Sei sulla pagina 1di 6

Government of Andhra Pradesh

Roads & Building Department

From To
Sri K. S. Raghava Rao, M.Tech., M.I.E., The Executive Engineer,
Deputy Executive Engineer (R&B), (R&B) Division,
East Sub – Division, Kakinada. Kakinada.

Letter No. HUDHUD/VE Road/East/SA/2014, dated 24.10.2014.


Sir,
Sub: - Works(R&B) Division, Kakinada – HUDHUD cyclone- Cyclone Damage Repairs to
Damaged B.T. Road portions from Km. 9/400 to 11/000 of Vakalapudi - Edatam
Road in East Godavari District - Submitted – Regarding.

The Vakalapudi – Edatam road is an important State Highway in East Godavari


District, having a total length of 46 kms., connects several fishermen villages of Kakinada
Rural, U.Kothapalli and Thondangi mandals to the District Head Quarters and Port City of
Kakinada. This road starts at km.3.500 of Sarpavaram Junction to Vakalapudi light house
peta road (M.D.R.) and crosses Kakinada - Rajanagaram (ADB) road and Samalkota -
Uppada road.

This road is passing through number of fishermen villages upto Tuni and number
of R&B roads and heavy intensity of traffic prevails on the road as the public of all these
villages travels on this road to reach Kakinada City on one side and to reach Pilgrim centre at
Annavaram on other side. The Road stretch from Km.9/400 to 11/ 00 runs in very close
proximity (i.e., 1.00M to 2.0M) to the Sea i.e., Bay-of-Bengal. Due to Cyclone namely
"HUDHUD" during 11.11.2014 to 12.11.2014 the Road embankment is eroded including BT
carriageway in the certain stretches from km.9/400 to 11/00 in bits and traffic interrupted in
very dangerous condition. The Restoration is very much essential for free flow of traffic.
Tidal waves during high tides are further eroding the embankment and there is every
possibility of further breaching of the existing road and Sea waters may enter in to the
nearby Paddy Fields and may cause extensive damage to Ryths and residents, if protection is
not taken up on war footing basis.

Hence it is proposed to rebuild the crust in the damaged portions/breach portions with GSB,
WMM and 30 mm thick Bituminous concrete for smooth flow of traffic..
In view of the above, it is top most priority to take up the temporary restoration work by
rebuilding the crust in the damaged portions/breach portions with GSB, WMM and 30 mm thick
Bituminous concrete for smooth flow of traffic.. Accordingly the estimate is prepared and
submitted for Rs. 50.00 lakhs for favour of approval of the competent authority at an early date.

Encl: Detailed estimate in triplicate.

Yours faithfully,

Deputy Executive Engineer


(R&B) East Sub-Divn., Kakinada.
Government of Andhra Pradesh
Roads & Building Department

From To
Sri K. S. Raghava Rao, M.Tech., M.I.E., The Executive Engineer,
Deputy Executive Engineer (R&B), (R&B) Division,
East Sub – Division, Kakinada. Kakinada.

Letter No. HUDHUD/VE Road/East/SA/2014, dated 10.12.2014.

Sir,
Sub: - Works(R&B) Division, Kakinada – HUDHUD cyclone- Cyclone
Damage Repairs to Damaged B.T. Road portions from Km. 9/400 to
11/000 of Vakalapudi - Edatam Road in East Godavari District -
Submitted – Regarding.

Ref:- T.O. letter no. HUDHUD/VE Road/East/SA/2014, dated,24.10.2014.

The estimate for the work “Cyclone damage repairs to Damaged BT Road
portions from Km 9/400 to 11/0 of Vakalapudi-Edatam Road in East Godavari
District for Rs. 50.00 Lakhs was submitted for favour of according necessary
approval. The reach from km 10/250 to 11/0 was black topped in the Periodical
maintenance work already sanctioned. Accordingly, modified estimate for the work
is herewith submitted as per actual site condition, for favour of taking further
necessary action.

Yours faithfully,

Deputy Executive Engineer (R&B)

East Sub division, Kakinada


Government of Andhra Pradesh
Roads & Building Department
From To
Sri M. Goving Mohan, B.Tech., The Dy. Executive Engineer,
Asst. Executive Engineer (R&B), (R&B) East Sub-Division,
East Section; Kakinada. Kakinada.

Letter No. /HUDHUD/VE Road/East/RA/2014, dated 18.10.2014.


Sir,
Sub: - Works(R&B) Division, Kakinada – HUDHUD cyclone- Cyclone damage repair by
stone dumping of Vakalapudi-Edatam road for temporary restoration pertaining to
East section, Kakinada-- Submitted – Regarding.

The Vakalapudi – Edatam road,is an important State Highway in East Godavari District,
having a total length of 46 kms., connects several fishermen villages of Kakinada Rural,
U.Kothapalli and Thondangi mandals to the District Head Quarters and Port City of Kakinada. This
road starts at km.3.500 of Sarpavaram Junction to Vakalapudi light house peta road (M.D.R.) and
crosses Kakinada - Rajanagaram (ADB) road and Samalkota - Uppada road.

This road is passing through number of fishermen villages upto Tuni and number of R&B
roads and heavy intensity of traffic prevails on the road as the public of all these villages travels on
this road to reach Kakinada City on one side and to reach Pilgrim centre at Annavaram on other side.
The Road stretch from Km.7/000 to 8/500 runs in very close proximity (i.e., 1.00M to 10.00M) to the
Sea i.e., Bay-of-Bengal. Due to "HUDHUD" Cyclone during 11.10.2014 to 12-10-2014 the Road
embankment is eroded Upto BT carriageway in the stretch from km.7/000 to 10/6 in bits and in very
dangerous condition. The Restoration is very much essential for free flow of traffic. Tidal waves
during high tides are further eroding the embankment and there is every possibility of breaching of the
existing road and Sea waters may enter in to the nearby Paddy Fields and may cause extensive damage
to Ryths and residents, if protection is not taken up on war footing basis.

In view of the above, it is top most priority to take up the temporary restoration works
proposed to fill the Scours with Jeddy Stone dumping using 450mm to 600mm size HBG
variety stone is proposed to a top width of 3.00M for protecting the road embankment on Sea
side and Juddy stone dump on Sea side to prevent the splashes of Tidal wave and sand
deposition at the time of High tide.

1) Cyclone Damage Repairs by Stone dumping to Vakalapudi - Edatam Road from km.
7/000 to 8/500 in East Godavari District. Estimate Rs. 50.00 Lakhs.

2) Cyclone Damage Repairs by Stone dumping to Vakalapudi - Edatam Road from km.
8/500 to 9/300 in East Godavari District. Estimate Rs. 50.00 Lakhs.

3) Cyclone Damage Repairs by Stone dumping to Vakalapudi - Edatam Road from km.
9/300 to 9/850 in East Godavari District. Estimate Rs. 50.00 Lakhs.

4) Cyclone Damage Repairs by Stone dumping to Vakalapudi - Edatam Road from km.
9/850 to 10/400 in East Godavari District. Estimate Rs. 50.00 Lakhs.
Encl: Detailed estimate in triplicate.

Yours faithfully,

Asst. Executive Engineer


(R&B) East Section., Kakinada.

Potrebbero piacerti anche