Introduction:.................................................................................................................................................. 2
Task 3.1 – Prepare project plans and establish the project organization: ....................................................... 2
1. Project’s fundamental information:.................................................................................................... 2
2. Organizational breakdown structure: ................................................................................................. 3
3. Participants: ....................................................................................................................................... 3
Task 3.2 – Apply project scheduling, estimating and cost control techniques: ............................................... 4
1. Gantt chart: ........................................................................................................................................ 4
2. Critical path: ...................................................................................................................................... 5
3. Cost estimate and sensitivity:.............................................................................................................. 5
Task 3.3 – Analyze the methods used to measure the project performance: ................................................. 6
1. Cost performance analysis: ................................................................................................................ 6
2. Monitor: ............................................................................................................................................ 7
3. Control performance: ........................................................................................................................ 7
Task 3.4 – Explain project control procedures evaluate the completed project: ............................................ 8
1. Project’s problems and solutions: ...................................................................................................... 8
2. Questionnaire: ................................................................................................................................... 8
3. Feedbacks: ......................................................................................................................................... 9
Conclusion: ................................................................................................................................................... 9
References: .................................................................................................................................................. 10
Introduction:
In the assignment 1, the project had set clear and specific information. And in this
assignment we will define the data of calculating the project’s investment, and the Gantt chart in
order to understand more the project management. Also in this assignment, we will create a
questionnaire to survey the customers in the first month of implement this project.
Owner
Sub-
Manager
manager
3. Participants:
Quantity: In terms of 18 months opening the shop, as reported from my manager, my
shop has roughly 50-100 clients visit every day. Since I didn't have enough experience to
assume control over an entire venture, this is a major motivation for me to proceed
onward. In this manner, the normal number of clients every week is around 300 clients,
so I am going to push my staff to work harder by PR the shop to different regions in the
city for pulling in more guests.
Feedback: According to the survey at the task 3.4 below for customers about our service.
Fortunately, feedbacks I have received are mostly positive, especially about the shop’s
lipsticks and the decoration. Not only students have visited us, but also the women came
to purchase lipsticks. However, the minus point of my shop is the items which is limited,
cannot test colour. The reason that the lipsticks which in limited product line usually
expensive, I cannot open the guarantee if the customer not sure to buy it. In this time I
will try my best to deal with the suppliers in order to provide test items.
1. Gantt chart:
Gantt chart is commonly used in project management; this is the most useful way in order
to showing the activities, tasks displayed against time, this table invented by Henry Gantt in
1910. Till now this table still use in project management with brand new innovation, such as
network diagram.
The performance of Gantt chart: in this chart, it will illuminate the beginning stage of the
project. It will take me 18 months in total in order to set up all things of the project. The table
below is showing all the activities, duration, and previous activity of this project. With these
elements, we can easily create a Gantt chart.
Previous
Activities Description Duration Cost estimation
activity
Find a renting premise and
1 2 months 40.000.000
decoration
2 Purchase items 6 months 1 27.000.000
3 Find shareholders 2 months 2 132.000.000
4 Recruit for personnel 4 months 2 20.000.000
Table of activities
0 2 4 6 8 10 12 14
According to the table above, we can see it contains 5 articles: activities, description,
duration, previous activity and cost estimation. All the information and data in the table that
illustrates activities for the beginning stage of opening the project. At the bar chart, we can see,
the vertical axis represents for the order of activities and the horizontal one is the number of
months to conduct them, numbers of duration are listed as the table.
2. Critical path:
There is no critical path in my project; and all the activities above are related to each
together. If one of these activities could not complete on time, then this project will delay.
2. Monitor:
So far, I have finished 2 difficult stages: purchasing items and finding shareholders. The next
stage, also the last stage of this project: recruit the personnel and will be done 100% after 3 tasks
(25% for each):
The passion in cosmetics: in the cosmetics industry, the passion is always the most
important element. I will have found those people who had a strong passion in cosmetics.
It will help the store get profit and show the professional. Status: 50% completed.
The skill: about the makeup artists. I have founded 2 artists and they already had
certifications of their major. Status: 25% completed.
The uniform: I will choose Cindy’s tailor in order to provide the uniform for my
employees. Status: 10% completed.
Total at work amount: 85%
3. Control performance:
Problem 1: Difficult in finding prestigious suppliers
Solution: I will search for the cosmetics companies in order to import real items and high
qualities.
Problem 2: Difficult to attract customers
Solution: I will create some events on social media, such as: Facebook, Instagram.
Posting review cosmetics videos on fan page in order to promote the new items.
Problem 3: Persuade the shareholders to invest the project
Solution: I will presentation the project to the shareholders in order to attract them. Show
them how this project brings back profits?
2. Questionnaire:
SATISFACTION OF CUSTOMERS WITH UNIQUE SECRET
This short questionnaire created for the customers in order to survey their satisfaction
after using the service of UNIQUE SECRET. This questionnaire will be including 5 questions of
asking regular services, products, quality, policy of change products, and so on. After paying the
bill, the customers will get a sheet of survey to answer how we serve you, we will improve our
services. Thank you for your supporting!
3. Feedbacks:
After collecting all the answers from customers for a week, I have fortunately received
compliments and the most positive answer is the number 1. Next up, customers absolutely agree
with the price for each items, because it fit and reasonable for middle incomes and for students.
Conclusion:
In this assignment, the beginning stage of this project seems smooth and well-
conveniently occurred. To a student like me, this project has lots of difficult and this is a
challenge for my project. And I will make it better, however, I have to thanks to my partners,
customers had supported me. Without them, I won't have enough strength to keep this project
going.
References:
Gallup, I. (2012). How to Run a Successful Project. [online] Gallup.com. Available at:
http://www.gallup.com/businessjournal/152756/run-successful-project.aspx [Accessed 21
Jul. 2016].
Gantt.com. (2016). What is a Gantt Chart? Gantt Chart Information, history and
Software. [online] Available at: http://www.gantt.com/ [Accessed 21 Jul. 2016].