For each sub panel, break switch tripping for an check the time optimal selectivity instead of breaker tripping as the rating for selectivity and current of the 2CB cost purpose. Pilot Add ELC are the same, supply light may be protections selectivity is not useful for tenants granted
Indicate power of each sub panel
The 2 CB have the same
current rating, check ti time tripping for an optimal selectivity no need to have 2 breaker in serie, load break swicth can replace downstream breaker Supplied from SPD 2 protection type which circuit shall be installed every Add CB to protect breaker? 30 m height. there is the line+ breaker no point to install it for control circuit every floors as it will take the surge directly on the busway.