FICHA N 8
CALCULO DE LAS CARGAS REALES DE TRABAJO PARA LAS 16 ACTIVIDADES DEL MANTENIMIENTO RUTINARIO TRANSFERIDOS A LOS INSTITUTOS VIALES PROVINCIALES

CODIGO ACTIVIDAD UNIDAD

DEPARTAMENTO SAN MARTIN MR-102 BACHEO M2 FECHA 18 NOV. 2009

CUADRO N 01 CALCULO DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO PARA LA ACTIVIDAD DE BACHEO
RUTA - 01
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB

0+000 1+000 II B 90.00 95.00 185.00 185.00


1+000 2+000 II B 180.00 60.00 120.00 180.00 540.00 540.00
2+000 3+000 II B 120.00 60.00 60.00 60.00 120.00 420.00 420.00
3+000 4+000 III B 300.00 60.00 60.00 60.00 480.00 480.00
4+000 5+000 III B 60.00 60.00 35.00 155.00 155.00
5+000 6+000 III B 290.00 90.00 60.00 60.00 500.00 500.00
A.C.M.V. PILLUANA 6+000 7+000 III B 60.00 30.00 60.00 150.00 150.00
PICOTA PICOTA LA UNION DEL VALLETRES UNIDOS 16.94 7+000 8+000 III B 60.00 50.00 30.00 102.00 25.00 267.00 267.00
DEL MISHQUIYACU ZAPOTILLO 8+000 8+920 = 9+000 II B 150.00 42.00 192.00 192.00
9+000 10+000 III B 85.00 25.00 102.00 60.00 120.00 60.00 452.00 452.00
10+000 11+000 III B 120.00 120.00 60.00 120.00 60.00 60.00 85.00 625.00 625.00
11+000 12+000 III B 90.00 60.00 120.00 60.00 85.00 415.00 -
12+000 13+000 III B 60.00 120.00 60.00 120.00 360.00 360.00
13+000 14+000 III B 120.00 60.00 60.00 120.00 60.00 420.00 420.00
14+000 15+000 III B 85.00 60.00 60.00 60.00 265.00 265.00
15+000 16+000 III B 120.00 60.00 60.00 60.00 300.00 300.00
16+000 16+940 III B 120.00 60.00 60.00 120.00 60.00 120.00 60.00 600.00 600.00
TOTAL 1,780.00 0.00 0.00 3,022.00

# KILOMETROS 0 0 7.94

LEYENDA TOTAL KILOMETROS 7.94 .

VP 10 MESES 380.60
SE HA REALIZADO EL ULTIMO MANTENIMIENTO PERIODICO DEL KM 0+000 AL KM 8+920 SOLO EN EL TRAMO PILLUANA - TRES UNIDOS EN AGOSTO A OCTUBRE DEL 2008 VP 12 MESES 456.73

NO EXISTE CARGA DE TRABAJO PARA EL TRAMO DEL KM 0+000 AL KM 8+920 EN EL PERIODO AGOSTO A DICIEMBRE DEL 2008 POR REGLA DE TRES SIMPLES
10 MESES.380 M2/KM/AO
MESES EN QUE NO HA HABIDO CONTRATO DE MANTENIMIENTO RUTINARIO (M.R). EJEMPLO 12 MESES.X

X= 380.60 * (12/10)
X= 456.73 M2/KM/AO
NOTA: 1.- ES PRECISO INDICAR QUE LA EVALUACION DEBE COMPRENDER UN AO DE TRABAJO REALIZADO.
2.- EL TRAMO DEL KM 0+000 AL (KM 8+920 =KM 9+000), NO HA SIDO CONSIDERADO EN LA EVALUACION DADO QUE LA INFORMACION DE LA CARGA DE TRABAJO SE HA TRUNCADO DESDE EL MES DE JULIO, PUESTO QUE EN EL
MES DE AGOSTO A DICIEMBRE 2008, DICHO TRAMO HA RECIBIDO EL MANTENIMIENTO PERIODICO (MP)
3.- EL TRAMO DEL (KM 8920=KM 9+000) AL KM 16+940 HA SIDO CONSIDERADO EN LA EVALUACION POR QUE HA RECIBIDO MR. DURANTE TODO EL AO

