a) M-20
Fotting 600 0.75 0.75 0.40 Cum 135.00
16 1 1 0.40 Cum 6.40
Coloum 600 0.2 0.2 0.60 Cum 14.40
16 0.3 0.3 0.60 Cum 0.86
Plinth beam 1 1900.00 0.20 0.20 Cum 76.00
10 4.00 0.20 0.30 Cum 2.40
Coloum 600 0.20 0.20 1.80 Cum 43.20
110 0.20 0.20 0.60 Cum 2.64
16 0.30 0.30 1.50 Cum 2.16
Copping 1 264.00 0.20 1.80 Cum 95.04
Total 378.10 4726.00
4 Centering and shuttering including strutting,
propping etc.and removal of form for :
20.1.1 Foundations, footings, bases of
columns etc. For mass concrete.
Sqm.
Fotting 600 0.75 0.40 Sqm. 180.00
16 1 0.40 Sqm. 6.40
Coloum 600 0.2 0.60 Sqm. 72.00
60 0.3 0.60 Sqm. 10.80
Plinth beam 1 1900.00 0.20 Sqm. 380.00
1 2.80 0.20 Sqm. 0.56
16 4.00 0.30 Sqm. 19.20
10 4.00 0.20 Sqm. 8.00
Coloum 800 0.20 2.00 Sqm. 320.00
60 0.20 0.60 Sqm. 7.20
60 0.30 1.50 Sqm. 27.00
Copping 10 264.00 0.10 Sqm. 264.00
Total 1295.16 138.00
.
5 Reinforcement for R.C.C. work including .
straightening, cutting, bending, placing in
position and binding including cost of
binding wire upto floor two level including
all wastages etc. complete.
TOTAL
Say
Amount
10
397062
3107885.76
1786919.504
178732.08
350398.80
3208857.12
307200
9337055.26
93.37