The execution of a

HERVE
HERVE
BARON
BARON

Complex Project…
A guided tour

© 2013 – Hervé Baron


HERVE
BARON
The actors The suppliers
The
COMPANY
The EPC
“Client”
Contractor

© 2013 – Hervé Baron


The sub-contractors
HERVE
BARON The phases

Sanction Sanction

Conceptual evaluation

© 2013 – Hervé Baron


Basic Engineering Project Execution
+ Pre-Project
By ENGINEERING by EPC CONTRACTOR
By COMPANY
HERVE
BARON
Design Procurement Manufacturing Shipping

Construction Inspection &


Installation Hand-over
& erection tests

© 2013 – Hervé Baron


HERVE
BARON The multiple sides of a Project

Project Control
PROJECT

Human Resources Management

© 2013 – Hervé Baron


HERVE
BARON
The multiple sites of a Project
Engineering Sub-Contractor
Home office (Paris) (India)
•Project management
•Detail Engineering (part) Detail Engineering (part)
•Procurement

Shipyard (Korea)
Hull Engineering & Fabrication

Satellite office
Detail Engineering (part)

Fabrication yard (Nigeria):


Fabrication (part)

© 2013 – Hervé Baron


Offshore (Nigeria):
Installation, commissioning, start-up
Shipyards (Singapore &
Malaysia)
Topsides Fabrication & Integration
HERVE
BARON

Project

Engineering Procurement Construction

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

© 2013 – Hervé Baron


HERVE The facilities design basis
BARON
Process facilities: Infrastructure:
50
Administrative and technical

Pressure (bar)
Feedstock and products flow 45 buildings
Feedstock composition 40
Control room
Battery limit conditions 35

30
Access road
Equipment Spare
25 Site fencing, gates, check point
20
Performance: 15
Design criteria:
Products specifications 10
% of over design
5
Energy efficiency, emissions
0
-85 -80 -75 -70 -65 -60 -55
Environment data:
Utilities:
Min/max temperature
Electric power supply
Rain/snow fall
Other utilities
Wind
Geological conditions
Systems:

© 2013 – Hervé Baron


Process control
Applicable codes and standards:
Fire/gas alarm
International standards
Public address, LAN, PABX
Local rules
HERVE Engineering
BARON
in the Project

Design basis: Documents for Construction:

- Functional Construction drawings &


requirements specifications
Engineering
- Client Documents for Purchase:
specifications
bill of quantity & specification
- Design codes

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


HERVE Process simulations
BARON

© 2013 – Hervé Baron


HERVE
BARON
Thermodynamic Heat & Material
calculations balance

© 2013 – Hervé Baron


Process Flow
Diagram (PFD)
HERVE
BARON Equipment list

© 2013 – Hervé Baron


HERVE
BARON

Equipment
duty

© 2013 – Hervé Baron


HERVE
BARON

Process data sheet

© 2013 – Hervé Baron


HERVE
BARON Process Flow Diagram (PFD)

© 2013 – Hervé Baron


HERVE
BARON
Piping & Instrumentation Diagram (P&ID)

© 2013 – Hervé Baron


HERVE
BARON

Piping &

© 2013 – Hervé Baron


Instrumentation
Diagram (P&ID)
HERVE
BARON
Process control

© 2013 – Hervé Baron


HERVE
BARON Emergency shut down

© 2013 – Hervé Baron


HERVE
BARON Emergency relief

© 2013 – Hervé Baron


HERVE
BARON Operating manual

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


HERVE
BARON

Rotating machinery

© 2013 – Hervé Baron


HERVE
BARON Pressure vessels

© 2013 – Hervé Baron


HERVE
BARON
Heat exchangers

© 2013 – Hervé Baron


HERVE
BARON
Packages,
Fired Equipment

© 2013 – Hervé Baron


HERVE
BARON

Process data
sheet

Mechanical
data sheet

© 2013 – Hervé Baron


HERVE
BARON Material Requisition

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE Fire fighting
BARON

© 2013 – Hervé Baron


HERVE
BARON Passive fire protection

© 2013 – Hervé Baron


HERVE
BARON
Fire & Gas detection layout

© 2013 – Hervé Baron


HERVE Environmental Impact Assessment
BARON

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

© 2013 – Hervé Baron


Equipment supporting
structures
HERVE
BARON

© 2013 – Hervé Baron


Piping supporting
structures (pipe-racks)
HERVE
BARON

© 2013 – Hervé Baron


Structural design
© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

Structural

© 2013 – Hervé Baron


drawings
© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

Architectural drawings

© 2013 – Hervé Baron


Equipment layout
drawing
© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

Layout/
principles

© 2013 – Hervé Baron


HERVE
BARON
Layout/consideration for all networks

© 2013 – Hervé Baron


HERVE
BARON General Plot Plan

© 2013 – Hervé Baron


HERVE
BARON

Piping Layout
drawing

© 2013 – Hervé Baron


HERVE
BARON 3D modelling

© 2013 – Hervé Baron


HERVE
BARON

3D model clash check

3D model review

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON Piping Design
ANSI B31.8 (for gas pipelines and
compressor stations)