RUTA - 02
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
18+000 19+000 IIIB 140.00 140.00 70.00 140.00 490.00 490.00
19+000 20+000 IIIB 30.00 30.00 140.00 70.00 270.00 270.00
20+000 21+000 IIIB 70.00 60.00 70.00 200.00 200.00
21+000 22+000 IIIB 70.00 70.00 140.00 35.00 70.00 385.00 385.00
22+000 23+000 IIIB 70.00 70.00 70.00 140.00 70.00 420.00 420.00
23+000 24+000 IIIB 105.00 70.00 70.00 140.00 70.00 70.00 525.00 525.00
24+000 25+000 IIIB 70.00 70.00 70.00 210.00 70.00 70.00 70.00 70.00 700.00 700.00
25+000 26+000 IIIB 70.00 105.00 70.00 70.00 70.00 385.00 385.00
PICOTA TRES UNIDOS A.C.M.V. ALTO SAUCE 26+000 27+000 IIIB 140.00 70.00 70.00 35.00 70.00 35.00 280.00 280.00
MOJARRILLO TRES UNIDOS 18.625 27+000 28+000 IIIB 245.00 70.00 35.00 100.00 70.00 70.00 70.00 415.00 415.00
28+000 29+000 IIIB 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 490.00 490.00
29+000 30+000 IIIB 170.00 140.00 70.00 70.00 70.00 70.00 70.00 490.00 490.00
30+000 31+000 IIIB 70.00 70.00 70.00 70.00 70.00 70.00 420.00 420.00
31+000 32+000 IIIB 140.00 70.00 70.00 140.00 310.00 35.00 30.00 30.00 685.00 685.00
32+000 33+000 IIIB 70.00 70.00 70.00 170.00 70.00 380.00 380.00
33+000 34+000 IIIB 140.00 70.00 70.00 70.00 170.00 70.00 70.00 100.00 140.00 760.00 760.00
34+000 35+000 IIIB 280.00 105.00 140.00 70.00 70.00 140.00 525.00 525.00
35+000 36+000 IIIB 380.00 70.00 105.00 70.00 210.00 455.00 455.00
36+000 36+525 IIIB 0.00 0.00
TOTAL 8,275.00 0.00 0.00 8,275.00
# KILOMETROS 0 0 18.525
TOTAL KILOMETROS 18.525 .
VP 11 MESES 446.69
VP 12 MESES 487.30
FICHA N 8
CALCULO DE LAS CARGAS REALES DE TRABAJO PARA LAS 16 ACTIVIDADES DEL MANTENIMIENTO RUTINARIO TRANSFERIDOS A LOS INSTITUTOS VIALES PROVINCIALES

CODIGO ACTIVIDAD UNIDAD

DEPARTAMENTO SAN MARTIN MR-102 BACHEO M2 FECHA 18 NOV. 2009

CUADRO N 01 CALCULO DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO PARA LA ACTIVIDAD DE BACHEO

RUTA - 03
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
23+000 24+000 IIB 84.00 84.00 84.00
24+000 25+000 IIB 101.50 190.00 110.00 165.00 566.50 566.50
25+000 26+000 IIB 44.10 150.00 120.00 120.00 434.10 434.10
26+000 27+000 IIB 90.00 105.00 120.00 315.00 315.00
27+000 28+000 IIB 82.50 120.00 60.00 262.50 262.50
28+000 29+000 IIIB 124.60 20.00 160.00 120.00 105.00 529.60 529.60
29+000 30+000 IIIB 122.50 225.00 105.00 120.00 572.50 572.50
30+000 31+000 IIIB 163.80 230.00 60.00 110.00 563.80 563.80
TINGO DE A.C.M.V. AYPENA 23.260 31+000 32+000 IIIB 165.80 60.00 120.00 110.00 455.80 455.80
PICOTA PONAZA CAMINANTES SHAMBOYACU 32+000 33+000 IIIB 154.70 120.00 105.00 165.00 544.70 544.70
SHAMBUYACU DEL 33+000 34+000 IIIB 95.20 155.20 120.00 120.00 215.00 705.40 705.40
PONAZA 34+000 35+000 IIIB 211.10 60.00 120.00 105.00 496.10 496.10
35+000 36+000 IIIB 105.00 170.00 240.00 515.00 515.00
36+000 37+000 IIIB 180.00 95.00 275.00 275.00
37+000 38+000 IIIB 36.00 240.00 276.00 276.00
38+000 39+000 IIIB 0.00 0.00
39+000 40+000 IIIB 140.00 45.00 185.00 185.00
40+000 41+000 IIIB 90.00 110.00 200.00 200.00
41+000 42+000 IIIB 68.60 72.50 170.00 311.10 311.10
42+000 43+000 IIIB 142.10 105.00 247.10 247.10
43+000 44+000 IIIB 217.00 120.00 337.00 337.00
44+000 45+000 IIIB 84.00 105.00 189.00 189.00
45+000 45+260 IIB 50.00 50.00 50.00 50.00
TOTAL 8,115.20 1,712.10 6,453.10
# KILOMETROS 6 16.26
TOTAL KILOMETROS 22.26 .
VP 8 MESES 285.35 396.87
VP 12 MESES 428 595.30

