This report is a summary of the activities on Environment health safety and social requirements taking
place at UPGRADING TO BITUMEN STANDARDS OF KARIMA A2-KIANJEGE-MUKANGU-NDIMAINI-
KARATINA&KIBURU-KABONGE(E1642/453)(E602)
TABLE OF CONTENTS
1. INTRODUCTION AND PURPOSE ............................................................................................. 3
Page | 2
1. INTRODUCTION AND PURPOSE
This monthly monitoring report has been prepared for the purpose of describing how
STECOL Corporation Ltd has complied with the conditions stipulated in the Environment
and Social Impact management plan and Kenya legal requirements. It also addresses
areas of non-conformity and actions that are being taken to correct such short comings.
4. SOCIAL IMPACTS
Page | 3
4.1. EMPLOYMENT
Currently, the construction works are at their full flow and tens of staff are engaged
in both office/camp and on site duties.
4.2. BUSINESS OPPORTUNITY
The business environment is improving and food joints and transport business are
currently thriving.
Page | 4
7. ECOLOGICAL / ENVIRONMENTAL DAMAGE OR DESTRUCTION
There were no events during the reporting period that resulted in ecological damage
or destruction. Owing to reduced works only domestic waste was generated during
the reporting period. The waste was disposed off safely through contracted services.
Soil erosion was minimised by ensuring that grass and trees were planted on bare
land. Vehicles were not allowed to trespass on the grass.
8. RESOURCE UTILIZATION
All site resources are monitored carefully through installed metering systems and
registers.
Page | 5
13. LEGAL/ADMINISTRATIVE NOTICES OF VIOLATION
There are no administrative notices of violation issued to the company during the
reporting period.
# Description
1 Land-Scaping at RE’s
office