Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika
(Agusan-Davao Road Section) (B00930MN)
For the period: September 1-30, 2017
Location : Trento, Agusan del Sur K1376+845- K1376+885.8(Bridge Station)
Note:
Project: Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road Section) (B00930MN
Location: Trento, Agusan del Sur K1376+845- K1376+885.8(Bridge Station)
Our records indicate that the status of test in the above project for the month of September 1-30, 2
is as follows.
PHYSICAL ACCOMPLISHMENT:
16.28 %
PREPARED BY: NOTED:
ad Section) (B00930MN)
Work
Accom.
50.00%
50.00%
50.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
. AGUHOB
neer III
ngineer III
Liquid Limits Test
MONTHLY MATERIALS QUALITY CONTROL PROGRESS REPORT
September 2017
Month Year
Project: Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao
Road Section) (B00931MN)
Trento, Agusan del Sur K1376+845.00- K1376+885.80(Bridge Station)
(Project Engineer,Gov't)
c. Inspection
PREPARED BY:
MYLVEN N. MANTUHAC
ME II, Accreditation #3765
MCDC Construction
SUBMITTED BY:
LEODEGARIO M. MAZO
Engineer III
Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
August 1, 2017
Date
CERTIFICATION
Name of Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang
Maharlika (Agusan-Davao Road Section) (B00930MN)
K1376+845.00- K1376+885.80(Bridge Station)
Contractor : MCDC
I hereby certify that item B.8 which represents the Traffic Management with a total quantity
seven (7.00) months of the above named project was done in accordance to the approved plans &
specifications.
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
CERTIFICATION
Name of Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang
Maharlika (Agusan-Davao Road Section) (B00930MN)
K1376+845.00- K1376+885.80(Bridge Station)
Contractor : MCDC
I hereby certify that item B.7 which represents the Occupational Safety and Health with a tota
quantity of seven(7.00)months of the above named project was done in accordance to the approve
plans & specifications.
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
July 3, 2017
Date
CERTIFICATION
Name of Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang
Maharlika (Agusan-Davao Road Section) (B00930MN)
K1376+845.00- K1376+885.80(Bridge Station)
Contractor : MCDC
I hereby certify that item B.8 which represents the Traffic Management with a total quantity
seven(7.00)months of the above named project was done in accordance to the approved plans &
specifications.
R13.11.6/ADS II/QAS/amvillaceran
CARLO L. AGUHOB
Project Engineer III
July 3, 2017
Date
CERTIFICATION
Name of Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang
Maharlika (Agusan-Davao Road Section) (B00930MN)
K1376+845.00- K1376+885.80(Bridge Station)
Contractor : MCDC
R13.11.6/ADS II/QAS/amvillaceran
I hereby certify that item 100(1)which represents the Clearing & Grubbing with a total quanti
of 0.18/100(0.18)hectare of the above named project was done in accordance to the approved plan
& specifications.
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
August 1, 2017
Date
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
June 16, 2017
Date
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
July 3, 2017
Date
R13.11.6/ADS II/QAS/amvillaceran
CARLO L. AGUHOB
Project Engineer III
July 3, 2017
Date
R13.11.6/ADS II/QAS/amvillaceran
1)which represents the Clearing & Grubbing with a total quantity
ve named project was done in accordance to the approved plans
& specifications.
CARLO L. AGUHOB
Project Engineer III
R13.11.6/ADS II/QAS/amvillaceran
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AGUSAN DEL SUR 2ND
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE XIII
San Francisco, Agusan del Sur
October 2, 2017
Date
CERTIFICATE OF QUALITY CONTROL ASSURANCE
Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road
Section) (B00931MN)
Trento, Agusan del Sur K1376+845 - K1376+885.8(Bridge Station)
We hereby certify that we have conducted an inspection and verification on work accomplished on the above-
mentioned project for the period September 16-30, 2017. We further certify that we have found that the quality of
materials in the following items of work corresponding to the quality accomplished conforms with the Standard
Specifications and Special Provisions of the contract viz :
Quantity Accomplished
October 2, 2017
Date
Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika (Agusan-Davao Road
Section) (B00931MN)
Trento, Agusan del Sur K1376+845 - K1376+885.8(Bridge Station)
We hereby certify that we have conducted an inspection and verification on work accomplished on the above-
mentioned project for the period September 16-30, 2017. We further certify that we have found that the quality of
materials in the following items of work corresponding to the quality accomplished conforms with the Standard
Specifications and Special Provisions of the contract viz :
Quantity Accomplished
Note:
No Activity done for period covered…
dge Station)
on the above-
t the quality of
the Standard
ACCOMPL.
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
n-Davao Road
dge Station)
on the above-
the quality of
the Standard
ACCOMPL.
%
%
%
%
%
%
%
%
%
MONITORING OF QUALITY ASSURANCE (QA) IMPLEMENTATION BY THE
DISTRICT ENGINEERING & CITY OFFICES IN DPWH INFRASTRUCTURE PROJECTS
Name of Project : Widening of Langkilaan Bridge (To more than 2 Lanes) along Daang Maharlika (Agu
Road Section) (B00930MN)
Contractor : MCDC Trento,Agusan del Sur
Implementing Office : DPWH 2nd Engineering District, San Francisco, ADS Project Cost :
Project Duration : a.) Date Started :
b.) Project Date of Completion :
c.) Calendar Days :
CONCERN REMARKS
* Accreditation of PE/PI A
None
None
REMARKS