© 2013 – Hervé Baron


HERVE
BARON Piping Design
ANSI B31.8 (for gas pipelines and
compressor stations)

© 2013 – Hervé Baron


HERVE
BARON Thickness (mm) Number of passes

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON
Isometric drawing

© 2013 – Hervé Baron


HERVE
Piping Pre-fabrication
BARON

© 2013 – Hervé Baron


HERVE
BARON

Piping General
Arrangement drawing

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON Standard Pipe Support
drawings

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON
Material Selection

© 2013 – Hervé Baron


HERVE
BARON Material Specification

© 2013 – Hervé Baron


HERVE
BARON Material Specification

© 2013 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE Instrument data sheet
BARON

© 2013 – Hervé Baron


HERVE
BARON

© 2013 – Hervé Baron


Process Control System
HERVE System architecture
BARON
drawing

© 2013 – Hervé Baron


HERVE Mechanical Equipment Control
BARON

© 2013 – Hervé Baron


HERVE The instrumentation hardware
BARON Instrument room Control room

Marshalling Controller
cabinet cabinet

VDU

PT JB

Process
line CPU

LAN
Secondary cable

Multi cable

© 2013 – Hervé Baron


HERVE
BARON

© 2013 – Hervé Baron


Building detail drawing/
Telecom and PAGA layout
HERVE Cable routing drawings
BARON

© 2013 – Hervé Baron


Cable list
HERVE
BARON

© 2013 – Hervé Baron


Cable routing inside
technical room
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2013 – Hervé Baron


HERVE
BARON

© 2013 – Hervé Baron


Electrical consumer list
HERVE
BARON

Electrical Load
Summary

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON

General One
Line Diagram

© 2013 – Hervé Baron


HERVE
BARON
Generators

Single line diagram

Switchgear

Transformer

© 2013 – Hervé Baron


HERVE
BARON Electrical equipment layout

© 2013 – Hervé Baron


HERVE
BARON

Electrical
Control System

© 2013 – Hervé Baron


HERVE
BARON

Process design

PFDs
H&M balance

© 2013 – Hervé Baron


HERVE
BARON

Process design

PFDs
H&M balance

Equipment specification
Process
data sheet
Rotating
Pressure vessels

© 2013 – Hervé Baron


Fired equipment
Heat exchangers
Packages etc.
HERVE
BARON

Process design

PFDs P&IDs

H&M balance

© 2013 – Hervé Baron


HERVE
BARON

Process design

PFDs P&IDs

H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Civil

© 2013 – Hervé Baron


Fired equipment
Heat exchangers
Electrical
Packages etc.
HERVE
BARON

Process design

PFDs P&IDs

H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Civil

© 2013 – Hervé Baron


Fired equipment
Heat exchangers
Electrical
Packages etc.
HERVE Electrical
BARON
Layout Instrumentation &
Vendor Control
Piping
Process

Civil

© 2013 – Hervé Baron


HERVE
BARON

What the
Vendor
supplied

What
Engineering
designed

© 2013 – Hervé Baron


HERVE Field Engineering
BARON

© 2013 – Hervé Baron


HERVE For more information and…
BARON
to get on top of Engineering in hours, not years!

A unique synthesis and


reference manual

200 pages, 250 illustrations

To browse the book:


http://goo.gl/dfDrS

To order with a 30% discount:


http://goo.gl/J3TkE
HERVE
BARON

Project

Engineering Procurement Construction

© 2013 – Hervé Baron


HERVE
BARON Procurement

© 2013 – Hervé Baron


HERVE
BARON Procurement / Steps

Inquiry (Call for Tender)


Short listing
Bid analysis
Clarifications
Negotiations
Purchase Order
Expediting
Inspection

© 2013 – Hervé Baron


Delivery
Warranty Period
HERVE
BARON Procurement / Supplier selection criteria

Technical Compliance
Price
Qualification of supplier
Schedule
Load of workshop
References
References with final Client
Financial situation

