REPAIRING LIST FOR BRC 2017

No Findings Location Picture Recommend PIC

Wall spoiled by adhesive


1 SLITTING Repaint Mr.Phi
plastic

Wall spoiled by adhesive QA warehouse-


2 Repaint Mr.Phi
plastic SLITTING
Gypsum Plaster and
3 Ceiling Damage SLITTING Mr.Phi
repaint

4 Floor surface broken LAM. Fill by Epoxy Mr.Giận


5 Anchor bolt Hole on Floor LAM. Fill by Epoxy/ AB gel Mr.Giận

6 Crack on Floor LAM. Fill by Epoxy/ AB gel Mr.Giận


7 Steel barrier damage LAM. Fix again Mr.Giận

Fix by gypsum and


8 Wall crack at Chiller Room LAM. Mr.Phi
repaint

9 SURFACE CRACK PRINT Fill Epoxy Mr.Giận


10 Printing 1 Ceiling Damage PRINT Repaint by contractor Mr.Giận

Gypsum cover drop down at


12 PRINT Repair by contractor Outsource
Printing Entrance

CURING
13 Floor surface broken Fill Epoxy Mr.Giận
ROOM
Wall and bracing beam
14 PACKING Repair by contractor Mr.Giận
damage at packing

15 Gypsum cover damage PACKING Repair by contractor Mr.Giận

16 Crack on the floor BLOW FILM Mr.Giận


17 Floor broken on surface BLOW FILM Mr.Giận
18 Ceiling had fungus CANTEEN Repaint Contractor

19 Crack on the wall MDP1 Plaster and repaint Mr.Phi

Install the new &


20 Gypsum cover damage MDP1 Mr. Giận
repaint
21 Need to repair column GA Repaint Mr.Phi

22 Sloughing Paint G.A Repaint Mr.Phi


23 Celing damage G.A Repaint Mr.Phi
24 Door lock damage IT Replace new one Mr. Giận

25 Wall & Ceiling damage IT Repair by contractor Mr. Giận


26 Fungus on the ceiling R&D Repaint Mr.Phi

Replace gypsum and


27 Damage the ceiling R&D Mr.Phi
repaint

28 Fungus on the ceiling QMA Repaint Mr.Phi


Cylinder
29 Expansion paint spoil Repaint Mr.Phi
Warehouse

Crack on the corridor Cylinder


30 Fill by Epoxy Mr. Giận
Cyl.Warehouse Warehouse
Cylinder
31 Expansion paint spoil Repaint Mr.Phi
Warehouse 2F

High Bay Lighting damage Cylinder


32 Repair and fix Mr.Phi
(4 pcs) Warehouse 2F

Cylinder Erect the scaford to cut


33 Insulation Layer drop down Mr. Giận
Warehouse 2F it out
CORRIDOR Repaint the anti fungus
34 Fungus on the wall Mr. Giận
2F paint

CORRIDOR Fill the motar and


35 Hole on the wall Mr. Giận
3F repaint
1,2m lighting lamp drop CORRIDOR
36 Fix again Mr.Phi
down 3F

CORRIDOR
37 Problem on the floor Fix again Mr. Giận
3F
17
Actual
Deadline Update action
completed date
status

3/15/2017

3/15/2017
3/15/2017

1/26/2017
1/26/2017

2/26/2017
2/26/2017

2/26/2017

2/26/2017
3/26/2017

3/26/2017

2/26/2017
1/26/2017

1/26/2017

2/26/2017
2/26/2017
3/26/2017

2/25/2017

2/25/2017
2/25/2017

2/25/2017
2/25/2017
2/25/2017

2/25/2017
2/25/2017

2/25/2017

2/25/2017
2/25/2017

2/25/2017
2/25/2017

2/25/2017

2/25/2017
2/25/2017

2/25/2017
2/25/2017

2/25/2017

Potrebbero piacerti anche