CAN/CSA Z245.20 Plant-applied External Coatings for Steel Pipe March 2012
Series 10
CSA C22.3 No. 6-13 Principles and Practices of Electrical Coordination June 2014
Between Pipelines and Electric Supply Lines
Page 1 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Page 2 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
ASME BPVC Section IX Welding, Brazing and Fusing Qualifications 01 July 2013
Page 3 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Other
Drawing Specifications
Design Standards
Administration
D01-101 Use of Engineering Standards January 1, 2005
D01-102 Policy & Style for Engineering Standards October 20, 2008
Page 4 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Page 5 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Page 6 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Electrical: 5 kV
Electrical: Other
Page 7 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Electrical: Power
Electrical: Transformers
Mechanical
EES101 Electric-Welded Steel Pipe (Supplement to API 5L) December 21, 2012
EES102 Submerged-Arc Welded Steel Pipe (Supplement to
November 29, 2013
CSA Z245.1-07)
EES103 Submerged-Arc Welded Steel Pipe (Supplement to
November 29, 2013
API 5L)
Mechanical/Electrical: HVAC
EES031 Heating, Ventilation & Air Conditioning Unit November 29, 2013
Page 8 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
EES016 Positive Displacement Meters for Custody Transfer May 28, 2014
Mechanical/Electrical: Other
EES004 Vertical Centrifugal Primer Sump Pumps & Motors November 29, 2013
EES027 Booster Pumps & Booster Pump Motors December 18, 2013
Buildings
Page 9 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
EES017 Skid Mounted Self Framing Metal Shelters November 29, 2013
EES053 Skid Mounted Self Framing Hazardous Waste
November 29, 2013
Storage Building
Painting Specifications
Coating
C-010 External Fusion Bonded Epoxy Coating for Mainline December 1, 2007
Pipe
C-020 Fusion Bonded Epoxy Coating Overcoated with Powder December 1, 2007
Coating
C-310 Coating of Girth Welds with Fusion Bond Epoxy November 2007
C-420 Coating of Buried Steel with Wax Tape Systems October 2001
Lining
L-210 Lining of Tanks with Spray Applied Coatings June 25, 2012
L-310 Lining of Tank Lines with Spray Applied of Fusion
May 2008
Bonded Coatings
Painting
Page 10 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Page 11 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Industry Standard
Page 12 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Canadian Pipeline Water and Crossing Committee. Watercourse Crossings, Second Edition.
Fisheries and Oceans Canada (DFO). Fresh Water Intake End-of-Pipe Fish Screen Guideline.
March 1995.
Government of Alberta. Alberta Environment. Water Act, Code of Practice for Pipelines and
Telecommunication Lines Crossing a Water Body.
Government of Alberta. Environmental Protection and Enhancement Act: Code of Practice for
the Release of Hydrostatic Test Water from Hydrostatic Testing of Petroleum Liquid and Gas
Pipelines. January 1999.
Government of Alberta. Water Act: Code of Practice for the Temporary Diversion of Water for
Hydrostatic Testing of Pipelines. January 1999.
Government of Canada. Environment Canada. Canada Water Act. R.S.C. 1985, c. C-11.
Government of Canada. Transport Canada, Navigable Waters Protection Act. R.S. 1985, c. N-
22.
Government of Manitoba. Water Rights Act, Manitoba Water Stewardship, Water withdrawal for
hydrostatic testing as pre water use licensing form and guidelines.
http://www.gov.mb.ca/waterstewardship/licensing/wlb/water_use.html
Page 13 of 14
Enbridge Pipelines Inc. Application Submitted to the NEB
Line 3 Replacement Program Appendix 7-8
Government of Saskatchewan, Water Security Agency. Temporary Water Rights Licence for
Industrial Water Use, https://www.wsask.ca/Permits-and-Approvals/Regulatory-Info/Temporary-
Water-Rights-Licence-for-Industrial-Water-Use/.
Page 14 of 14