RUTA - 04
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
00+000 01+000 IIB 320.00 320.00 320.00
01+000 02+000 IIB 35.00 35.00 35.00
02+000 03+000 IIB 80.00 80.00 160.00 160.00
03+000 04+000 IIB 195.00 195.00 195.00
04+000 05+000 IIIB 80.00 80.00 80.00
05+000 06+000 IIIB 240.00 40.00 280.00 280.00
06+000 07+000 IIIB 80.00 40.00 120.00 120.00
07+000 08+000 IIIB 40.00 40.00 80.00 80.00
PICOTA PUCACA A.C.M.V. PUCACA 19.240 08+000 09+000 IIIB 160.00 40.00 200.00 200.00
UNION DE LOS SEDASISA 09+000 10+000 IIIB 160.00 40.00 180.00 380.00 380.00
VALLES 10+000 11+000 IIIB 200.00 40.00 240.00 240.00
11+000 12+000 IIIB 240.00 160.00 40.00 440.00 440.00
12+000 13+000 IIIB 40.00 40.00 40.00
13+000 14+000 IIIB 40.00 40.00 40.00
14+000 15+000 IIIB 40.00 30.00 70.00 70.00
15+000 16+000 IIIB 40.00 550.00 427.50 30.00 1,047.50 1,047.50
16+000 17+000 IIIB 300.00 54.00 306.00 342.00 1,002.00 1,002.00
17+000 18+000 IIIB 160.00 232.50 30.00 210.00 632.50 632.50
18+000 19+000 IIIB 234.00 600.00 834.00 834.00
19+000 19+240 IIIB 40.00 60.00 100.00 100.00
6,296.00 710.00 5,586.00
KILOMETROS 4 15.24
KILOMETROS 19.24
LEYENDA VP 8 MESES 177.5 366.54
MESES EN QUE NO HA HABIDO CONTRATO DE MANTENIMIENTO RUTINARIO (M.R). VP 12 MESES 266.25 549.80

. FICHA 8
CALCULO DE LAS CARGAS REALES DE TRABAJO PARA LAS 16 ACTIVIDADES DEL MANTENIMIENTO RUTINARIO TRANSFERIDOS
A LOS INSTITUTOS VIALES PROVINCIALES ATRAVES DE LOS CONVENIOS DE GESTION
CODIGO ACTIVIDAD UNIDAD

