A. The length of the above project for DPR preparation as per LOA is 99.00 Km. The length of
the existing alignment connecting NH-66 (at Talere Junction) to NH-166 (at Kolhapur, near CPR
hospital) based on topographic survey is 88.30 Km. But it is decided to end the project section at
the start of the Kolhapur Municipal Corporation limit since the section within the Municipal area
is already 4-lane. Thus the existing length of the project section under scope is 83.950 Km whereas
the design length is 82.440. The Contract price of the DPR package is Rs. 2,28,27,500.
1. The route of the DPR package as per LOA is “Kolhapur – Gaganbawda – Talere” and
which is the final project route.
2. The start and end points of the project along with landmark details of those locations are as
below:
Sl. No. Reference Chainage & name of place Land mark
1. Start point At existing Ch. 53.600 (Design Talere village, Km 287.200 of NH-66
Km 0.000), Talere junction (Mumbai-Goa highway)
2. End point At existing Ch. 138.360 (Design At the start of Kolhapur Municipal
Km 82.440) near Phulewadi Corporation limit (near start of
Kolhapur Ring Road)
B. The particulars of the project stretch as per survey and design along approved alignment
are as follows:
1. The location of major towns / cities/ tourist centres on the project stretch are as follows:
Sl. Name of town / city / tourist centres Existing Ch. (Km)
No.
1 Talere 53.600
2 Vaibhavwadi 67.000
3 Gaganbawda 86.000
4 Salwan 111.300
5 Kale 121.500
6 Balinge 135.100
2. The location of existing major bridges on the project stretch are as follows:
Sl. Existing Ch. (Km) Name of Length of Span Year of
No. location / river bridge (m) arrangement construction
1 134.650 Bhogawati River 120.0 5 x 20.50 -
3. The location of major junctions (With NH / SH) on the project stretch are as follows:
Sl. Details of junction (with NH Type of intersection Existing Ch. (Km)
No. no…/ SH No….)
1 NH-66 (LHS-Mumbai, RHS-Goa) T-Junction 53.600
2 SH (RHS-Phonda) Y - Junction 67.585
Sl. Details of junction (with NH Type of intersection Existing Ch. (Km)
No. no…/ SH No….)
3 SH (LHS-Umbarde) Y - Junction 68.390
4 SH (LHS-Bhui Bawda) T - Junction 86.300
5 MDR (LHS-Kumbharwadi) T - Junction 122.250
6 Kolhapur Ring Road T - Junction 137.500
5. The location of ROBs / RUBs / flyovers and level crossings on the project stretch are as
follows:
Sl. Description (ROB/RUB/Flyover / level Existing Chainage of the ROB/RUB/flyover
No. crossing) & name of place, if any / level crossing
1 LC-21, TVU-186283, DoS: 18.01.16 to 66.320 (Near Kokisare)
24.01.16, Rly Km 287/9
10. The details of declared length of NH/ yet to be declared length are as follows-
11. The project has these specific features that need special mention……..