Im pleased to bring you our first Procon- Second, we would like to tell you about all and will pack them with valuable informa-
trol P13 Newsletter, intended for users of of the upgrade possibilities designed to tion for you. In addition, we encourage
the ABB Procontrol P13 control system. increase the performance of this system, feedback and invite you to share your
You might wonder why we would start a which can help secure your equipment interests and comments with us. We are
newsletter now for a control system that investments. delighted to provide any additional infor-
was introduced to the Power Genera- mation or advice you may need.
tion sector in 1982. It is not a marketing And finally third, we want to share with
oversight, so let me assure you there are you news about ABB`s R & D investments I wish you happy reading.
good reasons. in this platform, investments that are
designed to secure production and the
First, its an opportunity to remind you of availability of electronic components, and Kind regards
the fact that our Procontrol P13 control which enable 100 percent compatibility Matthias Bolliger
system family has now reached its fourth so your system is always ready for easy VP, Head of Global Execution
decade, and is still going strong. It might migration, the last step to making an
be hard to find another DCS that has investment future-proof.
been maintained for four decades, and is
committed to reaching five. We plan to issue three newsletters annually,
Projects Projects
Extending the life of the worlds ABB control solution delivers big savings
largest CSP plant for Indian hydropower plant
ABB has upgraded with state-of-the-art features the 22-year-old turbine control The Ranganadi Hydroelectric Project is a 405 megawatt (MW) generating plant
systems at the Harper Lake solar thermal power plant in the Mojave Desert, on the Ranganadi River in Arunachal Pradesh, northeastern India. A 68-meter tall
California. dam diverts water south into a 10-km long headrace tunnel, which is then diverted
into a 1,062 meter long penstock before it reaches three 135 MW turbines.
Built in 1989 and 1990 respectively, the ABB began work on upgrading the four The result is a cutting-edge turbine con-
two 80 MW units that make up the 160 MW units in 2010 and executed the project in trol system that provides NextEra Energy
Harper Lake solar thermal power plant stages over the course of two years during with faster fault finding, better diagnostic The plant is one of fi ve completed hydro
have been the largest solar thermal gen- scheduled outages and without additional capability, safer and more reliable opera- generation facilities operated by the state
erating units in the world for well over downtime. In line with ABBs control sys- tion, up-to-date documentation, fewer utility, North Eastern Electric Power Cor-
two decades. tem strategy of protecting as much of the spare part requirements, and a built-in poration Limited (NEEPCO), which cur-
customers investment in hardware and capability for the future addition of a re- rently oversees 1,130 MW of installed ca-
Along with five 30 MW units at Kramer software as possible, ABB retained the dundant processor. The Procontrol P13 pacity. The Ranganadi generation plant
Junction, and a 14 MW and 30 MW unit existing cabinets and I / Os to avoid new platform is now in its fourth decade of uses a Procontrol P13 / 42 control system
at Degget, Harper Lake is part of the vast wiring and commissioning. The processor providing safe and reliable power plant to auto sequence the complete operation
354 MW Solar Electric Generating Sys- was upgraded to the latest 70PR05 pro- operation. ABB continues to actively of three turbines. Operation was enabled
tems (SEGS) solar power facility, which cessing module, the bus traffic director maintain Procontrol P13 to safeguard completely through the backup panel
was built between 1984 and 1990 and was upgraded to enhance the systems the previous investments of its custo- there was no HMI (human machine in-
is the biggest and oldest solar thermal diagnostic capabilities, and the old HEX mers in the platform, ensuring seamless terface) which created difficulties for
complex in the world. code-oriented program was converted into evolution to Symphony Plus. operation and maintenance, trip analysis,
graphic-oriented tool. fault finding, etc, and provided no way to
ABB supplied the original Procontrol P13 implement preventive maintenance steps.
