Reservas minerales Metal contenido

Categoría Kton Plata Plomo Zinc Plata Plomo Zinc


g/ton % % Millones millones millones
Oz lb lb
Probado 30.083 66.60 1.041 0.603 64.4 690.4 399.9
Probable 126.047 50.73 0.872 0.467 205.6 2422.6 1297.7
Probado+ 156.13 53.79 0.904 0.493 270.0 3113.0 1697.6
Probable

PAGINA 12

Recursos minerales(adicionales a la reservas) Metal contenido

Categoria Kton Plata Plomo Zinc Plata Plomo Zinc


g/ton % % millones millones Millones
Oz lb Zn
Medido 10.878 17.50 0.38 0.33 6.1 91.1 79.1
Indicado 123.583 20.8 0.38 0.29 82.6 1035.3 790.1
Medido+indicado 134.461 20.5 0.38 0.29 88.7 1126.4 869.2
Inferido 49.793 30.0 0.464 0.278 48.0 509.4 305.2
PAGINA 24

EQUIPOS PRINCIOALES DE MINA EN OPERAR


TIEMPO DE PERIODO

Tipo de equipo PPQ-6 PPG-5 PPG-4 PPG-3 PPG-2 PPG-1 Yr1Q1 Yr1Q2 Yr1Q3 Yr1Q4 Yr2Q1 Yr2Q2 Yr2Q3 Yr2Q4 3 4
45000 Lb taladro desplegable 1 1 2 3 3 3 3 3 3 3 3 3 3 3 3
15 cu m pala hidráulica 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2
13.8 cu mcargador 1 2 2 2 2 2 2 2 2 2 2 2 2
135 mT camión de acarreo 2 4 7 8 8 8 8 9 9 9 9 9 10 10 10
410 HPpista topadora 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4
498 HPrueda topadora 1 1 1 1 1 1 1 1 1 1 1 1 1
16 ft motoniveladora 2 2 2 5 2 2 2 2 2 2 3 3 3 3 3 3
76000 camión de agua de litro 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
8.6 cu m cargadora de ruedas 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
40 tn camión articulado 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
taladro ploneer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 cu mexcavador 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
TOTAL 9 15 17 23 26 26 29 29 30 30 31 31 31 32 32 33
tipo de equipo 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
45000 Lb taladro desplegable 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
15 cu m pala hidráulica 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
13.8 cu mcargador 2 2 2 2 2 2 2 3 3 3 3 3 3 2 1 1
135 mT camión de acarreo 10 10 11 11 12 13 13 13 11 11 11 11 11 11 10 10
410 HPpista topadora 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3
498 HPrueda topadora 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
16 ft motoniveladora 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2
76000 camión de agua de litro 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
8.6 cu m cargadora de ruedas 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
40 tn camión articulado 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
taladro ploneer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 cu mexcavador 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 33 33 34 33 34 35 35 36 34 34 34 33 33 31 29 28
24

Concentrado Pb Concentrado de Zn
Pb Ag Zn Ag
Recuperacion 71.11% 60.29 % 51.58% 3.9 %
Ley Media 56.5 % 2.9 Kg/t 53.00% 437 g/t

PAGINA 30

Cargo Total del personal Salario anual Salario de todo el personal

Gerente de mina 1 $ 130,800 $ 130,800


Superintendente de mina 2 $ 97,600 $ 195,200
Capataz de mina 4 $ 72,800 $ 291,200
Superintendente de 2 $ 97,600 $ 195,200
mantenimiento
Capataz de mantenimiento 4 $ 72,800 $ 291,200
Ingeniero jefe de mina 4 $ 84,800 $ 339,200
Geólogo jefe 4 $ 84,800 $ 339,200
Geólogo 4 $ 54,400 $ 217,600
ingeniero 4 $ 54,400 $ 217,600
topógrafo 2 $ 16,500 $ 33,000
Pagina 41
𝑅𝑄𝐷 = 100𝑒 −0.1𝜆(0.1𝜆+1)
Donde
𝑁° 𝑑𝑖𝑠𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑖𝑑𝑎𝑑𝑒𝑠
𝜆= , 𝜆 = 9/2 = 𝜆 = 4.5
𝑚

𝑅𝑄𝐷 = 100𝑒 −0.1∗4.(0.1∗4.5+1) = 63.14 %

Basándose en los rangos de los valores del RQ,el macizo rocoso puede ser caracterizado según la
valoración siquiente

RQD % CALIDAD DE LA ROCA


100 – 90 Muy buena
90 – 75 Buena
75 – 50 Mediana(puntaje =8)
50 – 25 Mala
25 – 0 Muy mala

Valoración del RQD para la estación 3.

