mark only one oval per row.

1 2 3 4 5
Delayed Material Transportation
Overproduction of materials
Poor Inventory Management
High waiting time for machinery
(Idle)
Excessive Movement of Workers
Reworking of designs (Over
processing)
Construction Defects (Poor
Worksmanship)

7. 7. Do you agree that increasing waste processes will result in poor project performance and
major cost overruns for poorly executed projects? *
Mark only one oval.

1 2 3 4 5

Strongly Disagree Strongly Agree

SECTION 2 : Last Planner System (LPS) Lean Concept
(Methodology meant to improve project performance through effective planning using Master Schedule, Pull 
Schedule, Look Ahead Plan, Constraints Exercises and Weekly Percentage Completed Plans.

8. 8. Do you think that the Last Planner System could be applied in the following project delivery
stages? *
Mark only one oval per row.

Yes No Maybe
Procurement
Planning
Construction

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 2/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
9. 9. On a scale of 1 to 5, how effective will it be, for the CCPL Administration to create planning
teams (planners) and empower them to implement lean techniques in planning and
construction stages of in­house projects works? *
Mark only one oval.

1 2 3 4 5

Least Effective Most Effective

10. 10. Please specify, whether the following LPS tools if introduced by the planners will improve
the planning of In­House projects: *
1­ Strongly Disagree, 5 ­ Strongly Agree
Mark only one oval per row.

1 2 3 4 5
A Master Schedule (Detailed
phases with duration)
A Phase Pull Schedule
(Breakdown of tasks from Master
Schedule)
A 4 week Look Ahead Plan
(Planning work activities from
Phase Pull Schedule)
A Constraint Analysis Exercise
(Gathering required resources prior
start of planned activities)
Weekly Percentage Promises
Completed Plans (Check for labor
productivity)

11. 11. On a scale of 1 to 5, please specify how important Constraint Analysis is compared to Look
Ahead Plan? *
Mark only one oval.

1 2 3 4 5

Not Important Very Important

12. 12. According to you, which of the following barriers LPS can encounter during its
implementation phase? *
More than 1 choice possible
Check all that apply.

 Lack of Training for Planning Teams
 Language and Culture Issues
 Resistance of front line workers
 Weak communication and transparency among employees
 Lengthy approval process by CCPL Administration

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 3/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
13. 13. Please specify, how effective the advantages of LPS tools would be in improving project
performance in the long run: *
1­ Least Effective, 5­ Most Effective
Mark only one oval per row.

1 2 3 4 5
Flexible Work Planning that
integrates material delays,
variations and lengthy approvals
Scheduling of Back Log Work
(Pending) activities to meet
Master Schedule Phases on time
Efficient resource allocation and
work decisions during Constraint
Analysis Exercises
Weekly monitoring of Foremen's
Productivity through PPC Charts

14. 14. Do you agree that site foremen having low scores on Percentage Promise Completed Charts
should justify their work productivity in daily meetings? *
PPC = quantity of works effectively accomplished over total quantity of works initially planned
Mark only one oval.

 Yes
 No

SECTION 3: Just in Time Delivery (JIT) Lean Concept
"Supply and transport of quality materials in right quantities, in time for production on the actual day of 
use."

15. 15. Do you think that the concept of Just In Time Delivery could be applied in the following in
house project stages? *
Mark only one oval per row.

Yes No Maybe
Procurement
Design
Construction

16. 16. Please specify if you agree that departments undertaking in­house project works should
effectively plan their material schedule well in advance, include it in the Look Ahead Plan and
submit a copy to the procurement section for just in time delivery? *
Mark only one oval.

1 2 3 4 5

Strongly Disagree Strongly Agree

17. 17. According to you, what are the causes of material delays during the procurement stage? *
More than 1 choice possible
Check all that apply.

 Lack of Funding
 Unavailability of materials in Local Market
 Unclear material specifications
 Lengthy tender selection exercises

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 4/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
18. 18. According to you, what are the causes of material and equipment delays during the
construction stage? *
More than 1 choice possible
Check all that apply.

