By
Prasad Vejendla
Faculty in Mechanical Engineering
KHIT, Guntur
03.09.2012
TYPES OF POWER HOUSE
Surface.
Semi Under Ground
Under Ground.
SURFACE POWER HOUSE
All components of the Hydro power projects are
on the natural/excavated ground surface.
Surface power house has the advantage of pre-
determined topography ,design and is easy to
construct. However, these have the
disadvantage of limitation of head available as
per the topography.
In such projects the water inlet to the machines
could be from a penstock or from a tunnel
terminating into a penstock. The water outlet
goes into a tail race.
If the power house is located just adjacent to the
Dam then it is sometimes called a Dam-toe
power house.
Surface Power House
Surface power house
EOT CRANE
GENERATOR
TURBINE
Semi Underground powerhouse
Some components of the power house are
underground, while others are on surface.
The advantages of both surface &
underground are clubbed together in a
semi-underground powerhouse, provided
topography & geology so permit.
UNDER GROUND POWER HOUSE
DEAD STORAGE
Reservoir storage which cannot be used for generation
and is left for silt deposition( below MDDL)
LIVE STORAGE
The storage in the reservoir which is available for power
generation (between FRL & MDDL)
FIRM POWER
Continuous power output in the entire period of
hydrological data at 90% dependability
FIRM ENERGY
Energy generated corresponding to firm power
Hydro Development- IMPORTANT
TERMS- Cont
Peak Energy
Electric energy supplied during periods of relatively high
system demands.
Off-peak Energy
Electric energy supplied during periods of relatively low
system demands.
Load Factor
Ratio of the average load over a designated period to the
peak-load occurring in that period
DIURNAL STORAGE
Storage required to meet daily variations in load demand. It
depends upon the minimum flows and peak discharges.
Hydro Development- IMPORTANT TERMS
Cont
CRITICAL PERIOD
Most critical period with respect to system load
requirements, begins when reservoir begins
delivering water for generation from full i.e the
available storage is fully drafted at one point
during the period; and the critical period ends
when the storage has completely refilled.
CRITICAL DRAW DOWN PERIOD
That portion of the critical period in which
reservoir live storage is completely drafted while
meeting firm energy requirements
IMPORTANT TERMS HEAD Cont.
Design Head
The head at which the turbine will operate
to give the best overall efficiency
under various operating conditions.
Gross Head
The difference of elevations between
water surfaces of the forebay/ dam and
tailrace under specified conditions.
Net Head
The gross head chargeable to the turbine
less all hydraulic losses in water
conductor system.
Major components of Hydro
Power Stations
Dam/Barrage
Water Conductor System
Power House
Dam/Barrage
Located on rivers, where rock is
available at larger depth.
The dam/ Barrage is used for
delivering/diverting the water to
the water conductor system.
The barrage is used to regulate the
water for power generation.
DAM KURICHU
BARRAGE AT URI
Water Conductor System
Water conductor system consists of
head race tunnel of suitable size.
Water conductor system may consist
of tunnel, channel, cut and cover as
per the topography involved.
At end of tunnel there is surge shaft.
The water conductor system conveys
water to penstock.
Components of Water
Conductor System
Water intake structure
Head Race Tunnel
Surge shaft ,Pressure shaft ,gates,
gates and hoisting mechanism
Penstock Protection Valve
Penstock
Main inlet Valve
Tail Race Tunnel
Water Intake Structure
It consists of gated structure at the
dam/Barrage to control the flow of
water and provided with gates along
with hoisting arrangement.
Normally these gates remain open and
allows water to flow to the tunnel
/channel as the case may be until and
unless water conductor system is
taken under shut down for repair and
maintenance.
Surge Shaft
Surge shaft is located at the end of
tunnel .
It is a well type structure of suitable
height and diameter to absorb the
upcoming and lowering surges in case
of tripping and starting of the machine
in the power house.
The surge shaft is provided with gates
to stop flow of water to the penstock if
repairs are to be carried out in the
penstock or inlet valves.
Penstock Protection Valve
Nore Doppel -
NORWAY
KAPLAN
SPIRAL CASING
CUT SECTION SPIRAL CASING
FRANCIS RUNNER
AGUS-
PHILIPINES
FRANCIS RUNNER LIFTING
FRANCIS RUNNER BEING
HANDLED BY EOT CRANE
GENERATOR
Hydro generator is coupled to the turbine and converts the
mechanical energy transmitted by the turbine to electrical energy
Generators can be of:
Suspended type
Umbrella type
Main Generator components include:
Stator
Rotor
Upper Bracket
Lower Bracket
Thrust Bearing & Guide Bearings
Slip Ring & Brush Assembly
Air Coolers
Brakes & Jacks
Stator Heaters
UMBRELLA TYPE GENERATOR
COMBINED
LOWER
THRUST &
GUIDE
BEARING
SUSPENDED TYPE GENERATOR
UPPER
THRUST
BEARING -1
UPPER GUIDE
BEARING -1
LOWER GUIDE
BEARING -1
GEN SEC
STATOR SEGMENT
ROTOR
GOVERNOR