 Espaciado de las discontinuidades:

Ed1 20 – 60 cm
Ed2 20 – 60 cm
Ed3 20 – 60 cm
Ed4 20 – 60 cm
PROMEDIO 60 cm
Pagina 43

REGLAS PARA LA CLASIFICACION DE DISCONTINUIDADES (condicion)


Persisitencia <1m 1–3m 3 – 10 m 10 – 20 m >20 m
Puntaje 6 4 2 1 0

Abertura Niguno <0.1 mm 0.1 – 1.00 mm 1 – 5 mm >5 mm


Puntaje 6 5 4 1 0

Rugosidad Muy rugoso Rugoso Ligeramente rugosa Liso Espejo de falla


Puntaje 6 5 3 1 0
Relleno Niguno Relleno duro< 5 mm Relleno duro > 5mm Relleno suave< Relleno suave 5
5 mm >mm
Puntaje 4
6 2 2 0
Alteración Inalterado Legeramente Moderad. Alterado Altamente Descompuesto
alterado alterado
Puntaje 5
6 3 1 0

DESCRIPCION RANGO
Completamente seco 15
Semi húmedo 10
Húmedo 7
Mojado 4
Flujo de agua 0
Pagina 45

ESTIMACION DE COSTOS DE OPERACIÓN

COSTO OPERACION $ TONELADAS DE


MINERAL
Mina 5.19
Planta de procesos 8.76
Administración general 1.55
Fundición/ tratamiento concentrado de refino y 6.40
transporte
TOTAL 21.90
PAGINA 46

total YR -1 YR 1 YR 2 YR 3 YR 4 YR 5
OPEX TOTAL $ 714,528,400 $- $ 67,975,489 $ 57,514,661 $ 50,852,129 $ 47,580,246 $ 33,434,668
OPEX - Direct Op $ 580,997,182 $- $ 48,287,730 $ 38,105,553 $ 31,730,084 $ 28,535,784 $ 31,382,631
OPEX - Overhaul $ 23,438,493 $- $ 1,955,918 $ 1,565,697 $ 1,278,634 $ 1,127,835 $ 1,269,183
OPEX - Equip. Arrendamiento $ 110,092,726 $- $ 17,731,841 $ 17,843,411 $ 17,843,411 $ 17,916,627 $ 782,855
toneldas (oro + desmonte) $ 369,219,550 22,822,468 35,068,685 27,254,649 19,192,936 17,464,821 16,133,470
Op costo por tonelada $ 1.94 $- $ 1.94 $ 2.11 $ 2.65 $ 2.72 $ 2.07
CAPEX TOTAL $ 75,742,090 $ 56,928,551 $- $- $- $ 13,049,083 $-
CAPEX Configuración inicial $ 17,731,841 $ 17,731,841 $- $- $- $- $-
CAPEX prestripping $ 35,521,863 $ 35,521,863 $- $- $- $- $-
CAPEX inicial (otro) $ 3,674,847 $ 3,674,847 $- $- $- $- $-
CAPEX sostenimiento (pagos globales en $ 18,813,539 $- $- $- $- $ 13,049,083 $-
equipos arrendados)

YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 YR 12
$ 44,785,931 43,868,807 40,670,474 34,217,611 41,613,879 $ 38,036,272 29,954,480
40,969,496 36,904,181 33,747,389 27,175,150 34,267,348 31,461,954 26,957,370
1,701,153 1,525,637 1,372,526 1,067,627 1,404,210 1,271,431 1,059,388
2,115,282 5,438,988 5,550,559 5,974,835 5,942,320 5,302,888 1,937,722
24,792,058 23,307,190 21,343,423 14,831,190 21,697,278 19,503,455 16,601,176
1.81 1.88 1.91 2.31 1.92 1.95 1.80
$- 82.106 $- 53.88 440.126 980.55 2,528,063
$- $- $- $- $- $- $-
$- $- $- $- $- $- $-
$- $- $- $- $- $- $-
$- 82.106 53.88 440.126 980.55 2,528,063
YR 13 YR 14 YR 15 YR 16 YR 17 YR 18 YR 19
31,577,934 29,187,854 38,934,841 29,989,209 28,172,586 26,161,328 $-
28,399,213 26,473,242 36,315,041 28,446,309 26,770,161 25,068,547 $-
1,119,349 1,041,161 1,511,902 1,127,997 1,057,634 981.211 $-
2,059,372 1,673,452 1,107,898 $ 414.902 344.791 111.571 $-
17,766,344 14,477,051 19,099,531 14,787,056 13,178,581 9,898,189 $-
1.78 2.02 2.04 2.03 2.14 2.64 $-
82.106 366.11 38,934,841 29,989,209 28,172,586 171.63 82.106
$- $- $- $- $- $- $-
$- $- $- $- $- $- $-
$- $- $- $- $- $- $-
82.106 366.11 38,934,841 29,989,209 28,172,586 171.63 82.106

PAGINA 46

Costo operativo de la planta


costo de item LOM(000s) $ $/tn de mineral
trituración primaria 34127 0.248
molienda 383410 2.784
flotacion 546383 3.968
concentrado y relaves espesamiento y filtración 189506 1.376
auxiliar 53488 0.388
total de proceso de planta 1206914 8.764
Pagina 47

