ARCHITECTURAL 2
ELECTRICAL/LIGHTING 4
PLUMBING 5
CONTSTRUCTION DOCUMENTS 5
DOCUMENTATION 6
Provision of adequately sized & easily accessible & clearly labeled containers for the
storage and collection of source segregated waste as recommended by Center of Waste
Management. At a minimum allow for separations as follows:
Green container for recyclable plastics, glass & metals
Blue container for recyclable paper & cardboard
Black container for non-recyclable & non compostable waste
Orange waste skip for the collection of landscape wastes.
Internal waste bins/recycle bins should have minimum capacity of 120L each and external
skips to have minimum 1,100L each. The location of the waste bins/skips for internal and
exterior use shall be as per Waste Bin Layout.
General Requirements
General Requirement
All refrigerants and gaseous fire suppression systems to be installed within the
project site boundary should have an ozone depletion potential (ODP) of zero.
Separation distances between the outdoor air intake & any exhaust or discharge
points to have minimum distance of 5m as shown in the layout to comply with ASHRAE
62.1-2007.
All exhausts should be located outside the defined public realm or as defined by local
code whichever is more stringent.
All occupied areas in the building must comply with the minimum thresholds set out in
ASHRAE 62.1-2007 using the ventilation rate procedure or local code whichever is more
stringent.
Contractor is required to demonstrate compliance with weighted average U-values prior
to the procurement of envelope components, through the provision of test certificates,
updated calculations & drawings.
U-values considered are as below:
External wall 0.28 W/m².˚K
Beam 0.28 W/m².˚K
Column 0.28 W/m².˚K
All CHW pump motors shall be fitted with variable speed drivers.
All piping serving as part of cooling system shall be thermally insulated with a minimum
38mm insulation (base on insulation thermal conductivity of less than 0.039 W/m.K)
ELECTRICAL/LIGHTING
General Requirement
• All energy sub meters must have data logging capability and be connected to a central
monitoring system so that information on the building’s energy consumption can be
recorded. The monitoring system must have, at a minimum, the following capability:
PLUMBING
General Requirement
Contractor to procure the water sanitary fixtures that do not exceed the values as
mentioned in Table 4: Water Sanitary fixtures performance requirements.
CONSTRUCTION DOCUMENTS
Contractor to develop a construction & demolition waste management plan (CDWMP) prior to
the start of construction & demolition activities. The CDWMP must identify the materials to be
diverted from landfill and indicate whether the materials will be segregated on site or
commingled. If materials are planned for salvage the plan must indicate their planned use. A
minimum final recycling/salvage rate of 30% of construction and demolition waste (by weight or
volume) excluding hazardous waste.
Contractor to submit a cumulative waste management report with each Application for
Payment with the following attachments:
- A record of the type and quantity, by weight, of each material
salvaged, reused, recycled or disposed.
- Total quantity of waste recycled as a percentage of total waste.
- Disposal Receipts: Copy of receipts issued by a disposal facility for CDL
waste that is disposed in a landfill.
- Recycling Receipts: Copy of receipts issued by an approved recycling facility.
- For co-mingled materials, include weight tickets from the recycling
hauler or material recovery facility and verification of the recycling rate
for co-mingled loads at the facility.
- Salvaged Materials Documentation: Types and quantities, by weight,
for materials salvaged for reuse on site, sold or donated to a third part
• Manufacturer information for all installed fixtures and fittings indicating flow rates and flow
regulation systems.
• Manufacturer information for all installed appliances including information on their water
use.
• Contractor to provide off site testing of prototypes for custom made cladding systems before
installation.
• Contractor to provide a review of standard product pre-testing certificate for pre-tested systems