DEPARTAMENTO SAN MARTIN MR-102 BACHEO M2 FECHA 18 NOV. 2009

CUADRO N 01 CALCULO DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO PARA LA ACTIVIDAD DE BACHEO
RUTA - 05
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
00+000 01+000 IIB 0.00 0.00
01+000 02+000 IIB 0.00 0.00
02+000 03+000 IIB 220.00 375.00 595.00 595.00
03+000 04+000 IIIB 415.00 20.00 435.00 435.00
04+000 05+000 IIIB 175.00 20.00 200.00 395.00 395.00
05+000 06+000 IIIB 295.00 195.00 20.00 510.00 510.00
06+000 07+000 IIIB 175.00 215.00 390.00 390.00
07+000 08+000 IIIB 300.00 100.00 400.00 400.00
TINGO DE A.C.M.V. PICOTA 23.000 08+000 09+000 IIIB 60.00 200.00 80.00 340.00 340.00
PICOTA PONAZA CAMINEROS TINGO DE 09+000 10+000 IIIB 20.00 520.00 180.00 720.00 720.00
PUCACA DEL PONAZA 10+000 11+000 IIIB 395.00 55.00 220.00 670.00 670.00
FUTURO 11+000 12+000 IIIB 520.00 220.00 740.00 740.00
12+000 13+000 IIIB 135.00 515.00 220.00 870.00 870.00
13+000 14+000 IIB 380.00 380.00 380.00
14+000 15+000 IIB 275.00 275.00 275.00
15+000 16+000 IIB 440.00 480.00 920.00 920.00
16+000 17+000 IIIB 420.00 520.00 60.00 1,000.00 1,000.00
17+000 18+000 IIIB 400.00 500.00 900.00 900.00
18+000 19+000 IIIB 60.00 525.00 585.00 585.00
19+000 20+000 IIIB 400.00 400.00 400.00
20+000 21+000 IIIB 220.00 200.00 420.00 420.00
21+000 22+000 IIIB 360.00 360.00 360.00
22+000 23+000 IIIB 300.00 360.00 660.00 660.00
TOTAL 9,640.00 2,170.00 9,795.00
# KILOMETROS 6 17
TOTAL KILOMETROS 23 .
VP 9 MESES 361.67 576.18
VP 12 MESES 482.22 768.24
RUTA - 06
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
TINGO DE A.C.M.V. SANTO TOMAS 00+000 01+000 IIB
x PONAZA CAMINEROS CEDRO 6.00 01+000 02+000 IIIB 335.00 335.00 335.00
PUCACA DEL PAMPA 02+000 03+000 IIIB 200.00 100.00 300.00 300.00
FUTURO 03+000 04+000 IIIB 180.00 180.00 180.00
04+000 05+000 IIIB 200.00 200.00 200.00
05+000 06+000 IIIB
TOTAL 29.00 TOTAL 13,080.00 1,015.00
# KILOMETROS 1 4
TOTAL KILOMETROS 5 .
VP 4 MESES 253.75
VP 12 MESES 761.25
RUTA - 07
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
00+000 01+000 IIIB 40.00 30.00 30.00 30.00 30.00 20.00 180.00 180.00
01+000 02+000 IIIB 40.00 22.50 30.00 30.00 30.00 30.00 182.50 182.50
02+000 03+000 IIIB 38.00 30.00 30.00 30.00 30.00 30.00 188.00 188.00
03+000 04+000 IIIB 20.00 30.00 30.00 15.00 30.00 30.00 155.00 155.00
04+000 05+000 IIIB 40.00 30.00 30.00 30.00 30.00 24.00 184.00 184.00
05+000 06+000 IIIB 38.00 30.00 22.50 30.00 30.00 30.00 180.50 180.50
PICOTA PICOTA PARTENON NUEVO CONTROL 15.000 06+000 07+000 IIIB 40.00 30.00 30.00 30.00 30.00 30.00 190.00 190.00
CONTRATISTAS SANTA 07+000 08+000 IIIB 40.00 22.50 30.00 30.00 30.00 30.00 182.50 182.50
E.I.R.L ROSA 08+000 09+000 IIIB 20.00 30.00 30.00 30.00 30.00 30.00 170.00 170.00
09+000 10+000 IIIB 40.00 30.00 30.00 30.00 30.00 24.00 184.00 184.00
10+000 11+000 IIIB 40.00 30.00 15.00 30.00 16.00 30.00 161.00 161.00
11+000 12+000 IIIB 20.00 22.50 30.00 30.00 30.00 30.00 162.50 162.50
12+000 13+000 IIIB 40.00 30.00 30.00 30.00 30.00 30.00 190.00 190.00
13+000 14+000 IIIB 40.00 30.00 30.00 22.50 30.00 152.50 152.50
14+000 15+000 IIIB 20.00 30.00 30.00 30.00 30.00 140.00 140.00

TOTAL 2,602.50 0.00 2,602.50


# KILOMETROS 0 15
LEYENDA TOTAL KILOMETROS 15
MESES EN QUE NO HA HABIDO CONTRATO DE MANTENIMIENTO RUTINARIO (M.R). VP 6 MESES 173.50
VP 12 MESES 347.00