© 2013 – Hervé Baron


Annual turn-over
Internal feed-back
HERVE
BARON Procurement

© 2013 – Hervé Baron


HERVE
BARON Expediting

© 2013 – Hervé Baron


HERVE
BARON Expediting

© 2013 – Hervé Baron


HERVE
BARON Inspection

© 2013 – Hervé Baron


HERVE
BARON Inspection

© 2013 – Hervé Baron


© 2013 – Hervé Baron
Shipping
BARON
HERVE
© 2013 – Hervé Baron
Shipping
BARON
HERVE
© 2013 – Hervé Baron
Shipping
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

© 2013 – Hervé Baron


HERVE
BARON Earthworks

© 2013 – Hervé Baron


© 2013 – Hervé Baron
Pipeline
BARON
HERVE
© 2013 – Hervé Baron
Pipeline
BARON
HERVE
© 2013 – Hervé Baron
Roads
BARON
HERVE
© 2013 – Hervé Baron
Buildings
BARON
HERVE
HERVE
BARON Civil Works

Sand

Aggregate

Cement

Admixtures

© 2013 – Hervé Baron


HERVE
BARON Civil Works

© 2013 – Hervé Baron


HERVE
BARON Civil Works

© 2013 – Hervé Baron


HERVE
BARON Civil Works

© 2013 – Hervé Baron


HERVE
BARON Civil Works

© 2013 – Hervé Baron


HERVE
BARON Civil Works

© 2013 – Hervé Baron


HERVE
BARON Pre-fabrication

© 2013 – Hervé Baron


© 2013 – Hervé Baron
Erection
BARON
HERVE
HERVE
BARON Underground networks

© 2013 – Hervé Baron


HERVE
BARON Plant erection

© 2013 – Hervé Baron


HERVE
BARON Steel structure erection

© 2013 – Hervé Baron


HERVE
BARON Equipment installation

© 2013 – Hervé Baron


HERVE
BARON Equipment installation

© 2013 – Hervé Baron


HERVE
BARON Piping Pre-fabrication

© 2013 – Hervé Baron


HERVE
BARON Piping erection

© 2013 – Hervé Baron


HERVE
BARON Piping erection

© 2013 – Hervé Baron


HERVE
BARON Field Instrumentation Installation

© 2013 – Hervé Baron


HERVE
BARON Electrical equipment connection

© 2013 – Hervé Baron


HERVE
BARON Cable pulling

© 2013 – Hervé Baron


HERVE
BARON Arrangement of Technical rooms

© 2013 – Hervé Baron


HERVE
BARON Cable connections

© 2013 – Hervé Baron


HERVE
BARON Other Systems Field Equipment Installation

© 2013 – Hervé Baron


HERVE
BARON Control room consoles installation

© 2013 – Hervé Baron


© 2013 – Hervé Baron
Testing
BARON
HERVE
HERVE
BARON Commissioning
Handover System

Sub-System

Document Folder

Circuit Elect Equip Mech Equip

Instrument
Loop

Junction Instrument Instrument


Box Cable Tag

© 2013 – Hervé Baron


HERVE
BARON The multiple sides of a Project

Project Control
PROJECT

Human Resources Management

© 2013 – Hervé Baron


HERVE
BARON Project Organisation

Project
Manager

Engineering Procurement Project Control


Site Manager
Manager Manager Manager

Project Discipline Construction Contract Scheduling


Purchasers Expediters Inspectors Cost Control
Engineers Engineers Manager Manager Manager

Construction
Process
Superintendent

Construction
Civil
supervisor

Construction
Instrumentation
superintendent

Construction
Electrical
supervisor

© 2013 – Hervé Baron


Equipment
HERVE
BARON Project procedures

© 2013 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2013 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2013 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2013 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2013 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2013 – Hervé Baron


HERVE
BARON Construction Procedures

© 2013 – Hervé Baron


© 2013 – Hervé Baron
BARON
HERVE
HERVE
BARON Quality Control

© 2013 – Hervé Baron


HERVE
BARON Quality Control

Temperature
Sampling
Slump

© 2013 – Hervé Baron


HERVE
BARON Quality Control

© 2013 – Hervé Baron


HERVE
BARON Cost Control

© 2013 – Hervé Baron


© 2013 – Hervé Baron
Insurance
BARON
HERVE
HERVE
BARON Contracts

P.O.
P.O.

Purchase
Orders P.O.

