Project Code: Design By: Date:

INTER-PROJECT CONSORTIUM
ENGINEERS INDUSTRIAL & DEVELOPMENT CONSULTANTS RAM 27-Dec-17
300 TANKONG KATONG RD. #05-15 SINGAPORE 437083
Tel: 6748 6896 Fax: 6743 9554 Email: admin@pconsortium.com
Sheet No.: Checked By: Date
CKW 27-Dec-17
Project & Approved By: Date
6 nos M16 Gr 8.8 bolt removal and re-installation
Location CKW 27-Dec-17

BOLT DESIGN Eurocode ref; EN1993-1-8: 2005

BOLT DIA., d = 16 mm BOLT Gr. = 8.8 NOS. OF BOLTS = 6

1 CHECK FOR TENSILE RESISTANCE: Ft,Rd=K2fubAs


Y M2

WHERE : fub = 800 N/mm2 DESIGN TENSILE FORCE = 40.6 KN

k2 = 0.9 DESIGN SHEAR FORCE = 4.402 KN

TENSILE AREA As = 157 mm2 TENSILE FORCE / BOLT, Ft,ED6.77


= kN

= 1.25 SHEAR FORCE / BOLT, =0.73 kN

TENSILE RESISTANCE, Ft,Rd =K2fubAs


,= 90.43 kN
YM2

THEREFORE :Ft,Rd = 90.43 kN > 6.77 kN Ok

2 SHEAR RESISTANCE PER BOLT PER SHEAR PLANE CHECK

= 60.29 kN

WHERE = 0.6 for class 8.8


Note: If shear plane passe through unthreaded portion of bolt,
= 1

fub = 800 Mpa

TENSILE STRESS, As = 157 mm2


AREA OF BOLT
= 1.25

THEREFORE : 60.29 kN > 0.73 kN Ok


Project Code: Design By: Date:
INTER-PROJECT CONSORTIUM
ENGINEERS INDUSTRIAL & DEVELOPMENT CONSULTANTS RAM 27-Dec-17
300 TANKONG KATONG RD. #05-15 SINGAPORE 437083
Tel: 6748 6896 Fax: 6743 9554 Email: admin@pconsortium.com
Sheet No.: Checked By: Date
CKW 27-Dec-17
Project & Approved By: Date
6 nos M16 Gr 8.8 bolt removal and re-installation
Location CKW 27-Dec-17

3 BEARING RESISTANCE PER BOLT PER SHEAR PLANE CHECK

= 131.20 kN

WHERE

= min ( 2.50 ; 2.5 ) = 2.50

= min ( 3.35 ; 2.5 ) = 2.50

THEREFORE, = 2.5

= min ( 2.31 ; 2.0 ; 1 ) = 1.0

= min ( 3.45 ; 2.0 ; 1 ) = 1.00

THEREFORE, = 1.0

e1 = 125.00 mm
e2 = 27.00 mm
p1 = 200.00 mm
p2 = 65.00 mm
= 410 N/mm2
d0 = 18.00 mm
t = 10.00 mm

THEREFORE : = 131.20 kN > 0.73 kN Ok