. FICHA N 8
CALCULO DE LAS CARGAS REALES DE TRABAJO PARA LAS 16 ACTIVIDADES DEL MANTENIMIENTO RUTINARIO TRANSFERIDOS
A LOS INSTITUTOS VIALES PROVINCIALES
CODIGO ACTIVIDAD UNIDAD
DEPARTAMENTO SAN MARTIN MR-102 BACHEO M2 FECHA 18 NOV. 2009

CUADRO N 01 CALCULO DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO PARA LA ACTIVIDAD DE BACHEO
RUTA - 08
IVP MICRO RUTA LONG. TRAMO TIPO DE VALORES EJECUTADOS UNIDAD M2 TOTAL IDENTIFICACION POR TIPOLOGIA
PROV. DIST. EMPRESA C.V. (KM) DEL Km AL Km CAMINO VECINAL ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV. DIC M2 / AO/KM IB IIB IIIB
00+000 01+000 IIB 82.50 50.00 132.50 132.50
01+000 02+000 IIB 120.00 60.00 45.00 105.00 105.00
02+000 03+000 IIB 360.00 112.50 112.50 112.50
03+000 04+000 IIB 90.00 30.00 60.00 120.00 60.00 240.00 240.00
04+000 05+000 IIB 40.00 30.00 22.50 22.50 22.50
05+000 06+000 IIIB 30.00 20.00 52.50 72.50 72.50
06+000 07+000 IIIB 50.00 40.00 30.00 150.00 112.50 292.50 292.50
07+000 08+000 IIIB 30.00 30.00 30.00
BUENOS A.C.M.V. BUENOS AIRES -- 18.000 08+000 09+000 IIIB 22.50 60.00 150.00 30.00 240.00 240.00
PICOTA AIRES CAMINO SANTA ROSILLO 09+000 10+000 IIIB 50.00 82.50 22.50 105.00 105.00
AL DE 10+000 11+000 IIIB 60.00 60.00 60.00
DOS MIL UPAQUIGUA 11+000 12+000 IIIB 15.00 15.00 15.00
12+000 13+000 IIIB 60.00 30.00 90.00 90.00
13+000 14+000 IIIB 60.00 90.00 112.50 60.00 142.50 90.00 555.00 555.00
14+000 15+000 IIIB 80.00 60.00 45.00 202.50 307.50 307.50
15+000 16+000 IIIB 50.00 60.00 60.00 60.00
16+000 17+000 IIIB 50.00 30.00 60.00 60.00 60.00
17+000 18+000 IIIB 50.00 30.00 0.00
TOTAL 2,500.00 612.50 1,887.50
CUADRO N 02 CONSOLIDADO DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO ENCONTRADAS # KILOMETROS 5 12
TOTAL KILOMETROS 17
INSTITUTO VIAL CODIGO ACTIVIDAD RUTA NOMBRE LONGITUD TIPOLOGIA VALORES VP 11 MESES 122.5 157.29
PROVINCIA DISTRITO RUTA (KM) DEL CAMINO PRELIMINARES VP 12 MESES 133.64 171.59
PILLUANA - IB
PICOTA MR-102 BACHEO RUTA-01 TRES UNIDOS - 16.94 IIB LEYENDA
ZAPOTILLO IIIB 456.73 MESES EN QUE NO HA HABIDO CONTRATO DE MANTENIMIENTO RUTINARIO
ALTO SAUCE- IB
TRES UNIDOS MR-102 BACHEO RUTA-02 TRES UNIDOS 18.625 IIB
IIIB 487.30

AYPENA - IB CONCLUSION
PICOTA MR-102 BACHEO RUTA-03 SHAMBOYACU 23.260 IIB 428.03
IIIB 396.87 SE HA PROMEDIADO LAS CARGAS REALES DE TRABAJO ASUMIENDO QUE TODOS LOS CV TIEMEN LA MISMA EDAD
PUCACACA IB Y CONDICIONES SIMILARES DE PRECIPITACION Y "IMD"
PUCACA MR-102 BACHEO RUTA-04 SEDASISA 19.240 IIB 266.25
PICOTA IIIB 549.80
TINGO DE PICOTA- IB
PONAZA MR-102 BACHEO RUTA-05 TINGO DE 23.000 IIB 361.67
PUCACA PONAZA IIIB 768.24
TINGO DE SANTO TOMAS IB
PONAZA MR-102 BACHEO RUTA-06 CEDROPAMPA 6.00 IIB
PUCACA IIIB 761.25
NUEVO IB
PICOTA MR-102 BACHEO RUTA-07 CONTROL- 15.000 IIB
SANTA ROSA IIIB 347.00
BUENOS BUENOS AIRES -- IB
AIRES MR-102 BACHEO RUTA-08 SANTA ROSILLO 18.000 IIB 133.64
DE UPAQUIGUA IIIB 171.59