turbine control systems for the two Harper
Lake units and for two of the 30 MW solar Ranganadi plant technical array
thermal units at Kramer Junction, all of There are 70 analog and 325 digital I / Os
which are equipped with ABB steam turbi- ABB began work on upgrading the four units in 2010 per turbine, and 52 common analog and
nes and generators from the same period. and executed the project in stages over the course 122 common digital I / Os for the three
Although the original turbine control sys- units. With respect to the control sys-
of two years during scheduled outages and without
tems were still in perfect working order, tem, there is one redundant intra-plant The new Ranganadi HMI system features and ABB provided four customized face-
they were no longer at the cutting edge. additional downtime. In line with ABBs control system bus connecting six stations with a total two Symphony Plus servers (only one plates for the customer, in order to handle
Plant owner, NextEra Energy, the largest strategy of protecting as much of the customers of seven 70PR05a processor modules operates during runtime; the other re- SetPoint / Manual Station functionality,
generator of solar and wind power in the
investment in hardware and software as possible, two per unit, and one common to all units. mains on cold standby mode) and three due to non-standard logic usage. The ABB
United States, required a costeffective operator stations, one for each unit. solution represents a huge cost savings
state-of-the-art upgrade with minimal ABB retained the existing cabinets and I / Os to avoid Station 4 interfaces with the microcom- Together with the latest windows-based for the customer because it avoids a
disruption that would improve plant ope- new wiring and commissioning. puter bus, having the complete fami- engineering and diagnostic solution for total control system retrofit, while simul-
rations and reliability. ly of SK30 modules, and serves as the Procontrol P13, Progress 3, this enables taneously delivering the desired goal of
sequence-of-events recorder, and the the operators to completely operate and easier maintenance. ABB carried out the
PRAUT and SK03 interface. The PRAUT maintain the plant with all possibilities HMI implementation during the units
system, however, is nonfunctional today. in fault-finding, trip analysis, and even planned maintenance outage, avoiding
preventive maintenance. major generation loss. In addition to
Rather than completely revamp the Ran- the cost savings and ease of operation
ganadi control system with the latest To enable this comprehensive access to and maintenance, ABBs solution for the
state-of-the-art hardware, NEEPCO lis- the plant, virtual process control (VPC) en- plant reduces downtime and increases
tened to ABBs assurances that it would gineering was done on site for 204 drives, efficiency.
support the Procontrol P13 / 42 control
system for the next 15 years at least with
spares and lifecycle support. In addition, The ready-made connectivity solution for integrating
the ready-made connectivity solution for Procontrol P13 into Symphony Plus enabled the
integrating Procontrol P13 into Symphony
Plus, enabled the customer to retain the
customer to retain the existing control system hard-
existing control system hardware while ware while installing the latest state-of-the-art HMI
installing the latest state-of-the-art HMI at the same time.
at the same time.
2 The ABB Procontrol P13 newsletter 1 | 13 The ABB Procontrol P13 newsletter 1 | 13 3
Product news Projects
4 The ABB Procontrol P13 newsletter 1 | 13 The ABB Procontrol P13 newsletter 1 | 13 5
Contact Contact
ABB United Arab Emirates: Prakash Mysore ABB Malaysia: Kuang-Meng Yang
Phone: +971 2 4938382 Phone: +60356284567
ABB Peru: Julio Regalado E-mail: prakash.mysore@ae.abb.com E-mail: kuang-meng.yang@my.abb.com
Phone: +5114155100 1403
E-mail: julio.regalado@pe.abb.com
ABB Brasilia: Adriano Pires ABB Bahrain: Rajeev Padmanabhan
Phone: +55 1124644854 Phone: +97317810647
E-mail: adriano.pires@br.abb.com E-mail: rajeev.padmanabhan@bh.abb.com
ABB Argentina: Daniel Guerrero ABB South Africa: Johann Wasserman ABB Singapore: Ikshvakoo Vaid ABB Australia: Andrew Joyce
Phone: +54 11 4229 5500 Phone: +27 10 202 6007 Phone: +65 6773 8240 Phone: +61 3 8577 7369
E-mail: daniel.guerrero@ar.abb.com E-mail: johann.wasserman@za.abb.com E-mail: ikshvakoo.vaid@sg.abb.com E-mail: andrew.joyce@au.abb.com
6 The ABB Procontrol P13 newsletter 1 | 13 The ABB Procontrol P13 newsletter 1 | 13 7
Contact us
P13 Global Execution Center
01.13
The information in this document is subject to change without notice and
Power Systems
should not be construed as a commitment by ABB. ABB assumes no
Bruggerstrasse 72 responsibility for any errors that may appear in this document. In no event
1KHA-001316
CH-5400 Baden, Switzerland shall ABB be liable for direct, indirect, special, incidental or consequential
Phone: +41 (0)844 845 845 damages of any nature or kind arising from the use of this document,
nor shall ABB be liable for incidental or consequential damages arising
(customer contact center 24hours / 365days)
from use of any software or hardware described in this document. This
Phone: +41 (0)58 585 88 80 (during office hours) document and parts thereof must not be reproduced or copied without
Email: plantcontrol.support@ch.abb.com written permission from ABB, and the contents thereof must not be