EPC

Sub-Contracts
Main Contract Sub

© 2013 – Hervé Baron


Sub
HERVE
BARON Contracts

Terms and
Conditions
Price
Schedule
Performance
guarantees
EPC
Technical
Main Contract
basis
Specifications,
codes & stds

© 2013 – Hervé Baron


HERVE
BARON Contracts

© 2013 – Hervé Baron


HERVE
BARON Contracts

E P

© 2013 – Hervé Baron


HERVE
BARON Contracts

E P C

© 2013 – Hervé Baron


HERVE
BARON Contracts

© 2013 – Hervé Baron


∑ + x%
HERVE
BARON Construction contracts

Civil

© 2013 – Hervé Baron


HERVE
BARON Construction contracts

Mechanical

© 2013 – Hervé Baron


HERVE
BARON Construction contracts

E&I

© 2013 – Hervé Baron


HERVE
BARON Construction contracts

General
Contractor

© 2013 – Hervé Baron


HERVE Contracts
BARON
Terms and Conditions

EPC

Main Contract

Obligations of the 2 parties

© 2013 – Hervé Baron


Limit of liability
Penalties in case of bad performance
Conflict resolution
HERVE
BARON Quality Assurance (QA)

© 2013 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2013 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2013 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2013 – Hervé Baron


HERVE
BARON Document Control
Document code
1 Installation drawings
2 Detail drawings
3 Diagrams
4 Lists – Bill of Quantities
5 Isometrics
6 Calculation notes
7 Specifications
8 Data sheets
9 Requisitions

Discipline code
A Instrumentation & Control
C Civil engineering
E Electrical
G Project general documents
J Mechanical
K Safety

© 2013 – Hervé Baron


M Piping & Layout
P Processes
S Steel Structures
V Vessels – Heat exchangers
W Materials – Welding
HERVE
BARON Document Control

© 2013 – Hervé Baron


HERVE
BARON Document Control

Client

Documents Approval/
submitted
to client Comments

Engineering

Documents
Comments

© 2013 – Hervé Baron


submission

Vendors
HERVE
BARON Electronic Document Management System

Center 1 Sr.
Mgmt Center 2 Sr. Correspondence
Intranet / Mgmt
etc.
Internet

Electronic Document
Management System
Breakdown Projects
structures

Engineering
Reports
documents
Interfaces

© 2013 – Hervé Baron


Intranet /
Internet
Vendor
Satellite
documents
Engineering Construction
Center Site
HERVE
BARON Interface Management

© 2013 – Hervé Baron


HERVE
BARON Scheduling
MONTH
PROJECT SCHEDULE
PLANT START-UP
5
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

PIPING PRE-FABRICATION & INSTALLATION


PIPING MATERIAL & DRAWINGS AT SITE 4 X X X X X X X X X X

PIPING MATERIAL MANUFACTURING & SHIPPING X X X X X X


PURCHASE OF PIPING MATERIAL

2 3
TECHNICAL & COMMERCIAL CLARIFICATIONS X X
CALL FOR TENDER FOR PIPING MATERIAL
PREPARE PIPING MATERIAL TAKE-OFF X
PIPING ROUTING STUDIES 1 X X X
PIPING & INSTRUMENTATION DIAGRAMS (PIDs)

1 3 5

4 5
2

© 2013 – Hervé Baron


HERVE
BARON Scheduling

© 2013 – Hervé Baron


HERVE
BARON Progress Monitoring

How would you measure


progress?

© 2013 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2013 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2013 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2013 – Hervé Baron


HERVE
BARON IT

Today: 3D

Tomorrow:
15 years ago: 2D
3D & data

© 2013 – Hervé Baron


© 2013 – Hervé Baron
IT
BARON
HERVE
© 2013 – Hervé Baron
Safety
BARON
HERVE
HERVE
BARON
Safety

Guard Rail System with Toe Planking


Boards

Runner

Bearer

Cross Bracing Post

© 2013 – Hervé Baron


Sill Longitudinal Brace
© 2013 – Hervé Baron
Safety
BARON
HERVE
HERVE
BARON
Human resources / career path

Graduate Engineer, 25 years old

Process Engineer 3-5 yrs

Project Engineer 5 yrs

Engineering Manager/ 5-7 yrs


Deputy Project Manager

Project Manager
40-45 yrs old

© 2013 – Hervé Baron


Note: the career pattern shown here is a very fast track one to the PM
position... One would enjoy oneself just as well taking more time!
HERVE Beyond this presentation…
BARON

Share my new developments


Find my other on-line and classroom training

http://www.toblog.fr/en/baron.html

© 2013 – Hervé Baron