CUADRO N 03 PROMEDIOS FINALES DE LOS VALORES PRELIMINARES DE LAS CARGAS REALES DE TRABAJO POR TIPOLOGIA Y NIVEL DE SERVICIO DEL INSTITUTO VIAL PROVINCIAL DE PICOTA

TIPOLOGIA TOTAL SUMAT. PROM. FINAL


CODIGO ACTIV. N=# RUTAS RUTA-01 RUTA-02 RUTA-03 RUTA-04 RUTA-05 RUTA-06 RUTA-07 RUTA-08 DE LAS 8 RUTAS CARG. REALES
(M2/KM/AO) M2/KM/AO

SUMATORIA ( I B )

MR-102 BACHEO SUMATORIA ( II B ) 428.03 266.25 361.67 133.64 1,189.58 297.39


SUMATORIA ( III B ) 456.73 487.30 396.87 549.80 768.24 761.25 347.00 171.59 3,938.78 492.35

CUADRO N 04 COMPARACION DE LOS PROMEDIOS FINALES DE LAS CARGAS REALES DE TRABAJO DEL INSTITUTO VIAL PROVINCIAL DE PICOTA CON RESPECTO A LOS VALORES INDICATIVOS DEL "GEMA"

TIPO PROMEDIO VALOR ES EVALUACION DE RESULTADOS FINALES REFERIDOS AL GEMA


CODIGO ACTIVIDAD CAMINO FINAL DEL POR EXCESO POR DEFECTO

VECINAL M2/KM/AO GEMA (+) % (-) %


IB
MR-102 BACHEO II B 297.39 380.00 82.61 21.74%
IIIB 492.35 460.00 32.35 7.03%
1
FORMATO N 01
CARGAS DE TRABAJO POR ACTIVIDAD

(3) A.C.M.V. : LA UNIN DEL VALLE DE MISHQUIYACU


(1) CAMINO : PILLUANA - TRES UNIDOS - SAPOTILLO (7) DEPARTAMENTO : SAN MARTN (10) TOTAL DE DIAS TRABAJADOS : 26 (11) MES: ENERO
(2) LONGITUD : 16.940 KM (5) UNIDAD DE MEDIDA : m2 (8) PROVINCIA : PICOTA N DE HORAS POR DA : 8 (12) AO: 2008
(4) ACTIVIDAD : Bacheo (6) CUADRILLA : 6 (9) DISTRITO : TRES UNIDOS - PILLUANA

(13) PROGRESIVAS (14) DIAS


N M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J (15) TOTAL (16) OBSERVACIONES
KM. - KM.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MENSUAL
01+000 02+000 E L L L
02+000 03+000 R U U U
03+000 04+000 I V V V 60 60 60 60 60 300.00
04+000 05+000 A 60 I I I 60.00
05+000 06+000 D 60 60 A A 50 60 60 A 290.00
06+000 07+000 O 60 60.00
07+000 08+000 60 60.00
08+000 09+000

09+000 10+000

10+000 11+000 60 60 120.00


11+000 12+000 60 30 90.00
12+000 13+000

13+000 14+000

14+000 15+000

15+000 16+000

16+000 16+940

(17) CANTIDAD DE TRABAJO EJECUTADO 60 60 60 50 60 60 60 60 60 60 60 60 30 60 60 60 60 980.00


(18) TOTALDE SOCIOS 6.0 6.0 6.0 5.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 101.00
(19) REND. POR SOCIO 10 10 10 10 10 10 10 10 10 10 10 10 5 10 10 10 10 9.70
Nota: La Informacin consignada en el Presente Formato debe Coincidir con los trabajos asentados diariamente en el Cuaderno de Obra y
con el Rendimieto por Socio (Formato Anexo N 02 PSDI - UZSM - PCR)

