Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Client: AL-HARBI TRADING & CONSTRUCTION CO. LTD. J.O. NO. 14-15
TESTING OF BUILT-UP SECTION EMBEDDED IN RAFT FOUNDATION FOR FIELD ASSEMBLED FCR REVISION 0
Subject IRRIGATION WATER STORAGE TANK 66M ID X 9.1M H DATE 17 DEC. '14
VT 100% API Std. 650, Para. 8.5 (For Reference At shop, prior to delivery
Web-to-top flange joint and web-to-bottom flange only)
joint
Built-up section PO 100% - At shop, prior to delivery
embedded in raft
API Std. 650, Para. 8.5 (For Reference
foundation. VT 100% At site
Built-up section joints to form a circle (top flange only)
(Recommended by
Metscco) joint only) One (1) spot RT for every top flange
RT At site
- horizontal butt joints.
Built-up joints to form a circle (web and bottom API Std. 650, Para. 8.5 (For Reference
VT 100% At site
flange joints) only)
Legend: VT = Visual Test, RT = Radiographic Test, VB = Vacuum Box Test, UT = Ultrasonic Examination
PO = Penetrating Oil Test, LPT = Liquid Penetant Test, PP = Pneumatic Pressure Test, MT = Magnetic Particle Examination
Notes:
1. Supply, Fabrication and delivery to site of built-up section is in Metscco scope
2. Joining of built-up section to form a circle is in Metscco scope
3. Levelling and installation of built-up section are Al Harbi responsibilities, however Metscco supervision is required during installation.
4. For Tank Testing, Refer document METS-T-1415-01_Rev.0