Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Project Management
Name:
Course:
Tutor:
Institution:
Date:
PROJECT MANAGEMENT
Project Management
1. Evaluate the criteria FEL uses to assign managers to project teams. What
The criteria applied by FEL in assigning managers to the project team is clear. The
assignments are done based on the availability and expertise of the managers to operate on the
project. For instance, if a manager is assigned a project and the project will run up to July 20th
and another project of the similar nature will begin from 22nd same month same year, then the
manager will eventually undertake the new project. In other words, given that a manager is not
occupied with a current project undertaking, the new project will be assigned automatically
On matters of efficiency towards the projects, managers gets assigned to the new projects
on basis of their availability and loyalty. No assignments are done based on the work the worker
is performing. With no doubts, there are many challenges experienced as a result of using this
criteria. There are cases where some employees have been inefficient towards the tasks because
they do not want to experience burdens of finishing tasks on time and not before time. Another
problem is that the issue of working conditions is not put into consideration. As seen in the case,
two of the workers have engaged in a clash and there is no top management representative or any
other member from the company comes in to handle and resolve the problem (Imbeah &
Guikema, 2009).
2. Why is it even more important that project team members work well together on
When working on international projects, project team members are advised to work
together as a team. For instance, working for a project such as Project Abu Dhabi bearing in
mind that FEL is a known brand by many, the team will ensure that their efforts are productive in
marketing the product in foreign regions. Working as team helps the team to make research on
various marketing strategies that benefit their task. Such a move helps them become successful
and penetrate international market (Larson & Gray, 2014). As a result of working as a team and
the company becoming a renowned element, FEL has been able to engage and sign contracts
The organization is facing some challenges from the old employees such as Rankin and
Perry clashing. These two employees feels uncomfortable working together in their assigned
projects because of personal reasons. Such a situation affects and hinders effective operations of
the company. The area in which the top management fails is that they are assuming that the two
personal issue won’t affect or hinder operations of their work (Imbeah & Guikema, 2009). There
is need for a critical workplace training for al project team members that highlights some of
essential aspects. Some of the elements that should be pointed out in the training should include
the professionalism of all employees, setting common goals as a team, understanding the need
for the company projects, and the need for effective and suitable communication for all
employees.
There are a number of dilemma situations that Jobe is facing in the current times. As he
interviews the managers (Bruder, Rankin, and Perry), Jobe received some negative feedback
comments from this team about the current project of Abu Dhabi. As seen from the interview,
the team members have a feel that the new project won’t be successful rather it will just be a
PROJECT MANAGEMENT
failure for the company (Larson & Gray, 2014). The misunderstanding between Rankin and
Perry is another dilemma that Jobe faces since the two are effective employees. It is clear that the
two have differences, but Stonebreaker is seen not to mind when the two are put for a common
project.
Jobe is a confused person on matters of team reaction. The members have failed to
support moreover, something that makes Jobe feel stressed on Gatenby expectations about the
project. Gatenby trusts the work of Jobe and expects a successful implementation of the task.
Another stressing issue is that Gatenby expects Jobe to deal and respond to the clash facing
Rankin and Perry without affecting Abu Dhabi project (Larson & Gray, 2014).
Having hopes and expectations from your employees is not bad as seen in this case. The
problem or the risk is keeping unwanted expectations or expecting more than the employee can
handle. Jobe is known to be a successful person who does things in a professional way, hence he
has managed to implement a number of projects. Because of the negative attitude of most of the
team members and the clash between Perry and Rankin, executing the project in expected
There are recommendations that Jobe should have for Gatenby. Since Gatenby is the
senior manager, he should take the initiative of addressing the top managers and if possible new
project team members should be recruited for the project (Imbeah & Guikema, 2009). A face to
face interaction with the entire team should be made to address the way forward for the Abu
Dhabi project. The current clash between the two employees should be taken serious as it might
References:
Imbeah, W., & Guikema, S. (2009). Managing Construction Projects Using the Advanced
9364(2009)135:8(772)
Larson, E. W., & Gray, C. F. (2014). Project management: The managerial process (6th ed.).