JEFE DE OPERACIONES PRESIDENTE MONITOR VIAL


FORMATO N 01
CARGAS DE TRABAJO POR ACTIVIDAD

(3) A.C.M.V. : LA UNIN DEL VALLE DE MISHQUIYACU


(1) CAMINO
PILLUANA - TRES UNIDOS - SAPOTILLO (7) DEPARTAMENTO : SAN MARTN (10) TOTAL DE DIAS TRABAJADOS : 25 (11)Mes FEBRERO
(2) LONGI16.940 KM (5) UNIDAD DE MEDIDA : m2 (8) PROVINCIA : PICOTA N DE HORAS POR DA : 8 (12) AO: 2008
(4) ACTIVIBacheo (6) CUADRILLA : 6 (9) DISTRITO : TRES UNIDOS - PILLUANA

(13) PROGRESIVAS (14)DIAS


N V S D L M M J V S D L M M J V S D L M M J V S D L M M J V (15) TOTAL (16) OBSERVACIONES
KM. - KM.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 MENSUAL
00+000 01+000 60 30 90.00
01+000 02+000 60 60 60 180.00
02+000 03+000 60 60 120.00
03+000 04+000
04+000 05+000
05+000 06+000
06+000 07+000 30 30.00
07+000 08+000
08+000 09+000
09+000 10+000
10+000 11+000
11+000 12+000
12+000 13+000
13+000 14+000
14+000 15+000 60 25 85.00
15+000 16+000 60 60 120.00
16+000 16+940 60 60 120.00

(17) CANTIDAD DE TRABAJO EJECUTADO 60 30 60 60 60 60 60 25 60 60 60 60 60 30 745.00


(18) TOTAL DE SOCIOS 6.0 6.0 6.0 6.0 6.0 6.0 6.0 5.0 6.0 6.0 6.0 6.0 6.0 6.0 83.00
(19) REND. POR SOCIO 10 5 10 10 10 10 10 5 10 10 10 10 10 5 8.98
Nota: La Informacin consignada en el Presente Formato debe Coincidir con los trabajos asentados diariamente en el Cuaderno de Obra y
con el Rendimieto por Socio (Formato Anexo N 02 PSDI - UZSM - PCR)

JEFE DE OPERACIONES PRESIDENTE MONITOR VIAL


FORMATO N 01
CARGAS DE TRABAJO POR ACTIVIDAD
(3) A.C.M.V. : LA UNIN DEL VALLE DE MISHQUIYACU

-1 CAMINO PILLUANA - TRES UNIDOS - SAPOTILLO (7) DEPARTAMENTO : SAN MARTN (10) TOTAL DE DIAS TRABAJADOS : 24 (11) M MARZO
-2 LONGITUD 16.940 KM -5 UNIDAD DE MEDIDA : m2 (8) PROVINCIA : PICOTA N DE HORAS POR DA : 8 (12) AO: 2008
-4 ACTIVIDAD :Bacheo -6 CUADRILLA : 6 (9) DISTRITO : TRES UNIDOS - PILLUANA

N (13) PROGRESIVAS (14) DIAS (15) TOTAL (16) OBSERVACIONES


KM. - KM. S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MENSUAL
00+000 01+000 L
01+000 02+000 L
02+000 03+000 U
03+000 04+000 V
04+000 05+000 I
05+000 06+000 30 60 A 90
06+000 07+000
07+000 08+000 50 50
08+000 09+000
09+000 10+000
10+000 11+000 60 60 120
11+000 12+000
12+000 13+000
13+000 14+000 60 60 120
14+000 15+000
15+000 16+000
16+000 16+940

(17) CANTIDAD DE TRABAJO EJECUTADO 30 60 60 60 60 60 50 380


(18) TOTAL DE SOCIOS 6 6 6 6 6 6 5 41
(19) REND. POR SOCIO 5 10 10 10 10 10 10 9.27
ada en el Presente Formato
Nota:
debe Coincidir con los trabajos asentados diariamente en el Cuaderno de Obra y
con el Rendimieto por Socio (Formato Anexo N 02 PSDI - UZSM - PCR)

JEFE DE OPERACIONES PRESIDENTE MONITOR VIAL