Document No P-102-A/B-0.00 Date 26-Sep-2017 Pumps Rev 0.00 S.N. Specification UOM 1 Remarks 1 General Specifications 2 Tag No P-102-A/B 3 Pump Type Centrifugal 4 Description Details Reboiler Circulation Pump 5 Orientation Horizontal 6 Quantity No 2 7 Location Outdoor 8 MOC SS-316 9 Duty Continuous 10 Pumping Liquid Solvent 11 Hazardous Area Classification Class 1, Div 1, Group D 12 Design Code ASME B73.1/DIN EN ISO 5199 13 Make ITT/Akay/KSB/Sulzer/Alpha Laval 14 15 Process Data 16 Capacity m3/hr 50 17 Head m 10 18 Operating Temperature o 105 C 19 Design Temperature o 160 C 20 Liq Specific Gravity 1.05 21 Viscosity cP 1 22 Vapor Pressure mmHg 760 23 pH Neutral 24 % Solids % NA 25 Nature of solids NA 26 Suction Conditions Flooded 27 Suction Pressure mmHg Atmospheric 28 NPSHA m 3 29 NPSHR m * 30 Shut Off Head m 13 31 32 Shaft Sealing 33 Sealing Arrangement Gland Packing 34 Type of Mechanical Seal NA 35 Make Teflon/Graphite 36 O-Rings NA 37 Flushing Plan NA 38 I/B Faces NA 39 O/B Faces NA 40 41 Construction Data 42 Flange Drilling ASA#150 43 Impeller Dia mm * 44 Impeller Type Closed 45 Suction NB 125 46 Discharge NB 100 47 Efficiency % * 48 BKW * 49 Recommended Motor kw * 50 Pump Speed RPM 2900 51 Drive Sizing Basis End of the Curve 52 End Connection Flanged 53 54 Electric Motor Details 55 Type TEFC 56 Power Supply 410 Volt, 3Ph, 50 Hz 57 Frame Size * Project Process Data Sheet Location Document No P-102-A/B-0.00 Date 26-Sep-2017 Pumps Rev 0.00 S.N. Specification UOM 1 Remarks 58 Insulation Class F 59 Duty Continuous 60 Motor Protection Class IP65 61 Motor Efficiency Class IE3 62 63 MOC 64 Impeller CF8M 65 Casing CF8M 66 Gaskets PTFE 67 Shaft SS-316 68 Sleeve SS-316 69 Mechanical Seal SS-316 70 Base Plate CS 71 Foundation Bolts GI 72 Coupling Aluminum 73 Coupling Guard Aluminum 74 St.Box Cover CI 75 Bearing Housing CS 76 Flanges SA182GrF316 77 Bolts ASTM A193 GrB7 78 Nuts ASTM A194 Gr2H 79 80 General Notes 81 1 * indicates that the information shall be provided by the Vendor. 82 2 Flanges shall be drilled as per ANSI B16.5 ASA 150. 83 84 3 Documents Required 85 Vendor to provide qualification documentation before dispatch of the equipment. 86 PO acceptance copy. 87 Design documents 88 FAT Documents 89 SAT Documents 90 IQ Documents 91 OQ Documents 92 Commecial invoice, VAT and excise documents. 93 94 4 Identification Plate 95 Identification plate for all pumps shall be provided. 96 97 5 Test Certificate 98 The following test certificates shall be needed: 99 Hydraulic. 100 Material of Construction. 101 Trial Runs and Actual Performance Curve. 102 Internal testing and Quality Documents. 103 Operations, Maintenance and Troubleshooting Manual of the Pumps and all boughtout items like mechanical seal and electric motor. 104 105 6 Inspection 106 Inspection terms shall be agreed during the time of finalization of the order by the client. 107 108 7 Drawings 109 All drawings shall be submitted in A1 Size paper or higher. 110 Three sets of fabrication drawings for comments. 111 Three sets of drawings for approval. 112 Three sets of approved drawing before commencing fabrication. 113 Three sets of as-built drawings. 114 8 Surface Finishing 115 All SS Parts shall be chemically passivated. Project Process Data Sheet Location Document No P-102-A/B-0.00 Date 26-Sep-2017 Pumps Rev 0.00 S.N. Specification UOM 1 Remarks 116 All external parts shall be free from slug, flux and crevices. 117 All MS parts shall be sand blasted and provided with two coats of PU Primer followed by two coats of PU Paint. 118 119 9 Packaging 120 Equipment shall be properly packed as not to damage during Transit, Loading and Unloading. 121 Nozzles shall be properly blinded. 122 123 124 Revision History 125 Rev Date Change Summary Issued For 126 0 26/9/2017 Specifications Prepared For Comments 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 Rev 0 Rev 1 Prepared by/Date