List of Materials

No. Item Name Unit Unit Price (Php)


M. Material
M-1 Injection set for Epoxy Injection) Set 175.00
M-2 Injection Pipe for Caulking Set 127.00
M-3 Epoxy Resin for Injection kg 1,465.00
M-4 Epoxy Grout for Caulking kg 1,360.00
M-5 Epoxy Putty kg 658.00
M-6 Caulking sealant Lit. 700.00
M-7 Epoxy Primer kg 1,465.00
M-8 Epoxy coating for crack kg 1,465.00
M-9 Epoxy Resin Adhesive CFS kg 1,565.00
M-10 Epoxy Resin Adhesive CFP kg 1,565.00
M-11 Epoxy Resin Adhesive Steel Plate kg 1,565.00
M-12 Thinner Lit. 100.00
M-13 Gasoline Lit. 50.00
M-14 Carbon fiber sheet M2 6,750.00
M-15 Carbon fiber sheet Strap (W=500) M2 6,750.00
M-16 Carbon fiber Plate (W=50mm, t=1mm) M 1,800.00
M-17 Carbon fiber Plate (W=50mm, t=2mm) M 3,600.00
M-18 Steel plate (SS400) incl. fabrication kg 170.00
M-19 Rubber compound membrane kg 630.00
M-20 Primer for waterproof kg 495.00
M-21 Tack coat kg 400.00
M-22 Asphalt compound membrane kg 320.00
M-23 Silica sand #4 kg 54.00
M-24 Primer to Concrete Surface kg 440.00
M-25 Zinc Rich Primer kg 530.00
M-26 Special Anti-Corrosion Paint kg 700.00
M-27 Polyurethane Aluminum Paint kg 415.00
M-28 Epoxy Polyimide Paint kg 300.00
M-29 Concrete Class-A M3 7,900.00
M-30 Concrete Class-B M3 5,500.00
M-31 Leveling Concrete M3 4,000.00
M-32 Cement Mortar 1:3 M3 3,600.00
M-33 Polymer cement mortar kg 190.00
M-34 Non-shrink Mortar M3 16,500.00
M-35 Formwork (Soffit type) M2 560.00
M-36 Formwork (Mail box type) M2 580.00
M-37 Formwork (Envelop type) M2 380.00
M-38 Rebar kg 45.00
M-39 Anchor Bolt M20x50mm No. 100.00
M-40 Anchor Bolt M20x200mm No. 250.00
M-41 Wood (5 time use) M3 3,500.00
M-42 Steel Angle 75x75x6 kg 45.00
M-43 Seamless joint set M 10,500.00
M-44 Steel Finger Expansion Joint(2030mm) M 15,500.00
M-45 Laminate Rubber Bearing M3 1,300,000.00

M-46 H.T.B M22x125(Average) No. 108.00


M-47 Boulder M3 380.00
42
M-48 Crushed Stone M3 540.00
M-49 Gabion Mattress 3.0x1.5x0.5 No. 3,500.00
M-50 Cobble Filling M3 450.00
M-51 Wooden Pile 0.2x0.2x2.0m No. 2,100.00
M-52 Filter Fabric Sheet M2 110.00

B. Labor
B-1 Foreman M/D 1,200.00
B-2 Technician M/D 1,000.00
B-3 Skilled Worker M/D 703.00
B-4 Common Labor M/D 542.00

Note: Foreman & Technician are Manila base and Skilled worker
and Common labor are locally recruited.

E. Equipment/Tool
E-1 Disc Sander 50 210.00
E-2 Concrete Breaker 3,877.00
E-3 Saw Cutter 290.00
E-4 Injection Pump 150.00
E-5 Generator 2KVA 104.00
E-6 Generator 15KVA 113.00
E-7 Air Compressor 0.4KW 125.00
E-8 High Pressure Water Blaster 380.00
E-9 Melting Kettle 400 Lit. 250.00
E-10 Grout Mixer 200lit 374.00
E-11 Vibrator 45mm 101.00
E-12 Welder 300A 74.00
E-13 Concrete Drilling Machine 2,182.00
E-14 Vibration Roller 3,082.00
E-15 Compactor 187.00
E-16 Sand Blast Machine 300.00
E-17 Hydraulic Jack 75 ton 2,666.00
E-18 Dial Gauge 75.00
E-19 Torque Wrench 122.00
E-20 Pile Hammer 4,427.00