El costo de operación para las áreas de Administración General

COSTOS DE ITEM COSTOS LOM(000) $/TONELADAS

trabajo y flecos 55601 0.404


poder 4682 0.034
operación y mantenimiento de vehículos 13050 0.095
Comunicaciones 2727 0.02
suministros de seguridad / incentivos 3240 0.024
capacitación fuera del sitio y conferencias 648 0.005
seguros 19332 0.14
servicios corporativos y viajes 16092 0.117
ambiental 1944 0.014
seguridad y medico 4455 0.032
costos profesionales de la membresía 108 0.001
desarrollo comunitario 5400 0.039
autobuses (150 por semana y por día) 4032 0.029
gastos de mantenimiento del personal (250 en el campamento) 29565 0.215
consultores 1215 0.009
equipo / software de computadora 675 0.005
misc. material de oficina 324 0.002
misc. flete y correos 324 0.002
reclutamiento y reubicación 3564 0.026
acceso a la mina de mantenimiento de carreteras 7042 0.051
legal, permisos, libera 4950 0.036
contingencia (10%) 17902 0.13
Costo General Y Administrativo Total 196872 1.43
Pagina 48

Resumen de costos iniciales de capital

ÁREAS 2015 TOTAL (000) $

COSTO DIRECTO 352061


Sitio general 11021
Capital de mina+Pre producción 63066
Chancado Primario 24335
Recuperación de Reservas 8413
Molienda 48921
Flotación y molienda 49200
Concentrado de espesamiento y filtración 16174
Especiamiento de relaves 9443
Filtración de relaves 55263
Planta de agua 11491
Infraestructura de Suministro de energía 8551
Reactivos 12881
Auxiliares 33302
COSTO INDIRECTO 104736
Contratista Indirecto 20436
Servicios EPCM 45732
Puesta en Marcha y Proveedores 1976
Capital y Puesta en marcha inicial de repuesto y relleno inicial 11913
Fletes y obligaciones 24679
COSTO DE LOS PROPIETARIOS 103180
Costo generales de artículos 26718
Funcionamiento y construcción campamento 27918
Mina de Acceso 32623
Línea de transmisión eléctrica 15921
CONTINGENCIA 65150
Contingencia para plantas de proceso 59746
Contingencia Mina 5404
TOTAL 625127

Pagina 49 misma tabla


Pagina 50
Estimación del costo de capital de la transmisión de energía
Temas Costos
($ 000)
Interconexión de la subestación Antapala 5,770
Línea de transmisión de 138kv, antapala-corani 8,092
Línea de transmisión de 13.8 kv, corani-campamento 476
Equipos y materiales de flete 220
Ingeniería de detalle, CM, monitoreo ambiental, derecho de vía, 1,362
tarifa de conexión
Costo total 15,920

Pagina 54

COSTO DE LABORATORIO

Costos de item COSTOS LOM $/ TONELADAS


Trabajo y flecos 10,977,498 0.080
Instalaciones auxiliares de asignación de energía 76,256 0.001
Reactivos y combustible 288,000 0.002
Consumibles de ensayo 4,140,000 0.030
Piezas de desgaste y mantenimiento 891,000 0.006
Trabajo de mantenimiento, franjas y asignaciones (2%) 514,846 0.004
Suministros y servicios 90,000 0.001
Costo total de laboratorio $ 16,977,600 $ 0.123
PAGINA 57

PRECIO DEL COSTO DE CAPITAL INICIAL RECUPERACION


METAL OPERACION
20 % $ 1,707,042 $ 759,748 $ 899,973 $ 1,598,087
10 % $ 1,361,281 $ 887,633 $ 957,746 $ 1,306,803
0% $ 1,015,519 $ 1,015,519 $ 1,015,519 $ 1,015,519
-10 % $ 669,757 $ 1,143,404 $ 1,073,292 $ 724,235
-20 % $ 323,995 $ 1,271,290 $ 1,131,065 $ 432,950

PRECIO DEL METAL COSTO DE OPERACION CAPITAL INICIAL RECUPERACION


20 % 38.7 % 23.8 % 22.7 % 37.2 %
10 % 33.5 % 25.9 % 25.1 % 32.7 %
0% 27.9 % 27.9 % 27.9 % 27.9 %
-10 % 21.6 % 29.8 % 31.1 % 22.7 %
-20 % 14.3 % 31.6 % 35.0 % 16.7 %

PRECIO DEL COSTO DE CAPITAL INICIAL RECUPERACION


METAL OPERACION
20 % 1,119,086 462,823 535,329 1,045,112
10 % 882,180 554,177 592,897 844,712
0% 643,643 643,643 643,643 643,643
-10 % 403,557 733,033 693,687 441,929
-20 % 151,349 822,087 742,962 230,522

PRECIO DEL METAL COSTO DE OPERACION CAPITAL INICIAL RECUPERACION


20 % 29.1 % 17.3 % 16.2 % 27.9 %
10 % 25.0 % 19.0 % 18.3 % 24.4 %
0% 20.6 % 20.6 % 20.6 % 20.6 %
-10 % 15.7 % 22.2 % 23.4 % 16.5 %
-20 % 9.6 % 23.6 % 26. 7% 11.7 %