Design Service – Issues discussed

1. Detailed design & IFC drawings required.


2. Steel Tank design shall be done by Specialist appointed by Midmac.
3. Design of Pumping stations is part of the Design firm.
4. GSAS certification is not required.
5. Electrical, street lighting, Telecom is excluded.
6. CCTV & Networking is excluded.
7. Design of pond is to be in such a way that excavation is to be more.
8. 1 Pumping station & 5 lift stations
9. Limit of the design works is 1m outside the building.
10. Odor control for Lifting station may be required.
11. HAZOP/CFD?
12. MME requirement for EMP (Environmental protection)?