 Delayed transportation (Congested Roads)
 Non operational equipment (Lengthy Maintenance)
 Late Delivery by Main Supplier
 Thefts by 3rd Parties
 Delayed procurement stage

19. 19. Please specify, whether the following JIT lean strategies if introduced by planners will
improve the execution of In­House projects: *
1­ Strongly Disagree, 5­ Strongly Agree
Mark only one oval per row.

1 2 3 4 5
Compulsory quantity take off
sheets prior material requisition to
control wastage
Hiring of Quality Controllers to
ensure quality assurance on sites
Use of Restricted Tender Bidding
by procurement for rapid allocation
of material supply contracts
Healthy supplier Relationship for
flexible material delivery periods

20. 20. Please rank the barriers to the implementation of JIT Lean concepts at the CCPL in order of
importance: *
1­ Not Important, 5 ­ Most Important
Mark only one oval per row.

1 2 3 4 5
Resistance from Employees
Delays in Procurement approvals
Absence of quality controllers on
sites
Poor Education on JIT Lean
Concepts
Poor commitment from suppliers

21. 21. Using the scale below, please specify the importance of Quality Materials with respect to
Work Planning: *
Mark only one oval.

1 2 3 4 5

Not Important Very Important

22. 22. Using the scale below, please state the importance of good Resource Leveling in improving
the performance of in­house projects: *
(A technique that balances resource demand and supply for site activities based on availability)
Mark only one oval.

1 2 3 4 5

Not Important Very Important

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 5/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
23. 23. Please specify, how effective the advantages of JIT Lean concepts would be in improving In­
House project performance for the long run: *
1­ Least Effective, 5­ Most Effective.
Mark only one oval per row.

1 2 3 4 5
Decreased Inventory Costs
Smooth and uninterrupted work
flow
Elimination of waste processes on
sites
Improved Material Supply Chain
Management
Enhanced Quality Infrastructural
Development
Reduction in material & equipment
delivery lead times

24. 24. Would it be justified for the planning team to use the "PDCA" concept to monitor, analyse,
compare and re­evaluate LPS and JIT lean findings in a bid to promote continual improvement
within the projects? *
PDCA: Plan Do Check Act
Mark only one oval.

1 2 3 4 5

Strongly Disagree Strongly Agree

25. 25. Which of the following critical success factors you believe are compulsory in implementing
LPS and JIT concepts at the CCPL? *
More than 1 choice possible
Mark only one oval.

 Top Management Support
 Measurable project performance indicators
 Measurable long term cost savings after implementation
 Commitment of Front Line Workers

26. 26. According to you, how long will it take for the Lean Concepts to be fully integrated in the
planning and construction stages of in­house projects at the CCPL? *
Mark only one oval.

 Less than 1 year
 Between 1 and 2 years
 Between 2 and 3 years
 More than 3 years

27. 27. What other suggestions/comments do you
have concerning In­house drains, road and
building works at the CCPL with respect to
project performance? *

SECTION 4 : Personal Information
28. 28. What is your gender? *
Mark only one oval.

 Male
 Female

https://docs.google.com/forms/d/1s_C54hYAFTJ8vIQt­pVUaQ7ZY3m2C9v0ORZZ7bd9tnA/edit?uiv=0 6/7
6/7/2017 A survey on Lean Construction Techniques for In­house Building, Drain and Road Works at the City Council of Port Louis
29. 29. In what age group are you? *
Mark only one oval.

 18 ­ 25 years
 26 ­ 35 years
 36 ­ 50 years
 Above 50 years

30. 30. What is your highest level of education? *
Mark only one oval.

 Doctorate Degree
 Masters Degree
 Bachelor's Degree
 Diploma Graduate
 HSC Graduate
 SC Graduate

31. 31. How many years of work experience do you currently have? *
Mark only one oval.

 1 ­ 5 years
 6 ­10 years
 11 ­ 20 years
 21 ­30 years
 Above 30 years