Project

Process Data Sheet Location


Document No P-102-A/B-0.00
Date 26-Sep-2017
Pumps
Rev 0.00
S.N. Specification UOM 1 Remarks
1 General Specifications
2 Tag No P-102-A/B
3 Pump Type Centrifugal
4 Description Details Reboiler Circulation Pump
5 Orientation Horizontal
6 Quantity No 2
7 Location Outdoor
8 MOC SS-316
9 Duty Continuous
10 Pumping Liquid Solvent
11 Hazardous Area Classification Class 1, Div 1, Group D
12 Design Code ASME B73.1/DIN EN ISO 5199
13 Make ITT/Akay/KSB/Sulzer/Alpha Laval
14
15 Process Data
16 Capacity m3/hr 50
17 Head m 10
18 Operating Temperature o 105
C
19 Design Temperature o 160
C
20 Liq Specific Gravity 1.05
21 Viscosity cP 1
22 Vapor Pressure mmHg 760
23 pH Neutral
24 % Solids % NA
25 Nature of solids NA
26 Suction Conditions Flooded
27 Suction Pressure mmHg Atmospheric
28 NPSHA m 3
29 NPSHR m *
30 Shut Off Head m 13
31
32 Shaft Sealing
33 Sealing Arrangement Gland Packing
34 Type of Mechanical Seal NA
35 Make Teflon/Graphite
36 O-Rings NA
37 Flushing Plan NA
38 I/B Faces NA
39 O/B Faces NA
40
41 Construction Data
42 Flange Drilling ASA#150
43 Impeller Dia mm *
44 Impeller Type Closed
45 Suction NB 125
46 Discharge NB 100
47 Efficiency % *
48 BKW *
49 Recommended Motor kw *
50 Pump Speed RPM 2900
51 Drive Sizing Basis End of the Curve
52 End Connection Flanged
53
54 Electric Motor Details
55 Type TEFC
56 Power Supply 410 Volt, 3Ph, 50 Hz
57 Frame Size *
Project
Process Data Sheet Location
Document No P-102-A/B-0.00
Date 26-Sep-2017
Pumps
Rev 0.00
S.N. Specification UOM 1 Remarks
58 Insulation Class F
59 Duty Continuous
60 Motor Protection Class IP65
61 Motor Efficiency Class IE3
62
63 MOC
64 Impeller CF8M
65 Casing CF8M
66 Gaskets PTFE
67 Shaft SS-316
68 Sleeve SS-316
69 Mechanical Seal SS-316
70 Base Plate CS
71 Foundation Bolts GI
72 Coupling Aluminum
73 Coupling Guard Aluminum
74 St.Box Cover CI
75 Bearing Housing CS
76 Flanges SA182GrF316
77 Bolts ASTM A193 GrB7
78 Nuts ASTM A194 Gr2H
79
80 General Notes
81 1 * indicates that the information shall be provided by the Vendor.
82 2 Flanges shall be drilled as per ANSI B16.5 ASA 150.
83
84 3 Documents Required
85 Vendor to provide qualification documentation before dispatch of the equipment.
86 PO acceptance copy.
87 Design documents
88 FAT Documents
89 SAT Documents
90 IQ Documents
91 OQ Documents
92 Commecial invoice, VAT and excise documents.
93
94 4 Identification Plate
95 Identification plate for all pumps shall be provided.
96
97 5 Test Certificate
98 The following test certificates shall be needed:
99 Hydraulic.
100 Material of Construction.
101 Trial Runs and Actual Performance Curve.
102 Internal testing and Quality Documents.
103 Operations, Maintenance and Troubleshooting Manual of the Pumps and all boughtout items like mechanical seal and electric motor.
104
105 6 Inspection
106 Inspection terms shall be agreed during the time of finalization of the order by the client.
107
108 7 Drawings
109 All drawings shall be submitted in A1 Size paper or higher.
110 Three sets of fabrication drawings for comments.
111 Three sets of drawings for approval.
112 Three sets of approved drawing before commencing fabrication.
113 Three sets of as-built drawings.
114 8 Surface Finishing
115 All SS Parts shall be chemically passivated.
Project
Process Data Sheet Location
Document No P-102-A/B-0.00
Date 26-Sep-2017
Pumps
Rev 0.00
S.N. Specification UOM 1 Remarks
116 All external parts shall be free from slug, flux and crevices.
117 All MS parts shall be sand blasted and provided with two coats of PU Primer followed by two coats of PU Paint.
118
119 9 Packaging
120 Equipment shall be properly packed as not to damage during Transit, Loading and Unloading.
121 Nozzles shall be properly blinded.
122
123
124 Revision History
125 Rev Date Change Summary Issued For
126 0 26/9/2017 Specifications Prepared For Comments
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
Rev 0 Rev 1
Prepared by/Date

Checked by/Date

Approved by/Date