INTRODUCTION OF PROJECT
Project title : Construction and completion 1 unit semi-detached house 2
storey high Type B (Lot Lama 1774)
Address : Jalan kapar, Taman Sri Kapar (KU13), Mukim Kapar, Klang
Bandar Diraja, Selangor Darul Ehsan
Building Purposes: Residential
Type of Project: Private
SITE CONDITION
Generally flat. All earthwork, site clearance, external infrastructure works have
already completed by others.
KEY PLAN

CONSTRUCTION SITE
LOCATION PLAN
SITE PLAN
SEMI D TYPE A

SEMI D TYPE B
SEMI D TYPE B
FLOOR PLAN - GROUND FLOOR & FIRST FLOOR
FLOOR PLAN - ROOF PLAN
ELEVATION

FRONT ELEVATION BACK ELEVATION


ELEVATION

RIGHT ELEVATION
SECTIONS

SECTION B-B SECTION A-A


FORM OF CONTRACT
PAM Contract 2006 with Quantities

Under the terms and conditions of the PAM Standard Form contract 2006,
both the employer and contractor form the contractual parties to the
contract.

To ensure that the Contract is administered fairly between both


Contractual Parties, PAM Contract 2006 places the administration under
third party, namely the Architect.
FORM OF CONTRACT (contd)
Reasons of using PAM contract 2006 with Quantities

Quality and Quantity of works

Under clause 12, where PAM with quantities mentions that Contract Bills
form the basis for quantity of the works while PAM without quantities
mentions that the Contract Sum is derived from the contractor's own
estimate of the quantity based on Drawings and Specifications.

To ensure the performance on the quantities of works, BOQ is therefore


crucial to provide accurate and sufficient information of the project.
FORM OF CONTRACT (contd)
Completion of work on time

Under clause 22.1, liquidated damages and certificate of non-completion,


if the contractor fails to complete the works by the completion date and it
shall be ought to be completed in the opinion of the Architect, the architect
shall issue the certificate of non-completion.

The contractor will compensate the employer from the damages or


referred to as Liquidated Damages from the sum as a debt or from the
performance bond.
FORM OF TENDER
Form where the tenderer insert his
tender amount and agreement to
other specified tender conditions by
attesting its signature or company seal
and making this form to be his legal
offer to the Employer
INSTRUCTIONS TO TENDERER
Served to inform the tenderer on the
general rules & procedures that they need
to comply within the entire tendering
process
CONDITIONS OF TENDERING
Conditions of tendering is a rules and terms specific to a tender, submission,
evaluation and awarding of the contract.

Basis of Tender

Firm price tender and no claim is allowed for variation

Tender Deposit

Fee for the tender documents, RM500.00 shall pay in cash to

7QS CONSULTANT SDN BHD


CONDITIONS OF TENDERING (contd)
Tender Bond
- Shall made in the form of Bankers Draft or unconditional Bankers Guarantee
- Shall be retained and remain valid until the expiration of 90 days after the
closing of tender
Tender Validity Period

Remain valid open for consideration for a period of 90 days from the final

closing date for the submission of Tenders


FINAL SUMMARY OF TENDER
Summary of total amount of
every bill in bills of quantity

Total bill will be tender sum


PREAMBLE
Contain clauses that serve to introduce
and explain the provisions in the
Specification and Bills of Quantities
sections and the scope of coverage of
the rates in the BQ
SPECIFICATIONS
Contain extensive clauses on detail
procedures to be followed in executing
the works; requirements & description
of the works to be performed

Eg: Quality & performance of materials


Bill of Quantities
BILL NO. 1 - PRELIMINARIES
The purpose of Preliminaries is to
provide information, general
obligations and liabilities of the
project.

INSURANCE

Insurance of New Building/Works -

By The Employer
BILL NO. 1 - PRELIMINARIES
PROTECTION, PRECAUTION
& PREVENTION

Safety Precaution

Maintenance & protection of


Public Property

Mosquito Prevention

Watching and Security

Fencing and Hoarding


BILL NO 2 - MAIN BUILDING WORKS
PILLING

WORK BELOW LOWEST FLOOR FINISH

FRAME

UPPER FLOORS

ROOF

STAIR AND STAIRCASE FINISHES

EXTERNAL WALLS
BILL NO 2 - MAIN BUILDING WORKS
INTERNAL WALL AND PARTITIONS

WINDOWS & DOORS

INTERNAL WALL FINISHES

INTERNAL FLOOR FINISHES

INTERNAL CEILING FINISHES

EXTERNAL FINISHES

EXTERNAL WORK WITHIN BOUNDARY


BILL NO. 3 - PC AND PROVISIONAL SUMS
Prime Cost (PC) sums

Sums included in the contract to cover specialist works and the supply of
specific materials, which entail the employment of nominated
sub-contractor or nominated supplier.

Provisional sums

Sums included in the contract for works which the full extent and character
cannot be determined precisely at the time the BQ is prepared.
APPENDICES- LIST OF DRAWINGS
SCHEDULE OF FINISHES (1st Floor)
SCHEDULE OF FINISHES (Ground Floor)
SCHEDULE OF FINISHES CONTD (Ground Floor)
Terrazzo Tiles Cement Render

Anti-Slip Ceramic
Tiles for bathrooms
Timber Flooring Ceramic Tiles for Staircase
Cement Plaster Ceramic Wall Tiles in Cement Plaster
Emulsion Paint Bathroom Weathershield paint
Skim Coat Skim coat with plaster cornices
SCHEDULE OF DAYWORK RATES
SCHEDULE OF DAYWORK RATES
PRICES OF BASIC MATERIALS
FORM OF BANK GUARANTEE FOR EARNEST MONEY/ TENDER BOND
FORM OF BANK GUARANTEE FOR PERFORMANCE BOND
THANK YOU